NAME OF SCHOOL:… Changalume ZONE:Linyangwa TA:Mawawa CONSTITUENCY: Kasungu West Augus Sept Oct Nov Dec Loss of top soil for agriculrural activities during moulding of bricks Leave for natural regeneration of vegetation PMC Creations of dishes/open pits which could be a danger to children and could also be breeding grounds for mosquitoes Refill all open pits with PMC PMC Debri from construction activities left on site become a nuisance and eyesore Collect all debri and fill them in the open dishes and at designated area. PMC Reflections from roof surfaces and general poor workmanship roof surfaces should be non-reflective either through painting or use of tiles (However there is no budget line for painting the roofs) PMC KASUNGU DISTRICT COUNCIL ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF Time Frame Environmental Component Expected Impacts Proposed Mitigation measures Responsibility Soils Borrow pits & trenches left due to sand/clay mining or brick making may lead to growth of pathogens like mosquitoes as still water collects in them. Restoration of the sites, draining and filling pits with construction rubble. E3042 v3 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized

Upload: others

Post on 21-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

NAME OF SCHOOL:…………………………………………Changalume ZONE:Linyangwa TA:Mawawa

CONSTITUENCY: Kasungu West

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Leave for natural regeneration of vegetation PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Refill all open pits with PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Collect all debri and fill them in the open dishes and at designated

area.

PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles (However there is no budget line for painting the roofs)

PMC

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Time FrameEnvironmental

Component

Expected Impacts Proposed Mitigation measures Responsibility

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

E3042 v3

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

Loss of farming land due to

Extension of land for the school

Make proper consulattion and procedures if need arises PMC

Loss of livelihood Allocate the affected families with another peice of land PMC

Land ownership (was there any

extension of land)

Make proper consulattion and procedures if need arises PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks

Establishemnet/ revamping of woodlots for the schools

and establishment of village tree woodlots

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment

Empower community policing forum and employ a

watchman

Quality of materials and

workmanship Inspecvtions by the village local leadership

Leadership and committees

Hold meetings and minutes kept by the school

administration

Flora and

terrestrial Fauna

Sustainability

Social conflicts

Page 3: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Stage of the Project

at the time of

inspection

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………NSAWALA ZONE: CHANKHANGA TA: MWASE

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

N/A PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be filled by debris from the project PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be filled by debris from the project PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Page 4: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

Loss of farming land due to

Extension of land for the school

N/A (School Land) PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Planting Blue gum trees

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment School Watchman availableQuality of materials and

workmanship

Leadership and committees

Stage of the Project

at the time of

inspection Gable level

Sustainability

Soils

Social conflicts Flora and

terrestrial Fauna

Page 5: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Challenges faced

and their proposed

mitigation

measures Water supply problem

NAME OF SCHOOL:…………………………………………Makwiniro ZONE:Suza TA: Kaomba

CONSTITUENCY: Central

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

N/A ( School Land) Used the anti hill for moulding bricks PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

No ditches/open pits created- used Chulu soil for brick making. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Fill up small pits around the house. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Page 6: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Replant trees

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment School Watchman to provide securityQuality of materials and

workmanship

Leadership and committees SMC to provide for mainteinance & repairs

Stage of the Project

at the time of

inspection Gable level

Challenges faced

and their proposed

mitigation

measures Water supply Problem

Social conflicts Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Page 7: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

NAME OF SCHOOL:…………………………………………Mwimba ZONE:Kalolo TA: Mwase

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Company unused land PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

As above PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Fill up pits created for manure making PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Page 8: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Trees provided by co.To be replanted.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment Company security to be providedQuality of materials and

workmanship

Leadership and committees SMC to provide for mainteinances & repairs

Stage of the Project

at the time of

inspection Window level

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………Mponda ZONE: Lisasadzi TA: Kaomba

CONSTITUENCY:

AugustSept Oct Nov Dec

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Flora and

terrestrial Fauna

Sustainability

Page 9: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of top soil for agriculrural

activities during moulding of

bricks

N/A School land PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

N/A . Used surface soils PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Fill up used toilet pits PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it (hold sensistisation meetings)

PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A (None lost livelihood) PMC

Land ownership (was there any

extension of land)

