Karnataka Power Corporation Ltd. List of files and records Under Section 4(1)(a) of the Right to Information Act 2005
Name of the Office : SE(C)RO Address : No.82, Shakthi Bhavana, 2nd floor, RC road, Bangalore -1
Sl.No File No Subject Opening Date of file
Closing Date of file/running file
Date of transfer of file and authority whom transferred
Nature of file - permanent /Temporary
Remarks
1 2 3 4 5 6 7 8
1 A1STC1/C2(FD) STR- Gerusoppa dam and powerhouse works taken up after flood damages during 2007 monsoon.- vol.1
10.9.07 10.11.08 - T
2 A1STC1/C2(FD) STR- Gerusoppa dam and powerhouse works taken up after flood damages during 2007 monsoon- Vol 2
Nov 08 - - T
3 AVK(SVP) Flood monitoring at SVP during monsoon.
5.8.07 - - T
4 A1X1A(MGHE) SVP MGHE works 31.12.09 - - T 5 A1X1A(LD-Progress
report) Linganamakki dam remedial measures Deep pointing work Agency Dynasoure Concrete Treatment Pvt Ltd- progress work.
28.4.09 - - T
6 A1IO(Env) Environmental studies new projects
3.10.08- -- - T
-
7 A1WO(Compu) Computerization Vol.2 29.3.04 - - T 8 A1X1(Gen) Water supply to Sagar town
from Linganamakki reservoir 10.9.07 - - T
9 A1IO(SHIVA) Shivanasamudram seasonal power house scheme- Vol- III
16.11.04 - - T
10 A1IO(Minischeme/ MGHE(TR)
MGHE Tail race scheme(20MW) Vol 4
22.101999 - - T
11 A1X1A1(DS) CuPl gPv zsU- z
ZjPAi C Z Pjv 2.8.05 - -- T
12 A1IO(Raingauge) Rain gauge and river gauge correspondence
July 03 - - T
13 A1STC1/C2(Misc) Gerusoppa project miscellaneous works
29.6.05 - - T
14 A1WO(Env/RTPS) RTPS- Procurement, installation and commissioning of on line Ambient Air Quality Monitoring Equipment
7.2.09 - - T
15 A1IO(Mini Scheme) MGHE 0 Tail race Power Project executed by M/s. APPL
28.4.09 - - T
16 A1X1A1(SVP gates) Repairs to Power sluice Gates of Linganamakki dam
9.11.06 - - T
17 A1WO(Gen) Experimental ground based cloud seeding in the catchment area if Linganamakki dam reg
12.1.10 - - T
18 A1WO(Gen) General correspondence 9.12.09 -- - T 19 A1IO(Mini Scheme) Private sector participation July 1993 - - T
20 A1IO(Minihydels)/Details Details in a format on mini hydel scheme allotted to KPCL and wit22hdrawn by GoK
Nov 99 - -- T
-
21 A1X1(KWT) Krishna Water Dispute Tribunal Sept 07 - - T 22 A1X1A1(gen) Technical information 31.9.02 - - T 23 A1IO(West
Rivers)/Report Utilization of 2000 TMC of water available from west flowing river
9.10.01 - - T
24 A1IO(Hydro potential) Development of Hydro potential in river basins
- - - T
25 A1IO(H&M dam) Collection of hydrological data of various dams.
5.1.04 - - T
26 A1X1(WR)/TWG) State Water Resource Board/Technical Working Group
22.5.07 - - T
27 A1IO(Padubeedu) Padubeedu Diversion Scheme 30.10.1998 - - T 28 A1IO/CE(I&RE)/Grant in
aid Extra expenditure in carrying out grant in aid works for survey and investigation
- - - T
29 A1G1A Bedthi Run Off the river scheme
12.5.99 29.10.07 - T
30 A1WO(Gen) National water policy 21.11.03 29.8.05 - T 31 A1IO(Pending issues-
GoI Follow up project clearances in New Delhi
21.1.99 7.6.99 - T
32 A1IO(Manehole) Revised DPR of Manehole diversion scheme
15.3.97 18.3.02 - T
33 A1IO(Aghanashini) Aghanashini Hydro Electric Project.- Vol.7
22.1.98 31.7.07 - T
34 A1IO(Cauvery Valley SC)
Power development on D/s. Of KRS in Cauvery basin Vol.7
6.9.03 11.11.03 - T
35 A1IO(Barapole) Barapole Hydro Electric Project Vol 2
4.2.04 14.5.07 - T
36 A1IO(Kalasa diversion) Kalasa Diversion Scheme 24.2.01 19.6.07 - T
-
37 A1IO(Mekedatu/cost reimbursement)
Mekedatu cost reimbursement 11.2.00 9.10.02 - T
38 A1G1A/Bedthi (Samithi) Meeting on small Hydro Projects in Bedthi Gangavali river.
17.3.99 22.11.99 - T
39 A1IO(Tilari /Maharastra) Tilarai River Project (Maharashtra)
20.9.00 1.10.00 - T
40 A1IO(Energy Consultant.Inc)
Utilsation of normal flow in canals and rivers to produce Generation.
July 99 13.8.99 - T
41 A1IO(Land use/2025 AD) Preparation of a prospective land use plan for Karnataka 2025 AD
Aug 00 23.11.00 - T
42 A1IO(Future Projects) Protests on future projects 5.1.05 28.1.06 - T
43 A1IO(Barapole) Barapole H.E.P- Vol1 Spet 85 30.1.04 - T 44 A1IO(WRM) Water resource management in
Karnataka May 99 8.12.04 - T
45 A1G1A/TAS/Bore holes Tattihalla Augmentation scheme 12.2.99 26.10.99 - T 46 A1IO(Maddur) Maddur mini Hydel Schme 18.2.92 6.12.99 - T 47 A1IO(West rivers) Utilization of west flowing rivers 22.11.00 17.1.05 - T 48 A1IO(Brindavan) Vishveshwaraiah canal small
