CUSTOMER PROJECT DELIVERY REMARKS
204
External Electrification Dec - 2012 Supply , Erection, Testing and Commissioning of External Electrification for Substation at West Bengal
203
Electrical Package for Rawan wagon tippler, UltraTech
Mar - 2012 Electrical Package for Rawan wagon tippler, UltraTech
202
Design, Engineering, supply of Electrical Package
Mar - 2012 Design, Engineering, manufacturing, testing, inspection, painting of manufacturing works, packing, forwarding, supply , loading of plant electrical package and Mandatory Spares
201
Supply, Erection & Commissioning
Mar - 2012 Supply, Unloading, Storage, watch & ward, Erection & Commissioning of Instrumentation Package
200
Supply for Cochin ShipYard
Feb ‐ 2012 Supply of HMWPE Cables and TKD Cables
199
Rewiring of Residential Buildings
Feb - 2012 Rewiring of Residential Buildings at DAE Township
198
DRDO Jan - 2012 Supply of PLC Based Beam on interlocking system for LINACS
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
197
Supply for Titan Industries limited
Enduring
Supply of Westec / Wago Products
196
Supply for Tamilnadu Newsprint and Papers Limited
Enduring
Supply of EKD Drag Chain, Helaform Cable Trolley System and TKD Cables
195
Supply for Dynaspede Integrated Systems (P) Limited
Enduring
Supply of Cables and Connectors
194
Earth Pits for GMR 20MW
Dec - 2011 Supply and Installation of Earth Pits for Solar Power Plant GMR 20 MW at Gujarat
193
Earth Pits for TATA 8MW
Dec - 2011 Supply and Installation of Earth Pits for Solar Power Plant TATA 8MW at Gujarat
192
Earth Pits for GMR 5MW
Dec - 2011 Supply and Installation of Earth Pits For Solar Power Plant GMR 5MW at Gujarat
191
Supply and Installation of cables & GI flats for solar plant TATA , Gujarat
Dec - 2011 Supply and Installation of 8MW Solar Plant I,E Cables (UV Resistant ) & G.I Strips Hot Dip Galvanized for Solar Power Plant TATA at Gujarat
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
190
Electrical Erection & Commissioning for Solar Plant TATA
Dec - 2011 Erection and commissioning
189
Bharat Petroleum Corporation Limited – ongole
Dec - 2011 Drain Valve Close Position Indication at ongole
188
Bharat Petroleum Corporation Limited – Irugur
Dec - 2011 Drain Valve Close Position Indication at Irugur
187
Bharat Petroleum Corporation Limited - Irimpanam
Dec - 2011 Drain Valve Close Position Indication at Irimpanam
186
Supply of BMS Dec - 2011 Erection, Testing & Commisioning of BMS Software, DDC Controllers, Sensors & Field Devices, Cables & Conduits As Per Bill of Materials
185
Supply for Cordite Factory
Nov - 2011 Supply of VFD Panels with motors
184
Supply & Installation of BMS
Nov - 2011 Supply & Installation of BMS
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
183
Electric Supply for Solar Plant TATA , Gujarat
Nov - 2011 Supply of Equipments / Materials For 8MW Solar Plant I.E Electrical Balance Of Plant (EBOP) & Auxiliary Power System for Solar Power Plant TATA at Gujarat
182
Supply & Installation of BMS
Nov - 2011 Supply & Installation of BMS
181
Design, supply, installation, testing & commissioning
Nov - 2011 Design, Engineering, supply, Erection, Testing and Commissioning of complete Electrical, Instrumentation & PLC – Automation System for INI stacker
180 Design, supply, installation, testing & commissioning
Nov - 2011 Design, Supply, Installation Testing and Commissioning of Structure Mounted Flameproof Type, OSO
179
Supply for Apollo Tyres Limited , Chennai
Oct - 2011 Supply of TKD make Cables
178
Eversandai ,trichy
Erection and Commissioning
Sep - 2011 Erection and Commissioning
177
Eversandai ,trichy
Supply cables and Main Distribution panels
Sep - 2011 Supply of cables, Supply of Main Distribution panels
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
176
Supply for Kudankulam Nuclear Power Project
Aug - 2011 Supply and Installation of Copper Bus Bar
175 Design, supply, installation, testing & commissioning
Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at hyderabad terminal under apso
174 Design, supply, installation, testing & commissioning
Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at vijayawada terminal under apso
173 Design, supply, installation, testing & commissioning
Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at rajahmundry terminal under apso
172 Design, supply, installation, testing & commissioning
Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at vizag terminal under apso
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
171 Design, supply, installation, testing & commissioning
Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at kakinada terminal under
170 Design, supply, installation, testing & commissioning
Aug - 2011 Design, supply, installation, testing & commissioning of push button station outside dyke wall enclosure for tank movs and position indicators for drain valves located outside tank dyke wall at ramagundam depot under apso
169 Design, supply, installation, testing & commissioning
Aug - 2011 Design, supply, installation, testing & commissioning of position indicator for drain valves located outside tank dyke wall at kadapa depot
168 Design, supply, installation, testing & commissioning
Aug - 2011 Design, supply, installation, testing & commissioning of position indicator for drain valves located outside tank dyke wall at guntakal depot
167 Design, supply, installation, testing & commissioning
Aug - 2011 Design, supply, installation, testing & commissioning of position indicator for drain valves located outside tank dyke wall at ongole depot
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
166 Design, supply, installation, testing & commissioning
Aug - 2011 Design, supply, installation, testing & commissioning of position indicator for drain valves located outside tank dyke wall at vizag fhi
165 Design, supply, installation, testing & commissioning
Aug - 2011 Supply, Installation, Testing & Commissioning Of Standalone Pc Based Hmi Software For Remote Controlling / Monitoring Of Exisiting Movs Through Rotork Mov Master Station At Vijayawada Terminal
164 Design, supply, installation, testing & commissioning
Aug - 2011 Provision of Dyke drain valve position indicator at terminals/depots of OSO, Paradeep terminal, Bhubaneswar (jatini) depot Balasore depot Sambalpur depot Rourkela depot
163 Design, supply, installation, testing & commissioning
Aug - 2011 Provision of push buttons outside dyke walls for tank MOVs - Paradeep terminal
162 Coke and fluoride handling system for Aditya and Mahan Aluminum plants
Aug- 2011
Design, supply, installation and commissioning of instrumentation, electrical and control systems
SL NO
161
160
159
158
157
156
155
CUST
KEAS
OMER
REFE
S Control Systwww.ke
Internal work
TATA PBOKAR
Electricathe ServVarious Chennai
ESL & E
Electrifi
AutomatDehydra
Erection
ERENCE LIS
tems India Preascontrols.c
PROJECT
Electrification
PROJECT-RO STEEL PLA
al Arrangemenice Buildings aLocation in
i
ECC Buildings
cation work
tion for Gas ation package
n work
ST
rivate Limitedcom
DEL
n July -
ANT July -
nts to at
July -
s July -
June -
April
Mar -
d
LIVERY
2011 EleSIS
2011 DeEnEleInsAuforPr
2011 SuElean
2011 ReElein Bu
- 2011 EleIWSuSpElewaPla
- 2011 DeSutescompro
2011 Su132con
REMARKS
ectrification ofSCO Bay – Tri
esign and ngineering of ectrical, strumentation utomation packr HMDS Bokaroject
upply and Erecectrical Producd Wiring
efurbishment oectrical InstalESL & ECC
uildings
ectrification ofWMUST plantsupply of Electripares and AMCectrical Systemaste managemeants esign, Engineerupply, Manufacsting and mmissioning oocess control s
upply and erect2kV switchyarntrol station
S
f ichy
and kage ro
ction cts
of lation
f s, ical
C for m to ent
ring, cture,
f system
tion of rd and
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
154 Services and testing of high pressure valves.
Jan- 2011 Servicing & Testing Of Valves for ONGC Karaikal
153
Revamping of Electrical and Instrumentation / FPSO BROTOJOYO
Jan - 2011 Supply and Erection of Electrical, Instrumentation and Control System
152
Electrification of DAE – UGC – CSR Building
Jan - 2011 Design Manufacturing, Supply, Installation, Testing, and Commissioning of Electrical systems.
