@)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning & Development Services 1800 Continental Place Mount Vernon, WA 98273 RE: Section 4 Marblemount Quarry Pre-Application Request Dear Sirs: The following is a copy of the Marblemount Quarry Pre-Application Meeting Request Form for your reference.The Pre-Application Meeting was held on December 6, 2018. Very truly yours, Charles D. Nylund Estimating Director KIEWIT INFRASTRUCTURE CO. 2200 Columbia House Blvd. Vancouver, WA 98661 (360) 693-1478 (360) 693-5582 fax

Upload: others

Post on 09-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

@)Kiewit

January 22, 2019

Mr. Hal Hart, AICP Director

Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning & Development Services 1800 Continental Place Mount Vernon, WA 98273

RE: Section 4 Marblemount Quarry Pre-Application Request

Dear Sirs:

The following is a copy of the Marblemount Quarry Pre-Application Meeting Request Form for your reference.The Pre-Application Meeting was held on December 6, 2018.

Very truly yours,

Charles D. Nylund Estimating Director

KIEWIT INFRASTRUCTURE CO. 2200 Columbia House Blvd. Vancouver, WA 98661 (360) 693-1478 (360) 693-5582 fax

Page 2: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning
Page 3: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

November 21, 2018

ELEMENT Solutions 909 Squalicum Way, Suite 111

Bellingham, WA 98225

Submitted To: Skagit County Planning and Development Services

1800 Continental Place, Mount Vernon, WA 98273

(360) 416-1330

Subject: Pre-Application Meeting Submittal Memorandum for Marblemount Quarry

Dear SCPDS,

This memorandum and attached documents are being submitted on behalf of Kiewit Infrastructure West

Co. to request a Pre-Application meeting. Kiewit proposes to develop a jetty rock quarry on Rockport

Cascade Road in Marblemount. We are submitting 8 copies of the Pre-Development & Pre-Application

Request Form and the following attachments:

• $480 Submittal Fee

• Fact Sheet

• Additional Fact Sheet including Site Description & Project Description

• Assessor Site Map

• Project Issues or Key Questions

• Figure 1: Site Vicinity Map

• Figure 2: Proposed Quarry Site Layout Map

• Figure 3: Traffic Route Alternatives

• Figure 4: Mapped Critical Areas

• DRAFT Jetty Stone Quarry Reclamation Plan

We understand that a Lot of Record Certification and Critical Areas Approval are requirements of final

submittal. We are currently in process of obtaining those documents. Should you have any questions

concerning this application, please contact us at (360) 671-9172 or at [email protected].

Sincerely,

Paul Pittman, MS, LEG

Page 4: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning
Page 5: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

B ~~~g-&~;e:p~~n~~:~~~ C~in~~=:!~~ ~~~o~!~~~3 ~ voice 360-416-1320 · inspections 360-416-1330 · www.skaqitcounty.neUplanning

• Pre-Development is an informal feasibility meeting. It is meant to discuss in general terms the proposed development or business plan, application reqwements, design standards, design alternatives, and other required permits amithe approval process. There is no fee for this meeting.

• Pre-Application is to conduct a review of the development applications prior to submittal to Planning & Development Services. * Requires a submittal fee.

• In order to expedite development review, the staff may invite all affected jurisdictions, agencies and/or special use districts to the meeting

• Exemptions: Boundary Line Adjustments, Flood Area Development Permits, Administrative Decisions, Administrative Interpretations, Administrative Variances and Lot Certifications.

Please Submit 8 Copies of the Following: NOTE: If project is within the Shoreline jurisdiction a Shoreline site visit must

be completed before the pre-application meeting.

I Submitted with Pre-Application Meeting Request o o Shoreline Determination

_ Site plan indicating the ordinary high water mark (OHWM) and setbacks from OHWM to all structures, including neighbor's, within 300 feet from both side property lines. Indicate lot coverage totals, both before proposal and after proposed additions/ construction is complete.

l3il IXl*Submittal Fee $ $480 Valid for 6 months from date of meeting .

.,.-, ~ubmitted with Pre-Development Meeting Request ,.<>I DI Fact Sheet

Please complete the attached Fact Sheet. List all parcel numbers of land included in the application.

lxl Iii Assessor's Map 8 % x 11. Please identify the subject parcel.

oo !xl Lot of Record Certificatton _Approved Lot Certification File# PL __ -____ _

2-_ Applicant is aware this is a requirement of formal submittal.

oo 1x1 Critical Areas Review _ Completed staff report File# PL _ _ -_ ___ _

L Applicant is aware this is a requirement of formal submittal.

oo oo Site Description Please submit a brief written site description outlining the existing, physical conditions of the parcel (soils, drainage, topography, wetlands, streams, vegetation, wildlife, surrounding land use, traffic patterns, nearest schools if applicable.

l&J 5il Project Description Please submit a brief written description of the proposed development objectives, detailing the nature and impact of the proposed land use requested. For construction projects, please identify proposed square footage, construction type, uses etc.

129 129 Project Issues or Key Questions Please indicate what you see as key issues or specify questions that you have about the property that you would like the county staff to respond to. The more information you provide in the submittal package, the more feedback you will get from your project review team to help you towards finalizing your application.

rn Site Plan & Conceptual Lot Configuration See page 4.

