karl hunter cv 01122014

3
KARL HUNTER NEWCASTLE NE28 7JL uk.linkedin.com/pub/karl-hunter/1b/0/182 CANADIAN CELL = 780-914-0504 ENGLISH CELL = (0044) 7875161783 [email protected] SUMMARY DEMONSTARATED ACHIEVER WITH EXCEPTIONAL PIPEFITTING KNOWLEDGE AND EXPERIENCE. STRONG ABILITY TO WORK AS A TEAM OR ON OWN INITIATIVE. SKILLED AT LEARNING NEW CONCEPTS QUICKLY, WORKING WELL UNDER PRESSURE, COMMUNICATING IDEAS CLEARLY AND EFFICIENTLY. ENTHUSIASTIC, CONFIDENT AND SELF MOTIVATED INDIVIDUAL. QUALIFICATIONS. ST. THOMAS MORE R.C HIGH SCHOOL 1996. MATHETATICS, SCIENCES, ENGLISH & CDT. LONGLANDS TECHNICAL COLLEGE 1998. CITY & GUILDS IN ENGINEERING & NVQ LEVELS 1, 2 & 3 PROCESS SYSTEMS LTD 1996-2000. SERVED FULL APPRENTISHIP IN PIPEFITTING AND WELDING, WORKING WITH ALL GRADES OF STAINLESS STEEL, CARBON STEEL, COPPER, KUNIFER, DUPLEX, SUPER DUPLEX. WORKING IN THE FABRICATION SHOP AND ON SITE IN THE OIL AND GAS FIELD, DAIRY INDUSTRY, PHARMACUTICAL FIELD, AND BREWERIES & CLEAN ROOM ENVIROMENT. FABRICATING AND INSTALLING PIPE WORK SPOOLS USING ISOMETRIC DRAWINGS, G, A DRAWINGS & WORKING FROM P & I, D DRAWINGS. WORKING FROM NORTHERLIES EASTERLIES & ELEVATIONS TO MEET SATISFACTORY STANDARDS AND PROCEDURES. SCATTS 2010. SAFETY PASSPORT NUMBER 684625. RED SEAL CERTIFIED JOURNEYMAN OF CANADA. 2007. CERTIFICATE NUMBER J-21-81939. CAREER HISTORY KENTZ. AREA AUTHORITY MECHANICAL TECHNICIAN. OCT 2014 - PRESENT DAY. WORKING ON DYNAMIC AND STATIC COMMISIONING PROJECTS CHECKING VALIDITY OF VALVES PUMPS, MONITORING VIBRATION AND TEMPERATURE LEVELS OF OPERATION EQUIPMENT OVERSEEING OTHER COMPANIES WORK PRACTICES PATICULARLY REGUARDING THE STEAM TURBINE GENERATOR. INTRODUCING HIGH,MEDIUM AND LOW PRESSURE STEAM INTO THE STEAM GENERATOR TURBINE TAKING CARE OF GLYCOL SYSTEM CONDENSATE SYSTEM LUBE OIL HYDRAULIC OIL AND ALL OTHER PIPING SYSTEMS IN THE CO- GEN BUILDING ALSO AS AREA AUTHORITY I WAS ABLE TO WITH DRAW PERMITS AUTORIZE EXTRA HOURS ON PERMIT AND I WAS THE ONE OPERATORS HAD TO PROVE ZERO ENERGY TO, TO BE ABLE TO WORK ON SYSTEMS AND PRODUCE PERMIT. KEARL LAKE ALBERTA CANADA. BLACKET AND CHARLTON. PIPING FORMAN. JULY 2014.-.OCT 2014. PIPING FORMAN IN THE FABRICATION SHOP ENSURING ALL SPOOLS WERE FABRICATED CORRECTLY WORKING FROM ISOMETRIC DRAWINGS, I WAS IN CHARGE OF 40 PIPEFITTERS AND 30 WELDERS FABRICATING STAINLESS STEEL DUPLEX,

Upload: karl-hunter

Post on 29-Jul-2015

94 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: KARL HUNTER CV 01122014

KARL HUNTERNEWCASTLE

NE28 7JLuk.linkedin.com/pub/karl-hunter/1b/0/182

CANADIAN CELL = 780-914-0504ENGLISH CELL = (0044) 7875161783

[email protected]

SUMMARY DEMONSTARATED ACHIEVER WITH EXCEPTIONAL PIPEFITTING KNOWLEDGE AND

EXPERIENCE.

STRONG ABILITY TO WORK AS A TEAM OR ON OWN INITIATIVE.

SKILLED AT LEARNING NEW CONCEPTS QUICKLY, WORKING WELL UNDER PRESSURE, COMMUNICATING IDEAS CLEARLY AND EFFICIENTLY.