Hydel project- Vol11 23.1.99 28.9.99 - T
49 A1STC1/C2)FD) STR-Gerusoppa dam & Power house works taken after flood damages during flood monsoon Vol 3
Jan 2010 - T
50 A1X1A1(LD) Linganamakki dam remedial measures Vol -5
Oct 2010 - - T
51 A1W5B3(KHEP-1) P gvjU CAi jr Av 2.1.2012 - - T
-
w PAz C r Av
Mv i Pg Pjv
52 A1X1(Gen) Water suppy to Sagar to Town from Linganamakki reservoir
Jan 2008 - - T
53 A1VB1(Gen) J.. - U f Ug v
wx vPU UrAig j
U zq zz Dgtz
dPg CPPV zs
Ag itPV Ai Pj -
Pjv
Feb 2012 - - T
54 A1K2B1(Ulvi) KHEP-I- Suspension bridge across kali river ( Ulvi) Vol 2
Mar 03 - - T
55 A1W5B2( Roads) KHEP Stage II Improvements to roads
July 2011 - - T
56 A1X3R5 SVP_ Repairs and asphalting to Bidarur Indrodi road
June 2011 - - T
57 A1X1A(HRW) Repairs to head regulator works of SVP ( Repairs to Power Channel) vol- VIII
Feb 2012 - - T
58 A1W5B2( Roads) KHEP Stage II Improvements to roads vol6
Jan 2008 - - T
59 A1X1A(SVP Gates) Repairs to gates of SVP- Vol -II Jan 2010 - - T
60 A1VB1 VHEP_ Construction of road near Nagar to Balekoppa in the back waters of Linganamakki dma
April 2011 - - T
61 AWO(Roads) Use of RBI grade -81 additive to enhance the properties of soil.
Sept 2012 - - T
-
62 A1X3CO(WS/EIRL) WS/EIRL Committee meetings vol VIII
July 2011 - - T
63 A1W5RH KHEP-II- Construction of Guru Bhavan . vol II
Nov 2011 - - T
64 A1X1A(DS) Dam safety- Vol V Nov 2010 - - T 65 A1WO( Dam safety) Installation of Telemetry based
Reservoir monitoring system Aug - 08 - - T
66 A1W5B3( KHEP- I) gUg w PAzz Pjv -
Pgz Uq gg PjP
Pjv-
Jul09 - - T
67 A1W5B2( Road) KHEP- I- Construction of Fott bridge near exit tunnel of Upper Kaneri dam for providing communication facility to Teloli village
July 08 - - T
68 A1WO(Gen) Calling for response /report in HRC No.6750 about Ramanagar RH centre
Jan 2012 - - T
69 A1X3R5 SVP Improvement to roads in submersion area Vol III
Oct 2004 - - T
70 A1VB1( Roads) VHEP Project roads Jan 2010 - - T 71 A1ST(RH) STR) Gerusoppa R& R works
vol-I Dec 98 - - T
72 A1W5RH KHEP- Stage II- Demands of PAFs of Kadra & Kodasalli
July 09 - - T
73 A1X1A(SVP_ Gen) SVP = General civil works Nov 2011 - - T 74 A!X3R5 CgUr gAiP z
g it - UAz DyP
Ai Pj
Sep 2012 - - T
-
75 A1ST(RH) gw vz UAz v
gAUr UU vU v it
- Pjv
May 2012 - - T
76 A1VB1( gen) n Uv z l ( j) zU
itP Cz PjP - Pjv Jan 2010 - - T
77 A1WO(gen) Calling for response /report in HRC No.6749 about Joida RH centre
Mar 2012 - - T
78 A1W5RH Kadra RH centre Dec 2010 - - T
79 A1IO(Mini- MGHE) MGHE- tail race project executed by M/s. APPL
April 04 - - T
80 A1IO(Rain gauge) Rain gauge and river gauge correspondence
Aug 08 - - T
81 A1WO(ENV-RTPS) RTPS- Procurement of, Installation, and commissioning of AAQMS
Mar 09 - - T
82 A1STC1/C2 Gerusoppa Project Miscellaneous works
Dec 2005 - - T
83 A1WO( COmput) Computerization Dec 2004 - - T
84 A1X1A(MGHE) SVP- MGHE works Sept 09 - - T 85 A1X3(JDA) JMA Development of Tourism
activities near Talakalale dam and Jog falls area.
Mar 07 - - T
86 J1J n (Dg Z) Ug Pj Ui gl w
gg rPU Pjv Dec 2010 - - T
87 A1WO(Gen) Providing information under RTI Act
May 2010 - - T
88 A1WO(Gen) Updating of Publication on Hydro Sector by CBIP
May 2010 -- - T
-
furnishing details 89 A1WO(Gen) General correspondence July 2012 - - T 90 A1X3R5 SVP-Improvement to existing
road from Indrodimane to Kudugunji Bridge
11.02.2011 Running
91 A1WO(CSR) Corporate Social Resposibility 17.09.2013 Running 92 A1WO(RTI) Right To Information Act
Correspondance 02.12.2013 Running
93 A1W5C6 Lifting Of Water From Kali River By KNNL Permission reg.,
29.05.2013 Running
94 A1WO(Circular) To Maintain the Orders Of Court 23.09.2013 Running 95 A1W5C6 Permission for lifting
3.50Cusecs of water from Kali River @ Dadeli Town for proposed Drinking Water supply Scheme to Alnavar Town
11.03.2014 Running
96 A1K3B KHEP-Lifting Of Kali Water from private factories
21.01.2009 Running
97 A1WO(NPH)Drain Estimate for Diversion of water drains to the on going work of providing water supply to the KPCL Colony @ Ambikanagar from Nagjhari Power House
05.11.2013 Running
98 A1X3R5 SVP-Repairs and Asphalting to Bidarur-Indrodi road
List of files and records of EEC-1 Division Name of the office : EEC-1 / SE(C)/RO
-
Address : Karnataka Power Corporation Ltd., Project : Bangalore
Sl. No
File No.
Subject Opening date of file
Closing date of file
Date of transfer of file & authority
whom transferre
d.