Rev. 2-1-18

Date Received:

Accepted by

Permit Number

Zoning / Setbacks

Flood Plain/Floodway

Shoreline

Page 1 of 4

Page 6: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

PL# ____ _ Date Received

0 Binding Site Plan 0 Rezone 0 Bldg Permits Triggering SEPA 0 Fill & Grade Triggering SEPA 0 Forest Practice Waiver- HE 0 Level II, Ill and IV Applications 0 Long CaRD O Pre O Final 0 Plat or SPU Modification

0 Shoreline Substantial Use Permit 0 ShortCaRD 0 Short Plat Iii Special Use Permit Level II 0 Variance Level II 0 Other: ______ _

1. Applicant name: Kiewit Infrastructure West CO.

2. Proposed project description:_S_e_e_a_d_d_tl._s_h_e_e_t __________________ _

3. Related Permits or Approvals: _S_e_e_a_d_d_tl_. _sh_e_e_t __________________ _

4. Parcel ID#: See addtl. Assessor Tax#: _____________________ _

Parcel ID#: sheet Assessor Tax#: -----5. Section_lL Township 35N Range 10E Comprehensive Plan/Zoning Designation: See addtl. sheet

6. Site Address: Rockport Cascade Road, Marblemount, WA 98267

7. Lot of Record: D Yes Ci! No PL# ______________________ _

8. Urban Growth Area: D Yes IXI No If yes, City:-------------------

9. Comp Plan/Zoning within 200 feet: _S_e_e_a_d_d_tl_. _sh_e_e_t ________________ _

10. Mineral Resource Overlay within 1/.i mile Iii Yes D No

11 . Critical Area/Water within 200 feet: Ci! Yes D No

12 Acreage/Lot Dimensions: _s_e_e_a_d_d_t_l. _s_he_e_t ____________________ _

13. Flood Zone:_C ____ FIRM Map Panel# 530151 0310 C Map Date: January 3, 1985

14. Road access:llll Private O County - Permit# _______ 0 State - Permit# _______ _

15. Water Source:O Drilled well - Permit #_NI_A ___ 0 Community Well O Public ________ _

16. Sewage Disposal: D Septic - Permit #_N_/A _____ _ 0 Public Sewer: ________ _

17. Legal Description: _S_e_e_a_d_d_tl_. s_h_e_et _______________________ _

---------------------- (Attach additional sheet if necessary.)

E:\Pre-app Pre-Dev Application (9-24-2018 ).doc - last updated 05.23.05 Page 2 of 4

Page 7: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

a . Planning & Development Services

"'~ Community Development Division

Applicant

Kiewit Infrastructure West CO. Name

2200 Columbia House Blvd, Vancouver, WA 98661 Address

.c.--(36_0 ___ ) 6_93_-1_47_8 _ ___ ,!k;-U/3 "'£112 [email protected] e-mail address

Phone // £. ~ J:rd Signature: ~L,b.4~L.!.-:,~ ~~~-ffj~L~s!:3;:r=Q~==-____.EsE:!.· 2.LTlia.iff.Z!'fH'1.'!I.fJ."¥~Ar1tCLJt~N?.l!!io:£A~~::::._--

Owner

Cunningham Family Trust (Ann Parker Trustee) Name

PO Box 8, Hamilton, WA 98255 Address

(360) 826-3341 Phone

Contact

----- -----Fax

Kiewit Infrastructure West CO. Name

2200 Columbia House Blvd, Vancouver, WA 98661 Address

[email protected] e-mail address

..,_(3_60..:.-) 6_93_-1_47_8 ____ 36o-~92-f!l2.. [email protected] Phone Fax e-mail address

Contractor (When applicable. If owner, write owner-builder)

Kiewit Infrastructure West CO. Name

2200 Columbia House Blvd, Vancouver, WA 98661 Address

(360) 693-1478 [email protected] Phone

CC KIEWIIW904M1 Contractors License #

Rev. 2·1·18

Fax e-mail address

March 1, 2020 Expiration Date

Page 3 of 4

Page 8: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

Site Plan Requirements Please include the following if applicable:

• North arrow • Scale • Date drawn • Existing parcels assembled • Vicinity map • Existing septic systems and or wells • Proposed lot layout • Proposed lot size • Proposed connection to existing road • General dimensions of lots, right-of-ways, easements • Existing structures • Note of areas where existing elevation might exceed 5 feet • Streams generally known within 200 feet of project site • Wetlands generally known within 200 feet of the project site • Any other critical areas known within 200 feet of project • Flood Hazard Areas • Existing easements • Zoning of adjacent properties • Any existing building locations • Proposed internal roads and right-of-way width • Conceptual drainage • Scaled measurements for variance requests to reduce setbacks • Existing bulkheads, Ordinary High Water Mark, if surveyed • Fire District # • Estimate of total impervious surface

What you can expect from a Pre-Application/Pre-Development Meeting

Pre-application/Pre-Development meeting review will include discussion from staff or jurisdictions involved in the proposed project regarding the requirement for application(s), the completeness necessary to formally apply, permit or approval requirements, review process and schedule of timelines as well as a list of fees. Staff will also respond to the Applicant or their representative's questions. Staff notes will be provided at the conclusion of the meeting.

Scheduling Pre-Application/Pre-Development Meetings

Upon submittal of 8 copies of the requested information from the pre-application/pre-development submittal checklist items, (and paying the submittal fee for pre-application), staff shall schedule the meeting. The meeting shall be scheduled within approximately fourteen days after the submittal of a complete pre­application request packet. Meetings are scheduled on Thursdays at either: 9:15 am, 10:15 am or 11 :15 am and shall be forty-five minutes long. If additional pre-application meetings are required they shall be scheduled as needed.

Waivers

Applicants must participate in a pre-application meeting if governed by the application checklist unless a waiver is requested by the applicant and approved by the Administrative Official. Request for waivers shall be made in writing and addressed to the Administrative Official. Requests shall provide an explicit project description and narrative stating reasons why no pre-application meeting is necessary. The Administrative Official shall respond within 15 calendar days.

Rev. 2-1-18 Page 4 of4

Page 9: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

ELEMENT Solutions 909 Squalicum Way, Suite 111

Bellingham, WA 98225

November 21, 2018

Submitted To: Skagit County Planning and Development Services

1800 Continental Place, Mount Vernon, WA 98273

(360) 416-1330

Subject: Additional Fact Sheet for Marblemount Jetty Rock Quarry Project Pre-Application Meeting

Dear SCPDS,

The following is a supplemental document expanding on requirements in the Skagit County Pre­

Development and Pre-Application Request Form. The numbers below correspond with the Pre­

Development and Pre-Application Request Form.

