kek/isis/anl loi amplifier/second harmonic rf collaboration meeting
DESCRIPTION
KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting. Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM. IPNS RCS RF System Block Diagram:. Third Cavity Installed in L6 Straight Section:. Third Cavity and Final Amplifier:. - PowerPoint PPT PresentationTRANSCRIPT
KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting
Tuesday, 26th of June, 2007
PAC07, Albuquerque, NM
2
IPNS RCS RF System Block Diagram:
3
Third Cavity Installed in L6 Straight Section:
4
Third Cavity and Final Amplifier:
Final amplifier uses two Eimac 3CW150000H3 water-cooled power triodes in a grounded-grid, cathode-driven, push-pull topology.• Operated Class A.• Plate power supplied by an 8 kV, 24 A DC power supply.• Typical operating point:
•Vplate = 8 kVDC•Vgrid = -320 VDC• Zero-signal plate current/tube ~ 5 A
5
Final Plate Supply: 8 kV, 24 A DC Cavity Bias Supply: 0 to 1000 A DC
Final Grid and Filament Cabinet
Final Plate Supply, Cavity Bias Supply and Filament and Grid Supply Cabinet:
6
Predriver and Driver Amplifiers:
Predriver amplifier uses two Eimac YU-106 water-cooled power triodes in a grounded-grid, cathode-driven, push-pull topology.• Operated Class A.• Plate power supplied by a 5 kV, 4 A DC power supply.• Typical operating point:
• Vplate= 5 kVDC• Vgrid = +35 VDC• Zero-signal plate current/tube ~ 1 A
Driver amplifier uses two Eimac 4CW25000A water-cooled power tetrodes in a grid-driven, push-pull topology. • Operated Class A.• Plate power supplied by a 5 kV, 10 A DC power supply.• Typical operating point:
• Vplate = 5 kVDC• Vscreen = 1.5 kVDC • Vgrid = -300 VDC• Zero plate current/tube ~ 3 A
7
Timeline:• Summer Shutdown, 2005: Disassembled test stand and moved equipment into place.
• Winter Shutdown, 2005-2006: Installed third cavity in RCS.
• March, 2006: Operated all three cavities with beam (3rd cavity operated in fundamental mode).
• Septemember, 2006: Operated 3rd cavity in second harmonic mode (for first ~4ms of cycle) with beam.
8
3 2 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 170
2
4
6
8
10
12
14
16
18
20
22
Fundamental Rectified Gap VoltageSecond Harmonic Recitified Gap Voltage
Cycle Time (ms)
Rec
tifie
d G
ap V
olta
ge (
kV)
Vfi
V2fi
T i( )
0 90 180 270 3601.5
1
0.5
0
0.5
1
1.5
Fundamental Gap VoltageSecond Harmonic Gap VoltageTotal Vector Sum Gap Voltage
Degrees
Volta
ge (R
elat
ive
Uni
ts) Vf
t
V2ft
VTotalt
t
Time
Injection
Mountain range plot starting at injection without second harmonic, duration ~4 ms.
Mountain range plot starting at injection with second harmonic, duration ~4 ms.
Bunch profile without second harmonic, at ~1.8 ms after injection. Bunch profile with second harmonic, at ~1.8 ms after injection.
Rectified fundamental and second harmonic gap voltage. Single-turn, vector sum of gap voltages, at ~1.8 ms after injection.
Results with Second Harmonic:
9
Future Plans: