Karnataka Under Construction lNo MHS District Company Location Type GO_Nos Capacity Allotted 1 Addahole Mandya Nimishamba Energy India Pvt. Ltd. Across Bangaradoddi Canal Which takes off water from Cauvery river, Palahally village, Srirangapatna Taluk, Mandya District. CB EE 45 NCE 2005 dated 22-03-2005 (0.3MW) EN 460 NCE 2009 dated 16-10-2009 (3MW) 3 2 Aniyur Belgaum Glenco Gokak Canal MHS across Ghataprabha river Gokak Left Bank Canal between 4th & 5th KM at Ghataprabha vilalge of Gokak taluk in Belagavi district CB EN 238 NCE 2013 dt: 16.11.2013 (Corrigendum issued for changes in Lat & Long details vide Energy Department letter No. EN 43 NCE 2014 dt: 03.03.2014. Agreement executed on 08.08.2014 0.25 3 Balganur Belgaum Moodabagil Power Pvt. Ltd. Mugalkhod MHS Mugalkhod LBC at Mugalkhod village of Raybag Taluk in Belgaum District CB EN 197 NCE 2009 dated 29/1/2010 (2.6 MW), Reduced Capacity from 2.6 MW to 1.5 MW) vide GO.No. EN 194 NCE 2014 dt: 31.10.2014. 3 4 Barapole Belgaum Vara Siddi Vinayaka Energy Pvt. Ltd. Malaprabha LBC MHS across Malaprabha Left Bank Canal at Kalloli Village of Belgaum Taluk in Belgaum District. CB EN 220 NCE 2007 dated 19/05/2009 & 30/12/2009 3 5 Basavanna(Aidabhavi) Mandya Vijayalakshmi Hydro Power Pvt. Ltd.(unit -2) Hebbakavadi MHS across Hebbakavadi Branch Canal of Gopanahalli village of Malavalli Taluk in Mandya District CB DE 56 NCE 95 dated 16/02/ 1996 1.25 6 Basaveshwara MHS (Formerly Gaganachukki RBC) Yadgir Krishna Power Company Kakkera MHS across Kakkera Pick up Channel at Kakkera Village of Shorapur Taluk in Gulbarga District. CB DE 253 NCE 2003 dated 28/11/2003(1 MW,M/s Krishna Power Company ), EN 253 NCE 2003 dated 09/02/2004(to M/s Krishna Hydel Power Pvt. Ltd.) EN 264 NCE 2006 dated 03/07/2006(to Sai Krishna Hydro Power Pvt. Ltd.) 1 7 Bhadra LBC Uttara Kannada JH Patel Energy (Karnataka) Pvt. Ltd. Across Bedti river near Devigaddi Village, Yellapur Taluk in Uttara Kannada District CB EN 320 NCE 2007 dated 25.6.2009. 2 8 Bhadra RBC Yadgir Merit Biozone Ltd. Across Bhima river, kundalli village, (Kundalli barrage),Yadgir / Shapur taluk CB EN 161 NCE 2009 dt 17/2/2010 2 9 Bhadra RBC Dakshina Kannada MK Power Pvt. Ltd. Across charmadi river near Charmadi Village, Belthangadi Taluk, Dakshina Kannada district. CB EN 324 NCE 2006 dated 16.10.2006 EN 261 NCE 2007/1/8/2007 2 10 Bhimanakatte Chamarajanagar Shivanasamudram Right Bank canal of Ganganachukki scheme 2 near Shivanasamudram falls of Kollegala Taluk in Chamarajanagara District CB DE 70 NCE 2002 dated 11/07/2002(4 MW), EN 26 NCE 2006 dated 27/01/2006(36 Months), EN 434 NCE 2007 dated 11/12/2007, EN 303 NCE 2011 dated 07.09.2011 (enhanced 4 MW to 24.75 MW and change of name) (upto 27/01/2012) 24.75 11 Chikka Bellary NVS Power Projects (I) Pvt. Ltd. across Thungabhadra canal Ramsagar village of Hospete taluk in Bellary District CB EN 273 NCE 2009 dated 26-11-2009 2 AHEC-IITR/SHP Data Base/July 2016 118

Upload: vuque

Post on 24-Jun-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

Karnataka            Under Construction

lNo MHS District Company Location Type GO_Nos Capacity Allotted

1

Addahole Mandya Nimishamba Energy India Pvt. Ltd.

Across Bangaradoddi Canal Which takes off water from Cauvery river, Palahally village, Srirangapatna Taluk, Mandya District.

CB EE 45 NCE 2005 dated 22-03-2005 (0.3MW) EN 460 NCE 2009 dated 16-10-2009 (3MW)

3

2

Aniyur Belgaum Glenco Gokak Canal MHS across Ghataprabha river Gokak Left Bank Canal between 4th & 5th KM at Ghataprabha vilalge of Gokak taluk in Belagavi district

CB EN 238 NCE 2013 dt: 16.11.2013 (Corrigendum issued for changes in Lat & Long details vide Energy Department letter No. EN 43 NCE 2014 dt: 03.03.2014. Agreement executed on 08.08.2014

0.25

3

Balganur Belgaum Moodabagil Power Pvt. Ltd. Mugalkhod MHS Mugalkhod LBC at Mugalkhod village of Raybag Taluk in Belgaum District

CB EN 197 NCE 2009 dated 29/1/2010 (2.6 MW), Reduced Capacity from 2.6 MW to 1.5 MW) vide GO.No. EN 194 NCE 2014 dt: 31.10.2014.

3

4

Barapole Belgaum Vara Siddi Vinayaka Energy Pvt. Ltd.

Malaprabha LBC MHS across Malaprabha Left Bank Canal at Kalloli Village of BelgaumTaluk in Belgaum District.

CB EN 220 NCE 2007 dated 19/05/2009 & 30/12/2009 3

5

Basavanna(Aidabhavi) Mandya Vijayalakshmi Hydro Power Pvt. Ltd.(unit -2)

Hebbakavadi MHS across Hebbakavadi Branch Canal of Gopanahalli village of Malavalli Taluk in Mandya District

CB DE 56 NCE 95 dated 16/02/ 1996 1.25

6

Basaveshwara MHS (Formerly Gaganachukki RBC)

Yadgir Krishna Power Company Kakkera MHS across Kakkera Pick up Channel at Kakkera Village of Shorapur Taluk in Gulbarga District.

CB DE 253 NCE 2003 dated 28/11/2003(1 MW,M/s Krishna Power Company ), EN 253 NCE 2003 dated 09/02/2004(to M/s Krishna Hydel Power Pvt. Ltd.) EN 264 NCE 2006 dated 03/07/2006(to SaiKrishna Hydro Power Pvt. Ltd.)

1

7Bhadra LBC Uttara Kannada JH Patel Energy

(Karnataka) Pvt. Ltd.Across Bedti river near Devigaddi Village, Yellapur Taluk in Uttara Kannada District

CB EN 320 NCE 2007 dated 25.6.2009. 2

8Bhadra RBC Yadgir Merit Biozone Ltd. Across Bhima river, kundalli village,

(Kundalli barrage),Yadgir / Shapur talukCB EN 161 NCE 2009 dt 17/2/2010 2

9Bhadra RBC Dakshina

KannadaMK Power Pvt. Ltd. Across charmadi river near Charmadi

Village, Belthangadi Taluk, Dakshina Kannada district.

CB EN 324 NCE 2006 dated 16.10.2006 EN 261 NCE 2007/1/8/2007 2

10

Bhimanakatte Chamarajanagar Shivanasamudram Right Bank canal of Ganganachukki scheme2 near Shivanasamudram falls of Kollegala Taluk in Chamarajanagara District

CB DE 70 NCE 2002 dated 11/07/2002(4 MW), EN 26 NCE 2006 dated 27/01/2006(36 Months), EN 434 NCE 2007 dated 11/12/2007, EN 303 NCE 2011 dated 07.09.2011 (enhanced 4 MW to 24.75 MW and change of name) (upto 27/01/2012)

24.75

11Chikka Bellary NVS Power Projects (I)

Pvt. Ltd.across Thungabhadra canal Ramsagar village of Hospete taluk in Bellary District

CB EN 273 NCE 2009 dated 26-11-2009 2

AHEC-IITR/SHP Data Base/July 2016 118

Page 2: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

12Chikkamuttiraya MHS (formerly Gaganachukki LBC)

Yadgir Kodekal Basaveswara Power Generation Pvt. Ltd.

Across doni river near Kodekal Village, shorapur Taluk, gulbarga District.

CB EN 343 NCE 2006 dated 16.10.2006 2

13

Halagera Yadgir GSSMR Energy Private Limited

Bommanahalli MHS across Distributory-6 Canal of Shahapur Branch Canal of NLBC atBommanahalli village of Shorapur Taluk in Yadgir District

CB EN 223 NCE 2013, dt: 31.10.2013 1.4

14Harakodige Raichur Biradar Hydro energy Pvt.

Ltd.Wengalapur MHS, across Distributory-15 of NRBC wengalapur Village, Devadurga Taluk,

CB DE 301 NCE 2004 dated 13/09/2004(0.95 MW), EN 432 NCE 2007 dated 10/12/2007(3 Years)

0.975

15

Hegadde Raichur Mimesis Power Projects Private Limited

Maldkal MHS, canal based project of NRBC between Chainage 108 and 115 near Maldkal Village, Dodurga Taluk, Raichur District

CB EN 86 NCE 2013 dt: 04.03.2014 2

16Jaladurga Bijapur SKN Hydro Energy Pvt.

Ltd.Distributory-11 of indi branch canal of NLBC near Village, Yatanur, Sindagi Taluk,

CB DE 299 NCE 2004 dated 13.9.2004 & DE 118 NCE 2005, Dated 27.04.2005 & EN 374 NCE 2008, Dated 12.01.2009.Time extension GO…………………

1

17

Kagganala Yadgir GSSMR Power Pvt. Ltd. Across Shorapur Branch Channel, Machalgundal Village, Shorapur Taluk,

CB DE 12 NCE 2004 dated 13.2.2004, EN 139 NCE 2007 dated 01.06.2007 (time extended upto 31.05.2010), EN 172 NCE 2011 dated 23.04.2011 (Time extended upto 31.05.2011), EN 402 NCE 2011 dated 28.02.2012 (Time extended upto 31.05.2013), EN 167 NCE 2013 dated 09.07.2013 (Time extended upto 31.05.2015)

1.3

18

Kanchimane Mandya Innoverse Eco Friendly Solutions

Thimmana hosur MHS across V.C. Canal- Malavalli Branch, at Thimmana hosur village of Kotathi Hobli in Mandya Taluk/District

CB EN 45 NCE 2011 dated 10/11/2011 0.4

19

Kannadagal Mandya Mythree Power Developers Across right bank low level canal from Krishnaraja Sagar dam, 1 KM downstream of KRS near Hongalli Village, Srirangapatna Taluk, Mandya District.

CB DE 6 NCE 2005 dated 22.3.2005(0,25 MW), EN 352 NCE 2011 dated 28/11/2011(upto 31/03/2012)

0.25

20

Karigala Kare MHS Raichur Zeba Power Pvt. Ltd. Masarkal MHS across NRBC Distributory No. 16 branch distributory No.1 near Masarkal Village of Devadurga Taluk in Raichur District

CB EME 63 NCE 2005 dated 25/04/2005 1

21Kemphole Davanagere Subhash Kabini Power

Corporation Pvt. Ltd.Bhadra RBC MHS, Across Bhadra RBC near, Heremalali village, Cennagiri taluk

CB EN 223 NCE 2009 dt 16/1/2010 3

22

Kolavur Davanagere Manasa Sarovara Power Pvt. Ltd.

Harihara MHS across Chainage No. 11.9 Harihar Branch Channel of Bhadra Right Bank in

CB DE 61 NCE 2004 dated 13.2.2004( Venika Green Power Pvt. Ltd,) EN 61 NCE 2004 dated 22.03.2004 (Enhancement from 0.2 to 0.25), EN 1 NCE 2007 dated 04.02.2007 (time extended upto 20.03.2010), EN 257 NCE 2008 dated 12.02.2009 (Change of name), EN 383 NCE 2010 dated 05.04.2011 (Ammendment GO change of canal fro davanagere to Harihara), EN 12 NCE 2013 dated 06.03.2013 (Time extended upto 10.02.2014)

0.25

AHEC-IITR/SHP Data Base/July 2016 119

Page 3: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

23

Konnapur Doddi Davanagere Vishista Holding Bevinahalli MHS across Bhadra river BRBC between chainage 38.1 and 40.3 of Malebennur Branch Canal at Bevinahalli Village of Harihar Taluk in Davanagere District.