2. Proposed Project/Site Description:

The proposed project includes site clearing, operation, and reclamation of a bedrock quarry on

Rockport Cascade Road approximately one mile south of Marblemount, WA (Figure 1). The

proposed project involves the entirety of parcels P45543, P128574, P120304, P45550, and parts

of P45548 and P45541 (see attached assessor parcel map). The majority of the quarrying would take place on P45543, which has been used as a small-scale quarry (under 3 acres) in the past. It

is a 38-acre parcel that consists of small stands of second-growth timber in the western portion

of the site and a large (approximately 800-1,000-foot) rock face mostly consisting of Shuksan

greenschist that would be quarried under the proposed project (Figure 2). The quarry may be

expanded east onto P45541 contingent on a MRO overlay expansion via a Skagit County Comprehensive Plan Amendment currently in progress.

The proposed project would occur in five steps. Steps 1-3 would occur within the existing MRO

overlay and Step 4 would occur after a MRO overlay expansion: l} Clearing and Forest Practice

Conversion, 2) Building an access road, 3) Mining within the MRO overlay area, 4) Possible

mine expansion contingent on MRO boundary change, and 5} Reclamation (see attached Site

Plan and Reclamation Plan).

The purpose of the proposed project is to provide jetty rock for a project of nationwide

significance. A jetty construction project is currently underway on the Columbia River to aid

navigation and reduce sedimentation from the river, as the current jetties are failing. Several additional jetty projects are subsequently being implemented and a large volume of rock is

needed. However, the original source of jetty rock is no longer available. Jetty rock requires a

specific density and size, and an exhaustive search was performed along the West Coast for a

Marblemount Quarry-Pre-Application Additional Fact Sheet November 21, 2018 Page I 1

Page 10: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

new source of jetty rock. The Marblemount Quarry was identified as one of the few potential

source of jetty rock currently available.

Skagit County granted a Conditional Use Permit (CUP) for small-scale surface mining at the

Marblemount Quarry in 1982. Since then, the site has been sporadically used for small-scale

surface mining activities including some talus quarrying and sand and gravel mining. Neither of these mining activities exceeded 3 acres in size and were therefore exempt from DNR

reclamation permits at the time. A Class IV Forest Practice Conversion was approved by the DNR

in 1990 but it is no longer valid.

Now that a larger source of jetty rock is needed, the client proposes to quarry bedrock from the

cliff at the subject property for use on the Columbia River jetty project (see site plan). The total

estimated mineable rock available at this location is approximately 8,798,000 cubic yards, which

is enough to supply jetty rock for many decades.

The majority of the site is already within the Mineral Resources Overlay (MRO), with two exceptions. Steps 3 and 4 address the possible expansion of the mine if the MRO overlay is

amended through a Skagit County Comprehensive Plan Amendment.

Step 1 of the proposed project would involve clearing and removing stumps of approximately

100 acres on Parcels P45543, P45550, P120304, P128574, and parts of P45548 and P45541.

Step 2 would include building an asphalt entrance road to the quarry and an approximately 1-

mile gravel access road from the northwest corner of P45543 that would continue south

through P128574 and turn north on the northern portion of P4558. The road would continue

north to the top of the rock face where mining would occur.

Step 3 would include constructing an approximately 5.5-acre armor stone stockpile area in the western portion of P45543. It would also involve installing a mobile office trailer, heavy

equipment lot and fueling station, and shop adjacent to Rockport Cascade Road on the

northwest portion of P45548. An approximately 2.5-acre topsoil stockpile area would be

established south of the shop and a proposed stormwater pond would be located in the

southwest corner of the northwest portion of P45548. An approximately 10.2-acre undersized stockpile area would be established in the existing MRO area on P128574. Rock quarrying would

take place on the rock face on P45543. There is a proposed 30-foot buffer from the property line

of P45541 during Step 3 of the proposed project. This 30-foot buffer would be a variance from

the standard 100-200-foot buffer. 100 to 200-foot buffers would be maintained around the rest

of the proposed project footprint along property lines. A SO-foot vegetative buffer would be maintained on Rockport Cascade Road (see the Site Plan for details).

An approximately 19-acre benched rock quarry would be established on P45543 (see

Reclamation Plan). Rock would be quarried from above and hauled down the access road to the

bottom for processing. Active bedrock quarrying may have the following noise and traffic

impacts:

Marblemount Quarry-Pre-Application Additional Fact Sheet November 21, 2018 Page/ 2

Page 11: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

Table 1. Anticipated Traffic and Noise Impacts from Quarry Activities

QUANTITIES NOTES

1 ANTICIPATED# OF

UP TO 100 1 TRUCK/DAY= 1 ROUND TRIP TRUCKS/DAY

10% OF TRIPS MAY EXCEED

LOADED TRUCK BECAUSE ARMOR STONE IN

2 WEIGHTS (LBS)

105,500 EXCESS OF 25 TON/EA REQUIRES SPECIAL

PERMITIING

ANTICIPATED A ROUTE HAS NOT BEEN

3 ROUTES

SEE FIGURE 3 SELECTED YET; FIGURE 3 SHOWS ROUTE OPTIONS

4 BLAST FREQUENCY UP TO 2 BLASTS/DAY BLAST TIMES - LUNCH & END

OF SHIFT

6 A.M TO 6 P.M. NIGHT SHIFT MAY BE

s HRS OF OPERATION MON-SAT

REQUIRED FOR CERTAIN CONTRACTS

NORMAL OPERATIONS

6 EQUIPMENT 6 A.M TO 12 A.M. REQUIRE HEAVY EQUIPMENT

MAINTENANCE MON-SAT MAINTENANCE AFTER WORK HOURS

OTHER POTENTIAL CRUSHING, SCREENING,

7 NOISE SOURCES

PROCESSING, BACKUP

ALARMS, ETC.