N/A Land belonged to the school PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMCFlora and

terrestrial Fauna

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts

Page 10: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Replant trees

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment Community police to do patrolsQuality of materials and

workmanship

Leadership and committees School Committee to do periodic checks

Stage of the Project

at the time of

inspection Gable level

Challenges faced

and their proposed

mitigation

measures No beams in windows

NAME OF SCHOOL:…………………………………………Chaima. ZONE: Chaima. STA: Chaima

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Not Agriculural land (enhance sensitisation to the committees) PMCSoils

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Flora and

terrestrial Fauna

Sustainability

Page 11: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

N/A .Were using soils heaped during road construction. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be used to fill up little borrows & trenches made at brick

making site

PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it (sensitisation meetings on the need to protect the cemetery)

PMC

Loss of farming land due to

Extension of land for the school

N/A . School land. GVH

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Social conflicts Flora and

terrestrial Fauna

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 12: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of vegetation during kilning

of bricks

To replant trees from areas felled. (Planting will start

in September when schools open and students will be

watering the outplented tree seedlings)

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment To engange community police.Quality of materials and

workmanship N/A

Leadership and committees

Periodic checks for pre-damaged repairs by School

Committee

Stage of the Project

at the time of

inspection Window level

Challenges faced

and their proposed

mitigation

measures Brick repleneshment slow

NAME OF SCHOOL:…………………………………………: Khola. ZONE: Chaima TA: Chidzuma

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Not Agricultural land. N/A PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be filled with broken bricks from the project PMC

Soils

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Flora and

terrestrial Fauna

Sustainability

Page 13: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be used to fill up pit created when moulding bricks PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve hold meetings with the chiefs

and the comuunity

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest. Trees to be replanted

PMC

Loss of vegetation during kilning

of bricks Trees to be replanted

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment

Fence will be built around the house. (Mpanda

watsekela)

Social conflicts Flora and

terrestrial Fauna

Sustainability

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 14: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Quality of materials and

workmanship N/A

Leadership and committees

Periodic checks for pre -damaged repairs by School

Committee

Stage of the Project

at the time of

inspection Gable level, Kitchen yet to be constructed, Toilet dug.

Challenges faced

and their proposed

mitigation

measures No problems yet

NAME OF SCHOOL:………………………………………… Chafisi ZONE: Chaima STA: Chaima

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

N/A , Not Agricultural land PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be filled by soil excavated on the house site. PMC

PMC

PMC

PMC

PMC

PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Sustainability

Restoration of the sites, draining and filling pits with construction

rubble.

Page 15: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Debri from construction activities

left on site become a nuisance

and eyesore

To fill up pits dug during brick making PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles (budget constraint the roof cannot be painted)

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

N/A

Loss of farming land due to

Extension of land for the school

N/A land belonged to the school PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Trees used already replaced by replanting

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment Sensitization meetings will be heldQuality of materials and

workmanship

Leadership and committees Periodic checks for pre - damaged repairs by SMC

Stage of the Project

at the time of

inspection Window level

Social conflicts Flora and

terrestrial Fauna

Sustainability

Soils

Page 16: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Challenges faced

and their proposed

mitigation

measures

Cement wont be enough(150 bags),K123,000.00.

remaining in the MK1.5. 95bags used,10 more bags

needed to reach up to the Gable level, Toilet not yet

dug.

NAME OF SCHOOL:…………………………………………: Chipoza ZONE: Santhe TA: Santhe

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

N/A PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

No pits - Used top cover soil to mould bricks and manure will be

applied to replenish soil fertility

PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To fill up any pits made during construction PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles due budget constraint

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

N/A PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Restoration of the sites, draining and filling pits with construction

rubble.

Page 17: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A -School land PMC

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks To replant cemetry trees

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project PMCTheft and vandalism of solar

equipment and other equipment Sensitization meetings by SMC

Community

PolicingQuality of materials and

workmanship

Leadership and committees Periodic checks for pre - damaged repairs by SMC

Stage of the Project

at the time of

inspection Gable level / Still building kitchen

Challenges faced

and their proposed

mitigation

measures None

Social conflicts Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

Page 18: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

NAME OF SCHOOL:…………………………………………: Kamono ZONE: Chitenje

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

N/A , School land PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Top cover soil used PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Fill up unused rubbish pits PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles due budget constraint

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

N/A School has enough land and this will be enhanced by proper

planning and zoning

PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

TA: Chilowamatambe

Social conflicts

Restoration of the sites, draining and filling pits with construction

rubble.

