  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    1/62

    Determination of Crust thickness1- Total No. of Commercial vehicle per day C.V.P.D. B.B. Road to Karvai link road in Km. 1 as

    per last cenus (in 12/2010) P = 38

    2- Soaked CBR of sub-base grade is approximate = 4%

    3- Vehicle Damage Factor = 3.50 (Standard axles per commercial Vehicle)

    4- Design Life - 15 Year

    5- Distribution Factor (Para 3.3.5) = 0.075

    6- Traffic growth rate as per IRC 37-2001 is r = 7.5%

    The traffic in the year of completion is estimated using the following formula.

    A = P(1+r)n

    = 38 (1+0.075)3

    = 47.21

    Say 47.20

    7- Computation of design traffic.

    N = 365[(1+r)n

    - 1] A D Fr

    Where N = The cumulative number of standard axles to be catered for in the

    design in terms of m.s.a.

    A = Initial traffic in the year of completion of consumption in terms of the

    number of commercial vehicles per day.

    D = Lane distribution factor (As explained in IRC 37-2001 in Para 3.3.5)

    F = Vechicle damage factor

    N = Design life in years.

    r = Annual growth rate of commercial vehicles (for 7.5% annual growth rate r=

    N = 365[(1+0.075)15

    -1] 38.00 0.75 3.50

    0.075

    = 3940668.67

    = 0.99 m.s.a

    CBR = 4%

    DesignPavement Design (Flexible Pavement)

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    2/62

    1.24

    47.21

    47.20

    1.075

    2.96

    1.96

    714.9902338

    74376.86

    991691.45

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    3/62

    UP DN UP DN UP DN UP DN UP DN UP DN UP DN1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    1 12-01-11 Km-1 12 10 3 2 6 5 25 24 20 18 10 11 1200 1210 2556 146 38

    213-01-11 Km-1

    11 122 1

    8 6 20 21 21 20 15 12 1280 12852714 149 40

    314-01-11 Km-1

    12 104 3

    4 5 22 23 22 20 12 14 1275 12702696 151 38

    415-01-11 Km-1

    10 123 4

    5 4 25 26 23 21 13 15 1225 12282614 161 38

    516-01-11 Km-1

    9 113 2

    6 6 24 25 22 23 15 13 1265 12702694 159 37

    617-01-11 Km-1

    12 144 1

    5 4 23 24 18 20 11 10 1240 12302616 146 40

    718-01-11 Km-1

    13 122 2

    4 3 25 20 20 18 10 9 1245 12152598 138 36

    Avg. 2641 150.00 38

    Junior Engineer Assistant Engineer Executive Engineer

    P.D. P.W.D. Banda P.D. P.W.D. Banda P.D. P.W.D. Banda

    Cycle/MotorCycle/Scooter

    P.C.UTractorWith

    trolly

    Buses Trucks Car/Van/Jeep/Temp

    o

    BandaBaberu

    RoadtoKarvaiLinkRoad

    Site Traffic Data

    TotalMotaris

    edexcept

    C.V.P.D.

    SI.No.

    Name ofRoad

    Date ofTraffic

    Census

    Location/Chainage

    BullockCarts

    Tanga

    \\vboxsrv\conversion_tmp\scratch9363\68719 436.xls.ms_office

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    4/62

    Rate Amount Rate Amount Rate

    1 2 4 3 5 6 3 5 6 3 51 Laying and consolidation of 2.36 mm

    Stone dust coat 22.5 cm thick loose

    including hire and fuel charges of

    road roller. Unit - 1 cum

    (i) Collection of 2.36 mm stone dust Cum 1.00 596.60 596.60 1.00 601.10 601.10 1.00 605.60

    (iii) Water Allowance. (S.I. 757. P, 81) Cum 0.25 25.00 6.25 0.25 25.00 6.25 0.25 25.00

    (iii) Labour Charges Including Road Roller. hrs. 1.00 25.00 25.00 1.00 25.00 25.00 1.00 25.00

    627.85 632.35

    Loose rate 1 cum, /0.97 647.27 L-rate /0.97 651.91 L-rate /0.97

    Compacted Rate 1.33 860.87 C-Rate 1.33 867.04 C-Rate 1.33

    Qty. K

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0 la0 92 ds fdeh0 1

    nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    5/62

    Amount

    6

    605.60

    6.25

    25.00

    636.85

    656.55

    873.21

    . 3

    ls

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    6/62

    S.N. ITEM Amount

    1 cement concrete with 20 mm gauge stone ballast(Machine Broken),coarse sand o 1.25 to 3.5 F.M. and

    cement in proportion of 1:1.5:3 foundation and under floors,including s/o all materials,labour and t&p etc.rquired for prper competion of the work

    Rate as per |S. o.r No.279 3330.00

    add extra cost of cement(225-210)x6.74 101.10

    add extra cost of cement(8.68-6.74))x225 436.50

    Deduct Van kar for grit(57x0.85) -48.45

    Deduct Van kar for sand(57x0.425) -24.23

    Add extra cartage H.Q. to side (13-8) (173.60-139.00) 34.60

    Deduct rayality Grit (68x10%+68x4%)x0.85 -8.57

    Deduct rayality Sand (32x10%+32x4%)x.425 -2.02

    Total 3818.94

    Say 3819.002 cement concrete with 40 mm gauge stone ballast(Machine Broken),coarse sand o 1.25 to 3.5 F.M. and

    cement in proportion of 1:6:12In foundation and under floors,including s/o all materials,labour and t&p etc.

    rquired for prper competion of the workRate as per |S. o.r No.273 2300.00

    add extra cost of cement(225-210)x2.25 33.75

    Deduct Van kar for grit(57x1) -57.00

    Deduct Van kar for sand(57x0.48) -27.36

    Add extra cartage H.Q. to side (13-8) (173.60-139.00) 34.60

    Deduct rayality Grit (68x10%+68x4%)x1 -9.52

    Deduct rayality Sand (32x10%+32x4%)x0.48 -2.15

    Total 2272.32Say 2272.00

    4 Sand filling inplinth including supply of sand from a distance not excluding 8 km from the site of work &

    including watering , dressing etc.Rate to including cost of all materials, labour and tools & Plants etc.

    Required for proper completion of the work.Rate as per |S. o.r No.279 510.00

    Deduct Van kar for sand(57x1) -57.00

    Add extra cartage H.Q. to side (13-8) (173.60-139.00) 34.60

    Deduct rayalty Sand (32x10%+32x4%)x1 -4.48

    Total 483.12

    Say 483.00

    5 Ist class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of allmaterial, labour,curing and T&P etc required for proper completion of the work

    Rate as per |S. o.r No.305 2656.00

    add extra cost of cement(332-210)x1.86 226.92

    Add extra cost of brick (3800-3300)x460/1000 230.00

    Add extra cartage H.Q. to side (13-8) (173.60-139.00) 34.60

    Deduct Van kar for sand(57x0.27) -15.39

    Deduct rayality Sand (32x10%+32x4%)x0.27 -1.21

    Total 3130.92

    Say 3131.00

    Analysis of Ratedk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ

    lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    7/62

    CRC Month - 01-03-2011

    1. Bulk Bitumen V.G.-10 Grade From Mathura

    a Cost at Mathura Refinery Rs. 27470.00

    b Basic Excise @ 14% Rs. 3845.80

    c A/R Education Cess @ 3% Rs. 115.37

    Total 31431.17 3928.8968

    d Delivery Assistance 497 x 2 x 1.80 Rs. 1789.20

    Factory of Mathura = 5 Km. 35360.07Mathura to Banda = 457 Km. 353.60

    Banda to Baberu Mid = 35 Km.

    Total 33220.37

    Say Rs. 33220.40

    1. Bulk Bitumen V.G.-30 Grade From Mathura

    a Cost at Mathura Refinery Rs. 27790.00

    b Basic Excise @ 14% Rs. 3890.60

    c A/R Education Cess @ 3% Rs. 116.72Total 31797.32 3974.6648

    d Delivery Assistance 497 x 2 x 1.80 Rs. 1789.20

    Factory of Mathura = 5 Km. 35771.98

    Mathura to Banda = 457 Km. 357.72

    Banda to Baberu Mid = 35 Km.

