Page 1: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Kashafrud River (Mashhad) BasinGWADI PILOT BASIN

Facing Challenges and Problemsand

Short Progress report

Page 2: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Geographical Location of Kashafrod BasinGeographical Location of Kashafrod BasinCatchments Area : 16400 km2Mean annual rainfall : 275 mm

Altitude Max: 3302 Mean: 1328 Min: 390

Total Population in Basin: 3 MillionRenewable water per capita: 370 m3/capita/year

Page 3: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

2.5 million population (> 15 million tourists per year)

MashhadMashhad

Page 4: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Mashhad city 1972 Area : 15 km2 , Pop. : 0.55 million

Page 5: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Mashhad city 1986 Area : 50 km2 , Pop. : 1.5 million

Page 6: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Mashhad city 2006 Area : 170 km2 , Pop. : 2.6 million

Page 7: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Population growth in Kashafrud basin

Page 8: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Land Use in Kashafrud River Basin

Land UsePercentage

Mountains17.5

Pasture60

Agriculture22

(Irrigated Lands = 10)

Urban Area0.5

Page 9: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Surface WaterSurface Water

Torogh

Kar

dehArd

ak

Shandiz

Mah

nes

a

Kashafrod

Mean Annual runoff : 250 MCM

Used Water : 205 MCM

Outflow : 45 MCM

Page 10: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Olang-Asadee Hydrometric stationMean Annual Runoff (1967-84) : 44 MCMMean Annual Runoff (1985-02) : 18 MCMMin Annual Runoff : 0 MCMMax Annual Run off : 108 MCM

Pole-Khaton Hydrometric stationMean Annual Runoff (1967-84) : 76 MCMMean Annual Runoff (1985-02) : 44 MCMMin Annual Runoff : 0 MCMMax Annual Run off : 214 MCM

There is no more surface water to control

Page 11: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Kashafrud basin Groundwater Resources

Ground water recharge : 945 MCM/yearGround water exploitation : 1145 MCM/yearGround water deficit : -200 MCM/year

W.L. Drawdown from 1963 to 1973 : 7 m (0.7 m/year)W.L. Drawdown from 1974 to 2002 : 33 m (1.2 m/year)

Page 12: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Mashhad Plain Groundwater Exploitation

1971

Page 13: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Mashhad Plain Groundwater Exploitation

4.6 x 109 m3 Over-exploitation1971

2005

Page 14: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Mashhad Plain Groundwater Exploitation

4.6 x 109 m3 Over-exploitation

2.5 x 109 m3 Over-exploitation

1971

2005

2025

Page 15: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Year 1972Irrigated Area : 100,000 haPercentage of Cereals on crop patterns: 72

Agricultural Development in Kashafrud Basin

Page 16: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Year 1986Irrigated Area : 115,000 haPercentage of Cereals on crop patterns : 66

Agricultural Development in Kashafrud Basin

Page 17: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Year 2006Irrigated Area : 130,000 haPercentage of Cereals on crop patterns : 55

Agricultural Development in Kashafrud Basin

Page 18: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Kashafrud basin water uses in Agriculture

Surface water Use : 190 MCMGroundwater Use : 850 MCMIrrigation efficiency : 45 – 50 %Crop water use : 8000 m3 /ha/year

Total irrigated area : 130000 ha

Cropping pattern : Cereals 55%Orchards 19%Vegetables 21%Industrial crops 5%

Page 19: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Mashhad water supply and future requirement

0

50

100

150

200

250

300

350

400

450

Supplied w

ate

r(M

CM

)

1976 1981 1986 1991 1996 2001 2005 2011 2016 2021

Surface water : 15 MCMGroundwater resources : 220 MCM

Future Inter-Basin Transfer: 150 MCM

Page 20: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Kashafrud basin

water allotmentSurface water resources : 205 MCM

Groundwater resources : 1145 MCM

Agriculture1,040 MCM

(77%)

Industry& Services

75 MCM(6%)

Potable235 MCM

(17%)

Page 21: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Challenges and problemsChallenges and problems

Surface water control : more than 80% (There is no more surface water to control)

Groundwater table drawdown : more than 1 m/year

Land subsidence

Rapid population and water demand growth

Surface and ground water pollution

Sectarian water resource management

Page 22: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

The Solution

IWRMWith focus on

Participatory Decision Making

and

Water Demand

Management

Page 23: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Time Stages in IWRM Implementation

Short Term (3 Years)

Crisis Mitigation

Mid Term (5 Years)Environmental degradation control

Long Term (Continuously)

Environmental enhancement and sustainable management of the water resources

Page 24: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

CRICESS MITIGATION

Urgent solution for “MASHHAD” water scarce problem

Planning and conducting , IWRM related studies

Establishment of the temporary basin management structure

Initiate stakeholders participatory mechanism on IWRM

Page 25: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Urgent solution for “MASHHAD” water scarce problem

About 30% water scare happened In summer of 2006

More than 100 wells drilled or developed (safe for next five years, till the inter basin water supply project “Doosti” be operational).

Special efforts for closing unregistered water wells.

Page 26: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Planning and conducting , IWRM related studies

A well known consult engineer has nominated.The main items of his scope of work are :

Development of a basin-wide water knowledge database Quantitative and qualitative assessment of existing water resources Evaluating present consumption and future demands, related to different

sectors Water demand management plan Preparing :

– EAP– DSS – Monitoring & Evaluation System

Preparing strategies guidelines for IWRM (Mid & Long Term)

Page 27: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Establishment of a temporary Kashafrud basin management structure

Proposed managing structure:Management Unit

Ministry of Energy Khorasan Water Authority UNESCO Tehran Office

Executive BoardSteering Committee

Technical Advisory Committee Ferdowsi University of Mashhad Consultants

Water Council province State Water Authority company Agriculture Authority organization razavi Water and Wastewater Company Environmental Organization Industry & Mines Organization (NGO) Mashhad City Council (NGO) Farmers House (NGO) Other NGOs

Page 28: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Initiate stakeholders participatory mechanism on IWRM

By Holding Workshops Regarding IWRM Objectives in the Basin:

September 2005 : Introduction to Mashhad basin as an pilot plan

September 2007: Mashhad basin IWRM and participatory decision mocking

Workshops on IWRM objectives every six month

Page 29: Kashafrud River (Mashhad) Basin GWADI PILOT BASIN Facing Challenges and Problems and Short Progress report

Key issues for research projects on kashafrud basin

Overall existing irrigation efficiency at basin level

Irrigation water productivity in basin