CB EN 237 NCE 2013,dt: 19.11.2013 1.6

24

Mandagere Shimoga Sai Deepthi Power Pvt. Ltd. Bhadra LBC MHS across Bhadra LBC near BR project of Bhadravathi taluk in shimoga District

CB DE 154 PPC 94(C) dated 06/09/1994(1.5 MW to M/s Arun Engineering Projects (P) Ltd. ME155 NCE 2005 dated 16/06/2005(change of name to M/s Arun Engineering projects (P) Ltd., ME 278 NCE 2004 dated 18/08/2004( upto ), EN 117 NCE 2006 dated 06/03/2006( upto), EN 518 NCE 2008 dated 08/05/2009(cancelled), EN 582 NCE 2009 dated 28/02/2011(Restoration, upto 31/12/2015)

1.5

25Markandeshwara -I Mandya Subhash Kabini Power

Corporation Pvt. Ltd.Hulikere MHS, across Vishweshwaraiah canal, Hulikere koppalu village, pandavapura taluk,

CB EN 253 NCE 2009 dt 16/1/2010 2

26Markandeshwara -II Mandya Subhash Kabini Power

Corporation Pvt. Ltd.across Varuna low level RBC near Kannambadi vlllage of Srreerangaptna Talukin Mandya District

CB EN 209 NCE 2012/29-08-12 3

27

Papaiah Raichur Mimesis Hydel Projects (P) Ltd. #12/1, Next to Canara Bank, (Oriental Insurance Building) Bellary Road, Hebbal, Bangalore- 560 024

across Narayanapura RBC from Chainage 100 to Chainage 104 at arakere village of Devadurga Taluk in raichur District

CB EN 85 NCE 2013, dt: 04.03.2014 2

28Paschim vahini Hassan Photon Energy Systems

Ltd.Yegachi MHS across water from irrigationc canal of yegachi river at Belur town in Hassan District

CB DE 66 NCE 1001(3) dt: 29.11.01,EN 362 NCE 2009 dt 12/3/2010(1 MW), EN 362 NCE 2009 dt 12/03/2010(Reallotted)

0.5

29

Shahapur Mandya Samrudhi Hydro Energy across Right Bank low level canal on downstream of KRS Dam at Kannambadi village of Sriranagapatna taluk in Mandya District

CB EN 511 NCE 2009 dated 17/09/2010 1.22

30Sithapura Mandya Energiea Power Company Across Vishveshwariah link canal, near

Alugodu village, Srirangapattana talukCB EN 515 NCE 2009 dated 14/05/2010 0.8

31Sulkere Moguru Chamarajanagar Indra Dhanursh Power Pvt.

Ltd.Dhanagere RBC MHS at Dhanagere Right Bank canal of Kollegal Taluk in Chamarajanagar District

CB DE 71 NCE 2002 dated 15/07/2002, EN 25 NCE 2006 dated 27/1/2006(36 months), EN 434 NCE 2007/11/12/2007(23/11/2008 to 23/11/2011)

2

32

Tokapur Shimoga Photon Energy Systems Ltd.

Sampakatte MHS across Chakra water conduting channel at Sampakatte Village of Hosanagar Taluk in Shimoga District

CB DE 66 NCE 2001 (1) dated 29/11/2001(3.5 MW), EN 357 NCE 2005 dated 01/07/2006(Cancellation), EN 58 NCE 2007(1) dated 24/08/2007 (Re allotted)

3.5

33

Tunga Gulbarga Sarovar Energy Pvt. Ltd. Mandwal MHS, chainage, Point Viz Km 3.5 to 5.5 and Km 13.0 to 14.75 on Dy No. 12 of JBC near Mandwal Village, in Jewargi Taluk of

CB DE 382 NCE 2004 dated 21/12/2004 (Venika Green Power Pvt. Ltd. )TE GO………..

1.75

AHEC-IITR/SHP Data Base/July 2016 120

Page 4: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

34

Vaderhalli Shimoga Mrujaara Power Plant Agradalli MHS across Anveri Branch canal (Matti halla) in Shimoga District

CB DE 311 NCE 2002, dt: 30.04.2003 (0.25 Mw) DE 405 NCE 2004 Dated:10.12.2004 (0.25 MW to 0.5 Mw) DE 405 NCE 2004 dt: 17.02.2005 ( 0.5 Mw to 1.5 MW), EN 127 NCE 2008, dt: 10.04.2008 time extended from 18.3.2008 to 17.09.2009., EN 528 NCE 2008, dt: 08.05.2009 cancelled, Restored vide Go.No. EN 383 NCE 2009 dt: 19.11.2009.

0.75

35

VVNL Station Mandya Shivanasamudram Left Bank canal of Gaganachukki scheme-2 near Shivanasamudram falls of Kollegala Taluk in Chamarajanagara District

CB DE 70 NCE 2002 dated 11/07/2002(4 MW), EN 26 NCE 2006 dated 27/01/2006(36 Months), EN 434 NCE 2007 dated 11/12/2007, EN 303 NCE 2011 dated 07.09.2011 (24.75 MW)

20

36Raichur A Prabhakar Reddy & Co. Narayanapur Right Bank Canal near

rodalbanda, Lingasugur Taluk, raichur District.

CB EN 363 NCE 2004 dated 08.06.2005 5

37

Chikkamagalore Aishwarya Power Pvt. Ltd. Kandiya MHS utilizing water flowing in Bhadra river with about 2 Km intake and about 2KM Tail Race Canal at Kandiya Village of Chikamagalur Taluk & District

CB DE 103 NCE 2004 dated 13/05/2004, EN 148 NCE 2007 dated 26/05/2007(3 years from 26/05/2007) , EN 193 NCE 2008 dated 21/07/2008( 10 MW), EN 137 NCE 2011 dated 10/11/2011(upto 15/10/2012)

10

38Koppala Sree VeeraBhadrehswara

PowerPapaiah MHS across Papaiah Tunnel of TBLBC, near Mallapura Village, Gangavathi Taluk, Koppal District

CB EN 296 NCE 2010 dated 16/09/2010(1.05) 1.05

39

40Bonal Tank Kodagu Sanjivini Power Pvt. Ltd. Doddabetta MHS across Kumaradhara river

in Somavarpet Taluk of Coord District.DB DE 275 NCE 2005 dated 14.10.2005 21

41Chaitra Bangalore Rural Bellandur Power Projects

Pvt. Ltd.Bellandur -I Across Bellandur Tank, near Bellandur Village, Bangalore Taluk & District

DB EN 270 NCE 2010 dated 03/11/2010 1.5

42Harihara Bangalore Rural Bellandur Power Projects

Pvt. Ltd.Bellandur -II Across Bellandur Tank, near Yamalur Village, Bangalore Taluk & District

DB EN 269 NCE 2010 dated 03/11/2010 1.5

43

Idiga Raichur Glencoe Power Private Limited

Across Tungabhadra dam left bank cannal 54th branch channel 6th KM in srinivaspura grama, sindhanur Taluk, Raiuchur Taluk.

DB Go.No. EN 116 NCE 2014, dt: 23.12.2014. 0.3

44

Davanagere LK Power Corporation Ltd. Devara Belakere MHS across Shantisagar Barrage Lakkavalli Dam at Devara Belekere Village of Harihara Taluk in Davanagere District

DB EN 379 NCE 2009 dated 25/06/2009 2

45Abbur Shimoga Nimishamba Power Pvt.

Ltd.Amguddehole MHS across AmgundeHole at Yadur village of Hosanagara Taluk in Shimoga District

ROR EN 265 NCE 2009 dated 16/09/2010 (3 MW) 3

46Abilbiru Hassan Maruthi Power Gen (India)

Pvt. Ltd.across Malaprabha river near Jamboti at Kusumalli Village of Khanapur Taluk Belgaum District

ROR EN 277 NCE 2007 dated 5/10/2007(4 MW) & EN 277 NCE 2007 dated 29/11/2007(19 MW), EN 354 NCE 2010 dated 17/02/2011(24 MW)

24

AHEC-IITR/SHP Data Base/July 2016 121

Page 5: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

47

Addagane Dakshina Kannada

SLV Power Pvt. Ltd. Aniyooru MHS across Aniyooru river at Gundibagilu village of Belthangadi Taluk in Dakshina Kannada District

ROR DE 231 NCE 2002 dated 10/10/2002 (2 MW), EN 23 NCE 2004 dated 10/03/2004(3 MW),DE 246 NCE 2006 dated 27/06/2006(10 MW), EN 174 NCE 2010 dated 30//11/2010(upto 20/09/2012) Capacity Enhanced from 10 MW to 24 MW vide GO.No.EN 189 NCE 2013 dt: 18.11.2013.

24

48Agradalli Udupi Chamundeshwari Energy

Pvt. Ltd.Chikkothanahadi MHS across Kubja river near Chikkotanahadi Village of Kundapur Taluk in Udupi district.

ROR EN 44 NCE 2008 dated 19/05/2009 (3 MW) 3

49

Akkihebal Dakshina Kannada

Bhoruka Power CorporationLtd.

Kumaradhara MHS across Kumaradhara river at Kunturu village of Putturu Taluk in Dakshina kannada district

ROR DE 154 PPC 94(3) dated 6.9.1994 Capacity reduced and re allotted Vide G.O No. EN 206 NCE 2007dated 29.6.2007

18

50Akkihebbal Shimoga SBK Bommanahalli MHS across Bhadra river at

Bommanahalli village of Bhadravathi Taluk in Shimoga District

ROR EN 51 NCE 2011, dt: 18.11.2013 3.5

51Alehalli Sarya Udupi Sidhi Shree Shive Powers

Pvt. Ltd.Across Souparnika/Kollur river near Janmane Village, Kundapur Taluk, udupi District.

ROR EN 452 NCE 2006 dated 17/03/2007 2

52Ambindagundi Dakshina

KannadaFortune Five Hydel Projects Pvt. Ltd.

Kanthamangala MHS across payaswini river at Kanthamangala village of Sulya taluk in Dakshina Kannada District

ROR EN 20 NCE 2008 dt 16/2/2010 4.5

53Amguddehole Uttara kannada Corporate Hydro Energy

Pvt. Ltd.Castelrock MHS across Doodh Sagar Stream at Castelrock village of Joida Taluk in Uttara Kannada District

ROR EN 382 NCE 2007 dated 1/06/2009(4 MW) 4

54Andrahalla &Yennehole Belgaum KSS Power (I) Pvt. Ltd. across Malaprabha at Yadavgi Village of

Khanapur Taluk in Belgaum District.ROR DE 146 NCE 2006 dated 21/04/2006 1

55Aniyur Chamarajanagar Mahadeshwara Power Pvt.

Ltd.Across Cauvery River near Arabigere/Devarhalli Village, in Kolegal Taluk, Chamarajnagar District.

ROR EN 32 NCE 2009, Dated 17/02/2009 19.75

56

Aradalu Kodagu Core Green Sugar & Fuels Pvt. Ltd.

Surlabi Hole a streamelt of Madapur Hole which is a tributory to Harangi/River Cauvery, Surlabi Village, Somvarpet Taluk, Kodagu District.

ROR DE 276 NCE 2005 dated 14.10.2005. 4

57Arakere Uttara kannada Blue Pal Power Pvt. Ltd. Kotebhavi MHS across Kandanihalla at

Kotebhavi Village of Ankola Taluk in Uttara Kannada District

ROR EN 25 NCE 2008 dated 16/07/2009(4 MW) & 22/09/2009(Corrogendum-Lat & Long), EN 11 NCE 2011 dated 04/02/2011(6.4 MW)

6.4

58

Aremadanahalli Dakshina Kannada

Shrishti Power Pvt. Ltd. Baipadi MHS across Belthangady hole a tributory to Netravathi near Baipadi Village, Belthangady Taluk of Dakshina Kannada District.

ROR DE 439 NCE 2004 dated 5/01/2005(6 MW), EN 288 NCE 2007 dated 13/02/2008(upto 26/04/2011)

6

59Arsinagundi Mandya Parpikala Power Pvt. Ltd. Sithapura MHS across Chikka Devaraja

Sagar WeirROR DE 130 NCE 2001(2) dated 03/11/2001, EN 438 NCE 2007 dated

04/01/2008(from 23/11/2008 to 23/11/2011)0.5

60

Baburayanakoppalu Chikkamagalore Banashankari Hydro Power Plant

Idikani MHS, across, Hemakki halla, (tributary to Bhadra) at Idikani Village, Kalsa hobli of Mudigere Taluk in Chikkamagalore District

ROR EN 124 NCE 2009 dt 21/1/2010 2

AHEC-IITR/SHP Data Base/July 2016 122

Page 6: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

61

Baipadi Dakshina Kannada

Kukke Hydro Projects Pvt. Ltd.