ENTHUSIASTIC, CONFIDENT AND SELF MOTIVATED INDIVIDUAL.

QUALIFICATIONS. ST. THOMAS MORE R.C HIGH SCHOOL 1996.

MATHETATICS, SCIENCES, ENGLISH & CDT.

LONGLANDS TECHNICAL COLLEGE 1998. CITY & GUILDS IN ENGINEERING & NVQ LEVELS 1, 2 & 3

PROCESS SYSTEMS LTD 1996-2000.SERVED FULL APPRENTISHIP IN PIPEFITTING AND WELDING, WORKING WITH ALL GRADES OF STAINLESS STEEL, CARBON STEEL, COPPER, KUNIFER, DUPLEX, SUPER DUPLEX. WORKING IN THE FABRICATION SHOP AND ON SITE IN THE OIL AND GAS FIELD, DAIRY INDUSTRY, PHARMACUTICAL FIELD, AND BREWERIES & CLEAN ROOM ENVIROMENT.

FABRICATING AND INSTALLING PIPE WORK SPOOLS USING ISOMETRIC DRAWINGS, G, A DRAWINGS & WORKING FROM P & I, D DRAWINGS.

WORKING FROM NORTHERLIES EASTERLIES & ELEVATIONS TO MEET SATISFACTORY STANDARDS AND PROCEDURES.

SCATTS 2010.SAFETY PASSPORT NUMBER 684625.

RED SEAL CERTIFIED JOURNEYMAN OF CANADA. 2007.CERTIFICATE NUMBER J-21-81939.

CAREER HISTORY KENTZ. AREA AUTHORITY MECHANICAL TECHNICIAN. OCT 2014 - PRESENT

DAY.WORKING ON DYNAMIC AND STATIC COMMISIONING PROJECTS CHECKING VALIDITY OF VALVES PUMPS, MONITORING VIBRATION AND TEMPERATURE LEVELS OF OPERATION EQUIPMENT OVERSEEING OTHER COMPANIES WORK PRACTICES PATICULARLY REGUARDING THE STEAM TURBINE GENERATOR. INTRODUCING HIGH,MEDIUM AND LOW PRESSURE STEAM INTO THE STEAM GENERATOR TURBINE TAKING CARE OF GLYCOL SYSTEM CONDENSATE SYSTEM LUBE OIL HYDRAULIC OIL AND ALL OTHER PIPING SYSTEMS IN THE CO- GEN BUILDING ALSO AS AREA AUTHORITY I WAS ABLE TO WITH DRAW PERMITS AUTORIZE EXTRA HOURS ON PERMIT AND I WAS THE ONE OPERATORS HAD TO PROVE ZERO ENERGY TO, TO BE ABLE TO WORK ON SYSTEMS AND PRODUCE PERMIT. KEARL LAKE ALBERTA CANADA.

BLACKET AND CHARLTON. PIPING FORMAN. JULY 2014.-.OCT 2014.PIPING FORMAN IN THE FABRICATION SHOP ENSURING ALL SPOOLS WERE FABRICATED CORRECTLY WORKING FROM ISOMETRIC DRAWINGS, I WAS IN CHARGE OF 40 PIPEFITTERS AND 30 WELDERS

Page 2: KARL HUNTER CV 01122014

FABRICATING STAINLESS STEEL DUPLEX, SUPER DUPLEX AND CARBON STEEL PIPEWORK SPOOLS. FROM 1 INCH UP TO 20 INCH SCHEDULE 10 THROUGH TO SHEDULE 160.

SRS INDUSTRIAL PIPING GENERAL FORMAN. MAY 2014 – JULY 2014.WORKING AS GENERAL FORMAN OF THE WORK SITE MANAGEING THE PIPEFITTERS WELDERS SCAFFOLDERS RIGGERS SHEET METAL WORKERS. MAKING SURE THE JOB WAS EXECUTED IN COMPLIANCE WITH THE CARDINAL SAFETY RULES OF THE CLIENT AND COMPANY. COMPLETING FIELD LEVEL RISK ASSESMENTS AND CONDUCTING SAFETY WALK DOWNS REPRESENTING THE MECHANICAL DEPARTMENT TO THE CLIENT. MAKING SURE THE WORK CARRIED OUT WAS OF THE HIGEST QUALITY TO GUARENTEE ITS OPERABILITY, PERFORMANCE, RELIABILITY AND TRACEABILITY FOR THE ON COMING COMMISIONING STAGE. C,N,R,L