    Total 33586.52

    Say Rs. 33586.50

    1. Bulk Bitumen CRMB-55 Grade From Mathura

    a Cost at Mathura Refinery Rs. 28112.00

    b Basic Excise @ 14% Rs. 3935.68

    c A/R Education Cess @ 3% Rs. 118.07

    Total 32165.75 4020.72

    d Delivery Assistance 497 x 2 x 1.80 Rs. 1789.20

    Factory of Mathura = 5 Km. 36186.47

    Analysis of Rate

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    8/62

    \\vboxsrv\conversion_tmp\scratch9363\68719436.xls.ms_office

    Kacha

    Pacca

    Total

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    1 Kabrai 244.00 68.00 176.00 1 42 43 324.50 0.00 568.50 0.00 17.60 3.50 589.60 7.04 596.64 596.60 734.90

    2 Kabrai 244.00 68.00 176.00 1 43 44 329.00 0.00 573.00 0.00 17.60 3.50 594.10 7.04 601.14 601.10 738.90

    3 Kabrai 244.00 68.00 176.00 1 44 45 333.50 0.00 577.50 0.00 17.60 3.50 598.60 7.04 605.64 605.60 742.90

    1 Bhartkoop 264.00 68.00 196.00 1 70 71 440.00 0.00 704.00 0.00 19.60 3.50 727.10 7.84 734.94 734.90

    2 Bhartkoop 264.00 68.00 196.00 1 71 72 444.00 0.00 708.00 0.00 19.60 3.50 731.10 7.84 738.94 738.90

    3 Bhartkoop 264.00 68.00 196.00 1 72 73 448.00 0.00 712.00 0.00 19.60 3.50 735.10 7.84 742.94 742.90

    1 Kabrai 634.00 68.00 566.00 1 42 43 324.50 -32.45 958.50 0.00 0.00 0.00 958.50 0.00 958.50 958.50 1189.00

    2 Kabrai 634.00 68.00 566.00 1 43 44 329.00 -32.90 963.00 0.00 0.00 0.00 963.00 0.00 963.00 963.00 1193.00

    3 Kabrai 634.00 68.00 566.00 1 44 45 333.50 -33.35 967.50 0.00 0.00 0.00 967.50 0.00 967.50 967.50 1197.00

    1 Bhartkoop 749.00 68.00 681.00 1 70 71 440.00 -44.00 1189.00 0.00 0.00 0.00 1189.00 0.00 1189.00 1189.002 Bhartkoop 749.00 68.00 681.00 1 72 73 444.00 -44.40 1193.00 0.00 0.00 0.00 1193.00 0.00 1193.00 1193.00

    3 Bhartkoop 749.00 68.00 681.00 1 74 75 448.00 -44.80 1197.00 0.00 0.00 0.00 1197.00 0.00 1197.00 1197.00

    1 Kabrai 634.00 68.00 566.00 1 42 43 324.50 -32.45 958.50 0.00 0.00 0.00 958.50 0.00 958.50 958.50 1214.00

    2 Kabrai 634.00 68.00 566.00 1 43 44 329.00 -32.90 963.00 0.00 0.00 0.00 963.00 0.00 963.00 963.00 1218.00

    3 Kabrai 634.00 68.00 566.00 1 44 45 333.50 -33.35 967.50 0.00 0.00 0.00 967.50 0.00 967.50 967.50 1222.00

    1 Bhartkoop 774.00 68.00 706.00 1 70 71 440.00 -44.00 1214.00 0.00 0.00 0.00 1214.00 0.00 1214.00 1214.00

    2 Bhartkoop 774.00 68.00 706.00 1 72 73 444.00 -44.40 1218.00 0.00 0.00 0.00 1218.00 0.00 1218.00 1218.003 Bhartkoop 774.00 68.00 706.00 1 74 75 448.00 -44.80 1222.00 0.00 0.00 0.00 1222.00 0.00 1222.00 1222.00

    ROAD METAL RATES

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0 la0 92 dsfdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    9/62

    \\vboxsrv\conversion_tmp\scratch9363\68719436.xls.ms_office

    Kacha

    Pacca

    Total

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    ROAD METAL RATES

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0 la0 92 dsfdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    10/62

    \\vboxsrv\conversion_tmp\scratch9363\68719436.xls.ms_office

    Kacha

    Pacca

    Total

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    ROAD METAL RATES

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0 la0 92 dsfdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    11/62

    Quantity Rate Rs

    5.10 511 Open - Graded Premix Surfacing

    Providing, laying and rolling of open - graded premix surfacing of 20 mm

    thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration

    grade bitumen or cut-back or emulsion to required line, grade and level to serve

    as wearing course on a previously prepared base, including mixing in a suitable

    plant, laying and rolling with a smooth wheeld roller 8-10 tonne capacity finished

    to re uired level and rades.Unit = sqm

    Taking output = 10250 sqm (205 cum)

    Case - II: Open-Graded Premix Surfacing using cationic Bitumen Emulsion

    Unit = sqm

    Taking output = 900 sqm (24.3 cum)

    a) Labour

    Mate day 0.800 110.00

    Mazdoor day 18.000 100.00

    Mazdoor skilled day 2.000 100.00

    Total (A)

    b) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 6.000 150.00

    Smooth wheeled steel roller 8-10 tonne hour 6.000 297.00

    Total

    Add 40% for excalation on (b) for year 2010

    Total (B)

    c) Material

    Cationic Bitumen VG-10 @ 21.50 kg per 10 sqm tonne 1.940 33220.40

    Crushed stone aggregates 13.2 mm to 5.6 mm @ 0.27 cum per 10 sqm cum 24.300 1153.50

    Total (C)

    Total (A+B+C)

    D Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on (a+b+c)

    ii) Traffic control, watch and ward, sundries@1%on (a+b+c)

    iii) Insurance @ 0.50% on (a+b+c)

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0 la0 92 d

    12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    12/62

    5.10 511 Open - Graded Premix Surfacing

    Providing, laying and rolling of open - graded premix surfacing of 20 mm

    thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration

    grade bitumen or cut-back or emulsion to required line, grade and level to serve

    as wearing course on a previously prepared base, including mixing in a suitable

    plant, laying and rolling with a smooth wheeld roller 8-10 tonne capacity finished

    to re uired level and rades.Unit = sqm

    Taking output = 10250 sqm (205 cum)

    Case - II: Open-Graded Premix Surfacing using cationic Bitumen Emulsion

    Unit = sqm

    Taking output = 900 sqm (24.3 cum)

    a) Labour

    Mate day

    Mazdoor day

    Mazdoor skilled day

    b) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour

    Smooth wheeled steel roller 8-10 tonne hour

    Add 40% for excalatio

    c) Material

    Cationic Bitumen VG-10 @ 21.50 kg per 10 sqm tonne

    Crushed stone aggregates 13.2 mm to 5.6 mm @ 0.27 cum per 10 sqm cum

    D Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on (a+b+c)

    ii) Traffic control, watch and ward, sundries@1%on (a+b+c)

    iii) Insurance @ 0.50% on (a+b+c)

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0

    12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    13/62

    5.10 511 Open - Graded Premix Surfacing

    Providing, laying and rolling of open - graded premix surfacing of 20 mm

    thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration

    grade bitumen or cut-back or emulsion to required line, grade and level to serve

    as wearing course on a previously prepared base, including mixing in a suitable

    plant, laying and rolling with a smooth wheeld roller 8-10 tonne capacity finished

    to re uired level and rades.Unit = sqm

    Taking output = 10250 sqm (205 cum)

    Case - II: Open-Graded Premix Surfacing using cationic Bitumen Emulsion

    Unit = sqm

    Taking output = 900 sqm (24.3 cum)

    a) Labour

    Mate day

    Mazdoor day

    Mazdoor skilled day

    b) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour

    Smooth wheeled steel roller 8-10 tonne hour

    Add 40% for excalatio

    c) Material

    Cationic Bitumen VG-10 @ 21.50 kg per 10 sqm tonne

    Crushed stone aggregates 13.2 mm to 5.6 mm @ 0.27 cum per 10 sqm cum

    D Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on (a+b+c)

    ii) Traffic control, watch and ward, sundries@1%on (a+b+c)

    iii) Insurance @ 0.50% on (a+b+c)

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0

    12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    14/62

    5.10 511 Open - Graded Premix Surfacing

    Providing, laying and rolling of open - graded premix surfacing of 20 mm

    thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration

    grade bitumen or cut-back or emulsion to required line, grade and level to serve

    as wearing course on a previously prepared base, including mixing in a suitable

    plant, laying and rolling with a smooth wheeld roller 8-10 tonne capacity finished

    to re uired level and rades.Unit = sqm

    Taking output = 10250 sqm (205 cum)