Kukke Stage-2 MHS across river Kumaradhara between Kodimbala village of Puttur Taluk & Edamangala village of Sulya taluk in Dakshina Kannada District

ROR DE 224 NCE 2005 dated 19/08/2005(12 MW to M/s Fiza Developers & Inter Trade Pvt. Ltd. ), EN 1 NCE 2008 dated 07/01/2008(12 MW to 22.75), EN 1 NCE 2009 dated 25/03/2009(change of name to M/s Kukke Hydro Projects Pvt. Ltd.), EN 126 NCE 2011(2) dated 26/03/2011 (seperation of G.O.s

10.25

62Balagar Muth Dakshina

KannadaRSR Power Pvt. Ltd. Karmbar MHS across Phalguni river at

karmbar Village of Belthangadi Taluk in Udupi District

ROR EN 278 NCE 2007 dt 20/1/2010 2

63Balayantrahole Udupi Akshaya Hydro Power Jadkal MHS across Konki stream at Jadkal

Village of Kundapur Taluk in Udupi DistrictROR EN 295 NCE 2009 dt 29/1/2010 2

64Balekallu Raichur Chandana Energy (P) Ltd. Kataknur MHS across Thungabhadra river

at Kataknur village of Manvi taluk in raichur district

ROR EN 195 NCE 2011 Dtd 17-11-2011 2

65

Ballenahalli Uttara kannada Dishaa Power Corporation Ltd.

Across Sonda halla which is a tributary of Bedthi river near Gaddehalli village, Ankola Taluk, Uttara Kannada Dist

ROR EN 365 NCE 2007 dated 19/05/2009 6

66Balleshwara Raichur Kare Power Resources

Pvt. Ltd.Across River Krishna Kadardaagaddi village, Lingasur Taluk Raichur Dist.

ROR Allotted vide Go.No. EN 332 NCE 2012 dt: 07.04.2015 (9 MW) 24

67Balnaduhole Chikkamagalore Jalashakthi Power Pvt. Ltd. across Satukodige Hole, Satukodige village

in Koppa Taluk of Chikkamagalur DistrictROR EN 262 NCE 2009 dt 15/2/2010 4

68Banave Uttara kannada Abletech Electro Engineers

Pvt. Ltd.Kelasi MHS across Bedthi hole at Kelasi Village fo Yellapura Taluk in Uttara Kannada District

ROR EN 53 NCE 2006 dated 16/10/2006 5

69

Bandi yadgir MSG Power Pvt. Ltd. Devaragaddi MHS across Krishna river at Devargaddi Village of Lingasugur Taluk in Raichur District

ROR DE 445 NCE 2004 dated 05/01/2005(2 MW), EN 134 NCE 2006 dated 21/03/2006(5 MW),EN 182 NCE 2007 dated 16/05/2007(8 MW) EN 182 NCE 2007 dated 26/06/2007(Corrigendum) EN 475 NCE 2011 dated 20-03-2012(20MW)

20

70

Barachukki MHS Uttara kannada Padmavathi Power Pvt. Ltd.

Vaddihalla MHS across Vaddihalla at dabbesar, Sathoddi and barballi village of Yellapura taluk in Uttara kannada District

ROR EN 374 NCE 2007 dated 03/10/2009 9

71

Barapole Davanagere Rama Enterprises Sri Siddeshwara MHS across Shantisagara tank (Siddanala & Basavanala) at Sulikere Village of Chennagiri taluk in Davanagere District

ROR EN 514 NCE 2009 dated 14/05/2010 0.25

72Barapole Dakshina

KannadaRSR Power Pvt. Ltd. Across Aladangadi hole, near sulkemogaru

village Belthangadi talukROR EN 571 NCE 2009 dt 8/2/2010 2

73

Beedalli Uttara kannada Aji Engineers Dabewadi MHS across Pandhari river a tributory to Kali river at Dabewadi Village of Joida Taluk in Uttara Kannada District

ROR DE 238 NCE 2002 dated 10/04/2003( 2 MW), EN 93 NCE 2005 dated 18/04/2006 (12 MW), EN 28 NCE 2005 dated 03/03/2008 ( 1 Year), EN 70 NCE 2009 dated 12/6/2009( 31/03/2010), EN 70 NCE 2009 dated 23/02/2011(upto 31/12/2011)

12

AHEC-IITR/SHP Data Base/July 2016 123

Page 7: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

74Belakavadi Chamarajanagar Mahadeshwara Power Pvt.

Ltd.Across Cauvery River near Gandhi Nagar/Tellanur Village, in Kolegal Taluk, Chamarajnagar District.

ROR EN 62 NCE 2009, Dated 17/02/2009 5

75Bettakumari Bangalore Rural Bellandur Power Projects

Pvt. Ltd.Varthur-I Across Varthur Tank, near Varthur Village, Bangalore Taluk & District

ROR EN 568 NCE 2010 dated 03/11/2010 1

76Bettakumari Belgaum Dishaa Power Corporation

Ltd.across Malaprabha river near Jamboti at Kusumalli Village of Khanapur Taluk Belgaum District

ROR EN 308 NCE 2007 dated 19/05/2009 & 05/10/2009 9

77Bevinahalli Branch Canal MHS Belgaum Panchajanya Power

Projects Pvt. Ltd.Singanapura MHSacross Ghatprabha River at Singanapur village of Gokak Taluk in Belgaum Dist.

ROR EN 53 NCE 2008 dated 16/07/2009 & 22/09/2009 3

78

Bhadra Dakshina Kannada

Kukke Hydro Projects Pvt. Ltd.

Kukke Stage-1 MHS across river Kumaradhara at between Perabe-Kunthur village and Charavaka village of Puttur Taluk in Dakshina Kannada District

ROR DE 224 NCE 2005 dated 19/08/2005(12 MW to M/s Fiza Developers & Inter Trade Pvt. Ltd. ), EN 1 NCE 2008 dated 07/01/2008(12 MW to 22.75), EN 1 NCE 2009 dated 25/03/2009(change of name to M/s Kukke Hydro Projects Pvt. Ltd.), EN 126 NCE 2011(1) dated 26/03/2011 (seperation of G.O.s EN 126 NCE dated 28-11-2011(24MW).

24

79

Bhima Chamarajanagar Bhoruka Power CorporationLtd.

Chempuradoddi MHS across Cauvery river at Chempuradoddi Village of Kollegala Talukin Chamarajanagar District

ROR EN 509 NCE 2006 dated 08/03/2007 6

80

Bhima-1 ( Sonna ) Ramanagara Surya Chandra Wind Energy (P) Ltd.

Vaderalli MHS across suvarnamukhi river at vaderhalli village of Kanakapura taluk in Ramanagara district

ROR EN 43 NCE 2011 Dtd. 2-11-2011 3

81Bommanahalli Dakshina

KannadaKGK Power Pvt. Ltd. Mundaje MHS across Mundaje Stream at

Mundaje village of Belthangadi taluk in Dakshina Kannada District

ROR EN 263 NCE 2009 dated 29/07/2011 (3 MW) 3

82Brindavan Dakshina

KannadaRavi Kiran Power Projects Pvt. Ltd.

Uppugala MHS across Uppugala hole at Mudakaje village of Sulya taluk in Dakshina Kannada district

ROR EN 175 NCE2009 dated 01/02/2010 (5 MW) 5

83Budikatte Belgaum Gempro International Ltd. across Malaprabha river at Asoga Village of

Khanapur Taluk in Belgaum District.ROR DE 141 NCE 2006 dated 21/04/2006 1.5

84Bukkasagar Uttara Kannada Kare Power Resources

Pvt. Ltd.Ganeshpal MHS across Sonda River at Ganeshpal Village Siddapura Taluk in Uttarakannada District

ROR EN 343 NCE 2010 dated 16/09/2010 (24 MW) 9

85Chapparahalla Hassan Prolight Systems Kukanahall river at Magjihally Village, in

Sakaleshpura Taluk, of Hassan District.ROR EN 232 NCE 2005 dated 16.10.2006 1

86Chara Mandya Sree Mallikarjuna Powers Maddur MHS across existing maddur kere

kodi and canal near Dheshahalli village of Maddur taluk

ROR EN 259 NCE 2010 dated 16/09/2010(0.95 MW) 0.95

87Charmadi Belgaum BVH Hydel Pvt Ltd. Markandeya MHS across Markandeya

reservoir at Shirur Village of Hukkeri Taluk in Belgaum District

ROR EN 39 NCE 2011 Dtd 17-11-2011 0.5

AHEC-IITR/SHP Data Base/July 2016 124

Page 8: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

88Chaya Bhagavathi Uttara kannada Sai Spurthi Power Pvt. Ltd., Sirsi MHS across Bilihalla river at Muski

Village of Sirsi taluk in Uttara Kannada District

ROR EN 57 NCE 2008 dated 25/02/2010 3

89Chayadevi Dakshina

KannadaSai Leela Power Pvt. Ltd. Machadka MHS across Payaswini river at

Machadka Village of Sulya Taluk in Dakshina Kannada District

ROR EN 326 NCE 2007 Dated 15/12/2009 (2 MW), EN 12 NCE 2011 dated 07/02/2011(5 MW)

5

90

Chikkarsinakere Davanagere Gulbarga Bio Energy Pvt Ltd.(Thulasi Energy)

Baggadanalu MHS Across Thungabhadra River, near Baggadanalu Village, Honnale Taluk, Davanegere dist.

ROR EN 284 NCE 2007 dated 13/06/2011 2

91

Cholachagud Koppala B&G Energy Pvt. Ltd. Virupakshewara swamy MHS across Thungabhadra river at Pambapati Swami gudi Village of Gangavati taluk in Koppala District

ROR EN 232 NCE 2009 dated 19/01/2010 2.4

92

Dadla Uttara kannada Devar Power Ltd. Kilaragadde MHS across Kabbinagulehalla stream at Kilargadde village in yellapur town & taluk in Uttara Kannada District

ROR EN 386 NCE 2007 dt 16/2/2010 (4 MW) 3.8

93

Devara Belakere Koppala B&G Energy Pvt. Ltd. Sangapuram MHS across Thungabhadra river at Sangapuram Village of Gangavati taluk in Koppala District

ROR EN 235 NCE 2009 dated 19/01/2010 3.6

94Devaragaddi Udupi Chamundeshwari Energy

Pvt. Ltd.Ajri MHS across Kubja river at Ajri Village of Kundapur Taluk in Udupi district

ROR EN 50 NCE 2008 dated 19/05/2009 (3 MW) 3.2

95Devarahalli Uttara kannada Bairekoppa Mini Hydro Pvt.

Ltd.Across Gangavalli river near Bairekoppa Village, Ankola Taluk, Uttara Kannada District.

ROR EN 160 NCE 2006 dated 16/10/2006 ( M/s Mysore Mercantile Co. Ltd.) & EN 300 NCE 2008(3), dated 11/12/2008 (M/s Bairekoppa Mini Hydro Pvt. Ltd.)

5

96Devaraya Chikkamagalore Nisarga Hydro Power (P)

LtdKoovehalla MHS across Kuvehalla at Kuve village of Mudgere taluk in Chikkamagalore district

ROR EN 266 NCE 2009 dt 15/01/2010 (4 MW) 4

97Dhanagere Udupi RSR Power Pvt. Ltd. Machittehole MHS Across Machitte hole at

Kadari village of Karkala Taluk in Udupi District

ROR EN 286 NCE 2007 dt 20/1/2010 4

98Dinnekere Raichur Surya Chandra Energy (P)

LtdAcross maski halla near balganur village, Sindhnur taluk,

ROR EN 265 NCE 2010 dated 16/09/2010 4

99Doddabetta Gadag Karthik Hydro projectspvt

ltdShirol MHS Nragund Taluk, Gadag District ROR EN 117 NCE 2013 Dt:27.05.2013 2

100

Doddahalla Koppala B&G Energy Pvt. Ltd. Yippervare MHS across Thungabhadra river (on left bank) at Yippervare Village of Gangavati taluk in Koppala District

ROR EN 229 NCE 2009 dated 19/01/2010 4.2

101Doddahalla Belgaum Khanapur Electric Co. Pvt.

Ltd.Across Malaprabha river near Yadvagi Village, Khanapur Taluk,

ROR DE 53 NCE 2004 dated 9/9/2004 ( M/s Dipkit Limited-1.5 MW), EN 191 NCE 2007 dated 21/06/2007(1.5 to 1.75 MW)

1.75

102Doddrasinakere Davanagere Gulbarga Bio Energy Pvt

Ltd.(Thulasi Energy)Govinalu MHS across Tungabhadra river of Honnali Taluk in Davanagere District

ROR EN 282 NCE 2007 dated 13/06/2011 2

AHEC-IITR/SHP Data Base/July 2016 125

Page 9: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

103Duphadal Dakshina

KannadaSoham Kilanjara Renewable Energy Pvt. Ltd.