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Page 19: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks To replant hybrid trees

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment To Employ WatchmanQuality of materials and

workmanship N/A

Leadership and committees SMC to sustain house with DC's funds

Stage of the Project

at the time of

inspection Gable level

Challenges faced

and their proposed

mitigation

measures N/A

NAME OF SCHOOL:…………………………………………: Lisasadzi ZONE: Lisasadzi Zone TA: Kaomba

CONSTITUENCY:

AugustSept Oct Nov Dec

Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Page 20: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of top soil for agriculrural

activities during moulding of

bricks

School land PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

fill up up of pits with debri or plant bananas in the pits PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

collected and used for filling up the pits PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Social conflicts Flora and

terrestrial Fauna

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 21: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks planted tree, grass and shrubs

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment To employ a security guardQuality of materials and

workmanship N/A

Leadership and committees Maintenance & repairs plan produced

Stage of the Project

at the time of

inspection

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………: Kabira ZONE: Malepera. TA: Kawamba

CONSTITUENCY: Kasungu West

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Plant bananas PMC

Flora and

terrestrial Fauna

Sustainability

Soils

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Page 22: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Fill up with with broken bricks from the kiln PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Broken bricks to beautify the school. Fill up ditches. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

Loss of farming land due to

Extension of land for the school

To open new farming areas provided by the chief PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Social conflicts Flora and

terrestrial Fauna

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 23: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of vegetation during kilning

of bricks Replant more trees

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment Engange Community police for night patrolsQuality of materials and

workmanship

Leadership and committees SMC to provide funds for maintenance & repairs

Stage of the Project

at the time of

inspection Window level.

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………: Changuluwe. ZONE: Linyangwa. TA: Lukwa.

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

N/A - School land. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Fill up ditches / open pits with broken bricks from the kiln. PMC

PMC

PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Flora and

terrestrial Fauna

Sustainability

Page 24: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Fill up ditches created by vacated residents around the school PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Used wood donated by KFCTA.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment Community police to provide security.Quality of materials and

workmanship

Leadership and committees SMC to provide funds for maintenance & repairs.

Social conflicts Flora and

terrestrial Fauna

Sustainability

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 25: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Stage of the Project

at the time of

inspection Foundation level -Foundation walls.

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………: Kayereka. ZONE: TA:

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Land belongs to school - Land left farrow to regenerate PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Refill all open pits left during brick moulding. - Fill the pits with

crop residues.

PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Same as above. PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Page 26: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

Loss of farming land due to

Extension of land for the school

Land belongs to school. PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

Land belongs to school. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Village woodlots - Establish nurseries.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the projectTheft and vandalism of solar

equipment and other equipment Employ watchman,who will be paid by the communityQuality of materials and

workmanship Inspection by school committee.Leadership and committees Hold meeting to brief the school committee & chiefs

Stage of the Project

at the time of

inspection Window level.

Social conflicts Flora and

terrestrial Fauna

Sustainability

Soils

Page 27: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Challenges faced

and their proposed

mitigation

measures Supply of sand.

NAME OF SCHOOL:…………………………………………:Chimwang'ombe. ZONE: Wimbe. TA:

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Open space - Grass & other vegetation to be allowed to germinate. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Refill all pits. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Same as above. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 28: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of farming land due to

Extension of land for the school

No loss of land -Land was donated by Estate 41 PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

Chiefs met management of Press Agriculture PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Used Nthethe trees & Plant acacia trees(3000).

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment Community policing forum.

Quality of materials and

workmanship Inspections.

Leadership and committees

Stage of the Project

at the time of

inspection

Outside walls on Window level,Inside(rooms)at

foundation level.

Challenges faced

and their proposed

mitigation

measures Supply of bricks.

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 29: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

NAME OF SCHOOL:…………………………………………: Mthawira ZONE: TA: Mdunga.

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Open land was used for brick moulding/left open pits. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Refill all open pits. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Same as above. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

Loss of farming land due to

Extension of land for the school

No loss of land PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

Belonged to chief and donated to school. PMC

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts

Page 30: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment Employ watchman & community police.

Quality of materials and

workmanship Inspections by chief.

Leadership and committees Hold meetings.

Stage of the Project

at the time of

inspection Roofing level.

Challenges faced

and their proposed

mitigation

measures No roofing materials,waiting for the second tranche.