Step 4 includes a possible quarry and proposed undersized stockpile area expansion. Step 4 is

dependent on an expansion of the MRO overlay through the Skagit County Comprehensive

Plan Amendment process. If the MRO overlay is expanded, it would encompass additional

quarrying east of the Step 3 boundary on P45543. The quarry would be expanded east onto

P45541 and would be approximately 7 acres. Additionally, the MRO overlay would be

expanded to accommodate a larger undersized stockpile area (approximately 21 acres). The

undersized stockpile area described in Step 3 would be expanded south onto P45548 to

accommodate the additional undersized rocks from the expanded quarry.

Step 5 includes full reclamation of all the affected parcels following decommissioning of the

quarry. The full lifespan of the quarry could be up to 100 years or whenever the source of jetty

rock is exhausted, with reclamation following. The reclamation plan is currently under

development, but would be consistent with Department of Natural Resources surface mine

reclamation regulations.

Marblemount Quarry-Pre-Application Additional Fact Sheet November 21, 2018 Page/ 3

Page 12: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

3. Related Permits or Approvals:

• Skagit County Special Use Permit

• Skagit County Comprehensive Plan Amendment Application

• Skagit County Grading Permit

• Skagit County Road Access Permit

• Skagit County Building Permit (if necessary)

• Skagit County Forest Practice Conversion Permit

• DNR SM-6 Permit

• DNR SM-8a Permit

• DNR Class IV Forest Practice Permit

• National Pollutant Discharge Elimination System (NPDES) permit (Sand and Gravel)

• Oversize/Overweight Vehicle Permit Application

• Others as needed to complete the permitting process.

4. Parcel ID #s:

See Table 2.

9. Comp Plan/Zoning within 200 feet:

Rural Reserve (RRv), Secondary Forest-Natural Resource Lands (SF-NRL), Industrial Forest­

Natural Resource Lands (IF-NRL), Rural Resource-Natural Resource Lands (RRc-NRL) (Figure 4).

12. Acreage/Lot Dimensions:

See Table 2.

17. Legal Descriptions:

See Table 2.

Table 2. Parcel Information for Marblemount Quarry Parcel# Assessor Tax Acreage/Lot Legal Description (Ql7} (Q4) # (Q4) Dimensions

(Ql2}

CF-75: NEl/4 NWl/4 LESS TR & SOFT STRIP TO CO EXC

351024-2-TH N SIDE OF A TRI RUN ELY lOOFT & TH W SIDE OF SD

P45543 001-0012

~3g acres TRI RUN SLY lOOFT FR TH NW COR OF SD NEl/4 OF TH NWl/4 TH ENDS OF TH TWO SIDES CONNECTED WITH A DIAGONAL LI RUN NELY & SWLY 141.SFT M/L

P45541 351024-1-

~15 acres* CF-75: Wl/2 NEl/4 & LTS 12 3 4 001-0006

Marblemount Quarry-Pre-Application Additional Fact Sheet November 21, 2018 Page I 4

Page 13: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

Parcel# Assessor Tax Acreage/Lot Legal Description (Q17) (Q4) #(Q4) Dimensions

(Q12)

P45548 35102402- ~33 acres* CF-75: Wl/2 NWl/4 LESS RD & NEl/4 SWl/4 & Sl/2

003-0002 SWl/4 & Wl/2 SEl/4

CF-75 THE SOUTHEAST 1/4 OF THE NORTHWEST 1/4 OF SECTION 24, TOWNSHIP 35 NORTH, RANGE 10 EAST, W.M., EXCEPT THE NORTH 208 FEET OF THE

P128574 351024-2-

~3s acres WEST 208 FEET OF THE SEl/4 NWl/4 AND ALSO

005-0200 EXCEPT THE NORTH 90 FEET OF THE WEST 480 FEET, EXCEPT THE WEST 208 FEET IN THE SOUTHEAST 1/4 OF THE NORTHWEST 1/4 OF SECTION 24, TOWNSHIP 35 NORTH, RANGE 10 EAST, W.M.

INCLUDING MANUFACTURED HOME 2008 KIT MARQUIS MANOR 70.8X29.6 SERIAL NUMBER

P120304 351024-2-

~o.6 acre 4508KID2054A/CA&B; THE NORTH 90 FEET OF THE

005-0100 WEST 480 FEET, EXCEPT THE WEST 208 FEET IN THE SOUTHEAST 1/4 OF THE NORTHWEST 1/4 OF SECTION 24, TOWNSHIP 35 NORTH, RANGE 10 EAST, W.M.

P45550 351024-2-

~1 acre THE NORTH 208 FEET OF THE WEST 208 FEET OF THE

005-0000 SEl/4 NWl/4

* The acreage acquired and used for the proposed project; parcels are larger than the acreage reflected in this table

The above is a supplemental document for a Skagit County Pre-Development and Pre-Application

Request. Should you have any questions concerning this document, please contact us at (360) 671-9172 or

at [email protected].

Sincerely,

Paul Pittman, MS, LEG

Marblemount Quarry-Pre--Application Additional Fact Sheet November 21, 2018 Page/ 5

Page 14: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

~ --------------~

" ~ - !!! !2 :; ~ ~

~~ 11,1 ::I :!; 13 ~ ~

M ~ !l :i: t ~

~~ ~ ;; ~ R

~ Ii: ~ Pl

!!I ~ ~ ,;

t I

I I

"' ~

"' z It)

"' ....