Nature of file
permanent/
Temporary
Remarks
A
Construction of KPCL new office complex inside Drug controllers office. Palace Road Bangalore
1 1 Drug controllers office correspondence 27.06.2008 01.04.2013
T
2 2 KPCL/Drugs control office space Requirement. 12.09.2008 19.07.2010
T
3 3 Drug controllers office land records 22.07.2009 23.09.2009 T
4 4 Government Approvals NOCS 08.09.2009 01.07.2010 T
5 5 Revised application submitted to BBMP for 9 floors. 19.05.2012 04.02.2013
T
6 6 Construction of auditorium at RC College 01.06.2009 12.02.2013
- T
7 7 Demolition of old buildings at Drug Controllers office premises. 20.03.2009 17.05.2011
T
8 8 Construction of compound wall 20.06.2009* 17.10.2011 T
9 9 Estimate 15.12.2009 29.12.2009 T
10 10 Geotechnical investigations 10.11.2009 21.02.2013 - T
11 11 Architectural consultancy T
(a) Vol-1 09.07.2008 20.08.2010 T
-
(b) Vol-2 09.02.2010 21.12.2012 T
(c) Vol-3 09.09.2010 09.01.2014 - T
12 12 Enhanced commissioning Agency M/s Blue Star 01.08.2009 04.08.2012
- T
13 13 Feasibility Report of STP 20 KLD capacity for KPCL office complex. 08.10.2009 08.10.2009
T
14 14 Digging of Bore well 09.10.2009 10.11.2009 T
15 15 Shifting of UGD line 04.06.2010 02.08.2010 T
16 16 Shifting of LT power line 14.06.2010 06.10.2010 T
17 17 NIT and correspondence 2 Nos 16.01.2010 25.06.2011 T
18 18 Claims of Agency 16.11.2011 28.09.2012 T
19 19 Expert opinion 20.11.2010 10.05.2011 T
20 20 Approval of materials 30.05.2011 20.06.2011 T
21 21 Claims 20.07.2010 08.10.2010 T
22 22 Extra/Excess Items 08.09.2011 26.10.2011 T
23 23 Formation claims committee 17.10.2012 02.01.2013 T
24 24 EIRL/Work slip 17.01.2011 28.08.2012 T
25 25 Progress (i) Vol-1 02.02.2011 28.05.2013 T
(ii)Vol-2 06.03.2013 16.11.2013 T
26 26 Termination of contract 11.11.2011 11.09.2014 T
27 27 Legal correspondence 29.07.2013 18.09.2014 T
28 28 Final measurements 28.05.2013 18.09.2014 T
29 29 Reinforcement steel 17.10.2002 14.08.2012 T
30 30 Correspondence with Agency M/s Unity Infra projects Mumbai. Box file Vol-1 06.05.2010 25.10.2011
T
Vol-2 21.04.2010 14.09.2012 T
Vol-3 14.09.2012 31.01.2013 T
31 31 RA Bills submitted to A/C 20.09.2010 05.10.2012 T
-
32 32 Passed RA Bills T
Vol- 1 27.10.2010 26.10.2012 T
Vol- 2 19.07.2012 15.09.2012 T
33 33 Cube test out-ward letters to civil Aid
T
34 34 Cube Testing Reports T
35 35 RA Bills submitted by contractor T
36 36 Drawings received Reports T
37 37 Approved drawings Architectural and structural 9 files
- -
T
38 38 Electrical Correspondence 08.06.2010 26.12.2013 T
14 14 Digging of Bore well 09.10.2009 10.11.2009 T
15 15 Shifting of UGD line 04.06.2010 02.08.2010 T
16 16 Shifting of LT power line 14.06.2010 06.10.2010 T
17 17 NIT and correspondence 2 Nos 16.01.2010 25.06.2011 T
-
19 19 Expert opinion T
20 20 Approval of materials T
21 21 Claims T
23 22 Extra/Excess Items T
24 23 Formation claims committee T
25 24 EIRL/Work slip T
26 25 Progress (i) Vol-1 (ii)Vol-2
T
27 26 Termination of contract T
28 28 Final measurements T
29 29 Reinforcement steel T
30 30 Correspondence with Agency M/s Unity Infra projects
Mumbai. Box file Vol-1 Vol-2 Vol-3
T T T
31 31 RA Bills submitted to A/C T
32 32 Passed RA Bills Vol- 1
Vol- 2
T
33 33 Cube test outward letters to civil
Aid
T
34 34 Cube Testing Reports T
35 35 RA Bills submitted by
contractor
T
36 36 Drawings received Reports T 37 37 Approved drawings
Architectural and structural 9 files
T
38 38 Electrical Correspondence T
-
39 39 Technical Sanctioned Estimate T
B Construction of balance works of KPCL office complex inside the Drugs Controllers Office
Premises Palace Road Bangalore
39 39 Technical Sanctioned Estimate 13.11.2013
T
40 40 NIT CORRESPONDANCE --
T
VOL-I T VOL-II T
41 41 Credentials of M/s Unity infraprojects Ltd Mumbai
T
42 42 RTI Correspondence- M K Krishna, Bangalore
T
43 43 Correspondence- M K Krishna, Bangalore
T
44 44 RTI Correspondence- Sri L.B singh, Dhanbad.
T
45 45 Construction of balance works of KPCL office
-
complex inside the Drugs Controllers Office Premises Palace Road Bangalore- Call-II- NIT EVENTS
VOL I T VOL - II T
46 46 AGENDA NOTE for Technical committee
T
47 47 Original bank Guarantees T
-
List of files and records of EEC-1 Division Name of the office : EEC-1 / SE(C)/RO Address : Karnataka Power Corporation Ltd., Project : Bangalore
Sl. No
File No.
Subject Opening date of file
Closing date of file
Date of transfer of
file & authority
whom transferred.
Nature of file
permanent/ Temporary
Remarks
A Extension to existing Drugs controllers office complex Palace Road Bangalore.
1 1 Draft agreement Vol 1 old 26.07.2010 08.06.2011 T
2 2 Draft agreement Vol 2 New 07.09.2012 06.03.2013 T
3 3 Main file Vol III 30.07.2012 02.03.2013 T
4 4 LOA details Vol IV 02.03.2013 18.08.2014 T
5 5 EIRL/WORKSLIP 05.09.2013 11.09.2014 T
6 6 Electrical correspondence 28.12.2013 18.08.2014 - T
7 7 Architectural consultancy Bills 16.10.2009 29.04.2014 T
8 8 Estimate 08.08.2012 06.09.2012 T
9 9 Tender document for approval 22.09.2012 03.10.2012 T
10 10 NOC (BESCOM,BW&SSB,Fire and Emergency) 22.03.2011 16.12.2011
- T
11 11 Tenders vol -1 29.03.2010 26.04.2011 T
12 12 Tenders vol - 2 14.06.2010 24.12.2012 T
13 13 Termination of contract 24.10.2011 24.08.2012 T
14 14 PQR Requirements New 05.04.2012 20.10.2012 - T
15 15 Tender document 07.09.2012 07.09.2012 - T
-
List of files and records under section 4(1) (a ) of the Right Information Act 2005
Name of the office : SE(C)/RO Address : Karnataka Power Corporation Ltd., Project : R.T.P.S
16 16 Cover 1 e- procurement down load copy (Box file) 26.10.2012 26.10.2012
T
17 17 NOC applications (Box file) 06.06.2011 06.06.2011 T
18 18 Tender Drawings - - T
19 19 Fire and safety final Drawings - - T
20 20 Drawings for estimate - - T
21 22 Emergency advance 20.11.2010 27.11.2010 T
22 23 Purchase of safety materials 25.11.2010 21.06.2013 T
23 24 Expert opinion 14.06.2013 23.08.2013 T
24 34 Steel/Concrete Test reports 16.05.2013 T
25 36 Passed RA bills 19.06.2013 T
26 37 RA bills OC 19.06.2013 T
27 38 RA bills submitted by agency 11.06.2013 T
28 39 Site inspection 11.07.2013 T
29 40 Correspondence with agency (Box file) 06.04.2013
T
Sl. No
File No. Subject Opening date of file
Closing date of file
Date of transfer of file
& authority whom
transferred.