NAME OF SCHOOL:…………………………………………: Livwezi. ZONE: Livwezi. TA: Chitanthamapiri.

CONSTITUENCY:

AugustSept Oct Nov Dec

Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Page 31: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of top soil for agriculrural

activities during moulding of

bricks

Natural generation farming activities going on. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Planting banana in all pits. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

N/A PMC

Loss of farming land due to

Extension of land for the school

enhance proper planning and siting of the buildings and create

awareness to school management committee

PMC

Loss of livelihood NB PMC

Land ownership (was there any

extension of land)

project was built within school boundaries. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Page 32: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Planting of Blue gum trees amounting to 1500

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment Awareness meetings with all sorrounding villages.

Quality of materials and

workmanship Generally good.But wheelbarrows not in good condition.

Leadership and committees Meetings. Minutes of meetings.

Stage of the Project

at the time of

inspection House at Frame level.

Challenges faced

and their proposed

mitigation

measures Sand not readilly available to the contractor.

NAME OF SCHOOL:…………………………………………: Chigumba. ZONE: Livwezi. TA:

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Replacing top soil with building residues PMC

Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Page 33: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Filling with building material residues. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

collect and used for filling pits PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

No loss of land. PMC

Loss of livelihood No loss of livestock. PMC

Land ownership (was there any

extension of land)

It is within the school boundaries. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Page 34: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of vegetation during kilning

of bricks Tree planting.No loss of vegetation.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment There are no cases of vandalism.

Quality of materials and

workmanship

Generally good.But wheelbarrows have already passed

their usefulness.

Leadership and committees Holding meetings with Chiefs.

Stage of the Project

at the time of

inspection The house is at window level.

Challenges faced

and their proposed

mitigation

measures

Bricks and sand not readilly available to the

contractor.Part of the concrete mixture have soil

instead of sand.

NAME OF SCHOOL:…………………………………………: Mthitimira. ZONE: TA: Kapelula.

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Moulded at the Dambo and would be naturally replaced through

sedimentation

PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Refill all pits left during brick moulding PMC

Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Page 35: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be used to refill small pits at the school PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

N/A coz bricks were moulded outside the Estate belonging to

Kondowe.

PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Planting of trees.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 36: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Theft and vandalism of solar

equipment and other equipment

Solar to be fitted once the house is

occupied,Community police forum.

Quality of materials and

workmanship Not seen coz it is at slab level.

Leadership and committees Very good leadership.

Stage of the Project

at the time of

inspection Slab level.

Challenges faced

and their proposed

mitigation

measures No sand on site,

NAME OF SCHOOL:…………………………………………: Chikoko. ZONE: TA: Kapichira.

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Naturally replaced. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Refill PMC

PMC

PMC

PMC

PMC

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 37: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Refill with old houses under construction. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

Belong to CCAP Church - Snr group Mnundwe agreed amicably. PMC

Loss of livelihood None. PMC

Land ownership (was there any

extension of land)

School is under CCAP Church. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks No loss /School has a wood lot.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment

Community policing-Chiefs have rules &

regulations.Meetings were held locally & people were

briefed about the security.

Quality of materials and

workmanship Very good quality.

Leadership and committees Good leadership.

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 38: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Stage of the Project

at the time of

inspection Door frame level.

Challenges faced

and their proposed

mitigation

measures Supply of sand -quarry.Met Chiefs & TA on the issue.

NAME OF SCHOOL:…………………………………………: Kamizu. ZONE: TA: Kapelula.

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

To landscape and plant trees ,-Land Scaping. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be filled and plant Bananas. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Same as above. PMC

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 39: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

Belonged to school PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

Land belongs to school. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks To plant Acacia ,Cenderela trees.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment Watchman,Police forum

Quality of materials and

workmanship Very good -Inspection.

Leadership and committees Good leadership & hold meetings

Stage of the Project

at the time of

inspection Ring beam - Window level.

Soils

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 40: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Challenges faced

and their proposed

mitigation

measures None.

NAME OF SCHOOL:…………………………………………: Kamilaza ZONE: Sopani. TA: Chisemphere.

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Plant trees to replace fertility. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Burry all ditches old & new ones. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Burry to make compost manure. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles, To paint after works are through.

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 41: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

School land. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest. Plant trees and flowers and generate natural trees.

PMC

Loss of vegetation during kilning

of bricks Plant trees.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment Strengthen vigilants.

