kanban ballast mexico

22
Acuity Business System Acuity Business System Mexico City Ballast Kaizen - Kanban Ballast Supermarket & Kanban January 25 – 26, 2007

Upload: amscott2

Post on 24-Jun-2015

467 views

Category:

Documents


0 download

DESCRIPTION

Supply Chain Kaizen

TRANSCRIPT

Page 1: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Mexico CityBallast Kaizen - Kanban

Ballast Supermarket & Kanban

January 25 – 26, 2007

Page 2: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Team Members- Samuel Juarez, Francisco Lopez, Antonio Cruz,

Eduardo Jimenez, Andy Scott, Tom Winenger, Randy Crothers

Page 3: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Page 4: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Page 5: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Page 6: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Standard Pack – 1 layer per pallet

• Plus– Smaller buffer qnty.

– Easy material handling

– Increased safety

– Smaller replenish qnty.

– Reduced number of pallets purchased in Ohio

• Delta– Increased cost per

ballast ($0.25 USD) on average

– More spaced required in supermarket racks

Page 7: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Page 8: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Page 9: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

New Shipping Rules – S.O.P.• Load weight is the limiting factor for number of

ballasts per load• Ballasts can ship 3 pallets high (1 layer per pallet)• Trucks will always leave Mexico City to Newark

on Monday and Wednesday.• Additional trucks will be used on Thursday and/or

Friday if a full load is required through kanban signal and ballasts are available.

Page 10: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Standard Operating Procedures

• Supermarket Buffer Review

• Mexico City Truck Schedule

• Scheduling

• Supermarket

Page 11: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Mexico City Supermarket Layout

Page 12: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Page 13: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Page 14: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Current State Scheduling-MRP

Firm Ship

Schedule

Forecasted

Requirements

Page 15: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Plan For Every Part

Page 16: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Future State Scheduling-Pull

Page 17: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Buffer Levels• Mexico CityInventory increase from 2-5 days on hand for 21 supermarket ballasts

Inventory stay same for 40 Build to Ship ballasts

• NewarkInventory increase from 7-10 days on hand for 40 Build to Ship ballasts

Inventory decrease from 10-7 days on hand for 21 supermarket ballasts

• UticaInventory decrease from 3-1 days on hand for 61 Mexico City ballasts

Page 18: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Current Production Scheduling

Page 19: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Future Production Scheduling

M

T

W

R

F

Kanban Post

Supermarket

Production Schedule Board

Scheduling Department

Production Line

Finished Assembly

Take to the

supermarket

Page 20: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Page 21: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Page 22: Kanban Ballast Mexico

Acuity Business SystemAcuity Business System

Report Card