Nature of file permanent/ Temporary
Remarks
1 A1 HO A(Oil RTPS- Reconstruction 11.09.2012 15.04.2013 T Closed
-
decantation well)
of gravity concrete retaining wall adajacent to oil decantation well near main nala
2 A1 HO C8(UNIT 5 & 6)
RTPS UNIT 5 & 6 Civil works of station building- claims of M/s G.J.Fernandez
T Closed
3 A1 HO C5C RTPS Cooling water tunnel system: 1)cooling tower 2)Pump house
23.08.2007 26.09.2014 T Running
4 A1 WO (LA/LC) LA& LC Question & Replies
T Closed
5 A1 HO C(Compound wall)
RTPS-Raising the peripheral compound wall of plant at RTPS.
25.08.2008 21.01.2009 T Closed
6 A1 HO K1(CSB)) Construction of coal sampling building in CHP area at RTPS
31.01.2007 11.09.2009 - T Closed
7 A1 HO A2 (VOL-I)
Release of water from Narayanapura dam.
T Closed
8 A1 HO C RTPS- Improvements to road in plant area (From station building (circle to main gate)
18.02.2012 28.02.2013 T Closed
9 A1 HO C5C(Chimaney)
RTPS- Maintenance of Chimaney
18.2.2014 10.03.2014 T Running
10 A1 HO A2 (VOL-II)
Release of water from Narayanapura dam
07.02.2013 08.06.2013 T Running
11 A1 IO (Pavanaganga)
Pavanaganga Mini Hydel Scheme
02.02.2013 05.06.2013 T Running
12
A1 HOK1 (POB)
RTPS Construction of permanent Office
29.012.2010
02.01.2011
T
Running
-
building for CHP-II & CHP-E
13 A1 HO (Flood Works)
RTPS Plant compound wall: 1)Re-construction of peripheral compound wall of plant near main railway gate and parallel to Bombay Chennai railway track for collapsed length of 130M 2) Re-construction of peripheral compound wall of plant near main nala opposite to sedimentation tank for collapsed length of 135 M.
25.08.2008 31.01.2010 T Closed
14 A1 HO K1(CHP-Misc)
RTPS Coal handling system Miscellane -ous works)
30.03.2007 06.11.2008 T Closed
15 A1 HO (ASH Handling system)
RTPS ASH Handling wetting head system
19.08.2011 04.02.2013 T closed
16 A1 HO K1(CB) Construction of additional room to coal Bhavan at RTPS
03.01.2007 13.01.2007 Closed
17 A! HO (Audit) RTPS Audit paras T Closed 18 A1 HO
A(Maintenance) RTPS WelCome Arch at the entrance of RTPS plant site
04.09.2006 24.06.2008 T Closed
19 A1 HO A2(VOL-I) RTPS Flow in Krishna River for pumping raw water release of water from
12.05.1993 15.02.2012 T Closed
-
Narayanapura reservoir regarding
20 PA1 WO(Gen-Cess)
Construction workers welfare cess
11.12.2008 T Closed
21 A1 HO (RTM) RTPS Maintenance of railway tracks in marshalling yard
21.04.2011 11.02.2014 T Running
22 A1 HO C7(ASH
BUND) RTPS-Maintenanc of ASH BUND)
15.04.2008 04.01.2012 T Closed
23 A1 HO K1(Tax) RTPS Payment of tax for land buildings and license for plant.
P Running
24 A1 HO(Mill reject coal)
RTPS- Transportation of mill reject coal)
31.03.2013 11.10.2012 T Closed
25 A1 HO K(QC building)
RTPS- Construction of Quality Control Office & Laboratory building
06.11.2012 24.12.2012 T Closed
26 A1 HO K(Ware House)
RTPS extension of ware house No.3)
04.06.2008 20.07.2009 T Closed
27 A1 HO R(RHH) Raichur-Hyderabad Highway
28.10.2006 08.06.2007 T Closed
28 A1 HO (TRR-M-YARD)
RTPS- Providing through rail renewals (TRR) works in marshallling yard
10.10.2008 05.06.2014 T Closed
29 A1 HO W5 C(Repairs)
RTPS-Repair & pretrofitting works to the exposed reinforcement of cooling towers at UNIT I & II & chimaneyi
20.11.2012 05.06.2013 T Closed
30 A1 HO K(CHP) RTPS- Providing pavement concrete in the rock coal yard in
11.03.2008 12.04.2012 T Closed
-
CHP area. 31 A1 HO C(Station
building) RTPS Station building works
10.11.2011 08.08.2012 T Closed
32 A1 HO (RTM) RTPS Extension of Reception railway tracks in marshalling yard
04.07.2009 22.12.2012 T Closed
33 A1 HO (Repairs) RTPS-Repair works for damages occured during heavy rain or flood from 30.09.2009 to 03.10.2009
04.11.2009 10.11.2009 T Closed
34 A1 HO A RTPS-Formation of Kadloor-Arashinagi diversion road
11.12.1987 09.07.2007 T Closed
35 A1 HO C8(5 & 6) VOL-IV
RTPS- UNIT 5 & 6 Civil works of station building claims of M/s G.J.Fernandez
17.06.2004 07.03.2014 T Closed
36 A1 HO C8(5 & 6) VOL-IV
Claims of M/s G.J.fernandez RTPS Stage-III Unit 5 &6 of station building
22.05.2008 19.12.2009 T Closed
37 A1 HO A(Maintenance)
RTPS- plant main tenance works(Civil works)
13.01.2013 12.03.2013 T Closed
38 A1 HO C5C(CHP)
RTPS- Coal handling system strengthening of column structures of conveyars
143.06.2010 29.06.2013 T Closed
39 Vol-1 RTPS UNIT 5&6 Claims of GJF
T Closed
40 General correspondence -1
28.01.2012 14.08.2014 T Running
41 RTPS UNIT 5&6 T Closed
-
Variation in quantites Claims of M/s G.J.Fernandez
42 A1 HO K1 (CHP) Improvements to coal handling plant area