I I I I I I ., I §

I

w

·+ ]i i

I I I I I

-----------L---------~-

I~

i ' ! ;

I

" + f

11 .. 1lh' i ur, !i!~Hi· l ~ 1fntl11 I 1f U(!III i "m!iiU i II i1P! I

" I & ~ z t :. ,... '"""'""" I ~; q. " . lii ~ ! d .. ,. ~ii! ~JI

w ..i-0 N~

C Cl: 0

ti z Jl ~

t-

1'

! I

t ! w

Page 15: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

ELEMENT Solutions 909 Squalicum Way, Suite 111

Bellingham, WA 98225

November 21, 2018

Submitted To: Skagit County Planning and Development Services

1800 Continental Place, Mount Vernon, WA 98273

(360) 416-1330

Subject: Project Issues or Key Questions for Marblemount Jetty Rock Quarry Project Pre­Application Meeting

The following is a list of project issues and key questions for the Skagit County Pre-Application meeting.

1. We are planning to include the following technical studies with our application:

• Wetland and Fish and Wildlife Habitat Conservation Area Report including Marbled

Murrelet/Northern Spotted Owl Survey

• Geotechnical Report/Slope Stability Analysis

• Noise Impact Analysis

• Cultural Resources Report

• Traffic Impact Analysis

• Hydrogeology Report

• Reports required by DNR: Topsoil Budget Plan, Topsoil Salvage & Replacement Plan, Revegetation Plan, Backfilling Plan, Blasting Plan, Slope Stability Compaction Analysis

and others as needed.

Are there any studies we are missing/anything that could be added to strengthen our application?

2. We are aware that Step 4 of the proposed project requires mining outside the current MRO. We

are working with the County Commissioners to discuss the possibility of expediting the process for expansion of the MRO through a Comprehensive Plan Amendment. Do you see foresee any issues with this process?

Page 16: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

Data Credits: USDA NAIP 2017

USGS, QSI 2017

WSDOT2018

USGS 2006

.. t Project Location

~ • Roads

1 in= 1 miles

_c:::_c::: ____ Miles

0 0.5

909 Squalicum Way Ste111 Bellingham, WA 98225

[email protected] Phone: 360.671 .9172

1

"'1'.: 5L=M5NT

solutions

FIGURE 1

Page 17: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

Data Credits: USGS, QSI 2017 Skagit County 2011, 2018

0 200 400

909 Squalicum Way Ste111 Bellingham, WA 98225

[email protected] Phone: 360.671.9172

600

Feet

800

:!L:!M:!NT solutions

FIGURE 2

Page 18: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

'l'.t.NAO:. _ ---- -· • I

Shipping from Bellingham

Oal<Htrbor Sources: Esri, HERE, Delorme, USGS, lr')t'~riJ!P, INCREMENT P, NRaalil~ Esri

- 'Japan, METI, Esri China

--==---ic::=::::::::11-- Miles 0 0.5 1 1.5 2

tA:~ I 909 Squalicum Way, Ste 111 .~~ "/, Bellingham, WA 98225

[email protected] :L:M:NT Phone: 360.671 .9172 solutions

FIGURE 3

Page 19: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

Data Credits:

Skagit County 2018

USGS, QSI 2017

DNR 2005

Percent Slopes

1) No mapped wetlands occur within 300 feet of the proposed quarry site. No wetlands were observed in field assessments. 2) Stream occurrence has not been field verified. 3) Outside mapped FEMA SFHA

909 Squalicum Way Ste 111 Bellingham, WA 98225 - - -

[email protected] =L=M=NT Phone: 360.671 .9172 solutions

FIGURE 4

Page 20: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

~ ~ \J \J

~~ ,. ,. r... r... ::, ::,

~ ~ "'"' ~~

I~ o~ z~ ... ~ ... t,~ zg ... r:; t~ IU:;;; IU~ z~ .... t,~ z~ UJ il:

"' "' ca~ l

). -wi )~ re~ :) ~ U)~

:5 0~ -~ U.! ... u

SITUATE IN THE N.W. Y.i OF SECTION 24 TOWNSHIP 35 NORTH, RANGE 10 EAST, WILLAMETIE MERIDIAN, NEAR MARBLEMOUNT, SKAGIT COUNTY, WASHINGTON

JETTY STONE QUARRY RECLAMATION PLAN "

\ t

'

- ' . i ... ,· '

.'':.,,· '•,"\.\ •.

·' -1\ . ..,, _

\ \ \ .

··~ ~ '- .,,, f

- --- ... '-

·', ~1.,_·;( ¥'.,,.>·. ' ·, \ ... '- /'"•

, -7, , _,..,. .Jt , I '

--~ ' {! ' ,·­--•,: \,

r=-:-_<<~·:

-~ .....

~"' .~.. \

-.' . ~-~ ·/ ··=·:::~' .. :~·~ '-,, '

,_.

. (: ..,, , -.. . ,--- ~

.,..,·-

<

_, . ~, /'

~

·-:....~.:;; .'+ -

. .._ ....

/

" /

#

-~r=-o;..:--~-,iJ ~: I., • , I ~-

~'_~~:~~~/~Jt:i<~ .. . .. ~~ -_. .. ~/

~/ - - ·;-: , ·1.. -,

--·-

~ i I

=- ./. - -E',: y ;

1·-·-1 ·,, - -~--.. \ 'I'

rl ---------...... .. - ··

"- I ----

-· / ...... , ...... ~-

'l :,..-=-· -

.,~;,, , . ~,f';!J .I ', -- .' ,--.....,

--~--~-- - .,/_ .. ( ,. ..e ,·,:::-

- ;--~.,...r' . ' ,v.-

'_ r~': ,~-;__\f~: ~~·. ' .. ~---r,..;· ... ~"-..~

-~

;' I 1

\ d , l

I ~ I ~ . , ii ·,, ,·

+ '. ~·#l

. -1

- ·l I I -• -,JF\

\ ...