151
Revamping of Electrical and Instrumentation / FPSO BROTOJOYO
Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Heat Tracing
150
Revamping of Electrical and Instrumentation / FPSO BROTOJOYO
Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Fire Alarm Panel
149
Revamping of Electrical and Instrumentation / FPSO BROTOJOYO
Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of Electric Control System and DCS System
148
Revamping of Electrical and Instrumentation / FPSO BROTOJOYO
Dec - 2010 Design, Engineering, Manufacture, Supply, Erection, Install and Commissioning of E-House and Instrumentation
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
147
Electrical and Automation Panel
Nov - 2010 Design, Engineering, Manufacture, Supply and Commissioning of MMC cum VFD Panels, UPS, JUNCTION Boxes and PLC Panels
146
Building Management Systems
Nov - 2010 Supply and Installation of BMS
145
Automation System for Air Conditioning Equipments
Nov - 2010 Design, Manufacture, Supply, Installation, Testing , Commissioning and Training of Automation System.
144
Electrical System for RECLAIMER
Nov - 2010
Design, Engineering, Supply, Erection and Commissioning of Electrical System.
143
Control System Upgradation for EAF – III Project
Nov - 2010 Design, Supply, Erection, Testing, Commissioning of PLC based Control System
142
Electrical and Control systems for Wagon Tippler and Side Arm Charger ( Vedanta Aluminum Limited, Orissa )
Oct - 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.
141
Electrical and Control systems for Wagon Tippler and Side Arm Charger ( Bellary Thermal Power Station, Karnataka Power Corporation )
Oct - 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
140
Electrical and Control systems for Stacker & Reclaimer ( Bellary Thermal Power Station, Karnataka Power Corporation )
Oct 2010 Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.
139
Sub-Station 8 at DAE Township
Sep - 2010 Supply, Installation, Testing & Commissioning of LT Switch board & Bus duct for Sub‐Station 8 at DAE Township
138
6th Oxidizer Line at Cristal Pigment Plant
Sep - 2010 Detail Design Engineering, PDMS Modeling of Mechanical and Piping.
137
Control System for Nitrogen Package
Sep - 2010 Design, Engineering and Commissioning of PLC and Power Distributed Panels
136
Electrical Works at LOBS Project Site
Aug 2010 Supply, Installation, Testing & Commissioning of LT Switchgears ( Excluding Supply ), Cabling, Lighting etc at LOBS Project Site
135
PLC Based Control System for Fuel Recovery System
Jul - 2010 Design, Engineering and Commissioning for PLC, MCC and VFD Systems
134
ROC Plant
Jun - 2010
Design and Detail Engineering of Electrical, Instrumentation and control system
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
133
Electrical and Automation Panel
Apr - 2010 Design, Engineering, Manufacture, Supply and Commissioning of MMC cum VFD Panels, UPS, JUNCTION Boxes and PLC Panels.
132
OGIP IK WELLHEAD PLATFORM
Apr - 2010 Site survey, design and detail engineering for modification of Existing E-House with deck extension
131
OGIP SD WELLHEAD PLATFORM
Mar - 2010 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
130
GOHDS REVAMP PROJECT AT MRPL
Mar - 2010
Supply and Installation of Electrical & Instrumentation work
129
B193 – Detailed Engineering
Feb - 2010 Pre-Bid Engineering support
128
D1 Development Project
Feb - 2010 Pre-Bid Engineering support
127
Tank Level and Temperature Measurement System
Jan - 2010 Design, Engineering, Commissioning and Supply of Instrumentation and PLC Panel
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
126
B193 Process Platform
Jan - 2010 Pre-Bid Engineering support
125
PLC System
Jan - 2010
Supply, Installation, Commissioning and Testing of PLC system
124
Electrification of Modified Hall
Jan - 2010
Electrical Works
123
Drive Panels for Printing Machines - 47 Nos.