Quality of materials and

workmanship Very good.

Leadership and committees Strong but need close monitoring to encourage them.

Stage of the Project

at the time of

inspection Window level.

Challenges faced

and their proposed

mitigation

measures

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 42: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

NAME OF SCHOOL:…………………………………………: Mitula. ZONE: Chamwabvi.

CONSTITUENCY: South East.

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Plant trees. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Burry the pits. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Burry the debris to make manure. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles. To paint after roofing.

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

School land. PMC

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

TA: Chilowamatambe.

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts

Page 43: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest. Plant trees and flowers encourage regeneration of

natural trees.

PMC

Loss of vegetation during kilning

of bricks Replace the vegetation.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment N/A

Quality of materials and

workmanship

Leadership and committees Need a lot of encouragement.

Stage of the Project

at the time of

inspection At gable level.

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………:Dunda. ZONE: Lisasadzi. TA: Njombwa.

CONSTITUENCY: : South East.

AugustSept Oct Nov Dec

Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Page 44: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of top soil for agriculrural

activities during moulding of

bricks

To plant trees wwhich will replacefertility after gap filling. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Filling the pits with soil. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Burry the debris. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

School land. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Page 45: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest. Plant trees and flowers - natural trees regeneration.

PMC

Loss of vegetation during kilning

of bricks Plant trees.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment N/A

Quality of materials and

workmanship

Leadership and committees Need frequent follow ups.

Stage of the Project

at the time of

inspection

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………: Kalulu. ZONE: Chamwabvi.

CONSTITUENCY: South East.

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Plant trees which replace soil fertility. PMC

Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

TA: Chilowamatambe

Soils

Page 46: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Burry the pits with soil. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Burry in rubbish pits to make manure. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles. To paint after roofing.

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

School land. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest. To plant trees.

PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Page 47: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of vegetation during kilning

of bricks Replace trees.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment

Sensitize the community and form community policing

group.

Quality of materials and

workmanship Good work and are roofing the house.

Leadership and committees

Coorperative and cordial relationship-need

encouraging with follow ups.

Stage of the Project

at the time of

inspection At roofing stage,to finish in 4 weeks time.

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………:Chipata. ZONE: Nkhamenya. TA: Kalulu.

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Tree planting to replace soil fertility. PMC

Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Page 48: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To fill all the pits with soil. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

N/A PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles To paint after roofing.

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

School land. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Page 49: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of vegetation during kilning

of bricks N/A

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment Local leaders to strengthen community policing.

Quality of materials and

workmanship Good and are at slab making level.

Leadership and committees Very cordial relationship need follow ups.

Stage of the Project

at the time of

inspection

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………: Kanyata. ZONE: Sopani.

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Very minor- need for tree replacing soil fertiliy. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Available from old pits the community led by SMC to fill them. PMC

Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

TA: Chisemphere.

Soils

Page 50: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

N/A PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles To consider it after the completion of all work.

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

School land. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve. Not tampered with to

encourage regeneretion.

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Not in their area but from Mzimba side.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 51: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Theft and vandalism of solar

equipment and other equipment N/A

Quality of materials and

workmanship Have only dug foundation & put hardcore.

Leadership and committees Good and coorperative

Stage of the Project

at the time of

inspection Have only done footing.

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………:Kavidebwere ZONE: Nkhamenya. TA: Kaluluma.

CONSTITUENCY:

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

To plant fertility replacement trees. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To fill the ditches by Nov.The community led by SMC. PMC

PMC

PMC

PMC

PMC

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble. N/A.

Page 52: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

N/A PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles.To consider after completion of the house.

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

Land ownership (was there any

extension of land)

School land PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest. Used the planted forest within the school.To plant

more.

PMC

Loss of vegetation during kilning

of bricks Use planted forest. To plant more

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment N/A

Quality of materials and

workmanship Good but slow -at slab level.

Leadership and committees Good.

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble. N/A.

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 53: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Stage of the Project

at the time of

inspection Slab level.

Challenges faced

and their proposed

mitigation

measures None.

NAME OF SCHOOL:…………………………………………: Chambwe. ZONE: Chamwabvi. STA: Chambwe.

CONSTITUENCY: : South East.

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Planting of trees which replace soil fertility. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

Filling has already started led by STA Chambwe. 95% Done. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

N/A. PMC

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 54: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles. To consider after completion of work.