21.07.2010 09.04.2012 T Closed
43 A1 HO C5C RTPS-Stage -1 Claim of G.J.Ferendez In respect of unit 1&2 cooling water tunnel part- 4 & General civil works-2
T Closed
44 A1 HO A2 (Girijapur)
Construction of barrage across Krishna River near Girijapur Village Raichur Dist
02.05 2013 26.09.2014 T Running
45 A1 HO A2 Vol-1 RTPS- Alternative proposal for mitigating shortage of water
T Closed
45 (a)
A1 HO A2 Vol-2 RTPS- Alternative proposal for mitigating shortage of water
05.08.2013 21.03.2014 TT
-
List of files and records under section 4(1) (a ) of the Right Information Act 2005
Name of the office : SE(C)/RO Address : Karnataka Power Corporation Ltd., Project : R.T.P.S/Roads and buildings
Sl.No File Subject Opening
date of file Closing date of file
Date of transfer of file & authority Whom transferred
Nature of file permanant/ temporary
Remarks
1 A1 W5 K/NRB(RTPS)
Construction of permanent Office building (administrative building at RTPS)
31.08.2006 19.12.2007 T Closed
2 A1 WO(consultancy)
Bridge-cum-barrge across river Krishna near Gugal, Raichur district
07.07.2001 07.05.2002 T Closed
3 A1 WO(Consultancy)
Proposed district office complex at Bagalkot
24.01.2001 25.07.2001 T Closed
4 A1 HO H7(Delegation)
RTPS UNIT 7- delgation ceremony approval of emergent work procurement for guest house
16.10.2002 01.01.2004 T Closed
5 A1 HO K1 RTPS(Shakthinagar) Non-residential buildings (Dr.Ambedkar Bhavan)
T Closed
6 A1HO(Roads)VOL-II
Concreting/Asphalting to the roads from coal sampling room to nala No.4 widening and
18.01.2012 07.12.2012 T Closed
-
construction of storm water drains.
7 A1 W5 K9Cont/RTPS)
Construction of canteen building at Shakthinagar colony
30.08.2011 13.02.2012 T Closed
8 Design/ supply, installation ,testing and commissioning of power fencing of the RTPS compound wall
19.05.2011 19.05.2011 T Closed
9 A1 HO A Maintenance raising and protection of plantations, up-keeping and maintenance of gardens, providing stone benches and garden ornaments in the park rising of plantations at YTPS, maintenance of plantations at RTPS
03.05.2011 25.02.2013 T Closed
10 A1 HO (Misc-RTPS)
Miscellaneous matters of RTPS
13.06.2006 13.03.2010 T Closed
11 A1 HO (Gen) RTPS (Generals) 27.06.2006 23.02.2012 T Closed 12 A1 H1(Gen) Disposal of building at
JawaharNagar colony, Raichur
28.03.2008 21.04.2013 Closed
13 A1 W5 K NRB(RTPS)/green building
Construction of new office complex at RTPS at green building
29.11.2007 04.06.2010 T Closed
14 A1 HO K RTPS Construction of residential building at Shakthinagar colony
04.07.1996 12.12.2003 T Closed
15 A1 HO K1-1 RTPS colony extension of Dr. Ambedkar Bhavan
23.10.2000 23.10.2007 T Closed
16 A1 W5 RTPS Miscellaneous 28.07.2011 18.12.2012 T Closed
-
K(RTPS) works. 17 A1
WO(ENV)/RTPS
RTPS Procurement, installation and commissioning of on line ambient air quality montering equipement
11.11.2008 07.12.2012 T Closed
18 A1 HO(Roads) Concreting/Asphalting to the road from coal sampling room to nala No.4, widening and construction of storm drains- Tender Acceptance-reg
28.08.2008 29.03.2011 T Closed
19 A1 HO(RPCL-GEN)
Correspondence pertaining to RPCL at RTPS
20.03.2010 25.20.2010 T Closed
20 A1 W5 K/RB/RTPS
Residential buildings at RTPS colony
16.05.2011 16.03.2013 T Closed
21
A1 HO K(RTPS-CISF)
Taking up of civil works for reconditioning of Thermal dormitory rooms to accommodate the CISF personnels at RTPS
11.03.2009
08.02.2010
T
T
Closed Closed
22 A1 HO (Roads)
Concreting/Asphalting to the roads from coal sampling room to nala No.4, widening and construction of storm water drains - Tender acceptance regarding
T Closed
23 A1 HO (Arch) RTPS- Construction of Arch to Shakthinagar
09.02.2010 15.11.2010 T Closed
-
List of files and records under section 4(1) (a ) of the Right Information Act 2005
Name of the office : SE(C)/RO Address : Karnataka Power Corporation Ltd., Project : R.T.P.S/Running Files
colony 24 A1
W5(Colony) Improvements to the infrastructures facilities in the existing colonies of KPCL-RTPS
03.07.2008 07.02.2009 T Closed
Sl.No File Subject Opening date of file
Closing date of file
Date of transfer of file & authority Whom transferred
Nature of file permanant/ temporary
Remarks
1 A1 W5 K (RTPS)
Miscellaneous works( providing drain cleaning services through truck mounted Jatting-cum suction machine
31.03.2012 T Running File
2 TCH/RW/2010-11
Release of water from Narayanapura dam
20.03.2010 T Running File
3 A1 HO(colony roads)
Development of roads in the colony area (Re-carpeting to the roads at type VII area Tungabhadra block for the year 2013-14.