Dec - 2009
Manufacturing and Supply
122
Compression Test Bed Facility at SIEMENS, Vadodara
Dec - 2009
SITC of Electrical and Instrumentation Package
121
HRDC Building
Dec - 2009
Electrical Works
120
, KKNPP
Starter Panel
Nov - 2009
Manufacture, and Supply of Stater Panel
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
119
,KKNPP
Copper Bus Bar
Nov- 2009
Supply,Fabrication & Installation of Copper Bus Bar
118
Electrical System for Wagon Tippler
Nov - 2009
Design, Engineering, Supply, Erection and Commissioning of Electrical Systems.
117
, DAE , KALPAKKAM
Power Control Center
Nov - 2009
Manufacture,Supply,Erection, Commissioning and Testing of Control panel
116
Electrical and Control systems for Stacker & Reclaimer (Paradeep project of ESSAR STEEL)
Nov - 2009
Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.
115
6WPP Well Head Platform
Oct - 2009 Pre-Bid Engineering support
114
Orient Cement Plant
Oct - 2009
Manufacture and supply of MCC Panel
113
Orient Cement Plant
Oct - 2009
Manufacture and supply of Control desk
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
112
Automatic Cotton Feeding System
Oct - 2009
Design, Engineering and Supply of PLC System
111 INS KATTABOMMAN
Modification of compressor control system
Sep - 2009
Manufacture and supply of compressor control system
110 EXCEL TEXTRONICS
VFD Panel
Aug - 2009
Manufacture and Supply of VFD Panel.
109
Drive Panel
Aug - 2009
Manufacture and Supply of Drive Panel.
108
B-193 Well head
Aug - 2009
Pre-Bid Engineering support
107
Automation for 10 MW Bio Mass Power plant
Jun - 2009
Design , Engineering, Supply, Erection and Commissioning of DCS system
106
Fertilizer &Chemical Plant
May -2009
Design and Detail Engineering & supply of PLC control system
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
105
OGIP IB WELLHEAD PLATFORM
Apr - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
104
OGIP SR WELLHEAD PLATFORM
Apr - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
103
OGIP NH WELLHEAD PLATFORM
Apr - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
102
Electrical and Control systems for Paddle Feeder. (Santaldih Thermal Power plant)
Apr- 2009
Design, Engineering, Supply, Erection and Commissioning of Electrical and Control systems.
101
Automation for Amine Sweetening Plant
Apr - 2009
Design , Engineering, Supply, Manufacture, testing and Commissioning of Process control system and process shutdown system
100
OGIP RS2 WELLHEAD PLATFORM
Mar - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
99
OGIP SE WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
98
OGIP N4 WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
97
OGIP NJ WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
96
OGIP NV WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
95
OGIP SP WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
94
OGIP NM WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
93
OGIP SB WELLHEAD PLATFORM
Mar - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
92
OGIP IF WELLHEAD PLATFORM
Mar - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
91
Electrical Distribution system with DG sets
Mar- 2009
Design, Engineering, Supply, Erection and Commissioning of Electrical distribution systems and DG sets.
90
Unit - 400
Mar- 2009
Design and Detail Engineering of Electrical, Instrumentation and control system
89
OGIP RS11 WELLHEAD PLATFORM
Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
88
OGIP NO WELLHEAD PLATFORM
Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
87
OGIP NW WELLHEAD PLATFORM
Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
86
OGIP SS WELLHEAD PLATFORM
Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
85
OGIP SJ WELLHEAD PLATFORM
Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
84
OGIP SN WELLHEAD PLATFORM
Feb - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
83
OGIP IG WELLHEAD PLATFORM
Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
82
OGIP IA WELLHEAD PLATFORM
Feb - 2009 Site survey, design and detail engineering for modification of Existing E-House with deck extension
81 JEYA VISHNU TEX PROCESSORS PVT LTD
PLC based water level control panel
Feb - 2009
Manufacture and Supply of PLC Control Panel.