    Case - II: Open-Graded Premix Surfacing using cationic Bitumen Emulsion

    Unit = sqm

    Taking output = 900 sqm (24.3 cum)

    a) Labour

    Mate day

    Mazdoor day

    Mazdoor skilled day

    b) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour

    Smooth wheeled steel roller 8-10 tonne hour

    Add 40% for excalatio

    c) Material

    Cationic Bitumen VG-10 @ 21.50 kg per 10 sqm tonne

    Crushed stone aggregates 13.2 mm to 5.6 mm @ 0.27 cum per 10 sqm cum

    D Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on (a+b+c)

    ii) Traffic control, watch and ward, sundries@1%on (a+b+c)

    iii) Insurance @ 0.50% on (a+b+c)

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0

    12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    15/62

    5.10 511 Open - Graded Premix Surfacing

    Providing, laying and rolling of open - graded premix surfacing of 20 mm

    thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration

    grade bitumen or cut-back or emulsion to required line, grade and level to serve

    as wearing course on a previously prepared base, including mixing in a suitable

    plant, laying and rolling with a smooth wheeld roller 8-10 tonne capacity finished

    to re uired level and rades.Unit = sqm

    Taking output = 10250 sqm (205 cum)

    Case - II: Open-Graded Premix Surfacing using cationic Bitumen Emulsion

    Unit = sqm

    Taking output = 900 sqm (24.3 cum)

    a) Labour

    Mate day

    Mazdoor day

    Mazdoor skilled day

    b) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour

    Smooth wheeled steel roller 8-10 tonne hour

    Add 40% for excalatio

    c) Material

    Cationic Bitumen VG-10 @ 21.50 kg per 10 sqm tonneCrushed stone aggregates 13.2 mm to 5.6 mm @ 0.27 cum per 10 sqm cum

    D Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on (a+b+c)

    ii) Traffic control, watch and ward, sundries@1%on (a+b+c)

    iii) Insurance @ 0.50% on (a+b+c)

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0

    12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    16/62

    Quantity Rate Rs Amount Rs

    5.1 513 Seal Coat

    Providing and laying seal coat sealing the voids in a bituminous

    surface laid to the specified levels, grade and cross fall using Type A

    and B seal coatsUnit = sqm

    Taking output = 10250 sqm (92.25 cum)

    (i) Case - I :Type A

    a) Labour

    Mate day 0.240 110.00 26.40Mazdoor day 6.000 100.00 600.00

    Total (A) 626.40

    b) Machinery

    Hydraulic self propelled chip spreader hour 6.000 1700.00 10200.00

    Tipper 5.5 cum capacity hour 6.000 200.00 1200.00

    Front end loader 1 cum bucket capacity hour 6.000 520.00 3120.00

    Bitumen pressure distributor @ 1750 sqm per hour hour 6.000 692.00 4152.00

    Smooth wheeled roller 8 -10 tonne weight hour 6.000 297.00 1782.00

    Total (B) 20454.00

    Add 40% for excalation on (b) for year 2010 8181.60

    Total (B) 28635.60

    c) Material

    Bitumen VG-10 @ 9.80 kg per 10 sqm tonne 10.050 33220.40 333865.02

    Crushed stone chipping of 6.7 mm size defined as 100 per

    cent passing 11.2 mm sieve and retained on 2.36 mm sieve

    a lied 0.09 cum er 10 s m

    cum 92.250 728.50 67204.13

    Total (C) 401069.15

    Total (A+B+C) 430331.15

    D Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on 10758.28

    ii) Traffic control, watch and ward, sundries@1%on (a+b+c) 4303.31

    iii) Insurance @ 0.50% on (a+b+c) 2151.66

    4% VAT on Cost of Material

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0 la0 92 ds fdeh0 12 ls

    nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    17/62

    5.1 513 Seal Coat

    Provid ing and lay ing seal coat seal ing the voids in a bituminous

    surface laid to the specified levels, grade and cross fall using Type A

    and B seal coatsUnit = sqm

    Taking output = 10250 sqm (92.25 cum)

    (i) Case - I :Type A

    a) Labour

    Mate dayMazdoor day

    b) Machinery

    Hydraulic self propelled chip spreader hour

    Tipper 5.5 cum capacity hour

    Front end loader 1 cum bucket capacity hour

    Bitumen pressure distributor @ 1750 sqm per hour hour

    Smooth wheeled roller 8 -10 tonne weight hour

    Add 40% for excalati

    c) Material

    Bitumen VG-10 @ 9.80 kg per 10 sqm tonne

    Crushed stone chipping of 6.7 mm size defined as 100 per

    cent passing 11.2 mm sieve and retained on 2.36 mm sieve

    a lied 0.09 cum er 10 s m

    cum

    D Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on

    ii) Traffic control, watch and ward, sundries@1%on (a+b+c)

    iii) Insurance @ 0.50% on (a+b+c)

    4% VAT on Cost of Material

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek

    nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    18/62

    5.1 513 Seal Coat

    Providing and laying seal coat sealing the voids in a bituminous

    surface laid to the specified levels, grade and cross fall using Type A

    and B seal coatsUnit = sqm

    Taking output = 10250 sqm (92.25 cum)

    (i) Case - I :Type A

    a) Labour

    Mate dayMazdoor day

    b) Machinery

    Hydraulic self propelled chip spreader hour

    Tipper 5.5 cum capacity hour

    Front end loader 1 cum bucket capacity hour

    Bitumen pressure distributor @ 1750 sqm per hour hour

    Smooth wheeled roller 8 -10 tonne weight hour

    Add 40% for excalati

    c) Material

    Bitumen VG-10 @ 9.80 kg per 10 sqm tonne

    Crushed stone chipping of 6.7 mm size defined as 100 per

    cent passing 11.2 mm sieve and retained on 2.36 mm sieve

    a lied 0.09 cum er 10 s m

    cum

    D Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on

    ii) Traffic control, watch and ward, sundries@1%on (a+b+c)

    iii) Insurance @ 0.50% on (a+b+c)

    4% VAT on Cost of Material

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek

    nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    19/62

    Qty. Rate Amount

    1 2 3 4 5 6

    Granular Sub-Base with Coarse Graded MaterialConstruction of Granular sub base by providing coarse graded material, spreading

    in uniform layer with motor grader on prepared surface mixing in place method with

    rotavator at O.M.C. and compacting with vibratory rol ler to achieve the desired

    density, complete as per clause 401.

    Unit = cum

    Taking output = 300 cum

    a) Labour

    Mate day 0.40 110.00 44.00

    Mazdoor Sckilled day 2.00 100.00 200.00

    Mazdoor day 8.00 100.00 800.00

    Total 1044.00

    b) Machinery

    Motor grader 110 HP @ 50 cum per hour hour 6.00 1545.00 9270.00

    Vibratory roller 8-10 tonnes hour 6.00 994.00 5964.00

    Water Tanker hour 3.00 200.00 600.00

    Total 15834.00

    Add 40% for excalation on (b) for year 2010 6333.60

    22167.60

    c) Material

    For Grading I materialvolume of aggregate as per MORTH=384 cum

    So Taken lowest Qty. i.e. 384.00 cum.

    40 mm. M.B. @ 40% cum 153.60 958.50 147225.60

    19 mm. grit @ 25% cum 96.00 1238.50 118896.00

    10 mm. grit @ 20% cum 76.80 1153.50 88588.80

    2.36 mm/Stone dust @ 15% cum 57.60 568.50 32745.60

    387456.00

    Cost of Water K.L. 18.00 210.00 3780.00

    Total 391236.00

    Total (a+b+c) 414447.60d i) Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on (a+b+c) 10361.19

    ii) Traffic control, watch and ward, [email protected]%on (a+b+c) 2072.24

    iii) Insurance @ 0.25% on (a+b+c) 1036.12

    iv) Sale Tax/ Trade Tax/ woks contract Tax are service Tax etc @ 4% on cost

    of Material

    4% VAT on Cost of Material

    40 mm. M.B. @ 40% cum 153.60 566.00 86937.60

    19 mm. grit @ 25% cum 96.00 846.00 81216.00

    Km. 1

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    k0 ek0 la0 92 ds fdeh0 12 ls nka;h r Q d obZ lEidZ

    Analysis of Rate

    Sl.

    No.

    Item of Work Unit

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    20/62

    1 2 3

    Granular Sub-Base with Coarse Graded MaterialConstruction of Granular sub base by providing coarse graded material, spreading

    in uniform layer with motor grader on prepared surface mixing in place method with

    rotavator at O.M.C. and compacting with vibratory roller to achieve the desired

    density, complete as per clause 401.

    Unit = cum

    Taking output = 300 cum

    a) Labour

    Mate day

    Mazdoor Sckilled day

    Mazdoor day

    b) Machinery

    Motor grader 110 HP @ 50 cum per hour hour

    Vibratory roller 8-10 tonnes hour

    Water Tanker hour

    Add 40% for excalati

    c) Material

    For Grading I materialvolume of aggregate as per MORTH=384 cum

    So Taken lowest Qty. i.e. 384.00 cum.

