k. yamamoto , r. takahashi, t. sekiguchi, y. sakakibara, c. tokoku,

37
1 K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. Akutsu A , H. Ishizaki A , D. Chen A , A. Takamori B , T. Suzuki C , N. Kimura C , S. Koike C , K. Tsubono D , Y. Aso D , T. Ushiba D , K. Shibata D , N. Ohmae E , K. Somiya F , R. DeSalvo G , E. Majorana H , E. Hennes I , J. Van den Brand I , A. Bertolini IJ , N.A. Lockerbie K , LCGT collaboration ICRR.UT, NAOJ A ,ERI.UT B , KEK C , Phys.S.UT D , E.UT E , S.TIT F , Sannio Univ G ., INFN H , Nikef I , AEI J , University of Strathclyde K Development of vibration isolation systems for LCGT VII 2012 March 24 The meeting of Physical Society of Japan @Kwansei Gakuin University, Nishinomiya, Hyogo

Upload: ping

Post on 20-Mar-2016

64 views

Category:

Documents


4 download

DESCRIPTION

Development of vibration isolation systems for LCGT VII. K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. Akutsu A , H. Ishizaki A , D. Chen A , A. Takamori B , T. Suzuki C , N. Kimura C , S. Koike C , - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

1

K. Yamamoto, R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku, M. Kamiizumi, U. Iwasaki, T. Uchiyama, S. Miyoki, M. Ohashi, T. AkutsuA,

H. IshizakiA, D. ChenA, A. TakamoriB, T. SuzukiC, N. KimuraC, S. KoikeC, K. TsubonoD, Y. AsoD, T. UshibaD, K. ShibataD, N. OhmaeE, K. SomiyaF, R. DeSalvoG, E. MajoranaH, E. HennesI, J. Van den BrandI, A. BertoliniIJ,

N.A. LockerbieK, LCGT collaboration

ICRR.UT, NAOJA,ERI.UTB, KEKC, Phys.S.UTD, E.UTE, S.TITF, Sannio UnivG., INFNH, NikefI, AEIJ, University of StrathclydeK

Development of vibration isolation systems

for LCGT VII

2012 March 24The meeting of Physical Society of Japan

@Kwansei Gakuin University, Nishinomiya, Hyogo

Page 2: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

2

0. Abstract Progress of development of vibration isolation system, which includes cryogenic payload, for KAGRA in the last half year

Page 3: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

3

Contents

1.Introduction2.Vibration isolation3.Cryogenic payload4.Summary

Page 4: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

4

1. Introduction KAGRA (old name: LCGT)

2nd generation interferometric             gravitational wave detector in Japan

Key features of KAGRA projectSilent underground site (Kamioka) :         Small seismic motion Vibration isolation system is necessary. Cryogenic system : Reduction of thermal noise                                and so on

Page 5: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

5

Type-AIP + GASF (5 stage) + Payload (23kg, cryogenic)

Type-BIP + GASF (3 stage) + Payload (10kg/20kg)

Type-CStack + Single/Double-pendulum ( ~1kg)

1. Introduction

Page 6: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

6

Type-C Type-C

MirrorStack

1. Introduction

Page 7: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

7

Top filter[Filter0]

Inverted Pendulum (IP)

Filter1 (Filter1~3 in Type-A)

Bottom Filter (BF)

Intermediate Mass (IM)Intermediate Recoil Mass (IRM)

Test Mass (TM)Recoil Mass (RM)

Optical Bench[Breadboard]

Pre-isolator

Payload

Filter chain

Type-B Type-B

Page 8: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

8

1. Introduction

8

Cryogenic mirror

Cryostat

Vibration Isolation(Type A)

14m

Type A and

Cryo payload

Page 9: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

9

1. Introduction

Sapphire mirror(20K)

Sapphire fiber

Shield(8K)

Cryo payload

Page 10: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

10

1. Introduction Schedule for vibration isolation system of KAGRA iKAGRA (room temperature) - 2015.12 bKAGRA (cryogenic temperature) 2016.1 -

Prototype test (ICRR and NAOJ) : - 2014.3 Pre-isolator : 2011.7 – 2012.9 Type B payload : 2012.7 - 2013.6 Type B : 2013.1 - 2014.3 Assembling (Akeno and Kamioka) : 2012.4 - 2014.9 Standard GASF : 2012.4 – 2012.9 Installation (Kamioka) : 2014.4 - 2016.5 Type B (for iKAGRA) : 2014.4 - 2015.6 Type A and Type B (for bKAGRA) : 2015.5 - 2016.5

Page 11: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

11

Schedule for cryogenic payload of KAGRA iKAGRA (room temperature) - 2015.12 bKAGRA (cryogenic temperature) 2016.1 -

1/4 cryostat and R&D : - 2014.9 Design for cryostat and payload : Now

Cryostat installation in ICRR (Kashiwa) : 2013.3 Experiment of 1/4 cryostat : 2013.4 - 2014.9 Procurement : 2014.10 - 2015.6

Installation : 2015.8 - 2016.12

1. Introduction

Page 12: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

12

2. Vibration isolation

Total system

Prototype test (Pre-isolator) in Kashiwa (ICRR)

Page 13: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

13

2. Vibration isolation

Pre-isolator

Prototype test (Pre-isolator) in Kashiwa (ICRR)

Page 14: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

14

2. Vibration isolation Prototype test (Pre-isolator) in Kashiwa (ICRR)

Load for pre-isolator

Page 15: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

15

2. Vibration isolation Prototype test (Pre-isolator) in Kashiwa (ICRR)

Standard GASF (prototype)

Page 16: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

16

2. Vibration isolation

Digital system has already been installed(O. Miyakawa’s talk in this session).