OFFSHORE GROUP NEWCASTLE (OGN) PIPIING SUPERVISOR OCT 2013 – MAY 2014.MANAGING TEAM OF PIPEFITTERS CO-ORDINATING WELDERS, SCAFFOLDERS, SPOOL CO-ORDINATION MATERIALS CONTROL OF ALL FITTING FOR ENQUEST PRODUCER FPSO (FLOATING PLATFORM FOR STORAGE AND OFFLOADING OIL) WORKING CLOSELY AND TOGETHER WITH THE COMMISIONING TEAM AND THE CA (COMMISIONING AUTHORITY) TO MAKE SURE ALL PIPING SYSTEMS ARE MECHANICALLY COMPLETE AND TESTED TO ENSURE SAFE AND EFFECTIVE TURNOVER FOR THE OPR ( OWNER’S PROJECT REQUIREMENTS)

WOODGROUP – PSN JULY 2012 – OCT 2013WORKING AS PART OF A MAINTAINENCE TEAM UNDERTAKING ALL TASKS REQUIRERED TO MAINTAIN BP’S SULLEM VOE OIL TERMINAL, REPLACING OLD PIPEWORK FOR NEW, REPAIRING VALVES, PIPE SUPPORTS, SPADING PIPELINES FOR TESTING, FABRICATING NEW SPOOLS FOR THE PLANT.WORKING TO THE PERMIT TO WORK SYSTEM FILLING IN FIELD LEVEL RISK ASSESMENTS TO THE HIGHEST SATNDARDS AS THIS BEING A LIVE REFINERY.

OFFSHORE GROUP NEWCASTLE (OGN) JAN 2012 - JULY 2012.INSTALLATION OF ALL PRE- FABRICATED PIPESPOOLS ONTO APACHE OIL RIG STAINLESS STEEL, CARBON STEEL AND SCREWED PIPEWORKSIZES RANGING FROM 1” TO 30” LIGHT WALL AND HEAVY WALL SCHEDULES.

BLACKET & CHARLTON. OCT 2011- JAN 2012.FABRICATION OF ALL PIPEWORK SPOOLS FOR THE APACHE OIL RIG FOR OGN, FABBING SPOOLS FROM 1” TO 30” PIPEWORK LIGHT WALL STAINLESS TO XXS CABON STEEL. MOVING UP TO SPOOL CO-ORDINATOR FOR THE COMPANY RELAYING THE FINISHED PRODUCT TO OGN’S YARD FOR INSTALLATION.

DUCO LTD. DEC 2010 – OCT 2011.WORKING ON UMBILLICAL PIPELINES FOR THE SEA BEDS ON PROJECTS FOR TECHNIP AND BP ENERGY. I WAS FORTUNATE TO BE PART OF A WORLD FIRST, WHERE WE FABRICATED A MIDLINE JOINT INTO AN 10,000 METER UMBILLICAL WHICH HAS NEVER BEEN DONE BEFORE.

REDHALL ENGINEERING LTD SEPT 2010 – NOV 2010.WORKING ON THE TANK FARM 126 & A4 SHUT DOWNS AT THE BP SALT END SITE. DISMANTELING OLD PIPEWORK AND REPLACEING WITH NEW PIPEWORK & ADDING NEW SYSTEMS WHERE REQUIRED.

R.BLACKET & CHARLTON LTD. JUL 2010 – SEPT 2010.FABRICATING STAINLESS STEEL PIPEWORK SPOOLS FROM 3/4 INCH TO 24 INCH WORKING ON THE FABRICATION BLOCK WORKING FROM ISOMETRIC DRAWINGS. FABRICATING ALL SPOOLS FOR THE VIVERGO PROJECT AT BP SALTEND.

PCL CONSTUCTION LTD SEPT 2008 – JUL 2010.WORKING IN ALBERTA CANADA ON THE SCOTFORD SHELL UPGRADER. INSTALLING PIPEWORK SPOOLS STAINLESS STEEL CARBON STEEL AND CHROME TO ISOMETRIC DRAWINGS AND G, A DRAWINGS.

PCL CONSTRUCTION LTD APR 2008 – SEPT 2008.WORKING IN PCL’S FABRICATION SHOP, FABRICATING ALL SHEDULE 160 HEAVY WALL PIPE WORK SPOOLS FOR THE SCOTFORD SHELL UPGRADER AGAIN IN ALBERTA CANADA.