80
Automation for Sinter Plant
Feb - 2009
Design , Engineering , Erection and Commissioning of PLC system
79
OGIP SY WELLHEAD PLATFORM
Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
78
OGIP SM WELLHEAD PLATFORM
Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
77
OGIP N8 WELLHEAD PLATFORM
Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
76
OGIP N9 WELLHEAD PLATFORM
Jan - 2009 Design, detail engineering, commissioning supervision and Factory Acceptance Testing of new E-House
75
Drive Panels for Printing Machines – 21 Nos.
Jan - 2009
Manufacturing and Supply
74
Drive Panels for process Pumps
Jan - 2009
Design ,Engineering , Installation, Erection and Commissioning
73
MHN Process Platform
Dec- 2008
Pre-Bid Engineering support
72
6th Chlorinator
Dec - 2008
Design and Detail Engineering of Electrical, Instrumentation and control system
71
Automatic cotton feeding system
May - 2008
Design, Engineering , Installation, Erection and Commissioning
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
70
Digital Counting system for Castings
May-2008
Design, Engineering , Installation, Erection and Commissioning
69
Automation of Cup Cake Machine
Mar-2008
Design, Engineering , Installation, Erection and Commissioning
68 GLOBAL CONVEYOR
Automation of Material Handling System
Feb-2008
Design, Engineering , Installation, Erection and Commissioning
67
Automatic cotton feeding system
Feb-2008
Design, Engineering , Installation, Erection and Commissioning of PLC System
66
Design and Detail Engineering of ONGC - OGIP Power to ESP
Jan-2008/ Mar-09
Design and Detail Engineering for Offshore Grid interconnectivity Project comprising of Electrical Instrumentation, Structural modification Telecommunication, Catholic Production, JTube Design, SCADA System etc.,
65
Control Panel for Ready-mix Concrete preparation plant
Nov-2007
Design, Engineering , Installation, Erection and Commissioning of PLC System
64
Automatic cotton feeding system
Aug-2007
Design, Engineering , Installation, Erection and Commissioning of PLC System
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
63
Automatic cotton feeding system
July-2007
Design ,Engineering , Installation, Erection and Commissioning of PLC System
62
G.KUPPUSWAMYNAIDU MEMORIALHOSPITAL
Automation control panel for chillers p/c and plant room equipments
July-2007
Design ,Engineering , Installation, Erection and Commissioning of PLC System
61
2.5MW Captive Power Plant
July-2007
Design , Engineering , Erection and Commissioning of DCS
60
10MW Bio-Mass Power Plant
July-2007
Design , Engineering , Erection and Commissioning of DCS
59
3 MW Captive Power Plant
May-2007
Design , Engineering , Erection and Commissioning of DCS
58
SAXI – TEG regeneration package
June-2007
Design and Engineering of Gas Dehydration and TEG Regeneration System (160 MMscfd, 22 USgpm (99.8% wt TEG conc.)
57
PURE GROUP -Modec TEG Package
June-2007
13.28 MMscfd, Fuel Gas conditioning for Gas Turbine Generator
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
56
FRADE FPSO – TEG regeneration package
June-2007
Design and Engineering of Gas Dehydration and TEG Regeneration System
55
SBM / CHEVRON -FRADE FPSO Desander and Sand Jetting water feed pump package
June-2007
Design & Enginnering of sand removal system
54
PETROBRAS-GENERIC FPSO GAS
Aug-2007
Detailed engineering of Flare and Drain Module,Water Injection Module and Gas dehydration/Fuel gas module.
53
SRKP Field Development – TSIOC/Modec
Aug-2007
FPSO Topsides Basic design and Engineering - production and treatment of 25,000 BOPD
52
SHELL BC-10 FPSO-TEG Package
June-2007
Design and Engineering of Gas Dehydration and TEG Regeneration System(45 MMscfd,11USgpm (99.78% wt TEG conc.)