    40 mm. M.B. @ 40% cum

    19 mm. grit @ 25% cum

    10 mm. grit @ 20% cum

    2.36 mm/Stone dust @ 15% cum

    Cost of Water K.L.

    d i) Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on (a+b+c)

    ii) Traffic control, watch and ward, [email protected]%on (a+b+c)

    iii) Insurance @ 0.25% on (a+b+c)

    iv) Sale Tax/ Trade Tax/ woks contract Tax are service Tax etc @ 4% on cost

    of Material

    4% VAT on Cost of Material

    40 mm. M.B. @ 40% cum

    19 mm. grit @ 25% cum

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    k0 ek0 la0 92 ds fdeh0 12 ls nka;h r Q d obZ lEidZ

    Analysis of Rate

    Sl.

    No.

    Item of Work Unit

    Qty. Rate Amount

    4 5 6

    0.40 110.00 44.00

    2.00 100.00 200.00

    8.00 100.00 800.00

    Total 1044.00

    6.00 1545.00 9270.00

    6.00 994.00 5964.00

    3.00 200.00 600.00

    Total 15834.00

    6333.60

    22167.60

    153.60 963.00 147916.80

    96.00 1243.00 119328.00

    76.80 1158.00 88934.40

    57.60 573.00 33004.80

    389184.00

    18.00 210.00 3780.00

    Total 392964.00

    Total (a+b+c) 416175.60

    10404.39

    2080.88

    1040.44

    153.60 566.00 86937.60

    96.00 846.00 81216.00

    Km. 2

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    21/62

    1 2 3

    Granular Sub-Base with Coarse Graded MaterialConstruction of Granular sub base by providing coarse graded material, spreading

    in uniform layer with motor grader on prepared surface mixing in place method with

    rotavator at O.M.C. and compacting with vibratory roller to achieve the desired

    density, complete as per clause 401.

    Unit = cum

    Taking output = 300 cum

    a) Labour

    Mate day

    Mazdoor Sckilled day

    Mazdoor day

    b) Machinery

    Motor grader 110 HP @ 50 cum per hour hour

    Vibratory roller 8-10 tonnes hour

    Water Tanker hour

    Add 40% for excalati

    c) Material

    For Grading I materialvolume of aggregate as per MORTH=384 cum

    So Taken lowest Qty. i.e. 384.00 cum.

    40 mm. M.B. @ 40% cum

    19 mm. grit @ 25% cum

    10 mm. grit @ 20% cum

    2.36 mm/Stone dust @ 15% cum

    Cost of Water K.L.

    d i) Site accomodation, Office, site super vision and

    Estabilisment, drawings and stationary [email protected]%on (a+b+c)

    ii) Traffic control, watch and ward, [email protected]%on (a+b+c)

    iii) Insurance @ 0.25% on (a+b+c)

    iv) Sale Tax/ Trade Tax/ woks contract Tax are service Tax etc @ 4% on cost

    of Material

    4% VAT on Cost of Material

    40 mm. M.B. @ 40% cum

    19 mm. grit @ 25% cum

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    k0 ek0 la0 92 ds fdeh0 12 ls nka;h r Q d obZ lEidZ

    Analysis of Rate

    Sl.

    No.

    Item of Work Unit

    Qty. Rate Amount

    4 5 6

    0.40 110.00 44.00

    2.00 100.00 200.00

    8.00 100.00 800.00

    Total 1044.00

    6.00 1545.00 9270.00

    6.00 994.00 5964.00

    3.00 200.00 600.00

    Total 15834.00

    6333.60

    22167.60

    153.60 967.50 148608.00

    96.00 1247.50 119760.00

    76.80 1162.50 89280.00

    57.60 577.50 33264.00

    390912.00

    18.00 210.00 3780.00

    Total 394692.00

    Total (a+b+c) 417903.60

    10447.59

    2089.52

    1044.76

    153.60 566.00 86937.60

    96.00 846.00 81216.00

    Km. 3

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    22/62

    Qty. Rate

    1 2 3 4 5Wet mix MacadamProviding, Laying, Spreading and compacting graded stone aggregate to wet mix

    macadam specification including premixing the material with water at O.M.C. in

    mechanical mix plant carriage of mixed material by tipper to site laying in uniform

    layer with paver in sub-base/base coarse on well prepared surfaceand compacting

    with vibratory roller to achive the desired density.(As per Clause 406)

    Unit = cum

    Taking output = 225 cum (2252.12(D) = 477 Tonne)

    a) Labour

    Mate day 0.48 110.00

    Mazdoor Sckilled day 2.00 100.00

    Mazdoor day 10.00 100.00

    Total

    b) MachineryWet mix plant @ 75 M.T. capacity per hour hour 6.60 777.00

    Eletric Generator 125 KVA hour 6.00 450.00

    Front end loader 1 cum bucket capacity hour 6.00 520.00

    Paver Finisher hour 6.00 629.00

    Vibratory roller 8 tonnes. hour 3.90 994.00

    Water Tanker (5 x 15.60 + 234) = 312.00 hour 3.00 200.00

    Tipper 4 Km. lead (477 ) T.Km. 477.00 1.74

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Total

    Add 40% for excalation on (b) for year 2010

    Material (Table 400-11)

    volume of aggregate as per MORTH=297 cum

    22.4-53 mm. M.B. @ 30% cum 89.10 958.50

    19 mm. grit @ 20% cum 59.40 1238.50

    10 mm. grit @ 15% cum 44.55 1153.50

    6.70 mm. grit @ 15% cum 44.55 728.50

    2.36 mm./Stone dust grit @ 20% cum 59.40 568.50

    Km. 1

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    23/62

    1 2 3Wet mix MacadamProviding, Laying, Spreading and compacting graded stone aggregate to wet mix

    macadam specification including premixing the material with water at O.M.C. in

    mechanical mix plant carriage of mixed material by tipper to site laying in uniform

    layer with paver in sub-base/base coarse on well prepared surfaceand compacting

    with vibratory roller to achive the desired density.(As per Clause 406)

    Unit = cum

    Taking output = 225 cum (2252.12(D) = 477 Tonne)

    a) Labour

    Mate day

    Mazdoor Sckilled day

    Mazdoor day

    b) MachineryWet mix plant @ 75 M.T. capacity per hour hour

    Eletric Generator 125 KVA hour

    Front end loader 1 cum bucket capacity hour

    Paver Finisher hour

    Vibratory roller 8 tonnes. hour

    Water Tanker (5 x 15.60 + 234) = 312.00 hour

    Tipper 4 Km. lead (477 ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Add 40% for excalation on (b) for year 2010

    Material (Table 400-11)

    volume of aggregate as per MORTH=297 cum

    22.4-53 mm. M.B. @ 30% cum

    19 mm. grit @ 20% cum

    10 mm. grit @ 15% cum

    6.70 mm. grit @ 15% cum

    2.36 mm./Stone dust grit @ 20% cum

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    24/62

    1 2 3Wet mix MacadamProviding, Laying, Spreading and compacting graded stone aggregate to wet mix

    macadam specification including premixing the material with water at O.M.C. in

    mechanical mix plant carriage of mixed material by tipper to site laying in uniform

    layer with paver in sub-base/base coarse on well prepared surfaceand compacting

    with vibratory roller to achive the desired density.(As per Clause 406)

    Unit = cum

    Taking output = 225 cum (2252.12(D) = 477 Tonne)

    a) Labour

    Mate day

    Mazdoor Sckilled day

    Mazdoor day

    b) MachineryWet mix plant @ 75 M.T. capacity per hour hour

    Eletric Generator 125 KVA hour

    Front end loader 1 cum bucket capacity hour

    Paver Finisher hour

    Vibratory roller 8 tonnes. hour

    Water Tanker (5 x 15.60 + 234) = 312.00 hour

    Tipper 4 Km. lead (477 ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Add 40% for excalation on (b) for year 2010

    Material (Table 400-11)

    volume of aggregate as per MORTH=297 cum

    22.4-53 mm. M.B. @ 30% cum

    19 mm. grit @ 20% cum

    10 mm. grit @ 15% cum

    6.70 mm. grit @ 15% cum

    2.36 mm./Stone dust grit @ 20% cum

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    25/62

    1 2 3Wet mix MacadamProviding, Laying, Spreading and compacting graded stone aggregate to wet mix

    macadam specification including premixing the material with water at O.M.C. in

    mechanical mix plant carriage of mixed material by tipper to site laying in uniform

    layer with paver in sub-base/base coarse on well prepared surfaceand compacting

    with vibratory roller to achive the desired density.(As per Clause 406)