MOREAU INDUSTRIEL. MAY 2007 – MAR 2008.PIPING SUPERINTENDANT.MANAGEING A SQUAD OF PIPEFITTERS, SCAFFOLDERS, WELDERS, RIGGERS A TEAM OF LABOURERS THE TOOL STORES AND MATERIAL CONTROL OF ALL FITTINGS FOR THE JOB. THIS WAS PROJECT F035 ON CANADIAN NATURAL RESOURCES LTD (C.N.R.L) THE TAR SANDS OF NORTHERN ALBERTA. RUNNING ALL FABRICATION AND INSTALLATION AND DESTUCTION OF OLD PIPE WORK AND REPLACING WITH NEW.WORKING WITH THE CLIENT AND COMPANY TO MONITOR MECHANICAL COMPLETION AND PRE COMMISIONING ACTIVITIES.MAKING SURE ALL FIELD LEVEL RISK

Page 3: KARL HUNTER CV 01122014

ASSESSMENTS WERE COMPLETED AND THE JOB WAS CARRIED OUT IN A SAFE AND EFFECTIVE MANNER. THIS JOB WAS FINISHED ON TIME AND UNDER BUDGET.

FLINT ENERGY LTD MAY 2006 – MAY 2007.PIPING SUPERVISOR. RUNNING ALL TRADES FOR INSTALLATION OF PIPEWORK SPOOLS ON THE GASIFIER SECTION ON OPTI NEXENS SITE LONG LAKE. CREATING MECHANICAL COMMISIONING PACKAGES FOR TURNOVER PROCEEDURE ALSO IN NORTHERN ALBERTA TAR SANDS REGION. FINISHING THE JOB SAFELY AND EFFICIENTLY.

R.BLACKET & CHARLTON LTD SEPT 2005 – MAY2006.FABRICATING SPOOLS FROM ¾ INCH TO 18 INCH CARBON STEEL FROM SHEDULE 40 TO SCHEDULE 160. FABRICATING SPOOLS FROM ISOMETRIC DRAWINGS.

MERCURY MECANICAL SEPT 2004 – AUG 2005.WORKING ON INTEL FAB 24 EXPANSION PROJECT IN LEIXLIP DUBLIN ROI. FABRICATING & INSTALLATION OF PVC & UPVC PIPEWORK SPOOLS & FABRICATING AND INSTALLING COPPER INSTRUMENT AIR LINES. WORKING FROM ISOMETRIC DRAWINGS & SITE SKETCHING PIPEWORK.

SWAN HUNTERS LTD OCT 2003 – AUG 2004.WORKING ON THE MOD SHIPS HMS LARGS BAY & HMS LIMES BAY IN SWAN HUNTERS SHIP BUILDERS YARD WORKING ON CARBON STEEL PIPEWORK & COPPER PIPE WORK SPOOLS WORKING TO DECKS AND BULK HEADS OF SHIP DESIGN.

INTERSERVE INDUSTRIAL LTD APR 2002 – SEPT 2003.WORKING ON THE SB8 AUXILLERY BOILER PROJECT AT BP SALTEND THEN TRANSFERED TO THE A5 SHUT DOWN PROJECT ALSO AT THE BP SALTEND SITE. FABRICATING AND INSTALLING PIPEWORK OF ALL SIZES AND WORKING WITH STAINLESS STEEL AND CARBON STEEL PIPEWORK.

AKER MCNULTY LTD NOV 2001 – MAR 2002.INSTALLATION OF CARBON STEEL PIPE WORK SPOOLS AND FABRICATION AND INSTALLATION OF GLASS REINFORCED EPOXY (G.R.E) PIPEWORK SPOOLS FOR THE TALISMAN PRODUCED WATER MODULE AND GAS COMPRESSION MODULE.

SWAN HUNTERS LTD JUNE 2000 – OCT 2001.FABRICATION AND INSTALLATION OF CARBON STEEL, STAINLESS STEEL, KUNIFER AND DUPLEX PIPEWORK ON THE GLOBAL PRODUCER III FLOATING PLATFORM FOR STORAGE AND OFFLOADING PROJECT (F.P.S.O). TRANSFERED TO THE TECNIP STENNA PROJECT FOR THE SEA BED TEMPLATES FOR THE EGYPTIAN OIL FIELDS FABRICATING AND INSTALLING 1 INCH TO 20 INCH SUPER DUPLEX PIPEWORK SPOOLS.

OTHER CERTIFICATIONS. HERTZ AERIAL WORK PLATFORM DEC - 2008.

QUALIFIED TO DRIVE GENIE BOOM UP TO 80 FT IN THE AIR.

HERTZ AERIAL WORK PLATFORM FEB - 2009. QUALIFIED TO DRIVE GENIE BOOM UP TO 125 IN THE AIR.

FALL PROTECTION PROGRAM SEPT - 2008. COMPETENCY CERTIFICATE NUMBER. 82161.

M.J.I 10, 18, and 19 AUG – 2013. FULLY TRAINED IN HAND TORQUEING, HYDRAULIC TORQUEING AND HYDRAULIC

TENSIONING.