,. )\ ,,----:~,.-~- ,.. \f r -~- . . , ',. _ _.-·

( I /:/ .,..., - . ~ · . L J • , , .,..~ ---· '- .'"'-,..

-,. - "-l,,_~.· , h ., t'§f!;_ !,- I'·- '- ,

/ 1,' :, :.. . : - ;·· l,

I , - - /

11 I

.I

'·1 _., " - \

i

\ \,.'\lf"!", 'f ..

'I lj

\'

c.;KAT'"l 11C • .:5C"./\L.C.. , ............... _., f .... t,)

,e, - ~ .~:c _1

c;~D CLASSIFICATION]

~------- ----

SHEETINOEX

01. SITE ACCESS MAP

02. PRE-MINING TOPOGRAPHIC MAP

03. OVERAU. SITE MAP

04. MINING LIMITS

05. MINING VOLUME

06. CROSS SECTION A-A , .\ 1~\ \ \

.. '"\' \ \\ ~,."':. · t \ ~<~\

.'\

'(

,. 1.-/ \

r

#,:- ..... _#"\ ............ ' -~

'y

07. CROSS SECTION B-8

08. ACCESS ROADWAY PROFILE

... ACCESS ROADWAY PROFILE & DETAILS

LJBGS MAPS UTILIZED------

SAUK MOUNTAIN QUADRANGLE WASHINGTON-SKAGIT COUNTY

7 .5 MINUTE SERIES

ROCKPORT QUADRANGLE WASHINGTON-SKAGIT COUNTY

7 .5 MINUTE SERIES

MARBLEMOll.NT QUADRANGLE WASHINGTOtf-SKAGIT COUNTY

7 .5 MINUTE SERIES

ILLABOT PEAKS QUADRANGLE WASHINGTON-SKAGIT COUNTY

7 .5 MINUTE SERIES

MARBLEMOUNT QUARRY 0~ ~~t-~--::na:::-::"o~BOCK:;-~~r._::::-~:::i".~~-,~°"':,::::"""::r-~-,~flE';;:-;::.-r:~~,~,T"=.:-,-=..-,r-~~-~--~-~-.,,,.,,.~.~.-"'""r---,_,,,,,~ .. ,.,,,,,.,,,,,,,,,~~r._,,..,,~._,-,,_~ .. ~. -,.,,,.,.,.,.,.,."T".~.~--r~~~~~~~~ ~-- ·- · .,_, ·-·- ·· I.-.~, 1 .,,_, I - 1 -...1 = 1n-i: .. 1 ""''" I ni: .. .....,,.. .,.;.,._,.,,..,....., ........... """"" ""'""",.,...'"""

.. A,flf"Ol0UNT , WASHl"'GT01"

RECLAMATION PLAN EXHIBITS 0 JQB No.2017008

5"EET

01 09

IE - ,.,_ " - KIEWIT INFRASTRUCTURE WEST CO. IGN ,, IC >Pr- ,__ - 1,. 1011 2200 COUJMBIA HOUSE ILVD. r. VANCOUVER, WASHINGTON 98661

~ Q'\ - _ ·- ' ··~ - ~-~ 360.693.1478

'""-

SITE ACCESS MAP -;;I~ ~-- ,... ______

"""' RU£JlfflC< I i.ulncALlMTIJ,11 I Pf.AN CH£CK I """"'"' I ,ssv,

Page 21: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

~ ~ "" ~~ :,. :,.

55 ~~ "'"' '!-~

I~ o~ z! -~ "'" t,~ zg ..,7: re~ UI~ w~ z~ ;g \17: z~ UI it

"' "' ~~ 1

). . wi )~ re~ :); {I)~

:5 0~ -~

) )

U.! 0-~

§t=:::::::i~~~=~~~==~~==ni£:n;~~E::J31::::r=:J~=:::::is~n=:::;:;;~~~=::::il!!lst~~~~q~r:::ic:::=====:1 < r:::J Fl£LD 800K ru:w. Ho. LOCATION CUV. DArA ":"" S~L£ R£.v DU£ ROfSION D(SCRfPT10N l1Y No. ISSU£ 0£SCRIP110N ~re V) fJUIQI: IMS£ -z, , 1111W - ,.,_ llllf )3EWtT INFRASTRUCTURE W£ST CO. 0,. suo,,:=, D6IGH ,e • -,, a ,_. _ _,. a 1t111 2:ZOOCOLUMBIAHOUSEIILVD.

I\ ASIUlr: mcl'l VANCOIJ\/Elt WASt-lNCTON 98661 ... ~ DMGl 1!\,'11,~-,ogu,,mvw-...,,- J60.69t.147$

WMYRUFMNCE PLAN CHE'CJ<_ --- __J_ ROtslrMtS _l___ ~ I ml

c,R.Af'"t- 11c: .sc:ALr_ c.. .. - .. ._."f .. ~•)

)· - ~ ~-:r

0

l.

0 0 0 0

0

0 0 0 0 G 0 0

[~h~}!J:~T~3TR~ HAMIi.TON, WA. 98255

~i~fW wfstYN5ci& PARKS & RECREATION 1111 ISAAEL RO. S.W. OLYMPIA. WA. 911504

~~EJitN~45273 240 E. AAELLEI.! RO. UNION, WA. 98592

~EafRlf!SiO~PENCER STACY M 11805 S.E. 252ND PL KENT, WA. 980JO

LIGHT DEPT. IGHT 3200AP

~1~Z.E~fciJS~ ANO TIMBER COMPANY PO BOX 496028 REDOING, CA. 96049

~1~ifl!Jc1~is~g ANO TIMBER COMPANY PO eox '49&oza REDOING,CA..96049

~'l.r~~12 a NICHOLSON DENISE E 8132 NICHOLSON RO SERO-WOOLLEY, WA. 96284

~~~~i~r:oMUNO & SUSAN DEE PO eox z49 MARBLEMOUNT, WA. 98267

~~E~~&ft~~O~t.lJND & SUSAN DEE PO BOX 249 MARBLEMOUNT, WA 98267

~~~~fi~~OEDMUND & SUSAN DEE PO BOX 249 MARetEMOUNT, WI>.. 98267

r~ir,_E~fcl~s~g AND TIMBER COUPANY PO BOX 496028 REDOING, CA. 9&049

PARCEL INFORMATION OBTAINED ONLINE ntOM SKAGIT COUNTY ASSESSORS WEBSITE www . .i«,9iteounty."11I

G~~~=-1 EXJST1t/13 l.#E l.ECEM)

----, , ___ _ .. CJtS11NC PROPERIYUN£ - ...,, FERlllf1 BOUWWrY - EX1511N(/Q'Mll!"INDD(CONTf)UR

•£XIST,«;liRW"lllrDNM..OOll1DUR

MARBLEMDUNT QUARRY JOB No.2017008

SH£Er MAll!~[MOUNT, WASHINt;;TON

RECLAMATION PLAN EXHIBITS 02 PRE-MINING TOPOGRAPHIC MAP

09

Page 22: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

UJO:J ·,{;JAJns;,[email protected]~ :1II/W3 S89/T "U9 "09[ : )(11:J L8EL"lL9 "09[ ::1NOHd Sll86 tfM ' flltfH9NI1138 ·III 31.JnS·AtfM vvn:JntfnOs 606 UJD:J"A;JAJns;,sd·- ONI DNll!::l33N1DN3 ~ A3/\l!::lnS 01.::IIO"a'c:I

Page 23: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

88 <., <., 1- - - - - - - -~~ - -,. ,. '- '­::, ::,

"'"' QI"'

"'"' ~~

I~ ·~

o~ z~ -~ "" t,~ zg ... i:;

cc~ UJ:;.; UJ~ z5; -g t, ':;

)

~ ~Jiff? !'. :;f ~Ef < L

l= IQ.UIE S!UWIY :-:"""') =: Klilo1E' fflllW£ Rnlll • l.1N.OCC':;'

PROFOeED LIE LECEID - DIIS7N ""'1f'Dnr UN£

- - - • MMMfJPCRl#rllOfMDNlr --a.--ca.- • QtMlln'aENll'IICIMr.l ----- •EldS1M'lil!IU"/ICIEXCt:JNroUlt

- CJOS71M'JCIIWll'.MtJNII. CCW7tlU'f --<m>-- • Pl'IClll"O:SU) IWlfHED QWIE'INIJEX~ ---<l§)--- .. fll#JII05£D TN51ED QMOl" llm1flN. CQfflltll'

c.::::::.1 . ---~ • MNllll:57IM'.5K:IQIOIUMIP

JOB M,.2017008

SH£U

04 OF 09

Page 24: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

!•• •• •• •• I ! g g g g g g g g g • -L n n n ~ . ~ +' ~

! i n g g g g 2 g g i n n ~ ~ . i ''

f - ~ ~ .. . ' . ~

g

1i ~ Lt'\ 0\

~ 0 0

t I i1il ~ i ~ §

! ~1~11n I I ' ~ 11111111 I II >- UJ

"' ::.

I·;;'"' ~I '. "' !: :::, <: m ..J

jl ::> ~ i: 0 O' ~: > ..,

~ ~

lj " : :; .... ~ ~ z .: ' ~ z -~ :> ~ z :i

II I.J . 0 ~ f! C

~!j UJ

2 ., u 0 "' ::: "' <: D..

~

' I ..

--, ";

wo::, ·,<a11Jnsasdp;OJU! : .1I'lv/3 !i89t, ·u9 "09E :w.:1 L8EL"U9 "09E :3NOHd !ill86 lfM 'II/IIH9NI173B ·III 3.llnS·AlfM wn:JnlfnOs 606 wo::, ·,(a11Jnsasd·MMM ONI E:>Nl~33NIE:>N3 ~ A3A~ns 01.::::IIO'o'c:I

Page 25: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

~ ~ I.J I.J

ii ~ ~

'- '­::, ::,

~~ ~~

i~ .. o~

z~ ... ~ ~

t,~ zg ... ~ "'~ UJ~ w~ z~ Mg "'~ z~ UJ it

"' "' ca~ ~

),. -UJI )~

"'~ :) ; U);

s 0~ ... ~ u.~

) )

SECTION A-A ... ,,, .. _ ..... ., .. .,, ..... ,.

... \..J

o~ ... ~~~~~~--~ ..... ~~~--~~ .... --.... ,... ..................... ~~---~~ ........ --.... ~--~----~~-.,...,.,,.,.----------~ .... -= .... ~~~~~~~-t < CY F1CI..D BOOK 19lt No. t.OCArlON ELEY. LMTA '":"" ~ SCALE -'EV 0111£ RE'VfSION 0£SCM'TJON 81' No,. f$St£ DCSCRIP'110H ll41F V) /ll:5JO't' 8lSt , MW17.. • 14- KllWrTINFRASTIUJCTUREWESTCO. ~ s,..._ OC9CN ,, I# i,,ptr, z .,..__ IIITf. 11,.. 2200 COWMBtA HOUSEllW.

ft O --.r. J1J?fr: VANCOWER, WASHINGTON t 866\ ... O"I ~ ~\l'lo --- ____ .._ 360.6tJ.1 '178

SUIJV[Y RfFEl?ENC('_ ...,.., ....... !!WI c,,(t,r - /SSV£ !JI"_

m w

ESTIMA'IEO MIIIABI.E ROCK LIFT# ElfVATION VOLUMElrv1

1 320 • 360 328 200

2 360 - 400 326,500

3 400 - 440 335 600

4 440 - 480 339,700

5 480 • 520 341,700

6 520 - 560 359 900

7 560 - 600 384,800

8 600 - 640 416 500

9 640 - 680 453,400

10 680 • 720 488 400

11 720 - 760 515 600

12 760 • 800 535500 13 800 - 840 557,400

14 840 - 880 588 000 15 880 - 920 612,600 16 920 - 960 618,800 17 960 • 1000 586200 18 1000 - 1040 496000 19 1040 • 1080 308100 20 1080 - 1120 167,100

