Page 1: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

Lee County Bridge Replacements

Justin Hardee, P.E.Lee County Engineer

Page 2: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

Overview ALDOT Policy

Construction Process

Status

Lee County’s Bridge Inventory

2010 Bond Issuance for Bridges

ATRIP Program

Page 3: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 4: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

In 2010, the Lee County Commission issued approximately $8.0 Million in Bonds for the purpose of replacing aging bridge structures in Lee County.

15 structures were originally selected to be replaced using these funds.

8 were completed with Lee County performing our own approach work before ATRIP was announced.

Bond Issuance for Bridges

Page 5: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 6: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

The ATRIP Program was announced and Lee County focused on resurfacing for the first two rounds.

Round 3 we decided to utilize our bond funds to expand the impact we could have on our bridges.

Awarded 15 bridges in Round 3.

ATRIP

Page 7: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 8: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

Lee County committed to use our bond funds for design, right-of-way and all approach work to be performed by the county.

ATRIP was asked to fund 80% of the structure only.

Our Division expressed concerns about the County performing our own work and did not want to allow it.

ALDOT and Policy

Page 9: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

However, in just six (6) months, working with IP Bureau, County Transportation and the ACEA, a policy was established to satisfy ALDOT about the logistics of Lee County and the contractors working on the same project and handling the traffic control and erosion and sediment control from start to finish.

ALDOT and Policy

Page 10: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

Meanwhile, ALDOT restructured its Divisions into Regions and Lee County was transferred to the Montgomery Area of the Southeast Region.

So, our first bridge project was planned under one Division with construction and final closeout administered by the new Region under a new policy.

ALDOT and Policy

Page 11: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

Lee Road 10, Bridge over Chewacla Creek AADT = 2,400 vpd, with 15.4% trucks This bridge closure cut off interstate access for a

quarry, a paving company and a local restaurant. No onsite detour option available. Detour was 15

miles. High priority project for Lee County.

Our First ATRIP Bridge Project

Page 12: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

Road was closed on January 26, 2014. Required bridge was a 115’ single span on drilled shaft

foundations with 1,200’ of approaches. On March 12, 2014, Lee County began the east

approach after the contractor completed the east abutment.

County and contractor working simultaneously on the project.

Our First ATRIP Bridge Project

Page 13: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 14: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 15: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 16: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 17: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 18: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 19: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 20: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 21: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 22: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 23: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 24: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 25: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 26: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 27: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges
Page 28: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

Contractor finished barrier rails on May 19th. Grooved the deck on May 20th.

(This was their last item of work.) Guardrail was placed by County’s local bid

contractor on May 21st. ALDOT performed an inspection on May 22nd. Bridge was opened traffic two (2) days after

the completion of the structure.

Opened Road May 22, 2015

Page 29: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

1 - Bridge Completed

3 - Currently Under Construction

1 - Project Under Contract

10 - Plan Design/Right-of-Way Acquisition

Current Status

Page 30: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

Prior to our bond issuance and ATRIP our average sufficiency rating was a 65.

After we complete these bridges our average sufficiency rating will be an 81.

Lee County’s Bridge Inventory

Page 31: Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges

Contact Information:

Justin Hardee, P.E.

County Engineer

Lee County Highway Department

100 Orr Ave

Opelika, AL 36803

Ph: 334-737-7011

Questions?