Page 1: Key Management System Presentation: Jaguar

EGM080KEY MANAGEMENT SYSTEMSASSEMBLY PLANT AT

Mandeep Phull

11/12/09

Page 2: Key Management System Presentation: Jaguar

Presentation Content

Introduction Overview of the company

Who are Jaguar What do they do Products

Transformation model Polar Axis Service Profile Objectives Methodology

2/9

EGM080: Key Management Systems

Page 3: Key Management System Presentation: Jaguar

Introduction

Jaguar Cars Ltd Car manufacturer

Subsidiary of Tata Motors Ltd Operating under Jaguar Land Rover

Two plants Castle Bromwich, Birmingham Halewood,Liverpool

Products XJ, XF, XK X-type

3/9

EGM080: Key Management Systems

Page 4: Key Management System Presentation: Jaguar

Assembly Process Castle Bromwich

2 assembly lines Body Shop – Closure Line Interior line

4/9

EGM080: Key Management Systems

DOORINGSNAGGIN

GFENDE

RS LCD HOOD

Page 5: Key Management System Presentation: Jaguar

Transformation Model5/9

EGM080: Key Management Systems

Page 6: Key Management System Presentation: Jaguar

Service Profile6/9

EGM080: Key Management Systems

Assembly line

3 models

Order winner – Technical capability

Need to reduce cost in all aspects of operation

Order qualifiers – price, delivery and quality

Low skill levels

Page 7: Key Management System Presentation: Jaguar

Polar Axis Model7/9

EGM080: Key Management Systems

Speed is of high importance during assembly of components

Dependability is also of high importance – order winner

Flexibility is a low priority as the model range follows same process

Cost is a very high criterion

Quality is very important, affect dependability – brand name

Page 8: Key Management System Presentation: Jaguar

Objectives

Analysis of the assembly line Breakdown of individual

stages Comparison of previous

and current operations Mass production Lean production

Identify what areas can be improved upon

Type of Quality control Six Sigma – how is it

implemented in the business operations?

Identify any possible improvements

Capacity management How efficient is the

assembly line? Utilisation Effectiveness Identify any possible

improvements

8/9

EGM080: Key Management Systems

Page 9: Key Management System Presentation: Jaguar

Methodology

Interviews with current employees Group leader – assembly line Production Manager

Look at case studies where six sigma has been implemented at Jaguar

Access information from Jaguar Output levels of production

Determine utilisation, effectiveness

EGM080: Key Management Systems

9/9

Page 10: Key Management System Presentation: Jaguar

ANY QUESTIONS?