51
RAS GAS OFFSHORE EXPANSION PROJECT PH-2
Apr-2007
Design engineering of condensate and water strainers (Basket strainers)
50
ARMADA PEKASHA FPSO
Feb-2007
Existing system review and design
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
49
PETROBRAS- FPSO OPPORTUNITY OIL
Jan-2007
Gas comp capacity of 3,500k m3/day and De-sulphated water inj capacity of 22k m3/day.
48
SBM Saxi Bataque TEG Package
Dec-2006
Design and Engage of Gas Dehydration and TEG Regen Sys (160 MMscfd, 22 USgpm (99.8% wt TEG conc.)
47
SBM/Chevron- FRADE FPSO – Gas Dehydration and TEG Regeneration package
Dec-2006
Design and Engineering of Gas Dehydration and TEG Regen Sys (116.6 MMscfd, 18 USgpm (99.5% wt TEG conc.)
46
PETROBRAS- FPSO OPPORTUNITY OIL
Sep-2006
FPSO Topsides design Engg & (Bidsupport)prodandtreatment of 16k m3/day, Gas comp capacity of 3,500k m3/day & De-sulphated water inj capacity of 22km3/day
45
KIZOMBA- C FPSO MONDO
Sep-2006
Design and Engineering of Gas Dehydration and TEG Regeneration System
44
Premier Oil MERU Project
July-2006
Design, Review and Optimization of Marine Energy Resource Unit (MERU)
43
POLVO-FPSO – COTP 500BPD
May-2006
Design, Review and Optimization of Crude Oil Topping Plant (COTP)
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
42 Global Techno Systems Engineering
EPCC for MOGA and Transit Line
Mar-2006
Produced water treatment system
41
MODEC INTERNATIONAL LLC / PETROBRAS PRA-1 FSO Project- Fuel Gas Skid Package
Feb -2006
13.28 MMscfd, Fuel Gas conditioning for Gas Turbine Generator
40
SHELL(SSB)- F13 Glycol Dehydration package
Mar-2006
720 MMSCFD gas flow/ 132 USgpm (98.8% wt Glycol concentration)
39
Ujung Pangkah Development Project Gas Dehydration and TEG Regeneration Package
July-2006
148.8 MMSCFD gas flow/ 30USgpm (98.98% wt Glycol concentration)
38 TESMA/Singapore
PETROCHINA-TBA/TBC- Field Development
April-2006
FPSO Topside Process and Utilities
37 JORD International
PTTEP Arthit Field Development Central Facilities
Nov-2005
HP Production Separator Sand Jet Design case
36
COOEC
HZ21-1 Development Project
Aug-2005
Commissioning services
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
35
Capixaba FPSO of IHCGUSTO/SBM For Petrobras/Brazil
July-2005
Separators Design Assistance
34
SUMANDAK Processing Platform –B of Petronas Cargali Sdn. Bhd./Malaysia
Dec-2005
FEED for gas Processing Facility
33
FPSO Kikeh-Murphy Sabah Oil.Ltd. - Chemical Injection Package
Nov-2005
Chemical Injection System
32
FPSO Kikeh-Murphy Sabah Oil.Ltd.- Nitrogen Generator Package and Nitrogen Intensifier
Nov-2005
Membrane Technology, N2 purity 95%, 100 Nm3/hr
31
FPSO Kikeh-Murphy Sabah Oil.Ltd.- Gas Dehydration And TEG Regeneration Package
Nov-2005
141 MMscfd / 19 USgpm( 99.8% Wt Glycol Concentration)
30 CACT OG, China.
Feasibility Study for Marginal Field Development
Dec-2005
Feasibility Study
29
Panyu 4-2/5-1 Well head Platform Modifications.