    Unit = cum

    Taking output = 225 cum (2252.12(D) = 477 Tonne)

    a) Labour

    Mate day

    Mazdoor Sckilled day

    Mazdoor day

    b) MachineryWet mix plant @ 75 M.T. capacity per hour hour

    Eletric Generator 125 KVA hour

    Front end loader 1 cum bucket capacity hour

    Paver Finisher hour

    Vibratory roller 8 tonnes. hour

    Water Tanker (5 x 15.60 + 234) = 312.00 hour

    Tipper 4 Km. lead (477 ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Add 40% for excalation on (b) for year 2010

    Material (Table 400-11)

    volume of aggregate as per MORTH=297 cum

    22.4-53 mm. M.B. @ 30% cum

    19 mm. grit @ 20% cum

    10 mm. grit @ 15% cum

    6.70 mm. grit @ 15% cum

    2.36 mm./Stone dust grit @ 20% cum

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    26/62

    1 2 3Wet mix MacadamProviding, Laying, Spreading and compacting graded stone aggregate to wet mix

    macadam specification including premixing the material with water at O.M.C. in

    mechanical mix plant carriage of mixed material by tipper to site laying in uniform

    layer with paver in sub-base/base coarse on well prepared surfaceand compacting

    with vibratory roller to achive the desired density.(As per Clause 406)

    Unit = cum

    Taking output = 225 cum (2252.12(D) = 477 Tonne)

    a) Labour

    Mate day

    Mazdoor Sckilled day

    Mazdoor day

    b) MachineryWet mix plant @ 75 M.T. capacity per hour hour

    Eletric Generator 125 KVA hour

    Front end loader 1 cum bucket capacity hour

    Paver Finisher hour

    Vibratory roller 8 tonnes. hour

    Water Tanker (5 x 15.60 + 234) = 312.00 hour

    Tipper 4 Km. lead (477 ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Add 40% for excalation on (b) for year 2010

    Material (Table 400-11)

    volume of aggregate as per MORTH=297 cum

    22.4-53 mm. M.B. @ 30% cum

    19 mm. grit @ 20% cum

    10 mm. grit @ 15% cum

    6.70 mm. grit @ 15% cum

    2.36 mm./Stone dust grit @ 20% cum

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    27/62

    Qty. Rate Amount

    1 2 3 4 5 6

    Bitumen Emulsion From Hindcol Jhansi DepoSlow Setting - 2

    a Cost at EX-Jhansi 26210.66

    b Basic Excise @ 14% 3669.49

    c A/R Education Cess @ 3% 110.08

    29990.24

    d Delivery Assistance 1 x 1.80

    Jhansi to Banda Km. 228.00

    Banda to at site 35 Km. of Site Km. 35.00

    Total Km. 263.00 1.80 473.40

    Total 30463.64Say Rs. 30464.00

    Bitumen Emulsion From Hindcol Jhansi Depo

    Medium Setting 26640.66

    b Basic Excise @ 14% 3729.69

    c A/R Education Cess @ 3% 111.89

    30482.24

    d Delivery Assistance 1 x 1.80

    Jhansi to Banda Km. 228.00

    Banda to at site 35 Km. of Site Km. 35.00

    Total Km. 263.00 1.80 473.40

    Total 30955.64

    Say Rs. 30956.00

    Km. 1

    Analysis of Rate

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZrckank&ccs: jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ

    djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    28/62

    1 2 3

    Bitumen Emulsion From Hindcol Jhansi DepoSlow Setting - 2

    a Cost at EX-Jhansi

    b Basic Excise @ 14%

    c A/R Education Cess @ 3%

    d Delivery Assistance 1 x 1.80

    Jhansi to Banda Km.

    Banda to at site 35 Km. of Site Km.

    Total Km.

    Bitumen Emulsion From Hindcol Jhansi Depo

    Medium Setting

    b Basic Excise @ 14%

    c A/R Education Cess @ 3%

    d Delivery Assistance 1 x 1.80

    Jhansi to Banda Km.

    Banda to at site 35 Km. of Site Km.

    Total Km.

    Analysis of Rate

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZrckank&ccs: jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ

    djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    29/62

    1 2 3

    Bitumen Emulsion From Hindcol Jhansi DepoSlow Setting - 2

    a Cost at EX-Jhansi

    b Basic Excise @ 14%

    c A/R Education Cess @ 3%

    d Delivery Assistance 1 x 1.80

    Jhansi to Banda Km.

    Banda to at site 35 Km. of Site Km.

    Total Km.

    Bitumen Emulsion From Hindcol Jhansi Depo

    Medium Setting

    b Basic Excise @ 14%

    c A/R Education Cess @ 3%

    d Delivery Assistance 1 x 1.80

    Jhansi to Banda Km.

    Banda to at site 35 Km. of Site Km.

    Total Km.

    Analysis of Rate

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZrckank&ccs: jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ

    djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    30/62

    Qty. Rate

    1 2 3 4 5

    Prime Coat

    Providing and applying prime coat with slow setting-2 bitumen

    emlusion on prepared surface of Granular Base including cleaning

    of road surface and spreading primed coat @ 0.75 kg. per sqm.

    using machenical means as per MORT&H Clause 502

    Unit - sqm. (Taking Output 3500 sqm.)

    (a) labour

    Mate Day 0.08 110.00

    Mazdoor Day 2.00 100.00Total

    (b) Machinery

    Machanical Broom @ 1250 sqm. per hour Hour 2.80 230.00

    Air compressor 250 cfm. Hour 2.80 206.00

    Emulsion pressure distributor @ 1750/sqm/hrs. Hour 2.00 516.00

    Water Tanker 6 Kl. Capacity @ 1 Trip per hour (5 x 15.6+234 = 312) Hour 1.00 312.00

    TotalAdd 40% for excalation on (b) for year 2010

    Total

    (c) Material

    Emulsion (slow setting) @ 0.75 kg. per sqm. Tonne 2.625 30464.00

    Total of (a+b+c)

    d i) Site accomodation Office site super vision and

    Km. 1

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    31/62

    1 2 3

    Prime Coat

    Providing and applying prime coat with slow setting-2 bitumen

    emlusion on prepared surface of Granular Base including cleaning

    of road surface and spreading primed coat @ 0.75 kg. per sqm.

    using machenical means as per MORT&H Clause 502

    Unit - sqm. (Taking Output 3500 sqm.)

    (a) labour

    Mate Day

    Mazdoor Day

    (b) Machinery

    Machanical Broom @ 1250 sqm. per hour Hour

    Air compressor 250 cfm. Hour

    Emulsion pressure distributor @ 1750/sqm/hrs. Hour

    Water Tanker 6 Kl. Capacity @ 1 Trip per hour (5 x 15.6+234 = 312) Hour

    Add 40% for excalation on (b) for year 2010

    (c) Material

    Emulsion (slow setting) @ 0.75 kg. per sqm. Tonne

    d i) Site accomodation Office site super vision and

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    32/62

    1 2 3

    Prime Coat

    Providing and applying prime coat with slow setting-2 bitumen

    emlusion on prepared surface of Granular Base including cleaning

    of road surface and spreading primed coat @ 0.75 kg. per sqm.

    using machenical means as per MORT&H Clause 502

    Unit - sqm. (Taking Output 3500 sqm.)

    (a) labour

    Mate Day

    Mazdoor Day

    (b) Machinery

    Machanical Broom @ 1250 sqm. per hour Hour

    Air compressor 250 cfm. Hour

    Emulsion pressure distributor @ 1750/sqm/hrs. Hour

    Water Tanker 6 Kl. Capacity @ 1 Trip per hour (5 x 15.6+234 = 312) Hour

    Add 40% for excalation on (b) for year 2010

    (c) Material

    Emulsion (slow setting) @ 0.75 kg. per sqm. Tonne

    d i) Site accomodation Office site super vision and

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    33/62

    1 2 3

    Prime Coat

    Providing and applying prime coat with slow setting-2 bitumen

    emlusion on prepared surface of Granular Base including cleaning

    of road surface and spreading primed coat @ 0.75 kg. per sqm.

    using machenical means as per MORT&H Clause 502

    Unit - sqm. (Taking Output 3500 sqm.)