Kilanjara MHS across Phalguni river at Kilanjar Village of Mudabidre Taluk of Dakshina Kannada District

ROR DE 240 NCE 2002 dated 10.10.2002. EN 148 NCE 2010 dated 19/06/2010(cancelled), EN 148 NCE 2010 dated 18/02/2011 (restoration, upto 31/03/2012)

6

104Gaddimadi Hassan Deepak Cables (I) Pvt. Ltd. Across Bhima river near Revathgaon

Village, Indi Taluk, Bijapur District.ROR DE 14 NCE 2004 dated 13/09/2004(10 MW) & EN 433 NCE 2007

dated 11/12/2007(14.1 MW).14.1

105Gandhinagar Koppala B&G Energy Pvt. Ltd. Chintamani MHS across Thungabhadra river

at Anegundi Village of Gangavati taluk in Koppala District

ROR EN 237 NCE 2009 dated 19/01/2010 3.6

106Gandhinagar Mandya B&S Energy Pvt. Ltd. Across Lokapavani river, near

Pattasomanahalli Village, Pandavapura Taluk, Mandya District.

ROR EN 228 NCE 2009, dated 25-11-2009. 2

107

Ganganahal Uttara kannada Sagar Power (Dandela) Pvt. Ltd.

Kanchimane MHS across Bedthi Mogaddehalla River at Ramnagara Village of Yallapur Taluk in Uttara Kannada District.

ROR EN 21 NCE 2008 dated 05/08/2009 (4 MW to M/s Sagar Power (Dandela) Pvt. Ltd.)

4

108Gauri Halla yadgir Pavanaganga Power Pvt.

Ltd.Huvinahedagali MHS, across Krishna river, Maramakal Village, Shahapur Taluk, Gulbarga District.

ROR EN 129 NCE 2012 dated 05-04-2012 21.5

109Giirikanahalla Mandya SLS Power Industries Ltd. Belakavadi MHS across Cauvery river near

Sattegala Village, Malavalli Taluk, Mandya Dsitrict.

ROR EN 504 NCE 2006 dated 17/03/2007(1.5 MW) 1.5

110Gokak Hassan Trimurthi Power Pvt. Ltd. Addahole MHS across Addahole at Bisle

Village of Sakaleshpur Taluk in Hassan District

ROR DE 133 NCE 2001 dated 03/10/2002(5 MW), EN 177 NCE 2005 dated 5/7/2005(24 MW)

24

111

Gokak Falls Mandya SM Power Projects Pvt. Ltd.

Across Cauvery River d/s of Ganganachukki falls, Near Sivansamudar Village Malavalli Tal,Manday Dist

ROR EN 511 NCE 2006 dated 17.3.2007 10

112Gokak Falls Bangalore rural SNS Power Projects Pvt.

Ltd.across arkavati river near chunchinadoddi/uyamballi village

ROR DE 107 NCE 2004 dated 31.8.2005 10

113Gonavatal Bagalkot JSR Power Projects Pvt.

Ltd.Sivayogamandir MHS across Malaprabha river of Badami Taluk in Bagalkot District

ROR EN 193 NCE 2011 Dtd 31-10-2011 3

114Gopalpur Mandya Photon Energy Systems

Ltd.Hosaholalu MHS across Doddakere tank at Hosaholalu Village of KR Pet Taluk in Mandya District

ROR DE 66 NCE 2001 (2) dated 29/11/2001(0.5 MW), EN 357 NCE 2005 dated 01/10/2006(Cancellation), EN 58 NCE 2007(2) dated 24/08/2007 (Re allotted)

1

115Gundiadka Udupi Jyoti Green Energy Pvt.

Ltd.Tallur MHS across Swarna river near Tallur Village, Karkala Taluk, Udupi District.

ROR EN 290 NCE 206 dated 16.10.2006 ( M/s TCI Constructons) & EN 255 NCE 2007 dated 17/07/2007, EN 255 NCE 2007 dated 17/07/2007(12 MW)

12

116

Guntagola Chamarajanagar Vikram Sreeram In Cauvery River, reach about 600 Meter downstream of Barachukki falls of left bank, near shivanasamudram village, Palaya Hobli, Kollegal Taluk, Chamaraja Nagar District

ROR EN 20 NCE 2013,Dt:21.05.2013 5

117

Handikalur Shimoga South Canara Electric Company Pvt. Ltd.

Across the Hulikal hole stream, a streamlet to river varahi near hulikal village, Hosanagar taluk, (Kunchikal and Varahi MHS merged vide GO No.EN 103 NCE 2006 dt 2.3.2006

ROR (Devar power has transferred its 4MW hulikalhole to Sothcanara and enhanced to 9MW) Enhancement from 6MW to 9MW (i.e.4+2=6+3=9) vide GO EN 103 NCE 2006 dt 2.3.2006

3

AHEC-IITR/SHP Data Base/July 2016 126

Page 10: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

118Hanumanthapura Mandya Zen Power Pvt. Ltd Paschim vahini MHS, Across Paschim

vahini village, Swasthya ayurvedha village, Srirangapattana taluk

ROR EN 261 NCE 2009 dt 5/1/2010 (.5 MW), EN 306 NCE 2011 dt: 29.07.2011 (0.5 Mw to 2 MW),

0.5

119Harakeri Uttara Kannada JH Patel Energy

(Karnataka) Pvt. Ltd.Jakekumbri MHS across Bedthi river near Jakekumbri Village, Yellapur Taluk in Uttara Kannada District

ROR EN 305 NCE 2007 dated 25.6.2009 2

120

Harasangiri Dakshina Kannada

Prasanna Power Ltd. across Aniyur stream at Aniyur village of Belthangadi Taluk in Dakshina Kannada District

ROR DE 42 NCE 1998 dated 11/11/1998 (3 MW), DE 105 NCE 2002 dated 28/05/2002 (3 MW to 4.5 MW), DE 266 NCE 2003 dated 12/02/2004 (4.5 MW to 6 MW),& extension of time till 28.05.2005., ME 143 NCE 2005 dt: 13.06.2005 time extended for 2 years from 29.05.2005, EN 469 NCE 2006 dt: 27.02.2007 time extended for 18 months from 29.05.2007., EN 319 NCE 2010 dated 03/11/2010 (6MW to 9 MW)

3

121Harthuhole Belgaum Godachinamalki Power Pvt.

Ltd.across Markandeya river at Godchinmallki village of Gokak taluk in Belgaum Distrct

ROR EN 153 NCE 2007 dated 17/2/2010 2

122Hebbakavadi Mandya P6 Energy Pvt. Ltd. Ballenahalli MHS across Lokapavani river at

Ballenahalli village of Srirangapatna Taluk in Mandya District

ROR EN 44 NCE 2011 Dtd 2-11-2011 2

123Heggadahalli Raichur Mimesis Power Projects

(P) LtdNear Nagoli & Agrahara village Deodurga Raichur

ROR EN 219 NCE 2013 dt: 04.03.2014 1.5

124Hemavathi RBC Mandya West Mountain Power Ltd. across Kaveri river near Chikka Village in

Mandya DistrictROR Allotted vide G.O. No. EN 224 NCE 2007 dated 23/06/2007 24

125Hippargi Udupi Chamundeshwari Energy

Pvt. Ltd.across Chakra river near Hallihole Village of Kundapur Taluk in Udupi District

ROR EN 46 NCE 2008 dated 19/05/2009 (3 MW) 3

126

Hirekadabur Chikkamagalore Achit Infrastructure Pvt. Ltd.

Kottigehara MHS across right bank of the river Aniyur halla at Kotigehara village of Mudigere Taluk in Chikkamagalur District

ROR EN 395 NCE 2007 dated 16/09/2009(3 MW) 3

127

Hongadalla Shimoga Bhadragiri Power Pvt. Ltd. Gondi MHS across Gondhi anicut at Chikkagopanahalli Village of Bhadravathi taluk in Shimoga district

ROR DE 111 NCE 2001 dated 08/10/2001( 1 MW) & EN 449 NCE 2004 dated 30/12/2004 ( 3 MW), EN 255 NCE 2005 dated 16/12/2005 ( change in location ), EN 167 NCE 2010 dated 28/02/2011 (upto 30/06/2011)

3

128Honnammanahalla Bagalkot Evergreen Energy

Enerprises (I) Pvt. LtdHasangi MHS across Malaprabha river at Kattapura village of Badam taluk in Bagalkot district

ROR G.O. EN 199 NCE 2012 dated: 11/07/2012 1.6

129

Horihole & Govindathirtha Dakshina Kannada

Parpikala Power Pvt. Ltd. Parpikala MHS across Shisila stream at Parpikala village of Beltangadi taluk in Dakshina Kannada District

ROR DE 28 NCE 96 (8) dated 24/07/1996(6.5 MW), DE 173 NCE 2000 dated 11/12/2001(9.5 MW), DE 222 NCE 2004 dated 09/07/2004(from 25/08/2005 to 24/08/2008) EN 438 NCE 2007 dated 04/01/2008(from 25/08/2008 24/08/2011), EN 131 NCE 2011 Dated: 07-02-2013 (time extension till 31-12-2014)

0.5

130

Hosaholalu Bangalore rural Frontier offshore Drilling (India) Pvt. Ltd.

Sangam Stage-2 Across Cauvery river near Sangam Village, Channapatana Taluk, Bangalore rural District.

ROR EN 416 NCE 2006 dated 08/03/2007 & EN 539 NCE 2008 dated 30/01/2009(company name changed from M/s Frontier Off shore Drilling India Pvt. Ltd. to M/s. West Mountain Power Ltd.)

15

AHEC-IITR/SHP Data Base/July 2016 127

Page 11: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

131Hosangadi Raichur Sree Swarna Energy Ltd. Rajolibanda MHS at left side of the RDS

anicut at Rajoli Banda of Manvi Taluk of Raichur District

ROR DE 64 NCE 2002 dated 04/06/2002(2 MW) DE 64 NCE 2002 dated 18/09/2002(3 MW), EN 84 NCE 2003 dated 07/04/2003(4.5 MW)

4.5

132Hosmath Udupi Shravana Raj Power

Projects Pvt. Ltd.Andrahalla & Yennehole MHS across Yennehole at Yennehole Village of Karkala Taluk in Udupi District

ROR EN 338 NCE 2007 dated 19/05/2009(2 MW) 2

133Huigere Raichur Biradar Hydro energy Pvt.

Ltd.Miyapur MHS, across Distributory-16 of NRBC near Miyapur Village, Devadurga Taluk,

ROR DE 295 NCE 2004 dated 13/09/2004 (0.975 MW), EN 431 NCE 2007 dated 10/12/2007(3 Years)

0.95

134Hulavalli Chikkamagalore NVS Power Projects (I)

Pvt. Ltd.Hulukumale MHS across Hulukumale stream, Guttihalli village in Mudigere Taluk of Chikkamagalur District

ROR EN 103 NCE 2009 dated 26/11/2009 3

135Hulikere Bagalkot Monte Carlo Power Pvt.

Ltd.,Hippargi MHS across River Krishna Hippargi Barage at hippargi Village of Jamakhandi Taluk in Bagalkot District

ROR DE 97 NCE 2002 dated 11/07/2002 G.O EN 249 NCE 2006 dated 17/07/2006 G.O EN 438 NCE 2007 dated 4/1/2008. Time extended upto 23/11/2011

20

136

Hullahhalla Udupi Vriddhi Powers Horihole & Govindathirtha MHS across Horihole & Govinda Tirtha at Mudur Village of Kundapura Taluk in Udupi District

ROR EN 169 NCE 2009 dt 27/1/2010 2

137Hulukumale Dakshina

KannadaDishaa Power Corporation Ltd.

Singanapura MHSacross Ghatprabha River at Singanapur village of Gokak Taluk in Belgaum Dist.

ROR EN 192 NCE 2007 dated 19.5.2009 4

138

Huvinahedagali Bagalkot Evergreen Energy Enerprises (I) Pvt. Ltd

Karmuddanahalli MHS, across Karmuddanahalli stream, Karmuddanahalli Village, Hunsor Taluk, Mysore District

ROR G.O. EN 200 NCE 2012 dated: 11/07/2012 1.6

139

Huvinahedagali Dakshina Kannada

Perla Hydro Power (P) Ltd. Shanmukhasubramanya MHS across stream joining Nethravathi River on Left Bank near Perla Shamburi Village of Bantwal Taluk in Mangalore District

ROR G.O. No EN188 NCE 2011 Dt:21-05-2013 10

140

Kabini RBC Chikkamagalore Western Ghats Hydro Ventures Pvt. Ltd.

Gauri Halla MHS across Gauri Halla Stream a tributory to Vedavati river at Kamenshalli Village of Kadur taluk in Chikkamagalore District

ROR EN 267 NCE 2009 dated 10/05/2010 (4 MW) 4

141Kakkera Mandya Atria Brindavan Power Ltd. Hanumanahalla MHS cauvery river at

Chikkayarahalli village of Pandavapura Taluk in Mandya district

ROR EN 128 NCE 2011 dated 08/11/2011 G.O. EN 214 NCE 2012 dated: 21/07/2012(8MW)

8

142Kalasa Dakshina

KannadaNorth East Power Projects Pvt. Ltd.