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

N/A. PMC

Loss of livelihood N/A. PMC

Land ownership (was there any

extension of land)

School land. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest. No tresses seen.To plant more trees.

PMC

Loss of vegetation during kilning

of bricks No tresses observed. To plant more trees

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment N/A.

Quality of materials and

workmanship

Poor workmanship-Bent walls,no ring beam & poor

mixtures.

Leadership and committees

Stage of the Project

at the time of

inspection

Soils

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 55: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Challenges faced

and their proposed

mitigation

measures

Contractor & builders not coorperative,PMC was

advised not to buy some of the materials like

Brickforce wire,making the work difficult.

NAME OF SCHOOL:…………………………………………:Mderanjiwa ZONE: TA: Chisinga.

CONSTITUENCY: : North West.

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

To be covered. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be covered. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be well desposed of. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Project will protect the cemetery by not passing the by pass road

through it

PMC

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 56: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of farming land due to

Extension of land for the school

No land loss. PMC

Loss of livelihood No livestock loss. PMC

Land ownership (was there any

extension of land)

No. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Replant to replace the used ones.

PMC

Loss of roofs due to hailwinds

To increase vegetative cover. Planting

of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment Watchman to be maintained payed by Chiefs.

Quality of materials and

workmanship Good work.

Leadership and committees Good coordination among all committees

Stage of the Project

at the time of

inspection Gable level.

Challenges faced

and their proposed

mitigation

measures None.

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 57: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

NAME OF SCHOOL:…………………………………………: Nkhuta. ZONE: Kawiya. TA: Simlemba.

CONSTITUENCY: North north east.

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Manure application. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be covered after completion. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

Burnt and buried. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

N/A PMC

Loss of livelihood N/A PMC

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble. Disposal by burrying in the pit.

Social conflicts

Page 58: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Land ownership (was there any

extension of land)

N/A PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve. No.

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest. Used firewood from school woodlot.

PMC

Loss of vegetation during kilning

of bricks Re afforestation.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment Engange a watchman.

Quality of materials and

workmanship Good.

Leadership and committees Good Coordination.

Stage of the Project

at the time of

inspection

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………: Chimwa. ZONE: Sopani. TA: Simlemba.

CONSTITUENCY: : NNE

Social conflicts Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Page 59: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Manure to be applied. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To cover them with ribbish and broken bricks. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be buried and others to be burnt. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

No. PMC

Loss of livelihood No. PMC

Land ownership (was there any

extension of land)

No. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble. As above.

Social conflicts Flora and

terrestrial Fauna

Page 60: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks They used exotic trees from school forest.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment To engange a Watchman until the house is occupied.

Quality of materials and

workmanship Good.

Leadership and committees Good coordination among all committees.

Stage of the Project

at the time of

inspection Gable level.

Challenges faced

and their proposed

mitigation

measures 100 Bags of cement are not enough.

NAME OF SCHOOL:…………………………………………: Sopani. ZONE: Sopani.

CONSTITUENCY: NNE.

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

To be covered with manure. PMC

Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

TA: Chisemphere.

Soils

Page 61: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be covered by broken bricks PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be buried and others to be burnt. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

No. PMC

Loss of livelihood No. PMC

Land ownership (was there any

extension of land)

No. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Page 62: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of vegetation during kilning

of bricks Use of exotic trees from the school woodlot

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment

Watchman to guard,until the house is occupied by the

Head Teacher.

Quality of materials and

workmanship Good.

Leadership and committees Good coordination among committees

Stage of the Project

at the time of

inspection Window level.

Challenges faced

and their proposed

mitigation

measures 100 bags of cement are not enough.

NAME OF SCHOOL:…………………………………………:Kanyengezera. ZONE: Kavizinde. TA: Chisinga.

CONSTITUENCY: North west.

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Were advised to use manure. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be covered. PMC

Flora and

terrestrial Fauna

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Page 63: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be burnt or buried. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

No. PMC

Loss of livelihood No. PMC

Land ownership (was there any

extension of land)

Institutional land. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks To be replanted.Afforestation.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 64: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Theft and vandalism of solar

equipment and other equipment Community sensitization and project ownership.

Quality of materials and

workmanship Good

Leadership and committees Good coordination among all committees.

Stage of the Project

at the time of

inspection Window level.