    (a) labour

    Mate Day

    Mazdoor Day

    (b) Machinery

    Machanical Broom @ 1250 sqm. per hour Hour

    Air compressor 250 cfm. Hour

    Emulsion pressure distributor @ 1750/sqm/hrs. Hour

    Water Tanker 6 Kl. Capacity @ 1 Trip per hour (5 x 15.6+234 = 312) Hour

    Add 40% for excalation on (b) for year 2010

    (c) Material

    Emulsion (slow setting) @ 0.75 kg. per sqm. Tonne

    d i) Site accomodation Office site super vision and

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    34/62

    1 2 3

    Prime Coat

    Providing and applying prime coat with slow setting-2 bitumen

    emlusion on prepared surface of Granular Base including cleaning

    of road surface and spreading primed coat @ 0.75 kg. per sqm.

    using machenical means as per MORT&H Clause 502

    Unit - sqm. (Taking Output 3500 sqm.)

    (a) labour

    Mate Day

    Mazdoor Day

    (b) Machinery

    Machanical Broom @ 1250 sqm. per hour Hour

    Air compressor 250 cfm. Hour

    Emulsion pressure distributor @ 1750/sqm/hrs. Hour

    Water Tanker 6 Kl. Capacity @ 1 Trip per hour (5 x 15.6+234 = 312) Hour

    Add 40% for excalation on (b) for year 2010

    (c) Material

    Emulsion (slow setting) @ 0.75 kg. per sqm. Tonne

    d i) Site accomodation Office site super vision and

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    35/62

    Qty. Rate

    1 2 3 4 5

    1 Tack CoatProviding and applying tack coat with medium setting bitumenemulsion using emlusion pressure dristributor @ 0.25 kg. per sqm.

    on the prepared bituminous surface cleaned with machenical

    broom. As per MORT&H Clause 503

    Unit - Cum.

    Taking Output 3500 sqm.

    (a) labour

    Mate Day 0.08 110.00

    Mazdoor Day 2.00 100.00

    Total

    (b) Machinery

    Machanical Broom @ 1250 sqm./hour Hour 2.80 230.00

    Air Compressor 250 cfm. Hour 2.80 206.00

    Emulsion pressure distributior @ 1750 sqm./hour Hour 2.00 516.00

    Total

    Add 40% for excalation on (b) for year 2010

    Total

    (c) Material

    Bitumen emulsion (Medium setting) @ 0.25 kg. per sqm. Tonne 0.875 30956.00

    Total of (a+b+c)

    d i) Site accomodation, Office, site super vision and

    E t bili t d i d t ti t @2 5% ( b )

    Km. 1

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds

    lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    36/62

    1 2 3

    1 Tack CoatProviding and applying tack coat with medium setting bitumenemulsion using emlusion pressure dristributor @ 0.25 kg. per sqm.

    on the prepared bituminous surface cleaned with machenical

    broom. As per MORT&H Clause 503

    Unit - Cum.

    Taking Output 3500 sqm.

    (a) labour

    Mate Day

    Mazdoor Day

    (b) Machinery

    Machanical Broom @ 1250 sqm./hour Hour

    Air Compressor 250 cfm. Hour

    Emulsion pressure distributior @ 1750 sqm./hour Hour

    Add 40% for excalation on (b) for year 2010

    (c) Material

    Bitumen emulsion (Medium setting) @ 0.25 kg. per sqm. Tonne

    d i) Site accomodation, Office, site super vision and

    E t bili t d i d t ti t @2 5% ( b )

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds

    lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    37/62

    1 2 3

    1 Tack CoatProviding and applying tack coat with medium setting bitumenemulsion using emlusion pressure dristributor @ 0.25 kg. per sqm.

    on the prepared bituminous surface cleaned with machenical

    broom. As per MORT&H Clause 503

    Unit - Cum.

    Taking Output 3500 sqm.

    (a) labour

    Mate Day

    Mazdoor Day

    (b) Machinery

    Machanical Broom @ 1250 sqm./hour Hour

    Air Compressor 250 cfm. Hour

    Emulsion pressure distributior @ 1750 sqm./hour Hour

    Add 40% for excalation on (b) for year 2010

    (c) Material

    Bitumen emulsion (Medium setting) @ 0.25 kg. per sqm. Tonne

    d i) Site accomodation, Office, site super vision and

    E t bili t d i d t ti t @2 5% ( b )

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds

    lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    38/62

    1 2 3

    1 Tack CoatProviding and applying tack coat with medium setting bitumenemulsion using emlusion pressure dristributor @ 0.25 kg. per sqm.

    on the prepared bituminous surface cleaned with machenical

    broom. As per MORT&H Clause 503

    Unit - Cum.

    Taking Output 3500 sqm.

    (a) labour

    Mate Day

    Mazdoor Day

    (b) Machinery

    Machanical Broom @ 1250 sqm./hour Hour

    Air Compressor 250 cfm. Hour

    Emulsion pressure distributior @ 1750 sqm./hour Hour

    Add 40% for excalation on (b) for year 2010

    (c) Material

    Bitumen emulsion (Medium setting) @ 0.25 kg. per sqm. Tonne

    d i) Site accomodation, Office, site super vision and

    E t bili t d i d t ti t @2 5% ( b )

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds

    lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    39/62

    1 2 3

    1 Tack CoatProviding and applying tack coat with medium setting bitumenemulsion using emlusion pressure dristributor @ 0.25 kg. per sqm.

    on the prepared bituminous surface cleaned with machenical

    broom. As per MORT&H Clause 503

    Unit - Cum.

    Taking Output 3500 sqm.

    (a) labour

    Mate Day

    Mazdoor Day

    (b) Machinery

    Machanical Broom @ 1250 sqm./hour Hour

    Air Compressor 250 cfm. Hour

    Emulsion pressure distributior @ 1750 sqm./hour Hour

    Add 40% for excalation on (b) for year 2010

    (c) Material

    Bitumen emulsion (Medium setting) @ 0.25 kg. per sqm. Tonne

    d i) Site accomodation, Office, site super vision and

    E t bili t d i d t ti t @2 5% ( b )

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds

    lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    40/62

    Qty. Rate

    1 2 3 4 5Bituminous MacadamProviding and laying 50 mm. thick bituminous macadam with 100-120 TPH

    hot mix plant producing an average output of 75 tonnes per hour using

    crushed aggregates of specified grading premixed with bituminous binder,

    transported to site, laid over a previously prepared surface with paver finisher

    to the required grade, level and alignment and rolled as per clauses 501.6

    and 501.7 to achieve the desired compaction as per MORT&H Clause 504

    Unit = cum

    Taking output = 205 cum (2052.20 = 450 tonnes)

    a) Labour

    Mate day 0.84 110.00

    Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter

    and assistance for setting out lines, levels and layout of construction (16-2 =

    14) day 14.00 100.00

    Skilled mazdoor for checking line & levels day 5.00 100.00

    Total

    b) Machinery

    Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output. cum 6.00 13133.50

    Mechanical broom hydraulic @ 1250 sqm per hour hour 0.00 230.00

    Air compressor 250 cfm hour 0.00 206.00

    Paver finisher with mechnical 100 TPH hour 6.00 629.00

    Generator 250 KVA hour 6.00 450.00

    Front end loader 1 cum bucket capacity hour 6.00 520.00

    Tipper (4 Km. lead) (450 x ) T.Km. 450.00 1.74

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 3.90 297.00

    Vibratory roller 8 tonnes for intermediate rolling. hour 3.90 994.00

    Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 3.90 738.00

    Total

    Add 40% for excalation on (b) for year 2010

    Qty Teken As per Attached Job Mix Formula

    y

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    41/62

    1 2 3Bituminous MacadamProviding and laying 50 mm. thick bituminous macadam with 100-120 TPH

    hot mix plant producing an average output of 75 tonnes per hour using

    crushed aggregates of specified grading premixed with bituminous binder,

    transported to site, laid over a previously prepared surface with paver finisher

    to the required grade, level and alignment and rolled as per clauses 501.6

    and 501.7 to achieve the desired compaction as per MORT&H Clause 504

    Unit = cum

    Taking output = 205 cum (2052.20 = 450 tonnes)

    a) Labour

    Mate day

    Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter

    and assistance for setting out lines, levels and layout of construction (16-2 =

    14) day

    Skilled mazdoor for checking line & levels day

    b) Machinery

    Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output. cum

    Mechanical broom hydraulic @ 1250 sqm per hour hour

    Air compressor 250 cfm hour

    Paver finisher with mechnical 100 TPH hour

    Generator 250 KVA hour

    Front end loader 1 cum bucket capacity hour

    Tipper (4 Km. lead) (450 x ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour

