kansas gas service

37
KANSAS GAS SERVICE 112 NE Madison St. - Topeka, KS

Upload: others

Post on 04-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

KANSAS GAS SERVICE

112 NE Madison St. - Topeka, KS

GAS DRYER

CONDUIT PENETRATIONS C1-C81" 8 PLACES DRYER

CONDUITCONNECTIONS

(EXTERNAL)

MOTOR CONDUITPENETRATION

C9 3"PRIORITY PANELPENETRATIONS

1/2" COMPRESSIONFITTINGS (6 PLACES)

COMPRESSORINLET

DRYER INLET3" CL150 RF FLANGE

VENT STACKCOMPRESSOR DATAWEIGHT: 20,000 LBS (APPROXIMATE)TYPE: ARIEL RECIPROCATING COMPRESSOR JGQ/2 4-STAGECLEARANCE: ALLOW 36" MINIMUM ON ALL SIDES FOR ACCESS UNLESS OTHERWISE INDICATEDMOUNTING: REQUIRES EIGHT (8) 1" DIAMETER ANCHOR BOLTS (NOT PROVIDED). GROUTING THE COMPRESSOR TO CONCRETE IS NOT RECOMMENDED.LIFTING: MINIMUM 24" SPREADER BAR IS REQUIRED. UTILIZE FOUR (4) LIFT RINGS.SHIPPING: VENT STACK REMOVED FOR SHIPPING.

COMPRESSOR

NG50

24ft

SEQUENTIAL

PANEL

ESD

300

UCP

C106

DRYER

EXISTING

ON SKID

COM

PANEL

NEW ESD

3/4" CONDUIT

C105 - 3/4" CONDUIT

MOTOR CONTROL

PANEL

C109A - 3" CON

C108A

C107A

C112A

C104A 1-1/4" CONDUIT

GFCI

RECPT

C101A - 3/4" CONDUIT

Detail

A

SEE

DETAIL

'A'

DRYER

C105A 1 1/2 " COND.

C104 - 3/4" COND.

C103 - 3/4" COND.

C101B - 3/4" COND.

C101B - 3/4" COND.

C106B - 3/4" CONDUIT

C100

3/4" CONDUIT

TO H1 /GRUNSKY FILL POST

J BOX

C106B

C101B

WIRELESS

ANTENNA

COM1

50 MCP

50 UCP

TO CNG

DISPENSER

COMPRESSOR

NG50

POLE

TRANSFORMER

24ft

ASPHALT

NE

M

ON

RO

E S

T

PRIORITY

PANEL A

ESD2

3600/2000

FILL POST

1.25" PVC #3

ESD3

ESD4

SLO

W F

ILL E

XIS

TIN

G E

SD

7 &

8

ESD5

C111

CNG DISPENSER

ESD

POLE

TRANSFORMER

NG300 TERMINAL REFERENCE ONLY

FOR REFERENCE ONLY

FOR REFERENCE ONLY

FOR REFERENCE ONLY

FOR REFERENCE ONLY

FOR REFERENCE ONLY

FOR REFERENCE ONLY

FOR REFERENCE ONLY

FOR REFERENCE ONLY

FOR REFERENCE ONLY

FOR REFERENCE ONLY

FOR REFERENCE ONLY

COMPRESSOR

NG50

24ft

ASPHALT

NE

M

ON

RO

E S

T

PRIORITY

PANEL A

ESD2

3600/2000

FILL POST

1.25" PVC #3

(2) 3/4" PVC

1 1/4" PE

ESD3

ESD4

SLO

W F

ILL E

XIS

TIN

G E

SD

7 &

8

ESD5

POLE

TRANSFORMER

3" PE

3/4"

CONDUIT

COMPRESSOR

NG50

24ft

ASPHALT

NE

M

ON

RO

E S

T

24"

PRIORITY

PANEL A

ESD

FILL

POST

C111

3/4" CONDUIT

1.25" PVC #3

POLE

TRANSFORMER

COMPRESSOR

NG50

ASPHALT

PRIORITY

PANEL A

STORAGE LAYOUT

POLE

TRANSFORMER

COMPRESSOR

NG50

24ft

ASPHALT

SEQUENTIAL

PANEL

ESD

UCP

DRYER

Detail

B

DRYER

J BOX

TO

G

AS

M

ET

ER

D

IS

P

H

O

S

E

V

E

N

T

S

L

O

W

F

IL

L

L

O

W

B

A

N

K

M

ID

B

A

N

K

H

I B

A

N

K

H1

LOW BANK

MID BANK

HIGH BANK

3" BORE

3" YELLOW PE

1 1/2" YELLOW PE

DETAIL B

1/2" .049 SS

1/2' .049 SS

TUBE IN PE

SLEEVE

1 1/4" BORE

1/2" .049 SS

IN PE

SLEEVE

L

L

L L

M

H

FRONT

TO SEQUENTIAL PANEL

POLE

TRANSFORMER

NOTES:1. COMPRESSION SUCTION 20 PSI.2. MAOP MUST BE AT MINIMUM 28 PSIG.3. AT MINIMUM PIPE MUST TEST TO 42 PSIG (1.5 TIMES THE MAOP.)4. ABOVE GRADE USE 4-1/2" SCHEDULE 40 STEEL5. BELOW GRADE PLASTIC MAOP OF MIN.28 PSI

3/4" CONDUIT CONDUCTORS 11 - #12 awg 2 - #12awg

COMPRESSOR

NG50

24ft

ASPHALT

NE

M

ON

RO

E S

T

SEQUENTIAL

PANEL

ESD

UCP

DRYER

DRYER

J BOX

TO

G

AS

M

ET

ER

3" YELLOW PE

1 1/2" YELLOW PE

PROPOSED LOCATION -

TO BE DETERMINED

BY KGS

POLE

TRANSFORMER