06.11.2013 T Running File
4 A1 HO(colony roads)
Development of roads in the colony area (from Post
04.02.2013 T Running File
-
Office to Deosugur gate and Dr. Ambedkar park to Mango garden
5 WRM/Gen 0Ug U Czg vv 27 grv vPU PrAi g U CAvd UU jgPAqP gw, CW U vAU U vAz g vg Aid Pjv
26.12.2013 T Running File
6 A1 HO(Misc) Pending issue regarding 22.10.2011 T Running File 7 J1 Z
N/Evg fAz Pqw j f Eg dU Dg w J Eg /vd g qwg U
01.02.2014 Running File
8
A1 HO(ASH)
Collection of floating wet Ash(cenosphere) from ash pond 1 & 2 at RTPS
04.03.2014
T
Running File
9 J1 J3 J gAiZg Sv zv PAz QUg v Zj U Pjv.
21.01.2013 T Running File
10 J1 Z J2 gAiZg fAi P U VjegAz AUzgU ge it iqwz Cz q Pi ge it ir CP iPq U
30.05.2014 T Running File
11 J1 1 J Shri Zindavali addressed a letter to Secretary National
27.06.2014 T Running File
-
List of files and records under section 4(1) (a ) of the Right Information Act 2005
Name of the office : SE(C)/RO Address : Karnataka Power Corporation Ltd., Address : No: 82, Shakthi Bhavan, IInd floor, RC Road, Bangalore-1.
Karnataka Power Corporation Ltd.
Human Right Commission, New Delhi regarding
Sl.No File Subject Opening date of file
Closing date of file
Date of transfer of file & authority Whom transferred
Nature of file permanant/ temporary
Remarks
1 1 Tender file of house keeping for the year 2013-14
2013-14 Running T
2 Rent file 2012 onwards
Running T
3 Property Tax file of Shakthi Bhavan
2012 Onwards
Running P
4 KPCL Guest House File a)Koramangala/Tender files for disposing
2012 Onwards
Running T
5 Registration of Establishment employing contract labour
2012 Onwards
Running T
-
List of files and records Under Section 4(1)(a) of the Right to Information Act 2005
Name of the Office : SE(C)RO
Address : No.82, Shakthi Bhavana, 2nd floor, RC road, Bangalore -1
Sl
no
File no Subject Opening
date of file
Closing
date of
file
Date of transfer
of file and
authority whom
transferred
Nature of file
Permanent/Tem
porary
Remarks
-
1 A1X3/MGHE MGHE Maintenance works 05.06.2014 - - T -
2 A1W5K2(Hgadi) Maintenance works at Hosangadi colony 05.01.2013 - - T -
3 A1X3K(Jog-
Kargal)/Gen
Estimate for extension to KPCL Junior college
building at MGHE Colony
01.12.2008 - - T -
4 A1WO(Audit) Internal Audit 20.09.2011 - - T -
5 A1STR(Gerusoppa-
Gen)
Miscellaneous works at Gerusoppa colony 30.05.2013 - - T -
6 A1X3K(Jog/Kargal)/
Dismantling
SVP- Proposal for dismantling of old and unfit
vacant temporary quarters at Linganamakki colony
20.10.2009 - - T -
7 A1X3K(Jog-Kargal) Miscellaneous works at Jog-Kargal 13.08.2014 - - T -
8 A11X3K(Jog-Kargal)/Gen
Land slide on Approach road to MGHE Power House
30.05.2014 - - T -
9 A1WO(LD-Seepage) Seepage analysis of Linganamakki dam 06.08.2011 - - T -
10 A1WO(Gen) Pending issues 01.08.2011 - - T -
11 A1X3K(SVP-
Jog)Dismantling
Proposal for dismantling and disposing of old
and unfit permanent and temporary quarters at
SVP colony, Jog
28.10.2009 - - T -
12 A1WO(Gen) General file 24.06.2013 - - T -
13 A1WO(E-Pr) E-Procurement Portal 22.12.2009 - - T -
-
14 A1WO(S-tax) Service tax 25.08.2012 - - T -
15 Almatti works 10.07.2009 - - T -
16 A1WO(Gen) Contractor Sri. Sugappa Gurjapur
Permission to participate in the tender
29.03.2011 - - T -
17 A1X3K(SVP-RB) Construction of A, B,C type quarters at SVP-
Vol-II
25.04.2007 - - T -
18 A1VK(BHEP-Roads) BHEP Estimates for the proposed for
carrying out improvements to approach roads to Bhadra left and right bank power house,
river tern jungle lodge resort at BHEP from Lakkavalli Shimoga road Administrative
approval
26.06.2009 - - T -
19 A1ST(L/B Road) Proposed improvements of STR left bank
roads Nagarabasthikeri Kodani road
17.10.2001 - - T -
20 A1X3k(SVP-NRB) Non residential buildings at Jog, Kargal and
Linganamakki colony-Vol-I
01.08.2006 - - T -
21 A1WO(Gen) Gvg Pq fAi P g Uz PmAi Gzv P.E. Vq it Uz z U
23.08.2011 - - T -
22 A1W5K(Shiva/Shims
ha)
Water supply system for Shivanasamudram
and Shimsapur colonies
14.05.2010 - - T -
23 A1X3K(APP)/(Jog-
Kargal)
Strengthening of roof surface by providing
APP membrane for RCC roof of permanent
residential buildings at Kargal colony
31.10.2013 - - T -
24 A1X1A(DS)/Gerusop
pa
Gerusoppa dam Miscellaneous works 21.06.2014 - - T -
-
25 A1X3K(Kargal)Dism
antling
SVP Proposal for dismantling and disposal
of old and unfit vacant temporary quarters at
Kargal colony
19.09.2009 - - T -
26 A1WO(Gen) APm Utw z z fuzgz V Cz qUq U
05.08.2011 - - T -
27 A1X1M(Asset) Munirabad Power House Handing over of
Guest house to Indian reserve battalion,
Munirabad unit
26.08.2008 - - T -
28 A1STK(Misc) Gerusoppa Hydro Electric Project Sparing of
residential quarters and dormitory for running
morarji desai pre-university residential college
jyothinagar colony, Gerusoppa
12.03.2010 - - T -