Panaja MHS across Kumaradhara river at Panaja Village of Puttur Taluk in Dakshina Kannada District

ROR EN 26 NCE 2008 dated 03/07/2009 (5 MW), EN 26 NCE 2008 dated 10/01/2011(Corigendum- lat & long)

5

143Kalaseshwara Uttara kannada Hosakambi Mini Hydro Pvt.

Ltd.Across Gangavalli river ner Hosakambi village, near Ankola Taluk, Uttara Kannada District.

ROR EN 175 NCE 2006 dated 16/10/2006 ( M/s Mysore Mercantile Co. Ltd.) & EN 300 NCE 2008(4) dated 11/12/2008 ( M/s Hosakambi Mini Hydro Pvt. Ltd.)

5

144Kampli Uttara kannada Dhanalakshimi Power Pvt.

Ltd.Konki MHS across Bedti river at Konki Village of Ankola Taluk in Uttara Kannada District

ROR EN 49 NCE 2008 dated 03/10/2009 (2 MW) 2

145Kanayatana Udupi Mysore Mercantile co. Ltd. Varahi MHS across Varahi river near

Hosagadde Village of Kundapur Taluk in Udupi District

ROR EN 302 NCE 2007 dated 19/05/2009(4 MW), EN 10 NCE 2011 dated 18/01/2011 (8 MW)

8

AHEC-IITR/SHP Data Base/July 2016 128

Page 12: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

146

Kapila Chikkamagalore Mimesis Hydel Projects (P) Ltd.

Huigere MHS across Bhadra river at Huigere Village of NarasimharajaPura Taluk in Chikkamagalore District

ROR EN 330 NCE 2007 dated 16/09/2009(M/s Prolight systems,2 MW), EN 350 NCE 2010 dated 31/08/2010(change of company name to M/s Mimesis Hydel Projects Pvt. ltd.)

2

147

Karmbar Mandya IJK Power Pvt. Ltd. Ganadahalli MHS across Hemavathy river, near Ganadahalli Village, KR Pet Taluk,

ROR DE 252 NCE 2004 dated 13/09/2004(1 MW to M/s SMR Power Pvt. Ltd.), EN 395 NCE 2009 dated 03/10/2009(15 MW & change of company name to M/s IJK Power Pvt. Ltd.) Recomended to ED for time extension

15

148Karmuddanahalli MHS Raichur XS Hydro Energy Pvt. Ltd. across Krishna near KK Halli Village of

Devadurga taluk of Raichur District.ROR DE 54 NCE 2006 dated 21/04/2006 2

149

Kattemaralavadi Chikkamagalore Shakuntalam Power Pvt. Ltd.

Magundi MHS across Bhadra river 14 km from Balehonnur town at Balehonnur to Kalasha road at Magundi Village of Mudigere Taluk in Chikkamagalore District

ROR DE 138 NCE 2006 dated 21/04/2006(2 MW), EN 267 NCE 2007 dated 13/08/2007(9 MW)

9

150Kattinakudige Udupi Dishaa Power Corporation

Ltd.Joseph nagar MHS across Sita nadi Josph nagar village, Kundapur taluk,

ROR EN 173 NCE 2009 dt 1/2/2010 4

151Keerthi Hole Udupi Moodabagil Power Pvt. Ltd. Shambhavi MHS across Shambhavi river at

Attur Kalkar village of karkala taluk in Udupi District

ROR EN 172 NCE 2009 dt 29/1/2010 (3 MW) 1.5

152Keri Hole Raichur Baliyan Power Pvt. Ltd. across Markandeya river at Godchinmallki

village of Gokak taluk in Belgaum DistrctROR EN 258 NCE 2009 dated 29/1/2010 4

153

Kilanjara Mandya Manasa Gangothri Power Pvt. Ltd.

across LOKAPAVANI river, near BABURAYANAKOPPALU village, SRI RANGAPATNA Taluk of MANDYA District

ROR EN 236 NCE 2009, dated 25-11-2009. 3

154

Kilara Mandya V Pram Power Co. Devaraya MHS Devaraya Anicut, Majjigapura Village, Sri Rangapattana,

ROR DE 28 NCE 96 (25) dated 24.7.1996, EN 383 NCE 2005 dt: 16.12.2005, EN 300 NCE 2007 dt: 27.10.2007, EN 162 NCE 2010 Dt: 26.02.2011, EN 29 NCE 2012 dt: 28.01.2012, Final time extension from 01.01.2012 to 31.12.2013. Time extended vide GO.No. EN 100 NCE 2012 dt: 16.01.2015 from 01.01.2014 to 31.12.2015.

0.5

155Kittur -I Raichur North East Power Projects

Pvt. Ltd.Dadla MHS across Thungabhadra river near Dadla village, Manvi Taluk, Raichur District

ROR EN 507 NCE 2006 dated 17/03/2007 3

156Kolagave Bagalkot Evergreen Energy

Enerprises (I) Pvt. LtdRamtal MHS across Malaprabha river at Kattapura village of Badam taluk in Bagalkot district

ROR G.O. EN 197 NCE 2012 dated: 11/07/2012 1.6

157Kollur Bagalkot Lakshmi Amritha Power

Projects Pvt. Ltd.Cholachagud MHS across Malaprabha river of Badami Taluk in Bagalkot District

ROR EN 199 NCE 2011 Dtd 31-10-2011 2

158Kollya Mandya B Soilmec India Pvt. Ltd. Hasurubore halla MHS across Kaveri river

near Shivanasamudram in Mandya DistrictROR EN 217 NCE 2007 dated 23/06/2007 20

AHEC-IITR/SHP Data Base/July 2016 129

Page 13: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

159

Koovehalla Dakshina Kannada

Dakshina Kannada Power Pvt. Ltd.

Kempuhole Gundia MHS across Kemp Hole of Sakaleshapura Taluk in Hassan Distrct & Puttur taluk in Dakshina Kannada District

ROR DE 109 NCE 2000 (1) dated 12/01/2001(24 MW), EN 35 NCE 2005 dated 03/03/2005(36 months), EN 438 NCE 2007 dated 04/01/2008 (from 03/03/2008 to 03/03/2011) EN 131 NCE 2011 Dated: 07-02-2013 (time extended till 31-12-2014)

24

160Kotekoppa Chikkamagalore Padmavathi Power Pvt.

Ltd.Kattinakudige MHS across Bhadra river at Kattanakudige Village of Mudigere Taluk in Chikkamagalore District

ROR DE 137 NCE 2003 dated 26/02/2004(2 MW), EN 87 NCE 2007dated 28/03/2007 924 months), EN 285 NCE 2009 dated 27/11/2009 (9 MW, upto 31/12/2010)

2

161KRS Mysore Karnataka Renewable

Energy Development Ltd.Hullahalli MHS ROR DE 97 NCE 2004 dated 17.5.2004 2

162KRS Kodagu Ramgad Minerals & Mining

Pvt. Ltd.Across Lingadahole a tributary to river Kumaradara near Mallalli Village SomwarpetTaluk of

ROR DE 299 NCE 2005 dated 14.10.2005 3

163

Kudarebi Mandya Pioneer Genco Ltd. (Formerly Chanakya Cements Ltd)

Budikatte MHS across Cauvery river 2 KM of downstream of Shivanasamudram at Nettakallu village of Malavalli Taluk in Mandya District

ROR DE 33 NCE 2002 dated 13/06/2002(2 MW) & EN 152 NCE 2007 dated 30/04/2007 (24.75 MW) and Change of MHS to Adi Shakthi Maramma from Budikatte MHS and change of Company name as M/s. Pioneer Gaenco Limited.

24.75

164

Kuduregundi Ramanagara Dishaa Power Corporation Ltd.

Amruth Narayana MHS across Vrushabhavathi river at Tippur Village of Ramanagar Taluk in Ramanagara district

ROR EN 48 NCE 2008 dated 19.5.2009 1

165

Kukkawada Bangalore Rural Greenko Energies Pvt Ltd. Tagachikuppe MHS, across Vrushabhavathi river at Tagachikuppe Village of Bangalore south Taluk in Bangalore Rural district

ROR EN 533 NCE 2009 dt 03-05-2010 6

166Kukke Stage-1 Dakshina

KannadaB Soilmec India Pvt. Ltd. Durgadalli MHS across Durgadalli halla

Stream at Durgadalli village of Dakshina Kannada District.

ROR DE 273 NCE 2005 dated 14/10/2005 3

167Kukke Stage-2 Mandya B Soilmec India Pvt. Ltd. Someswara Stage-II MHS across Kaveri

river near Shivanasamudram, Mandya District.

ROR EN 223 NCE 2007 dated 23/06/2007 15

168Kurkamane Chikkamagalore Namana Hydro Power Pvt.

Ltd.Aradalu MHS across Sitanadi at Aradalu Village of Koppa taluk in Chikkamagalore District

ROR EN 122 NCE 2009 dt 26/11/2009( 2 MW), EN 09 NCE 2011 dated 05/02/2011 (4 MW)

4

169

Kuruvalli Dakshina Kannada

Sai Prasanna Power Pvt. Ltd.

Upper Charmadi MHS across charmadi river near Charmadi Village, Belthangadi Taluk, Dakshina Kannada district.

ROR EN 322 NCE 2006 dated 16.10.2006 EN 43 NCE 2008/13/2/2008 2

170Kuskal Yadgir Sirwal Hydel Powe Pvt. Ltd. Across the stream sirwal a tributary to

bhima, Shirwal near Sirwal Village in Shahapur Taluk of

ROR DE 216 NCE 2005 dated 14.9.2005 0.95

171Lingadahole-I Udupi GVR Construction Pvt. Ltd. Kokkarni MHS across Sita river near

Kokkarni village of Karkala Taluk in Udupi district.

ROR EN 294 NCE 2006 dated 16/10/2006( M/s GVR Construction Pvt. Ltd., 3 MW)

3

AHEC-IITR/SHP Data Base/July 2016 130

Page 14: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

172

Lingadahole-II Udupi GVP Infra Projects Pvt. Ltd.

Durgahole MHS across Durgahole ner Durga Village, Karkala Taluk Udupi district.

ROR EN 439 NCE 2006 dated 13/03/2007(4 MW), EN 439 NCE 2006 dated 01/06/2007(K.Gangaprasad company to GVP Infra projects Pvt. Ltd.), EN 254 NCE 2007 dted 17/07/2007(10 MW)

10

173Lokasara Raichur Zeba Power Pvt. Ltd. D/s of Narayanapur Dam near Gopalpur

Village of Devadurga Taluk in Raichur District

ROR EME 58 NCE 2005 dated 25/04/2005 0.95

174Machadka Mysore Kaltronics Office

Automation and Networking Pvt. Ltd.

CMRJ weir MHS at Ballur Village of K.R. nagar Taluk in Mysore District

ROR DE 128 NCE 2001 (1) dated 03/11/2001, EN 347 NCE 2005 dated 23/11/2005(36 months), EN 434 NCE 2007 dated 11/12/2007 (23/11/2008 to 23/11/2011)

0.5

175

Machittehole Mandya Innoverse Eco Friendly Solutions

Balekallu MHS across Balekalluhole a tributory to Yettinahole at marenahalli village of Sakaleshapura Taluk in Hassan District

ROR EN 271 NCE 2010 dated 16/09/2010 (1 MW) 1

176Maddur Mandya Master Marine Akkihebbal MHS near Akkihebbal village in

K.R Pet Taluk of Mandya DistrictROR EN 198 NCE 2013 dt: 10.10.2013 3

177Maddur Branch Canal Udupi Vriddhi Powers Malebahundi MHS across Malebahundi at

Mavinkar Village of Kundapura Taluk in Udupi District

ROR EN 168 NCE 2009 dated 27/01/2010 (2 MW) 4

178Madhavamantri Dakshina

KannadaSai Leela Power Pvt. Ltd. Gundiadka MHS across Payaswini river (6.5

Km from Sulya to West) of Sulya Taluk in Dakshina Kannad District

ROR EN 376 NCE 2007 dated 30/06/2009 (2 MW), EN 376 NCE 2007 dated 10/08/2010 (Corrigendum:Lat & Long), EN 08 NCE 2011 dated 04/02/2011 (5 MW)

5

179Madhugundi Raichur KKV Energy India Pvt. Ltd. Nalgamdinni MHS across Maski halla near

Nalgamdinni village of Manvi Taluk in Raichur District

ROR EN 110 NCE 2011 Dtd 2-11-2011 4

180Magee Bail Mysore VV Energy Pvt. Ltd. Nugu MHS across Nugu river at Motha

village of Nanjangud Taluk in Mysore DistrictROR EN 274 NCE 2009 dated 16/09/2010(0.5 MW) EN 221 NCE 2011

dated 20-03-2012 (1MW)1

181

Magundi Kodagu Kodagu Hydel Projects Pvt. Ltd.

Across Bhadra river 1.5 KM from Balehonnur, near Bannur Village, Narasimharajpur Taluk, chikkamagalore District.