    Vibratory roller 8 tonnes for intermediate rolling. hour

    Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour

    Add 40% for excalati

    Qty Teken As per Attached Job Mix Formula

    y

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    42/62

    1 2 3Bituminous MacadamProviding and laying 50 mm. thick bituminous macadam with 100-120 TPH

    hot mix plant producing an average output of 75 tonnes per hour using

    crushed aggregates of specified grading premixed with bituminous binder,

    transported to site, laid over a previously prepared surface with paver finisher

    to the required grade, level and alignment and rolled as per clauses 501.6

    and 501.7 to achieve the desired compaction as per MORT&H Clause 504

    Unit = cum

    Taking output = 205 cum (2052.20 = 450 tonnes)

    a) Labour

    Mate day

    Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter

    and assistance for setting out lines, levels and layout of construction (16-2 =

    14) day

    Skilled mazdoor for checking line & levels day

    b) Machinery

    Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output. cum

    Mechanical broom hydraulic @ 1250 sqm per hour hour

    Air compressor 250 cfm hour

    Paver finisher with mechnical 100 TPH hour

    Generator 250 KVA hour

    Front end loader 1 cum bucket capacity hour

    Tipper (4 Km. lead) (450 x ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour

    Vibratory roller 8 tonnes for intermediate rolling. hour

    Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour

    Add 40% for excalati

    Qty Teken As per Attached Job Mix Formula

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    43/62

    1 2 3Bituminous MacadamProviding and laying 50 mm. thick bituminous macadam with 100-120 TPH

    hot mix plant producing an average output of 75 tonnes per hour using

    crushed aggregates of specified grading premixed with bituminous binder,

    transported to site, laid over a previously prepared surface with paver finisher

    to the required grade, level and alignment and rolled as per clauses 501.6

    and 501.7 to achieve the desired compaction as per MORT&H Clause 504

    Unit = cum

    Taking output = 205 cum (2052.20 = 450 tonnes)

    a) Labour

    Mate day

    Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter

    and assistance for setting out lines, levels and layout of construction (16-2 =

    14) day

    Skilled mazdoor for checking line & levels day

    b) Machinery

    Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output. cum

    Mechanical broom hydraulic @ 1250 sqm per hour hour

    Air compressor 250 cfm hour

    Paver finisher with mechnical 100 TPH hour

    Generator 250 KVA hour

    Front end loader 1 cum bucket capacity hour

    Tipper (4 Km. lead) (450 x ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour

    Vibratory roller 8 tonnes for intermediate rolling. hour

    Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour

    Add 40% for excalati

    Qty Teken As per Attached Job Mix Formula

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    44/62

    1 2 3Bituminous MacadamProviding and laying 50 mm. thick bituminous macadam with 100-120 TPH

    hot mix plant producing an average output of 75 tonnes per hour using

    crushed aggregates of specified grading premixed with bituminous binder,

    transported to site, laid over a previously prepared surface with paver finisher

    to the required grade, level and alignment and rolled as per clauses 501.6

    and 501.7 to achieve the desired compaction as per MORT&H Clause 504

    Unit = cum

    Taking output = 205 cum (2052.20 = 450 tonnes)

    a) Labour

    Mate day

    Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter

    and assistance for setting out lines, levels and layout of construction (16-2 =

    14) day

    Skilled mazdoor for checking line & levels day

    b) Machinery

    Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output. cum

    Mechanical broom hydraulic @ 1250 sqm per hour hour

    Air compressor 250 cfm hour

    Paver finisher with mechnical 100 TPH hour

    Generator 250 KVA hour

    Front end loader 1 cum bucket capacity hour

    Tipper (4 Km. lead) (450 x ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour

    Vibratory roller 8 tonnes for intermediate rolling. hour

    Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour

    Add 40% for excalati

    Qty Teken As per Attached Job Mix Formula

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    45/62

    Qty. Rate

    1 2 3 4 5Semi-Dense Bituminous Concrete

    Providing and laying 25 mm. thick semi dense bituminous concrete with 100-

    120 TPH batch type HMP producing an average output of 75 tonnes per hour

    using crushed aggregates of specified grading, premixed with bituminous

    binder @ 5 per cent of mix and filler, transporting the hot mix to work site,

    laying with a hydrostatic paver finisher with the required grade, level and

    alignment, rolling with smooth wheeled, vibratory and tandem rollers to achievethe desired compaction as per MoRTH specification clause No. 508 complete

    in all respects

    Unit = cumTaking output = 195 cum (1952.30 (D) = 448.50 tonnes)

    a) LabourMate day 0.84 110.00

    Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter

    and assistance for setting out lines, levels and layout of construction .(16-2=14) day 14.00 100.00

    Skilled mazdoor for checking line & levels day 5.00 100.00Total

    b) Machinery

    Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output hour 6.00 13133.50

    Paver finisher with mechnical 100 TPH hour 6.00 629.00

    Generator 250 KVA hour 6.00 450.00

    Front end loader 1 cum bucket capacity hour 6.00 520.00

    Tipper (4 Km. lead) (448.50 x ) T.Km. 448.50 1.74

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 3.90 297.00

    Vibratory roller 8 tonnes for intermediate rolling. hour 3.90 994.00

    Finish rolling with 6-8 tonnes smooth wheeled tandem roller hour 3.90 738.00

    TotalAdd 40% for excalation on (b) for year 2010

    Qty Teken As per Attached Job Mix Formulac) Material

    * Grading II: 10 mm (Nominal Size)i) Bitumen@ 5 00 per cent of weight of mix (C R M B -55 grade bitumen) tonne 22 50 33955 00

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0

    ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds

    lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    46/62

    1 2 3Semi-Dense Bituminous Concrete

    Providing and laying 25 mm. thick semi dense bituminous concrete with 100-

    120 TPH batch type HMP producing an average output of 75 tonnes per hour

    using crushed aggregates of specified grading, premixed with bituminous

    binder @ 5 per cent of mix and filler, transporting the hot mix to work site,

    laying with a hydrostatic paver finisher with the required grade, level and

    alignment, rolling with smooth wheeled, vibratory and tandem rollers to achievethe desired compaction as per MoRTH specification clause No. 508 complete

    in all respects

    Unit = cumTaking output = 195 cum (1952.30 (D) = 448.50 tonnes)

    a) LabourMate day

    Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter

    and assistance for setting out lines, levels and layout of construction .(16-2=14) day

    Skilled mazdoor for checking line & levels day

    b) Machinery

    Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output hour

    Paver finisher with mechnical 100 TPH hour

    Generator 250 KVA hour

    Front end loader 1 cum bucket capacity hour

    Tipper (4 Km. lead) (448.50 x ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour

    Vibratory roller 8 tonnes for intermediate rolling. hour

    Finish rolling with 6-8 tonnes smooth wheeled tandem roller hour

    Add 40% for excalatio

    Qty Teken As per Attached Job Mix Formulac) Material

    * Grading II: 10 mm (Nominal Size)i) Bitumen@ 5 00 per cent of weight of mix (C R M B -55 grade bitumen) tonne

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0

    ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds

    lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    47/62

    1 2 3Semi-Dense Bituminous Concrete

    Providing and laying 25 mm. thick semi dense bituminous concrete with 100-

    120 TPH batch type HMP producing an average output of 75 tonnes per hour

    using crushed aggregates of specified grading, premixed with bituminous

    binder @ 5 per cent of mix and filler, transporting the hot mix to work site,

    laying with a hydrostatic paver finisher with the required grade, level and

    alignment, rolling with smooth wheeled, vibratory and tandem rollers to achievethe desired compaction as per MoRTH specification clause No. 508 complete

    in all respects

    Unit = cumTaking output = 195 cum (1952.30 (D) = 448.50 tonnes)

    a) LabourMate day

    Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter

    and assistance for setting out lines, levels and layout of construction .(16-2=14) day

    Skilled mazdoor for checking line & levels day

    b) Machinery

    Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output hour

    Paver finisher with mechnical 100 TPH hour

    Generator 250 KVA hour

    Front end loader 1 cum bucket capacity hour

    Tipper (4 Km. lead) (448.50 x ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour

    Vibratory roller 8 tonnes for intermediate rolling. hour

    Finish rolling with 6-8 tonnes smooth wheeled tandem roller hour

    Add 40% for excalatio

    Qty Teken As per Attached Job Mix Formulac) Material

    * Grading II: 10 mm (Nominal Size)i) Bitumen@ 5 00 per cent of weight of mix (C R M B -55 grade bitumen) tonne