29 A1X3K(SVP-NRB) Non residential buildings at Jog, Kargal and
Linganamakki colony-Vol-II
06.02.2013 - - T -
30 A1X3K(Jog-
Kargal)dismantling
Dismantling of Temporary residential
buildings at MGHE colony -Jog
14.10.2009 - - T -
31 A1X1A(GHEP-
Gates)
GHEP Estimates for the work of providing
painting to radial gates and stop log elements of Gerusoppa dam Administrative approval
09.04.2014 - - T -
32 A1YA1(Bhadra) BHEP Bhadra colony works 18.06.2005 - - T -
33 A1X3K(SVP RB) Construction of residential buildings at Jog -
Kargal
21.06.2006 - - T -
34 A1X1M (Assets) Bifurcation of assets at Munirabad Power
House generating station -
18.08.2007 - - T -
35 A1X1MGHE(Assets) Bifurcation of assets at MGHE Jog 07.05.2014 - - T -
-
36 A1X3K(Tax) Payment of self-assessment of tax to Pattan
Panchayat - Jog Kargal
- - T -
37 A1W5K2(Kadra-Tax)
Kadra Colony-Payment of Tax to Panchayat 21.02.2009 - - T -
38 A1X3K(Anagar
Tax)
KPCL Buildings at Ambikanagar Colony
Payment of Tax
24.01.2012 - - T -
- - T -
40 A1 K3 C3 (Kodasalli)
Maintenance of Kodasalli Dam and Appurtenant works
30.03.2009 - - T -
41 A1 W5K-(RB-
`Anagar)
Buildings at Ambikanagar -Vol-V 02.05.2007 - - T -
42 A1 W9 (Hidkal) Works
Hidkal Colony Works 05.08.2008 - - T -
43 A1 W5
K/NR/A/Hospital
KHEP Stage-I- Improvement and extension
work to Hospital Building at Ambikanagar
02.01.2009 - - T -
44 A1 W5 K(Anagar) KHEP Tender for the work of Patching of
pot holes and depression filling of
Ambikanagar Colony roads
16.02.2008 - - T -
45 A1 WO (Gen) Water supply to NPCIL colony at Mallapur &
Hubli Dharwad & other issues
04.03.2002 - - T -
46 A1 W5 K(Anagar) Construction of Office Complex at
Ambikanagar
05.02.2005 - - T -
47 A1 W5 K2 (Colony) KHEP-II Proposal for dismantling & disposal of unfit Temporary quarters Type T-3,
T-4, T-5 & T-6 at Kadra Colony on as is where is basis through tender cum-auction
22.01.2009 - - T -
-
48 A1 W5 K
(Dismantling)/AN
Dismantling of unfit/dilapidated buildings at
Ambikanagar Colony
10.02.2009 - - T -
49 A1 X 3 K(GGudi) Office Complex at Ganeshgudi 24.01.2012 - - T -
50 A1 W5 K (GG) 1)KHEP Stage I Impairment of assets and
implementation / identification of physically
damaged buildings at Ganeshgudi Colony
2) KHEP-I Improvements to school ground
stage including chain link fencing at
Ganeshgudi
3) KHEP-I Improvement and Asphalting of
Ganeshgudi Colony Roads
4) Anti Terminate Treatment - Ganeshguid &
Ambikangar
25.04.2008 - - T -
51 A1 W5 K(Anagar) Construction of High School Complex with
Other related works at Ambikanagar
24.11.2009 - - T -
52 A1 WO (Gen) Sparing of Residential and Dormitory for
running Morarji Desai School at Ganeshgudi
18.08.2011 - - T -
53 A1 W5 K2 (Kadra) KHEP- Stage II Strengthening of the roof
Surface by providing APP membrane to the
roof of permanent residential and non
residential building at Kadra Colony
31.03.2008 - - T -
54 A1 WO (Gen) Disposal of Buildings at Ambewadi/Dandeli Vol-V
29.04.2010 - - T -
55 A1 W5 K2 (Kadra) Maintenance / Miscellaneous works of Kadra
Colony Vol 3
04.02.2006 - - T -
56 A1 W5 C6 (SPH
Road)
KHEP-I Improvements and Asphalting of
Supa Dam Power House Road
30.01.2013 - - T -
-
57 A1 25 K (G.Gudi) KHEP-Stage-1 Adjustment of Royalty amount
towards rent dues of Forest Department
22.02.2008 - - T -
58 A1 W5 K2 (Anagar) Ambikanagar Colony Works 05.02.2013 - - T -
59 A1 W5 K2
(Kodasalli)
KHEP-II-Construction of residential Quarters
for security Personnel and DAR Guard staff
near Kodasalli Power House
25.10.2008 - - T -
60 A1VR Road works comprising of Sharavathy valley project (VHEP)
04.07.2008 - - T -
61 A1VC7 VHEP Hulical Forebay dam 02.06.2011 - - T Closed
62 A1VC7 VHEP Hulical Forebay dam 20.04.2009 - - T -
63 A1VK(Main-
Mkatte)
Masthikatte Colony Maintenance works
Vol-II
14.03.2014 - - T -
64 A1X5K
(Hosangadi/Dsmantl
ing
VHEP Dismantling of Type-1 tiled roof
residential 99 tenements (50 blocks) at
Hosangadi colony in two phases
30.04.2012 - - T -
65 A1VK(Roads)H VHEP Estimate for the work of upgradation
of road (Ch 0 m to 4400 m) to VUGPH from
Hosangadi colony
24.10.2009 - - T -
66 A1VC(drilling) VHEP Drilling of blocked foundation
drainage holes of Mani dam
17.01.2008 - - T -
67 A1VC(Gen) VHEP Mani dam 28.0.2009 - - T -
68 A1X3K(Tax) KPCL buildings at Hosangadi colony
Payment of tax
07.01.2008 - - T -
-
69 A1VK(NRB)H VHEP Construction of Office complex at
Hosangadi colony
28.09.2013 - - T -
70 A1VK3(MISC)/H Miscellaneous works at Hosangadi colony 23.09.2005 - - T -
71 A1CK(Chakra dam) VHEP Maintenance of Chakra dam 14.12.2009 - - T -
72 A1VC(Gen) VHEP Pick up dam Reaming of foundation
drains and body drains
24.01.2007 - - T -
73 A1VC (Gates) VHEP Special repairs of chakra, savehaklu,
kyragunda and intake structure gates Workslip
07.10.2008 - - T -