ROR DE 140 NCE 2006 dated 21.4.2006 EN 23 NCE 2013 Dt:12.02.2013 (Time Extension) 01.04.2013 to 31.03.2014, Time extended vide GO.No. EN 107 NCE 2014, dt: 21.01.2015 from 01.04.2014 to 30.06.2015.

3

182Malaprabha LBC Koppala North East Power Projects

Pvt. Ltd.Gaddimadi MHS across Thungabhadra river at Gaddimadi Village of Gangavathi Taluk in Koppal District

ROR EN 508 NCE 2006 dated 17/03/2007 3

183Maldkal Scheme -1 (750 KW) Scheme- 2 (750 KW) Scheme - 3 (500 KW)

Shimoga Brigade Infrastrcture & Power Pvt. Ltd

Kumadavathi river at Anjanapura village of Shikaripura taluk in Shimoga District

ROR EN 272 NCE 2010 dated 16/09/2010(1 MW) 1

184Malebahundi Mandya Parpikala Power Pvt. Ltd. Viraja MHS at Viraja, Srirangapatna Taluk of

Mandya DistrictROR DE 130 NCE 2001(1) dated 03/11/2001, EN 438 NCE 2007

dated(04/01/2008(23/11/2008 to 23/11/2011)9

185Mandewal Raichur KCP Energy Pvt. Ltd. Across Maskhi halla near Hirekadabur

village, Sindhnur talukROR EN 266 NCE 2010 dated 16/09/2010 2

186Manjanadka Dakshina

KannadaSagar Power (Neerukatte) Pvt. Ltd.

Balnaduhole MHS across Balnadu Hole at Chandadka village of Sulya Taluk in Dakshina Kannada District

ROR EN 45 NCE 2008 dated 04/06/2009 2

AHEC-IITR/SHP Data Base/July 2016 131

Page 15: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

187Maraduru Yadgir Sharan Power Pvt. Ltd. Across Bhima river near Yadgir Taluk, ROR DE 293 NCE 2004 dated 9/9/2004(1 MW) & EN 298 NCE 2007,

Dated 09/10/2007(6 MW) & EN 375 NCE 2008, Dated 13/01/2009(9 MW).

9

188Masarkal Udupi PGC Hydro Power projects

Pvt Ltd.Ambindagundi MHS across Ambindagundi Hole at Manjalthar Village of Karkala Taluk in Udupi District

ROR EN 181 NCE 2009 dated 04/12/2009 (2 MW) 4

189Mavaling Raichur Balaji Biomass Power Pvt.

Ltd.Golapalli MHS across Hatti hole stream a tributary of krishna river in golapalli village, lingasugur taluk

ROR EN 328 NCE 2007 dated 17/2/2010 (2 MW) 2

190Megadde Hassan Hotel Maruthi Pvt. Ltd. Yettinahole MHS across Yettinahole stream

at alavalli village of Sakleshpur taluk in Hassan District

ROR EN 237 NCE 2008 dated 18/12/2009 (4 MW) 4

191

MGHE tail race kodagu Pushpagiri Power Pvt. Ltd. Harthuhole MHS across Kumaradhara river at Harthuhole village, Mallahalli falls in Somawarapet Taluk in Kodagu District

ROR DE 28 NCE 96 (19) dated 24/07/1996 (4 MW), DE 209 NCE 2002 dated 18/05/2004 (19.5 MW), EN 438 NCE 2007 dated 04/01/2008 ( from 20/02/2008 to 20/02/2011) EN 131 NCE 2011 Dated 07-02-2013 ( time extension till 31-12-2014)

19.5

192

Moodaba Mandya Rama Enterprises Chikkarsinakere MHS across Hebbahalla Nala (this nala joints the Shimsha river, which will further join river cauvery) at Chikkarasinakere Village of Maddur Taluk in Mandya District

ROR EN 513 NCE 2009 dated 14/05/2010 0.5

193

Mouneshwara Shimoga Vikranth Energy Pvt. Ltd. Kotekoppa MHS across Kotekoppa, Mavinaagundi & Nagahalli streams, Kotekoppa village of Sagara Taluk in Shimoga Distrct

ROR EN 306 NCE 2007 dated 15/12/2009 2

194Mudhol Udupi Vriddhi Powers Arsinagundi MHS across Souparnika hole at

Arsinagundi Village of Kundapura Taluk in Udupi District

ROR EN 170 NCE 2009 dated 27/1/2010 ( 2 MW) 2

195Mugalkhod Udupi Chamundeshwari Energy

Pvt. Ltd.Mudugal MHS across Chakra river near Hanchinakatte Village of Kundapur Taluk in Udupi district

ROR EN 47 NCE 2008 dated 20/05/2009 (3 MW) 3

196Mundaje Uttara Kannada Adithya Green Power Pvt.

Ltd.Hosur MHS across River Benne Hole at Hosur village of Sirsi Taluk in Uttara Kannada District

ROR EN 345 NCE 2010 dated 16/09/2010 (1 MW) 1

197

Mundelu Hassan MVK Infrastructure Pvt. Ltd.

Balekallu MHS across Balekalluhole a tributory to Yettinahole at marenahalli village of Sakaleshapura Taluk in Hassan District

ROR EN 491 NCE 2009 dated 16/09/2010 ( 4 MW) 4

198Nagoli Scheme -1 (0.5 MW) Scheme-2 (1 MW)

Mysore Brahadeeswara Power Projects Private Limited

across cauvery river, near ranganthapura village, Mysore District

ROR EN 205 NCE 2012 dated: 09-05-2013 4.5

199

Nalgamdinni Hassan Aishwarya Power Pvt. Ltd. Kumbenahalli MHS across Hemavathi river at Kumbenahalli village of Channarayapattana Taluk in Hassan District

ROR EN 337 NCE 2007 dated 03/10/2009 (1.5 MW), 1.5

200Nekkiladi Gulbarga Jasper Energy Pvt. Ltd. across Dudganga river at Karadga Village of

Nippani Taluk of Belgaum District.ROR DE 156 NCE 2004 dated 09/09/2004(1 MW) & EN 404 NCE 2007

dated 3/12/2007 (16 MW)16

AHEC-IITR/SHP Data Base/July 2016 132

Page 16: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

201Neria Mysore Sai Rutwika Power

Projects Pvt. Ltd.Sulekote MHS across Cauvery River at Sulekote Village of Periyapattana taluk in Mysore District

ROR EN 235 NCE 2008 dated 20/01/2010 (2 MW) 2

202

Neria Davangere Sai Simrita Power Pvt. Ltd. Balleshwara MHS across Tungabhadra river in Honnalli taluk of Davangere district about 7km downstream of the confluence of the Honalli town.

ROR EN 261 NCE 2011 dated 31/10/2011 2

203Nidiamale Raichur Sai Krishna Hydro Power

Pvt. Ltd.Gonavatal MHS across Krishna River, near Gonavatal Village, Lingasagur Taluk, Raichur District.

ROR 40 2

204Nugu Chikkamagalore Parvathavardini Pvt. Ltd. Tanikode MHS across Tunga river near

Tanikode Village, Srungeri Taluk, Chikmagalur District.

ROR EN 109 NCE 2007 dated 05/10/2007 3

205

Pallatadka Chikkamagalore Pavanaganga Power Pvt. Ltd.

Honnammanahalla MHS across HonnammanaHalla in Attigundi village of Chikkamagalore Taluk in Chikkamagalore District

ROR DE 107 NCE 2001(1) dated 19/09/2001(1.5 MW)EN 123 NCE 2004 dated 24/08/2004(1.5 to 4.1 MW) EN 367 NCE 2006 dated 12/09/2006(4.1 to 6 MW)

6

206

Palloli Dakshina Kannada

Sidhi Shree Shive Powers Pvt. Ltd.

Shambhavi MHS across Mulki river at Kanchivayal at Puttige Village of Mangalore Taluk in Dakshina Kannada District

ROR EN 135 NCE 2007 dated 19/12/2009(2 MW), EN 127 NCE 20011 dated 08/03/2011(Corrigendum- lat & long)

1.2

207

Panaja Udupi Devar Power Ltd. Baje MHS across Swarna river near Hiriadaka Village of Udupi Taluk

ROR EN 87 NCE 2003 dt 2/8/2003(2MW), EN 87 NCE 2003 dated 10/02/2004(3 MW), EN 18 NCE 2007 dated 07/02/2007( 3 years), EN 622 NCE 2009 dated 23/02/2010(3.8 MW & 1 year from 07/02/2010), EN 300 NCE 2011 dated 29/07/2011(1 year from 07/02/2011) EN 44 NCE 2014 dated 18.03.2014 (Time extension from 07.02.2014 to 06.02.2015)

4

208Parpikala Uttara kannada Duggan Bailu Mini Hydro

Pvt. Ltd.Across Gangavalli river near Dugganabailu village, Yallapur Taluk, Uttara Kannada District.

ROR EN 158 NCE 2006 dated 16.10.2006 & EN 300 NCE 2008(2), dated 11.12.2008

5

209Pattadalla Mandya Instrument & Systems across Shimsha river near Banasamudra

village in Mandya DistrictROR G.O. No. EN 301 NCE 2005 dated 14/10/2005 1

210Perla Davanagere R Sreeramulu Reddy and

Co.Kukkawada MHS across Shagalehalla near Kukkavada Village, Davanagere Taluk,

ROR EN 325 NCE 2006 dated 16.10.2006 & EME 230 NCE 2007 dated 26.6.2007

2

211Rajan Kollur Yadgir Saiteja Energies Pvt. Ltd. Across Bhima river at Joldadgi Village,

Yadgir Taluk,ROR DE 154 NCE 2004 dated 9.9.2004 & EN 403 NCE 2007 dated

3.12.2007 time extension GO…………………….16

212Rajankollur Yadgir Saiteja Energies Pvt. Ltd. Across Bhima river at Yadgir, Yadgir Taluk, ROR DE 377 NCE 2004 dated 21.12.2004 1

213

Rajolibanda Chikkamagalore Mimesis Hydel Projects (P) Ltd.

Harakodige MHS across Bhadra river at Harakodige Village of NarasimharajaPura Taluk in Chikkamagalore District

ROR EN 324 NCE 2007 dated 16/09/2009 (M/s Prolight systems,2 MW), EN 350 NCE 2010 dated 31/08/2010(change of company name to M/s Mimesis Hydel Projects Pvt. ltd.)

2

214Raya Kodagu Subhash Keerthihole Power

Company Ltd.Keerthi Hole SHP ROR DE 329 NCE 2004 dated 21.4.2005 & DE 154 NCE 1994(3) dated

6.9.199421

AHEC-IITR/SHP Data Base/July 2016 133

Page 17: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

215Rayabasavanna Hassan UMR Power Projects Pvt.

Ltd.Abbur MHS across Soteabburhalla at K. Abbur Village of Arakalagud Taluk in Hassan District

ROR EN 111 NCE 2011 dated 03/11/2011(2 MW) 2

216Sampaji Raichur Chandu Power Projects

Pvt. Ltd.Across maskihalla at confluence point of maski halla and anikat halla near tarkal village, Manvi taluk

ROR EN 260 NCE 2010 dated 16/09/2010 5

217Sampkatte Bangalore rural Frontier offshore Drilling

(India) Pvt. Ltd.Sangam Stage-1 Across Cauvery river near Sangam Village, Channapatana Taluk, Bangalore rural District.

ROR EN 447 NCE 2006 dated 08.3.2007 24

218sanapur Mysore Karthik Energy Resource

Pvt. Ltd.Banave MHS across Cauvery river at Banave villafe of T. Narasipura Taluk in Mysore District

ROR EN 317 NCE 2012 dt: 01.07.2013 6

219Sanapur Shimoga Sai Aksha Power Projects

Pvt. Ltd.Harakeri MHS across Tunga river at Harakeri Village of Shimoga Taluk Shimoga District

ROR EN 191 NCE 2011 dated 31/10/2011 2

220Sankadagundi Chikkamagalore Limbavali Power Pvt. Ltd. Doddahalla MHS across Doddahalla near

Banjur Village of Mudigere Taluk in Chikkamagalore District.

ROR DE 303 NCE 2005 dated 14/10/2005(18 MW) 18

221Shagalehalla Kodagu Golflinks Software Park

Pvt. Ltd.Barapole MHS across Barapole near Mukuta Village of Virajpet Taluk in Kodagu District

ROR DE 89 NCE 2004 dated 12.3.2004 5.5

222Shahapur Scheme 1 ,2,3,4 (4*1.3)

Dakshina Kannada

Sahasralingeshwara Power Pvt. Ltd.