21 1120 - 1160 38000 TOTAL: 8 798 000

QUARRY BENC;_,'! •. ':'-SECTION (TYP)

MARBLEMOUNT QUARRY

RECLAMATION PLAN EXHIBITS

CROSS SECTION A-A

JOB AA>-2017008

SHt£T

06 09

Page 26: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

>-0: 0: t <( m co :, ~ i ct> Oi ~ z ... ~ ~ 0 :l: ~- ii j::

u :, ~ z: UJ

~ ;~ V> V> V>

LI.J :: ~ 0 ...i ;::5 "" Ill

~ u

0: <(

0 ~ "' N

8 0 u -~ . 3S! --~ =·~~ gH ~~~i ~ B~

; ~~ " u

Ill t ~ r ~

:i i o· ~ 1 I i=' ~ I ~ o. Iii ~ l - • II).

~

I ! "· a. ~

~

~ g

t i

~ ~

i" hi wo:, ·,(aAJnsasd@o)U.t : m M3 S89f,"TL9 "09£ :xttd L8EL "TL9"09E:3N0Hd Sll86 tfM 'vWH9NI1138·11131.JnS·,HIMWn:Jl1tfnDS606 wo:,·,(aAJnsasd·- ONI DNll!::l33NIDN3 ~ .A.3/\l!::lnS Ol~IO"'o'c:I

~

!

~ a ~ ;

I i

Page 27: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

ss ~~ ::,. ::,. '- '­::, ::,

~~ "'"' ~<§-

Ii 0 .:1

Z! ... ~ "'"

C)~ zg ... <:;

It~ UJ~ w~ z~ ;g \,I':; z~ UJ it

"' "" ca~ ~

). . w! )~

')

ROADWAY PROFILE .,.,,...,,.,,•-•- ., ..,.a, .,, •• _,_

re~ :) ; 600-+--~--~--~--~-~~-~--~------~----,--~--~--------~-- ~--~--~---;--~--~--~--~--..,,

rn~ :S

0~ ... ~ lL! ... I.)

0~, <t ey1t:::::::::;-~.~800K~==~-~ .. ~==:'.!,~ ... ~"""~==:P=~-l!"'~'~·!::'E~:=Er===~~=]fm .. ~..,qc:::::;-~~~~~~=:::n"'!!l;:r:~~~~~i:: .. ~"':r=======:1 l'l uc;rx 8lSE" - ~- IOlWITINFRASTRUcnJREWESTCO.

O'I STN(~ ~ - /, IOII 2200COUIMIIAHOUSEILVD.

D.. C) I ASIWJI.I) »JU-" VANCOWER, WASHINGTON !.11661

~ -~ .,.,...""""""'

ROADWAY PROFILE H. 8CAL.E: f -.10!1' V.ICALE.:1"-100'

a, MARBL E MOUNT Q UAR R Y OfAU l(MU U,.T . WASH• .. cro ..

RECLAMAT ION PLAN EXHIBITS

ROADWAY PROFILE

~ .Gill IIEMSltWS I fSSUE: I FOR

JOB M:>,2017008

SHITT

08 09

Page 28: @)Kiewit · 2019-03-20 · @)Kiewit January 22, 2019 Mr. Hal Hart, AICP Director Mr. John Cooper, LG, LHG Geologist/Hydrogeologist/Natural Resource Planner Skagit County Planning

~ ~ "" ~~ ,. :,. '- '­::, ::,

~ ~

"'"' "!-~

I~ o~ z~ ... ~ ~

t,~ zg ... ~ re~ UJ:;.; w~ z~ ;;g \,I~

11

10

9

so+oo 52t00 54-tOO 56t00 5Bt00 60t00 62t00 64+00

------~~- --

;~~ :

- < -·.·· .. •'.-.· .,·· -h · .• ~==+ '"si ····· - : 1! -~ --- ·-.:

' ~

Ll ... , ' . ' . ' . ' ' . ' . ' . . .

'"- ·- ·- 1 . -:':.

z~ UJ ii:

700-f--~--~--~--~-~--~--~--~--~- -i---i-- - ~--~- ~~-~--....;..--~--~- ~--+'

"' "' ca~ 1

). '

wi )~ rt:~ ::,~ U) ~

:5 0~ ... ~ u.~

ROADWAY PROFILE ~ A~ .. ~ - • -· U • • r • • • ~

O ... ~ :§ 1-------,.-..... -------, .......... - ....................... ----. ..... - --------...-...... ...-----.--.......... -----~ <t r:::J FIElO BOOK TB/ti. No. LOCAl'/ON £LEY. £MTA SC.AL£ R[V r lM1c ffE.VfSION 0£SCRIPn(JN BY No. ISSUC: OCSCRIPnoH 041£ ""I DCSICII: fllS£ EK u.-. IOEWIT INFRASTRUCTURE WEST CO. ,..._ s__. OCSIQI 1 ,-;-- t tlllf 2ZOOCOLUMB1AHOUSE8lW. f\ - ""I VANCOUVER, WASHINGTON 98661

... ~ ASIMl..r: = 360.605.1"478

SIJINCY ~NC(,, ~~ tMnJIJ B£lfSIONS _!SSQf ~

TYPICAL ROADWAY SECTION

MA R BLEMOUNT QUARRY

RECLAMATION PL AN EXHIBITS

ROADWAY PROFILE AND TYPICAL ROADWAY SECTION

.JQ8 No.2017008

SHm

09 09