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0

    ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds

    lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    48/62

    1 2 3Semi-Dense Bituminous Concrete

    Providing and laying 25 mm. thick semi dense bituminous concrete with 100-

    120 TPH batch type HMP producing an average output of 75 tonnes per hour

    using crushed aggregates of specified grading, premixed with bituminous

    binder @ 5 per cent of mix and filler, transporting the hot mix to work site,

    laying with a hydrostatic paver finisher with the required grade, level and

    alignment, rolling with smooth wheeled, vibratory and tandem rollers to achievethe desired compaction as per MoRTH specification clause No. 508 complete

    in all respects

    Unit = cumTaking output = 195 cum (1952.30 (D) = 448.50 tonnes)

    a) LabourMate day

    Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter

    and assistance for setting out lines, levels and layout of construction .(16-2=14) day

    Skilled mazdoor for checking line & levels day

    b) Machinery

    Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output hour

    Paver finisher with mechnical 100 TPH hour

    Generator 250 KVA hour

    Front end loader 1 cum bucket capacity hour

    Tipper (4 Km. lead) (448.50 x ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour

    Vibratory roller 8 tonnes for intermediate rolling. hour

    Finish rolling with 6-8 tonnes smooth wheeled tandem roller hour

    Add 40% for excalatio

    Qty Teken As per Attached Job Mix Formulac) Material

    * Grading II: 10 mm (Nominal Size)i) Bitumen@ 5 00 per cent of weight of mix (C R M B -55 grade bitumen) tonne

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0

    ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds

    lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    49/62

    1 2 3Semi-Dense Bituminous Concrete

    Providing and laying 25 mm. thick semi dense bituminous concrete with 100-

    120 TPH batch type HMP producing an average output of 75 tonnes per hour

    using crushed aggregates of specified grading, premixed with bituminous

    binder @ 5 per cent of mix and filler, transporting the hot mix to work site,

    laying with a hydrostatic paver finisher with the required grade, level and

    alignment, rolling with smooth wheeled, vibratory and tandem rollers to achievethe desired compaction as per MoRTH specification clause No. 508 complete

    in all respects

    Unit = cumTaking output = 195 cum (1952.30 (D) = 448.50 tonnes)

    a) LabourMate day

    Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter

    and assistance for setting out lines, levels and layout of construction .(16-2=14) day

    Skilled mazdoor for checking line & levels day

    b) Machinery

    Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output hour

    Paver finisher with mechnical 100 TPH hour

    Generator 250 KVA hour

    Front end loader 1 cum bucket capacity hour

    Tipper (4 Km. lead) (448.50 x ) T.Km.

    Add 10 per cent of cost of carriage to cover cost of loading and unloading

    Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour

    Vibratory roller 8 tonnes for intermediate rolling. hour

    Finish rolling with 6-8 tonnes smooth wheeled tandem roller hour

    Add 40% for excalatio

    Qty Teken As per Attached Job Mix Formulac) Material

    * Grading II: 10 mm (Nominal Size)i) Bitumen@ 5 00 per cent of weight of mix (C R M B -55 grade bitumen) tonne

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0

    ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds

    lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    50/62

    Rate Amount

    1 2 4 3 5 6

    1 Carted Earth work from 2 km. distance.

    (i) Cost of Earth work cum. 1.00 67.00 67.00

    (ii) Cost of Cartage for 2 Km. (Kaccha) cum. 1.00 81.30 81.30

    (iii) deduct loading cum. 1.00 19.00 -19.00

    (iv) Extra Roylty (9-6) = 3 3.00

    132.30

    Unit Qty.

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs:

    jk0 ek0 la0 92 ds fdeh0 12 ls nka;h rjQ djobZ lEidZ

    ekxZ ds l n`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    51/62

    Sl.

    No.

    Item No. L. B. H/D

    1 2 3 4 5 6

    PART-A (BITUMINOUS WORK)

    1 Scraping of old painted surface including disposal ofscrapped material upto a distance of 30 m. as per

    direction of the Engineer-in-Charge.

    Km-1 1 x 1 1000.00 3.00 -2 Earth work in trench cutting in proper camber according

    to required depth for laying Granular Sub Base

    including rolling, with road roller to required M.D.D.,

    dressing, cost of labour, machinery, T&P etc. required

    for proper completion of the work.

    Km-1 1 x 2 1000.00 (1.50+2.30)/2 0.40

    3 Laying of Polythene Sheet.

    Km-1 1 x 2 1000.00 3.75 -

    4 Providing laying, spreading and compaction of

    stone dust as Filtar Media Compacted 17 cm.)

    including spreading in uniform thickness, hand

    packing, rolling with three wheel 80-100 kN static

    roller in stages to proper grade and camber and

    also including cost of material, royality,trade tax

    and all other Taxes,labour, T&P, hire chargers of

    roller etc required for proper completion of thework as per direction of Engineer-in-Charge.

    Km-1 1 x 2 1000.00 (4.00+4.34)/2 0.17

    5 Construction of Granular sub base by providing coarsegraded material, spreading in uniform layer with motor

    grader on prepared surface mixing in place method

    with rotavator at O.M.C. and compacting with vibratory

    roller to achieve the desired density, complete as per

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek

    fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    52/62

    Sl.

    No.

    Item No. L. B. H/D

    1 2 3 4 5 6

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek

    fdeh0 12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    53/62

    3000.00 sqm

    1520.00 cum.

    7500.00 sqm

    708.90 cum.

    7

    la0 92 ds

    dk;Z A

    Qty.

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    54/62

    7

    la0 92 ds

    dk;Z A

    Qty.

    3750.00 sqm

    3750.00 sqm

    3750.00 sqm

    1 No.

    Bill of Quantity

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0 la0 92

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    55/62

    Qty. RatePART-A (BITUMINOUS WORK)

    1 Scraping of old painted surface including disposal of scrapped

    material upto a distance of 30 m. as per direction of the Engineer

    in-Charge. sqm 3000.00 6.50

    2 Earth work in trench cutting in proper camber according to

    required depth for laying Granular Sub Base including rolling,

    with road roller to required M.D.D., dressing, cost of labour,

    machinery, T&P etc. required for proper completion of the work.

    cum. 1520.00 50.003 Laying of Polythene Sheet.

    sqm 7500.00 6.00

    4 Providing laying, spreading and compaction of stone dust as

    Filtar Media Compacted 17 cm.) including spreading in uniform

    thickness, hand packing, rolling with three wheel 80-100 kN

    static roller in stages to proper grade and camber and also

    including cost of material, royality,trade tax and all other

    Taxes,labour, T&P, hire chargers of roller etc required for proper

    completion of the work as per direction of Engineer-in-Charge.

    Km-1 cum. 708.90 860.87

    5 Construction of Granular sub base by providing coarse graded

    material, spreading in uniform layer with motor grader on

    prepared surface mixing in place method with rotavator at

    O.M.C. and compacting with vibratory roller to achieve the

    desired density, complete as per clause 401.

    #REF!cum. 250.00 1605.10

    6 Providing, Laying, Spreading and compacting graded stone

    aggregate to wet mix macadam in layers not exceeding 100 mm.

    including premixing the material with water at O.M.C. in

    mechanical mix plant, carriage of mixed material by tipper at site,

    laying in uniform layer with paver in base coarse on well

    prepared surface and compacting with vibratory roller to achive

    the desired density as per MORT&H clause 403

    dk;Z dk uke %& 3054 jk0l0fu0 ds vUrxZr ckank&ccs: jk0 ek0 la0 92

    12 ls nka;h rjQ djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    56/62

    Amount

    19500.00

    76000.00

    45000.00

    610268.26

    401275.00

    ds fdeh0

    Qty. Rate

    Sl.

    No.

    Item of Work Unit

    Total

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    57/62

    Amount

    3497262.01

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    58/62

    ; u e u s v rx r c an ccs: e a

    Abstract of Cost

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    59/62

    Sl.

    No

    Particulars

    1 2

    1

    ek0 la0 92 ds fdeh0 12 ls nka;h rjQ

    djobZ lEidZ ekxZ ds lqn`

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    60/62

    2.25 mtr. 2.25 mtr.

    0.51 Mtr.

    0.60 Mtr..

    12.58 Mtr.

    J.E. A.E. E.E.

    Existing Blanket coat 15 CM.

    3.75 Mtr.

    Cross Section of Bituminous Road

    W.M.M. 15 CM.

    P.C,. 3.75

    Seal coat 3.75

    Existing crust 25 CM.

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    61/62

  • 8/4/2019 Karbai Link Road Strength In 1.00 Km P.C. Seal Coat-1

    62/62

    1.50 mtr. 1.50 mtr.

    1.00 Mtr..

    10.80 Mtr.

    J.E. A.E. E.E.

    Existing Embankment

    3.00 Mtr.

    Cross Section of C.C. Road

    Existing but Damage C.C.+L.C. crust 20 CM.

    Proposed C.C. 1:1.50:3 (15 CM.)