kiewit foundations group - tunnels & tunnelling€¦ · kiewit foundations group. ... cannelton...

5
KIEWIT FOUNDATIONS GROUP

Upload: doanthien

Post on 14-Aug-2018

233 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KIEWIT FOUNDATIONS GROUP - Tunnels & Tunnelling€¦ · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting

KIEWITFOUNDATIONS

GROUP

Page 2: KIEWIT FOUNDATIONS GROUP - Tunnels & Tunnelling€¦ · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting

With a strong local presence and access to a vast network

of industry experts, Kiewit can quickly mobilize and help

design the best solution and value for any project. From the

smallest jobs to the multi-billion dollar projects we build,

our resources and experience ensure clients receive the

highest-quality, hands-on service they’ve come to expect.

Keeping safety at the forefront, the Kiewit Foundations Group self-

performs complex geotechnical projects across North America.

We deliver creative, cost-efficient solutions that are responsive to

each project’s specific site conditions. We utilize value engineering

and constructability reviews, and our depth of expertise to offer

constructible solutions that optimize budget and schedule.

T R A N S P O R T A T I O N

P O W E R

W A T E R / W A S T E W A T E R

M I N I N G

B U I L D I N G

O I L , G A S & C H E M I C A LSelf-performing work results in

RELIABLE BUDGET AND SCHEDULE

FORECASTS.

WHAT SETS US APART?

Safety record

Innovative solutions

Depth of expertise

Self-performance

Specialty equipment

Market capabilities

ISO 9001:2008 Quality Program

MARKET CAPABILITIESKiewit has the proven experience at every stage of the project development life cycle. The earlier we get involved in project development and design, the more value Kiewit can provide clients.

DELIVERY METHODSConstruction | Design-Build/EPC | CM-at-Risk | CM-for-Fee | Design-Build, Operate, Maintain

PROCUREMENT MODELSTraditional | A+B | Best Value | Negotiated

SERVICESPreconstruction | General Contracting | Building Information Modeling | Construction Management Engineering | Self-Performed Scopes of Work | LEED

OUR MARKETS

KIEWIT AT-A-GLANCE

32

Page 3: KIEWIT FOUNDATIONS GROUP - Tunnels & Tunnelling€¦ · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting

Deep Rock Tunnel Connector, Indianapolis, IN | Cement bentonite soldier pile application for three open-cut excavations totaling 69,400 sf.

World Trade Center East Bathtub Slurry Wall, New York, NY | 53 slurry wall panels of depths of 75-110 feet to form the basement of the PATH station and new World Trade Center Site

Clinton CSO, Syracuse, NY | Triple box culvert constructed using slurry wall construction and a jet grout plug with cement bentonite wall for a base groundwater cutoff

Harbor Siphon Slurry Wall, Brooklyn & Staten Island, NY | Excavation, reinforcement, and concrete for a slurry wall as part of two launch shafts for a tunnel

Tunnel Shafts | Building Foundations | Open Cut Excavation Support

Gulf Intracoastal Water Way West Closure Project, West Bank, Mississippi River, LA | Slurry-trench for 85,000 sf soil bentonite slurry cut-off wall along the WBV levee

Metro PAR 1085 Project, Denver, CO | Sheet pile and cement bentonite cut-off wall to eliminate deep excavation seepage

Lower Mattagami River Project, Kapuskasing, ON | 5,050 sf cut-off wall to support construction to repair and replace four hydroelectric generating stations

Cannelton Hydroelectric Cofferdam Cut-off Wall, Owensboro, KY Self-hardening cement bentonite cut-off wall as part of a dewatered and excavated cofferdam

Dam Repair | Temporary and Permanent Water-Tight Enclosure

STRUCTURAL SLURRY WALL

CUT-OFF WALL

54

Page 4: KIEWIT FOUNDATIONS GROUP - Tunnels & Tunnelling€¦ · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting

Center Hill Dam, DeKalb County, TN | 1,643,000 gallons of cement permeation grouting for groundwater cut-off and pre-treatment for a barrier wall

Cooper Nuclear Station, Brownville, NE | Chemical grouting around pipe penetrations through a cofferdam

Dry Dock Bund Wall for Gravity Based Structure, Newfoundland, CA Vibroflotation of hydraulically placed material to allow for cut-off wall construction

Cannelton Hydroelectric Cofferdam Vibroflotation, Owensboro, KY Vibroflotation to densify hydraulically placed sand to ensure stability during excavation of the cut-off trench

Grouting | Soil Mixing | Vibroflotation

Tappan Zee Bridge, Tarrytown, NY | 24 ea 48” diameter shafts w/ 42” Rock Sockets for the Westchester Abutment and initial pier

Metro-North Rail Road Embankment Stabilization, Cortland Manor, NY | Installation of 20 48” diameter drilled shafts to stabilize the railroad embankment along the Hudson River

PSE&G Susquehanna-Roseland Transmission Line, NJ and PA 145 mile transmission line requiring installation of large diameter reinforced concrete drilled shaft foundations

Farrington Guideway, Honolulu, HI | 500 ea 2.2m – 2.5m diameter shafts for an elevated railway

Transmission Lines | Bridge | Rail | Large Diameter Caissons | Soundwalls | Buildings

DRILLED SHAFT

GROUND IMPROVEMENTS

76

Page 5: KIEWIT FOUNDATIONS GROUP - Tunnels & Tunnelling€¦ · KIEWIT FOUNDATIONS GROUP. ... Cannelton Hydroelectric Cofferdam Cut-off ... 1,643,000 gallons of cement permeation grouting

3/2016

Kiewit Infrastructure Co.

302 S. 36th Street, Suite 400

Omaha, NE 68131

(402) 346-8535

KIEWIT.COM/FOUNDATIONS