74 A1VC(HSR) Improvements to HOsur saddle dam top road 27.12.2008 - - T -
75 A1VK(Roads) VHEP Improvements of dam site roads
(Hulical checkpost to MDPH)
19.12.2007 - - T -
76 A1VC1(MDPH) Construction of Store room at MDPH premises 04.03.2010 - - T -
77 A1VC-II Varahi under ground power house II stage 28.06.2006 - - T -
78 A1VC(PD) Maintenance of pick up dam 01.10.2010 - - T -
79 A1VC (mining) VHEP Mining activities in water spread area
of mani dam
04.09.2008 - - T -
80 A1V7C VHEP Hulical forebay dam (Installation of
stand pipe pizo meters)
14.12.2009 - - T -
81 A1VC2 Hulical forebay earthen dam - - T -
-
82 A1VC2 (Vol-II) VHEP Hulical forebay dam (CNMC) - - T -
83 A1VC7 (Vol-III) VHEP Hulical forebay dam - - T -
84 A1VC2 Vol-I VHEP Construction of Hulical forebay
earthen dam
- - T -
85 A1VC2(A) Hulical forebay dam balance works - - T -
86 A1VC(PD) VHEP Construction of pickup dam from
05.09.2007 to 19.11.2009
- - T -
87 A1VC1 (Misc) Vol-
IV
VHEP Construction of ornamental parapet
wall on top of mani dam from 30.01.2003 to
09.08.2007
- - T -
89 A1WO(Gen) AUQ P MU Eg gg z z iqzg V AiiU Ai tU PU dAP m q U
19.10.2013 - - T -
90 A1WO(Gen) AUQ PAi eg Pzg Uz U dAnU PU ijPA zAiP q Pjv
15.12.2012 - - T -
91 A1VC(Gen) VHEP Construction of security check post at
Chakra dam, chakra control structure
(Sampekatte), savehaklu control structure and
Kyragunda control structure Fore closure of
contract
29.10.2013 - - T -
92 A1W5K2(Kadra) KHEP-II Providing and fixing TATA blue
scope steel colour coated trapezoidal sheets for
05.03.2014 - - T -
-
roofing to godown no.4 at Kadra colony
Administrative approval
93 A1WO(Gen) Request for providing daily inflow data of
Linganamakki reservoir
07.03.2014 - - T -
94 A1WO(Gen) AUr zv WlPz gj CAi KNNLU w Pjv
17.05.2014 - - T -
95 A1WO(Gen) Pj jAi xP , AUrAi 8 vgUwUV Pu PPV Cw Pjv
18.02.2013 - - T -
96 A1WO(Gen) 1981 ZP Ugz wl z At y Aiz zgUV DyP g Pjg Pjv
05.09.2012 - - T -
97 A1WO(Gen) Improvements to road at Kadra colony
(KHEP) by PWD Request for transfer of
road to PWD by Honble minister for fisheries, science and Tech
31.10.2011 - - T -
99 A1VK(Bhadra) BHEP-Upgradation/construction of approach
road to river Tern Lodge Bhadra &
permission to Conduct Water Sports at
Talakalale
28.02.2011 - - T -
100 A1WO(Gen) Release of water into the Kali River down
stream from Ganeshgudi reservoir
09.06.2011 - - T -
101 A1WO(Gen) Project for final year B E students of civil
Engg of ACS College of Engineering - permission to collect the details for their
project work reg
22.02.2013 - - T -
102 A1W5K(GG) Elimination of Monkey menace in the project
colonies of KHEP - reg
02.04.2008 - - T -
-
103 A1WO(Gen) CCES WING Submission of Estimates to
HO for approval
06.12.2012 - - T -
104 A1X3K(Jog)(SVP-
RB)
LIGHT VEHICLE PARKING SHED AND
DRIVERS REST ROOM
31.07.2014 - - T
105 Meeting with KPC Employees Union - - T -
106 A1 WO(Gen) CONFERENCE ON REHABILITATION OF
DAMS AND APPURTENANTS
STRUCTURES TO BE HELD FROM 27-28
May 2014
28.04.2014 - - T -
107 A1W5(Bhadra-
colony)
BHEP Proposal of giving 16 tenements of
OG type qtrs. at BHADRA colony to KNNL-
reg
21.12.2012 - - T -
108 A1WO(Gen) One day Technology Awareness program on
USE OF MANUFACXTURED SAND IN
CIVIL CONSTRUCTION on 16th October
2012 at NCB Hyderabad Nomination - reg
25.09.2012 - - T -
109 A1W(Jog) Allotment one vacant quarter to M/s Jog
Holiday Resorts Pvt Ltd
07.01.2013 - - T -
110 A1W5K/A VANAVASI KALYANA (R) STUDENTS
HOSTEL
18.09.2010 - - T -
111 A1X3K(Jog-
Kargal)(Gen)
HILL SIDE SLOPE OCCURRED AT SVP
COLONY, JOG
19.07.2013 - - T -
112 A1WO(Gen) SVP Geological report on Active slide in the
SGS road Remedial measures - reg
25.03.2014 - - T -
113 A1X3K(Jog-
Kargal)(Gen)
Sewage Treatment plant at Kargal colony
Approval to draft NIT
28.09.2012 - - T -
-
114 A1WO(Gen) Allotment of site to SBM Masthikatte Branch 20.06.2014 - - T -
115 A1WO(Gen) zAqAi CArAig vg Uz 182 U Q 18 U Azz UU P t ESU Adg iq U
05.06.2012 - - T -
116 A1WO(Gen) AUrAz iPmU Uz PbjU Avj U
23.01.2014 - - T -
117 J1JP 3 P (eU-PU) Evg
Uz S eUz CPv Plq Pjv
22.09.2010 - - T -
118 A1WO(Gen) PU g UP jz Pj qs Ai Pzg Uz Plq vvPV LnL PfU GAiV q Pjv
26.08.2014 - - T -
119 A1WO(Gen) s|| zsi zg UAg e U zAi s it iq 250 dAP m U q Pjv
06.08.2014 - - T -
120 A1WO(Gen) iPmAi Uz PAiP PUj irg U
14.08.2014 - - T -
121 A1WO(Gen) AUQ qA Dgtz UU P AUAiP Pq U
07.12.2010 - - T -
122 A1WO(Gen) Pv zs Ui Aid(j) PAiPUU Plq q Pjv
30.08.2012 - - T -
123 J1JP 3 P (eU-PU) dg
P. j Uq CzsPg, lt AZAiv, eU PU gjU eU PAi Uz AS: f -191 AaP Pjv
19.09.2013 - - T -
-
124 A1WO(K) AZAivz gV qAiz PAAq Uq it iq Pjv
20.11.2010 - - T -
125 A1WO(Gen) eU-PU lt AZAiv Ai PU r g ESAi eUz CAU Plq it iq Cw Pjv
15.10.2013 - - T -
126 A1WO(Gen) gw Pt Aid eU Aiv Az eg iUV P... qs AigV 1.25 Q. Gzz g Ai u
Pjv
20.10.2012 - - T -