Nekkiladi MHS across Kumaradhara river at Nekkiladi village of Puttur Taluk in Dakshina Kannada District

ROR DE 253 NCE 2004 dated 13/09/2004(1 MW), EN 279 NCE 2006 dated 21/07/2006(4.5 MW)

12.5

223Shahapur Scheme 5 Bellary Sai Sri Power Projects &

Systems Pvt. Ltd.Bukkasagra MHS across Tunga Bhadra river at Bukkasagara Village of Hospet Taluk in Bellary District

ROR EN 271 NCE 2009 dt: 02.07.2013 2

224Shambhavi Udupi Chamundeshwari Energy

Pvt. Ltd.across Chakra & KubjaVillage of Kundapur Taluk in Udupi district.

ROR EN 160 NCE 2009 dt 19/1/2010 3

225

Shambhavi Dakshina Kannada

Kumaradhara Power Pvt. Ltd.

Kollya MHS across Kumaradhara, a tributory to river Nethravathi at Kollya/Paranagaje Village of Puttur Taluk in Dakshina Kannada District

ROR DE 168 NCE 2005 dated 23/08/2005(18 MW, M/s Shree Shnakaranarayan Constructions), EN 194 NCE 2006 dated 26/05/2006(change of name as M/s SNC Power Corporation Pvt. Ltd.) name, EN 184 NCE 2008 dated 01/07/2008 ( change of name to M/s Kumaradhara Power Pvt. Ltd.) EN 102 NCE 2010dated 20/03/2010(24 MW)

24

226Shanmukhasubramanya Chikkamagalore Fortune Five Hydel

Projects Pvt. Ltd.Lakya MHS across Lakya hole near malleswara Village near Mudigere Taluk, Chikkamagalur District.

ROR EN 342 NCE 2006 dated 16.10.2006 3

227Sheshadri Iyer Kodagu Ramgad Minerals & Mining

Pvt. Ltd.Across Kumaradhara river near Mallahalli Village, Somwarpet Taluk,

ROR DE 295 NCE 2005 dated 14.10.2005 24

228Shimsha Chikkamagalore Renovo Power Gen Pvt.

Ltd.Kalaseshwara MHS across Bhadra river near Kalasa town in Chikkamagalur District

ROR EN 331 NCE 2009 dated 25/06/2009(2 MW) & 25/05/2010(Corrigendum)

2

229Shimsha Udupi Roshini power Tech Ltd. Across Megadde hole, megadde village,

karkala talukROR EN 158 NCE 2009 dt 1/2/2010 6

AHEC-IITR/SHP Data Base/July 2016 134

Page 18: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

230

Shimsha Kaveri Confluence SHP Chikkamagalore Pavanaganga Power Pvt. Ltd.

Kolagave MHS across Kolagave stream near Girikhana Cofee Estate, Fire Boundary,Chikkamagalur Taluk,

ROR DE 54 NCE 2004 dated 22/07/2004(3.5 MW) was allotted in the name of M/s. Geneva Power Limited), DE 54 NCE 2004 dt: 24.11.2004 (corrigendum) was issued, EN 188 NCE 2006 dt: 06.05.2006 Change of name to M/s. Pavana Ganga Power PrivateLimited, Capacity enhanced from 3.5 MW to 4 MW vide Go.No.EN 368 NCE 2006 dated 12/09/2006.

4

231

Shiragola Udupi Sidhi Shree Shive Powers Pvt. Ltd.

Sankadagundi MHS, 50mts downstream of sankundi stream, Shiru Village, Baindur town, Kundapur Taluk,

ROR DE 82 NCE 2002 dated 15/07/2002( V.I Shetty and company ) Change of name vide GO EN 383 NCE 2006 dated 22/9/2006, EN 354 NCE 2006 dated 26/6/2006(Time extension), EN 383 NCE 2006 dated 8/5/2007

2

232

Shirurmutt Dakshina Kannada

GCI Power Pvt. Ltd. Elaneeru MHS across Elaneeru stream at Elaneeru village of Belthangadi Taluk in Dakshina Kannada District

ROR DE 109 NCE 2000 (5) dated 12/01/2001( 2 MW), EN 34 NCE 2003 dated 03/03/2003(36 months), EN 438 NCE 2007 dated 04/03/2008(from 03/03/2008 to 03/03/2011) EN 131 NCE 2011 Dated: 07-02-2013 Dated: 07-02-2013 (time extended till 31-12-2014)

2

233

Shiva Chikkamagalore SD Nageshwar Doddahalla MHS across Dodda Halla Stream at Somanakadu village of Mudigere Taluk in Chikkamagalore District

ROR EN 493 NCE 2009 dated 25/11/2009 (4 MW) 4

234Shivapur TLBC Uttara kannada Sagar Power (Neerukatte)

Pvt. Ltd.across Pattadalla at Narskal Villlage of Sirsi Taluk in Uttara kannada District

ROR EN 261 NCE 2009 dt 5/1/2010 3

235Shoirol Hassan Acacia Energy Ventures

Pvt. Ltd.Devaralla MHS across Devarahalla Stream at Maragunda village of Sakaleshpur Taluk in Hassan District

ROR EN 219 NCR 2009 dated 16/09/2010(4 MW) 4

236Sindhanooru Chikkamagalore Rajarajeswari Power Pvt.

Ltd.Kagganala MHS across Bhadra river near Kagganala Village of Mudigere Taluk in Chikkamagalore district

ROR DE 138 NCE 2003 dated 26/02/2004(2 MW), EN 52 NCE 2007 dated 07/03/2007( 3 years), EN 192 NCE 2008 dated 21/07/2008(12 MW)

12

237Singanapura Udupi Dishaa Power Corporation

Ltd.Across Suddhahole, Suddha village, Karkalataluk

ROR EN 153 NCE 2009 dt 1/2/2010 4

238

Sirsi Raichur Kare Power Resources Pvt. Ltd.

Across Right Bank of Krishna River, Yelagundi Village, Lingsugur Taluk, Raichur District vide GO.EN 281 NCE 2011, Bangalore, dt: 11.04.2012.

ROR 24.75

239Sitanadi Chikkamagalore Sree VeeraBhadrehswara

PowerKapila MHS across existing weir of Kapilahalla at Kuduregundi Village of Koppa taluk in Chikkamagalore District

ROR EN 295 NCE 2010 dated 17/09/2010 (1.05 MW) 1.05

240Sitanadi-2 Hassan South West Hydro Power

Pvt. Ltd.Abilbiru MHS across Abilbiru Stream at Marenahalli village of Sakaleshpura Taluk in Hassan District

ROR DE 148 NCE 2003 dated 18/11/2003( 4.5 MW) EN 148 NCE 2003dated 22/03/2004(6 MW)

6

241Somanadi Chikkamagalore Swayambu Power Systems

Pvt. Ltd.Bandi MHS across Bandihole Stream at Bandihole village of N.R.Pura Taluk in Chikkamagalore District

ROR EN 117 NCE 2010, Bangalore dt: 13.03.2012 1

242Sreeramadevara Mysore Flow net power Pvt. Ltd. Across River Kaveri, Chinga Village, K.R.

Nagar Raluk, Mysore DistrictROR EN330 NCE2012 dt11-02-2013 3

243Sri Ramadevarakatte Mandya Sriven Power Pvt. Ltd. Across Lokapavani river at Heggadahalli

Village of Pandavapura Taluk in Mandya District

ROR EN 490 NCE 2009, dated 15-12-2009 5

AHEC-IITR/SHP Data Base/July 2016 135

Page 19: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

244Sri Siddeshwara Davanagere Gulbarga Bio Energy Pvt

Ltd.(Thulasi Energy)Hallur MHS across Tungabhadra river of Honnali Taluk in Davanagere District

ROR EN 285 NCE 2007 dated 13/06/2011 2

245Sulekote Kodagu Kapila Manjushree

Apparels Pvt. Ltd.across three streams flowing in Kote Male Estate, Near Thannimani Village, Bhagamandala Town, Madikeri Taluk

ROR EN 453 NCE 2009 dated 30-04-2010 & 20-05-2010 9

246

Tadri Chikkamagalore Swayambu Power Systems Pvt. Ltd.

Mundelu MHS across a stream tributory to Sitanadi at Jayapura Village of Koppa taluk in Chikkamagalore District

ROR EN 298 NCE 2010 dated 16/09/2010(1 MW) 2

247Talakalale Mandya MAR Fabricators India Pvt.

Ltd.Chaitra MHS across Vrishabhavati river near Sheshgiri halli village in Bangalore Rural district

ROR EN 512 NCE 2009 dated 14/05/2010 4

248Tanikode Bagalkot Evergreen Energy

Enerprises (I) Pvt. LtdNagartal MHS across Malaprabha river at Kattapura village of Badam taluk in Bagalkot district

ROR G.O. EN 198 NCE 2012 dated: 11/07/2012 1.6

249

Upper Charmadi Mandya Kaltronics Office Automation and Networking Pvt. Ltd.

Mahadevapura MHS across Cauvery River at Mahadevapur Village(RS & RP weir) of Srirangapattana Taluk in Mandya District

ROR DE 128 NCE 2001(2) dated 03/11/2001(0.5MW), EN 348 NCE 2008 dated 23/11/2005(36 months), EN 434 NCE 2007 dated 11/12/2007(from 23/11/2008 to 23/11/2011)

0.5

250Uppugala Mandya Hallikeshwara Energy

Projects Pvt. Ltd.Across Hebbahalla stream near Belur villagein Mandya Taluk of

ROR DE 211 NCE 2005 dated 31.8.2005 0.5

251Vaddihalla Udupi Dishaa Power Corporation

Ltd.Across Madisal Hole near Peradur Village, ROR EN 203 NCE 2007 dated 5.10.2007 7

252Varahi Raichur Chandu Power Projects

Pvt. Ltd.Across maskihalla near devipur village, Sindhnur taluk,

ROR EN 261 NCE 2010 dated 16/10/2010 6

253

Varahi Hassan Maruthi Power Gen (India) Pvt. Ltd.

Bettakumari MHS across Bettakumari stream a tributory to Kumaradhara near Jadahatti/Vadahalli Village of Sakaleshpur Tlauk in Hassan District.

ROR EN 393 NCE 2006 dated 17/03/2007(4 MW), EN 440 NCE 2007 dated 15/12/2007 (13 MW)

13

254Varuna RBC Chamarajanagar Modern Rice Mill Across Cauvery river near Budikatte Village,

Kollegala Taluk, chamarajanagar District.ROR EN 502 NCE 2006 dated 17-03-2007 2

255Viraja Bagalkot Evergreen Energy

Enerprises (I) Pvt. LtdAihole MHS across Malaprabha river at Kattapura village of Badam taluk in Bagalkot district

ROR EN 196 NCE 2012 dated 12/09/2012 1.6

256

vyamballi Hassan Malleshwara Power Gen Pvt. Ltd.

Across Keri Hole near Keri Village, Sakaleshpur Taluk,

ROR DE 245 NCE 2003 dated 19/01/2004, EN 196 NCE 2008 dated 17.09.2008 (Time extended upto 16.09.2011), EN 47 NCE 2013 dated 07.08.2013 (Time extension from 17.09.2011 to 16.09.2013)

1.5

257Yadavgi Mandya Atria Brindavan Power Ltd. Visveswara MHS across cauvery river at

Chikkayarahalli village of Pandavapura Taluk in Mandya district

ROR EN 109 NCE 2011 dated 08/11/2011(6 MW) and EN 213 NCE 2012 dated:21/07/2012 (12 MW)

12

258

Yadgiri Raichur Kare Power Resources Pvt. Ltd. Formerly (Sai Krishna Hydro Power Pvt Ltd

Hanchinal MHS across Krishna River, near Hanchinal Village of Lingasagur Taluk in Raichur District

ROR EN 348 NCE 2010 dated 16/09/2010 (2 MW) EN 346 NCE 2012 dated: 27-12-2012 ( Transfered to M/s Kare Power ), Time Extended from 25.11.2010 for 5 years vide corrigendum Energy Department letter No. EN 11 NCE 2014 dt: 04.03.2014, Capacity Enhanced from 2 MW to 16 MW vide GO.No.EN 226 NCE 2014 dt: 23.05.2015.

2

AHEC-IITR/SHP Data Base/July 2016 136

Page 20: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

259

Yadgiri Kodagu Kodagu Power Pvt. Ltd. Balayantrahole MHS across Balayantrahole at Chelavara village of Virajapete Taluk in Kodagu district

ROR DE 28 NCE 96 (21) dated 24/07/1996(3 MW), ED 32 NCE 2007 dated 27/03/2007(6 MW), EN 14 NCE 2008 dated 22/01/2008(36 months)EN 131 NCE 2011 Dated 07-02-2013 (time extension till 31-12-2014)

6

260Yagachi Mandya XS Hydro Energy Pvt. Ltd. Across Cauvery river near Nandikere Oddu

Village, Malavalli Taluk, Mandya District.ROR DE 338 NCE 2006 dated 16.10.2006 & EN 151 NCE 2007 dated

3.5.200724.75

261Yedakumari Yadgir Bhoruka Power Corporation

LtdAcross river krishna on the leftbank,at narayanpur village,Shorapur taluk,yadgir Dist

ROR EN 195 NCE 2012 dated 17-07-2012 15

262Yegachi Bangalore rural Frontier offshore Drilling

(India) Pvt. Ltd.Sangam-3 across Cauvery river near Sangam Village, Channapatana Taluk, Bangalore rural District.