Details of experimental test will be reported by T. Sekiguchi (next talk !).

Prototype test (Pre-isolator) in Kashiwa (ICRR)

Page 17: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

17

Storage & Assembling

Delivered apparatus will be assembled in clean booths and stored in Akeno observatory (ICRR), Yamanashi.

2. Vibration isolation

Page 18: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

18

2. Vibration isolation

19 standard GASF’sfrom Italy and clean booths arrived.We will start assembling soon.

Page 19: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

19

3. Cryogenic payload

19

Preparation for 1/4 cryostat Design of 1/4 cryostat is in progress.

This is NOT FINAL version.

Page 20: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

20

3. Cryogenic payload

20

Preparation for 1/4 cryostat Design of cryogenic payload is in progress.

http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=570

This is NOT FINAL version.

Page 21: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

21

3. Cryogenic payload

21

Preparation for 1/4 cryostat Themal and mechanical simulation of payload (S. Koike and T. Sekiguchi)

Page 22: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

22

3. Cryogenic payload

22

Preparation for 1/4 cryostat (C. Tokoku)Cryocooler has already arrived at ICRR !

Page 23: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

23

3. Cryogenic payload Sapphire fibers to suspend sapphire mirrors

Page 24: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

24

3. Cryogenic payload Sapphire fibers to suspend sapphire mirrors

Test sample (T. Uchiyama)

Page 25: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

25

3. Cryogenic payload

25

Sapphire fibers to suspend sapphire mirrors Sapphire fibers from MolTech GmbH (Germany)

Thier length (350 mm) and diameter (1.8 mm) are almost same as what we will need in bKAGURA. We should check the quality.

Page 26: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

26

3. Cryogenic payload Baffle for the (large angle) scattered light

Mike Smith (Caltech, the support of LIGO and the U.S. National Science Foundation )How will it be suspended in radiation shield ?

Page 27: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

27

3. Cryogenic payload

Digital system for temperature monitor Discussion is in progress.

Page 28: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

28

4. Summary Vibration isolation Prototype test in Kashiwa : pre-isolator (Sekiguchi and Miyakawa talk) Assembling of Standard GASF in Akeno is started soon. Cryogenics payload Design of the 1/4 cryostat and payload are in progress. Cryocooler for 1/4 cryostat and test samples of sapphire fibers arrived. Discussion for baffle in cryostat and digital system are being discussed.

Page 29: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

29

Thank you for your attention !

Page 30: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

30

4. SummaryPlan for next half year Vibration isolation Prototype test : pre-isolator and payload Assembling in Akeno : Standard GASF Cryogenics payload Design of the 1/4 cryostat and payload

Page 31: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

31

(1)How to assemble Details of construction, clean room ….

(2)Strength Tensile strength, development of clamp, …

(3)Control system Actuators (what and where), resonant mode (frequency and Q)

2. Issues

Page 32: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

32

(4)Cooling

Temperature of mirror, initial cooling time, heat resistance …

(5)Noise

Thermal noise, vibration via heat links …

2. Issues

Page 33: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

33

Cryogenic payload : One of key features of LCGT projectCryogenic part of seismic isolation system

Cryostat installation in ICRR (Kashiwa) ~2013.3 (Check of cryostat system)

Check of cryogenic payload in ICRR

Preparation is in progress. (1)Thermal simulation (2)Sapphire fiber-mirror connection (3)Simulation of effect of external vibration (with heat link) (4)Thermal noise

4. Summary

Page 34: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

34

(1)How to assemble Details of construction, clean room ….

(2)Control system Actuators (what and where), resonant mode (frequency and Q)

5. Future work

Page 35: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

35

Type-B Type-B Inverted pendulum

Top filter

2-stage GASF

Mirror

Page 36: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

36

iKAGRA operation

    2011 2012 2013 2014 2015 2016  Standard GASF Prototype test                                                 in NIKHEF/ICRR  Procure                                                    Assembling                                                 in AkenoPre-isolator Prototype test                                                 in ICRR  Procure                                                    Assembling                                                 in AkenoType-B payload Prototype test                                                 in NAOJ  Procure                                                    Assembling                                                 in Kamioka  Installation                                                  Type-A SAS Prototype test                                                 in the site  Installation                                   ET

M   ITM        

Type-B SAS Prototype test                                                 in TAMA  Installation                                     SRM PRM      Stack Procure                                                    Installation                                                  

Schedule along roadmap

1. Introduction

Page 37: K. Yamamoto , R. Takahashi, T. Sekiguchi, Y. Sakakibara, C. Tokoku,

37

Type-A: IP + GASF (5 stage) + Payload (23kg, cryogenic)Type-B: IP + GASF (3 stage) + Payload (10kg/20kg, room temp.)Type-C: Stack + Single/Double-pendulum (~1kg)

ConfiguratioConfigurationn

Chamber iKAGRA bKAGRAITMX, ITMY, ETMX, ETMY

Type-A

IAOX, IAOY, EAOX, EAOY

Type-B Payload on Stack(for ITM/ETM)

Type-C(for AO)

BS, PR2, PR3 Type-B Payload on Stack

Type-B

PRM, SRM, SR2, SR3

Type-B

MCF, MCE, MMT Type-C Type-CPD, BRTX, BRTY Type-C