Challenges faced

and their proposed

mitigation

measures

NAME OF SCHOOL:…………………………………………: Vilingowe. ZONE: TA: Mnyanja.

CONSTITUENCY: NNE.

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be covered. PMC

PMC

PMC

PMC

PMC

Sustainability

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Page 65: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be buried in pits. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

Yes but to be compensated. PMC

Loss of livelihood No. PMC

Land ownership (was there any

extension of land)

No. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks No.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment To discuss with Chiefs.

Quality of materials and

workmanship Use of poor bricks at foundation level.

Leadership and committees No good coordination between PMC & SMC.

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 66: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Stage of the Project

at the time of

inspection Foundation level.

Challenges faced

and their proposed

mitigation

measures Used earth mortar on some parts of the foundation.

NAME OF SCHOOL:…………………………………………: Makungwa. ZONE: Kasasanya. TA: Mphomwa.

CONSTITUENCY: NW.

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Use of manure. PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be covered. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be disposed in pits PMC

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble. To be covered.

Page 67: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Loss of farming land due to

Extension of land for the school

No. PMC

Loss of livelihood No. PMC

Land ownership (was there any

extension of land)

No. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Exotic trees from school forest used.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment Community to safeguard safety of solar panel.

Quality of materials and

workmanship

Leadership and committees Good leadership between SMC & PMC.

Stage of the Project

at the time of

inspection Foundation level.

Soils

Social conflicts Flora and

terrestrial Fauna

Sustainability

Page 68: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Challenges faced

and their proposed

mitigation

measures Very slow progress.

NAME OF SCHOOL:…………………………………………: Chamkango. ZONE: Chulu. TA: Mphomwa.

CONSTITUENCY: NW

AugustSept Oct Nov Dec

Loss of top soil for agriculrural

activities during moulding of

bricks

Applying manure PMC

Creations of dishes/open pits

which could be a danger to

children and could also be

breeding grounds for mosquitoes

To be covered. PMC

PMC

PMC

PMC

PMC

PMC

Debri from construction activities

left on site become a nuisance

and eyesore

To be disposed clearly. PMC

Reflections from roof surfaces

and general poor workmanship

roof surfaces should be non-reflective either through painting or use

of tiles

PMC

Cultural Heritage

and SitesDestruction of nearby cemetery

and artifacts therein is possible

Observe cultural rights and create awareness PMC

Soils

Borrow pits & trenches left due

to sand/clay mining or brick

making may lead to growth of

pathogens like mosquitoes as still

water collects in them.

Restoration of the sites, draining and filling pits with construction

rubble.

KASUNGU DISTRICT COUNCIL

ENVIRONMENTAL MANAGEMENT PLANS FOR CONSTRUCTION OF TEACHERS HOUSES UNDER LDF

Environmental

Component

Expected Impacts Proposed Mitigation measures Responsibility Time Frame

Page 69: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Loss of farming land due to

Extension of land for the school

No. PMC

Loss of livelihood No. PMC

Land ownership (was there any

extension of land)

No. PMC

Disturbance and loss of protected

and endangered animal and plant

species

Protect the planted natural miombo woodlot to give potential for

biodiversity ; observe stream reserve

PMC

Destruction of vegetation during

burning of bricks, clearing &

excavation; may cause loss of

fauna or important ecosystems

Confine cutting of tree to positions of activity. Provide tree belts in

the layout plan and implement; avoid any building in natural

miombo forest.

PMC

Loss of vegetation during kilning

of bricks Used exotic trees to burn bricks.

PMC

Loss of roofs due to hailwinds Planting of windbreaks and proper siting of the project

Theft and vandalism of solar

equipment and other equipment Permanent Watchman to be paid by community.SMC.

Quality of materials and

workmanship Good.

Leadership and committees

Strong school management committee to take over

the project.

Stage of the Project

at the time of

inspection Slab level.

Challenges faced

and their proposed

mitigation

measures Slow progress coz of witchcraft cleansing.

Sustainability

Social conflicts Flora and

terrestrial Fauna

Page 70: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 71: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 72: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 73: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 74: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 75: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 76: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 77: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 78: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 79: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 80: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 81: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to
Page 82: KASUNGU DISTRICT COUNCIL ENVIRONMENTAL ...documents.worldbank.org/curated/en/517721468084535958/...Company unused land PMC Creations of dishes/open pits which could be a danger to

Jan/FebJan/Feb