ROR EN 414 NCE 2006 dated 08/03/2007, EN 537 NCE 2008 dated 12/06/2008 (from M/s. West Mountain power Ltd. to M/s. Frontier offshore Drilling India Pvt. Ltd.)

22

263

Yellur & Kellur Bijapur KSS Power (I) Pvt. Ltd. Across Bhadra river 1.5 KM from Balehonnur, near Bannur Village, Narasimharajpur Taluk, chikkamagalore District.

ROR EN 271 NCE 2006 dated 16.10.2006 1

264Yennehole -1 Udupi South Canara Electric

Company Pvt. Ltd.Varahi MHS across Varahi river at KunchikalFalls, Mavinakana Village of Kundapur Talukin Udupi district

ROR DE 244 NCE 2003 dated 10.02.2004 2

265

Dakshina Kannada

Asia Pacific Industries Ltd. Subramanya MHS across Subramanya hole of Sulya taluk in Dakshina Kannada District

ROR DE 132 NCE 97 dated 20/04/1999(0.5 MW), EN 25 NCE 2007 dated 27/03/2007( Cancelled), EN 13 NCE 2008 dated 22/01/2008(Re allotted & time extension- 36 months) EN 131 NCE2011 Dated 07-02-2013 (time extenisoned till 31-12-2014)

0.5

266Mandya Atria Hydel Power Ltd. Across Cauvery river near

Shivanasamudram, Malavalli Taluk, Mandy District.

ROR EN 149 NCE 2006 dated 16.10.2006 12

267

Udupi CGP Hydro Power Pvt. Ltd. Mallar MHS across Mallar Hole a tributory to Yenne Hole/Swarna Nadi at Mallar Village ofKarkala Taluk in Udupi District

ROR EN 159 NCE 2009 dated 26/11/2009 (2 MW) 2

268

Dakshina Kannada

Corporate Hydro Energy Pvt. Ltd.

Durgadahallla MHS across Durgadhahalli Halla at Charmadi village of Belthangady Taluk in Dakshina Kannada Distrct

ROR DE 109 NCE 2000 (3) dated 12/01/2001(18 MW to M/s Corporate Securities and Holdings Pvt. Ltd.), G.O. No. DE 273 NCE 2004 dated 17/08/2004(change of name to M/s Corporate Hydro EnergyPvt. Ltd.), EN 370 NCE 2007 dated 15/10/2007(3 Years), EN 384 NCE 2010 dated 22/02/2011(time extension upto 14/10/2011)

18

269Ramanagara Glencoe Power Private

LimitedHarobele Village, Kanakapura Taluk, Ramanagaram District

ROR GO.No. EN 118 NCE 104, dt: 25.11.2014 0.4

270

Raichur Kare Power Resources Pvt. Ltd. Formerly (Sai Krishna Hydro Power Pvt Ltd

Hanchinal MHS across Krishna River, near Hanchinal Village of Lingasagur Taluk in Raichur District

ROR EN 348 NCE 2010 dated 16/09/2010 (2 MW) 14

271

Chamarajanagar Mahadeshwara Power Pvt. Ltd.

Across Cauvery River near Gandhi Nagar/Tellanur Village, in Kolegal Taluk, Chamarajnagar District.

ROR Allotted vide Go.No. EN 62 NCE 2009, Dated 17/02/2009 ( 5 MW) , Capacity enhanced vide Go.No. EN 84 NCE 2015 dt: 04.05.2015.(19.75 MW), Total allotted Capacity (24 MW)

5

AHEC-IITR/SHP Data Base/July 2016 137

Page 21: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

272Uttara kannada Mailarling Energy Ltd. Across Kali river near Mavaling village in

joida Taluk of Uttara Kannada District.ROR DE 181 NCE 2005 dated 14/10/2005 4

273

Hassan Maruthi Power Gen (India) Pvt. Ltd.

Hongadalla MHS across Hongadahalla stream a tributory to Kemphole near Yedakumari Village of Sakalehspura Taluk in Hassan District

ROR EN 392 NCE 2006 dated 17/03/2007 (5 MW) & EN 299 NCE 2007 dated 04/09/2007(18.9 MW), EN 355 NCE 2010 dated 19/10/2010( 24 MW)

24

274Hassan Om Shakthi Power

ProducersBettakumari MHS across Bettakumari river at Bhiman kal village of Sakleshpur Taluk in Hassan District

ROR EN 143 NCE 2007 dated 05/02/2010 5

275

Chikkamagalore Oysters Power Projects Pvt. Ltd.

Kuduregundi MHS across the existing weir Kuduregundi Halla about 2 km from Kuduregundi village of Koppa Taluk in Chikkamagalore District.

ROR DE 329 NCE 2004 dated 21.4.2005 & DE 154 NCE 1994(3) dated 6.9.1994

1

276

Mandya Penna Cements Industries Ltd.

Sreeramadevara MHS across Handihalla stream 2KM downstream of Shivansamudram mlavalli Taluk in Mandya district

ROR DE 37 NCE 2002 dated 13/06/2002 24.75

277Udupi Pinakin Energy Pvt. Ltd. Shirurmutt MHS across Swarna river near

Shirurmutt Village of Udupi Taluk in Udupi District.

ROR EN 505 NCE 2006 dated 17/03/2007 (2 MW), EN 455 NCE 2010 dated 21/01/2011(tranfer to M/s Pinakin Energy Pvt. Ltd. & T.E. upto 22/06/2012)

2

278

Hassan Punam powers (P) Ltd. Idiga MHS across Hemavathi river at idaganahosur village of Chennarayapattana taluk in Hassan District

ROR EN 329 NCE 2007 dt 22/2/2010 (3 MW) 7.5

279Davanagere R Sreeramulu Reddy and

Co.Across Shagalehalla near Bhanuvalli Village,Harihara Taluk,

ROR EN 321 NCE 2006 dated 16.10.2006 & EN 231 NCE 2007 dated 26.6.2007

2.5

280Yadgir Rajalaxmi Hydro Power Across Lakshampu nala, Halagere village,

Shorapur talukROR EN 163 NCE 2009 dt 17/2/2010 1

281Mandya Rama Enterprises Doddrasinakere MHS, Across Sulekere

canal, Doddarasinakere village, Maddur taluk

ROR EN 231 NCE 2009 Dt 8/1/2010 0.5

282

Bellary Sangameshwara Energy (P) Ltd. Ceebros Power Gen Ltd.,

Across Tungabhadra 1 KM D/S of Sanapur village, Hospet taluk

ROR DE 39 NCE 2002 dated 13.6.2002 EN 304 NCE 2008 dated 3/12/2008(1.5 MW to 9 MW). Corrigendum EN 304 NCE 2008 dated 30.12.2008 (2 Years time extension from 21/03/2009

1.5

283

Chikkamagalore Sealwel Power Corporation Durgadalla MHS across Durgadalla Stream at Madhugundi Village of Mudigere Taluk in Chikkamagalore District

ROR EN 130 NCE 2009 dated 26/11/2009 (1 MW) 1

284

Dakshina Kannada

Shravana Raj Power Projects Pvt. Ltd.

Yellur & Kellur MHS across Yellur & Kellur river near Bidarabettu Village, Belthangadi Taluk in Dakshina Kannada District

ROR EN 339 NCE 2007 dated 19.5.2009 2

285Shimoga Shree Channesha Powers Kumadavathi river at Anjanapura village of

Shikaripura taluk in Shimoga DistrictROR EN 297 NCE 2010 dated 16/09/2010 (5 MW) 5

AHEC-IITR/SHP Data Base/July 2016 138

Page 22: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

286

Dakshina Kannada

Soham Kolavur Renewable Energy Pvt. Ltd.

Kolavur MHS across Phalguni(Puchamogaru/Gurupur) river, near Kolavur Village of Mudabidre Taluk in Dakshina Kannada District

ROR DE 239 NCE 2002 dated 10/10/2002(6 MW, M/s Phalguni Power Projects Pvt. Ltd.-II ), DE 78 NCE 2003 dated 04/04/2003 (M/s Phalguni Power Projects-II (A division of Ground & Air Technical Services (P) Ltd.),DE 289 NCE 2003 dated 07/01/2004(change of taluk & district), EN 423 NCE 2006 dated 09/11/2006(3 years), EN 438 NCE 2006 dated 15/2/2007(9 MW), EN 176 NCE 2011 dated 04/08/2011 (Change of name to M/s Soham Kolavur Renewable Energy Pvt. Ltd. & 3 years TE from 24/05/2010), EN 463 NCE 2011 dated 07.05.2012 (9 to 18 MW), EN 174 NCE 2013 dated 16.09.2013 (TE upto 23.05.2016)

18

287Shimoga Soham Renewable Energy

India Pvt. Ltd.Talakalale MHS across Talakalalehole near Talakalale village of Sagar Taluk in ShimogaDistrict

ROR EN 440 NCE 2006 dated 17/03/2007(M/s. Abhram energy Pvt Ltd.), EN 437 NCE 2007 dated 10/12/2007(change of name to M/s. Soham Renewable Energy Pvt Ltd.)

2

288

Shimoga Sree Nandi Basaveshwara Power Gen. Co.

Bhadra R.B.C. MHS across 22nd Distributory @ 2nd & 3rd KM Bhadra RBC atYadehalli Village of Bhadravathi Taluk in Shimoga District.

ROR EN 292 NCE 2009 dated 25/11/2009 0.18

289

Chikkamagalore Sterling Estates & Properties Ltd.

Hegadde MHS across Narle gundi stream at Hegadde village of Balehonnur taluk in Chikkamagalore District

ROR EN 125 NCE 2009 dated 16/2/2010 (3 MW) 3

290Bangalore rural Tarini International Kanayatana MHS across Arkavati river near

Sangam, Bangalore District.ROR EN 215 NCE 2007 dated 23.06.2007 7

291

Uttara kannada Trident Power Systems Ltd.

Kannadagal MHS across Kali River Kannadagal Naala Stream near Kannigeri Village of Yallapur Taluk in Uttara Kannada District.

ROR EN 63 NCE 2008 dated 05/08/2009 (10 MW) 10

292Hassan Trimurthi Power Pvt. Ltd. Kurkamane MHS across Addahole near

Bisle Village, (Kurkumane) of Sakaleshpur Taluk in Hassan District.

ROR EN 313 NCE 2006 dated 16/01/2006 (24 MW) 24

293Belgaum Vara Siddi Vinayaka

Energy Pvt. Ltd.Kittur -I MHS across Markandeya river at Kempatti Village of Gokak Taluk in Belgaum District

ROR EN 218 NCE 2007 dted 5/10/2007 2.5

294Chikkamagalore Varunodaya Power Pvt.

Ltd.Across Karle Hole near Kalasa Village, in Mudigere Taluk, chikkamagalur District.

ROR EN 441 NCE 2006, Dated 10/12/2008(1.5 MW) 1.5

295Mandya Venika Green Power Pvt.

Ltd.Locate at Near Chikka Makalli Village, Malavalli Taluk,

ROR DE 339 NCE 2006 dated 16.10.2006 & EN 154 NCE 2007 dated 15.5.2007

24.75

296Chikkamagalore Venkata Satyanarayana

Power Pvt. Ltd.Hulavalli MHS across Bhadra river at Hulavalli Village, Kalasa in Chikkamagalore District

ROR DE 322 NCE 2002 dated 27/01/2003(3.5 MW), EN 72 NCE 2006 dated 07/03/2006(36 months), EN 284 NCE 2009 dated 27/11/2009. (7.5 MW, 31/12/2010)

7.5

297Udupi Vijaya Durga Power

Proejcts Pvt. LtdAcross right bank of sita nadi in kelachawadi village, karkala taluk,

ROR EN 19 NCE 2008 dt 23/2/2010 5

298Chamarajanagar Vijaya Green Power Pvt.

Ltd.Across Souparnika/Kollur river near Janmane Village, Kundapur Taluk, udupi District.

ROR EN 52 NCE 2006 dated 17.3.2007 EN 224 NCE 2008 dated 22.8.2008

24.75

AHEC-IITR/SHP Data Base/July 2016 139

Page 23: Karnataka Under Construction - Alternate Hydro …ahec.org.in/.../Karnataka_under_construction_projects.pdfKarnataka Under Construction lNo MHS District Company Location Type GO_Nos

lNo MHS District Company Location Type GO_Nos Capacity Allotted

299Dakshina Kannada

Vyshali Energy (P) Ltd Pallatadka MHS across Kalmakar stream, Palathadka village, sulya taluk

ROR EN 176 NCE 2009 dated 01/02/2010 (6.75 MW) 6.75