Sep-2005
Pre-Commissioning and Commissioning Procedure & IOM
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
28
OKUME TLP – Modec International
May-2005
Methanol Injection System
27
OKUME TLP – Modec International
May-2005
Methanol Injection System
26
OKUME TLP – Modec International
May-2005
Chemical Injection System
25
OKUME TLP – Modec International
May-2005
Chemical Injection System
24
SUMANDAK Processing Platform –B of Petronas Cargali Sdn. Bhd./Malaysia
May-2005
Sea Water Treatment And Deaeration- Conceptual Design
23
Rong Doi Field Development/Vietnam For Korean National Oil Corporation
June-2005
201 MMscfd / 18 USgpm( 99.0% Wt Glycol Concentration)
22
Capixaba FPSO of IHCGUSTO/SBM For Petrobras/Brazil
May-2005
121 MMscfd / 7.5 USgpm( 99.5% Wt Glycol Concentration)
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
21
PC Myanmar (Hong Kong) Ltd
FEED
Mar-2005
Pipeline Heaters
20
Back Processing Facility Block 51
Nov-2004
On Shore Processing Facility, Tank Form, Utilities Etc.
19
D1 WWIP
Sep-2004
Fine Filters Package
18
Sumatec Corporation Sdn.Bhd
Rehmat Gas Processing Facilities/Bid Support
June-2003
2 x 62 MMscfd / 10 gpm
17
/NanHaiwest
FPSO (Hai Yang She You 111) Debottlenecking Project
June-2004
FPSO Capacity Upgrade Studies
16
PCSB –Fuel Gas Package- Bid Support
May-2004
Fuel Gas Package
15
BR-E CO2 Topsides Talisman Malaysia Limited
Dec-2004
Condensate Stabilization And Flash Gas Recovery
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
14
Basis and Detailed Engineering of BAOBAB FPSO Gas Processing Module
May-2004
Gas Dehydration, Gas Hydrocarbon Dew point Control, Gas Metering
13
Basis and Detailed Engineering of BAOBAB FPSO Separation Packages – 4 Skids
May-2004
RVP, BS&W, OIL IN WATER
12
Gas Dehydration And TEG Regeneration Facility -Venezuela
July-2003
2 x 17 MMscfd / 3.4 gpm
11 CPOC/Thailand
CO2 Removal Facility/Bid Support
June-2003
468 MMscfd, CO2 Mole frac.0.4335
10
Training for IBA / EXXON Mobil - Gas Dehydration And TEG Regeneration System/Bid Support
April/May 2003
Training – Operators and Engineers
9 Prai Power Sdn.Bhd.
TENAGA NAZAR - Trouble Shooting/ (350MW Combine cycle gas turbine project Prani, Pulau Pinang .Malaysia)
Feb-2003
Trouble shooting of Diesel Handling System
8
Salman Oil & Gas Field, Gas Dehydration And TEG Regeneration System
July-2003
2 x 300 MMscfd / 55 GPM
REFERENCE LIST
KEAS Control Systems India Private Limited www.keascontrols.com
SL NO
CUSTOMER PROJECT DELIVERY REMARKS
7
KINARUT Development - ERB West Tie - in
May-2003
150 MMscfd / 6 GPM
6
MISC - FPSO Project- Gas Dehydration System
May-2003
60 MMscfd / 14 GPM
5
BOABAB Field Development-FPSO Topsides / CNR International (Côte d' Ivoire) S.A.R.L.- Bid Support
Nov-2003
90,000 BPD with 78% Water Cut/ 64 MMscfd/ 9 GPM
4
Espadarte FPSO Brazil - Trouble Shooting of Gas Dehydration Facility
Dec-2003
100 MMscfd
3 General Electric/
Turbine Encloser Structural General Arrangement
Dec-2003
Engineering Support
2
OKUME & OVENG Field's - FPSO Topsides Triton Eqaterial Quinea Inc./Bid Support
Oct-2003
230,000 BPD with 60% Water cut. Gas Flow Rate 70 MMscfd
1 Santa Fe Energy Resources Of China,Ltd. / China Offshore Oil Nanhai West Corporation
Process Design Engineering of PANYU FPSO Topsides
May-2002
220,000 BPD with 0-90% Water Cut, Highly Waxy, High Dew point