Page 1: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 1

TDP / AWG Update

Lynn Baker

USSKA Consortia MeetingWashington DCJune 3,4, 2010

Page 2: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 2

Feed / Optics Analysis

• Wideband feeds analyzed in a range of conic and shaped optics– ATA log periodic feed, Lindgren feed (Cal Tech), QSC feed (Cornell),”11” feed (Chalmers)

– Each feed modeled in multiple optics to select best matched optics

– Efficiency and noise temperature calculated over the feed frequency range

• Results presented in papers and submitted for publication– Three talks at the URSI meeting in Boulder

– Two papers submitted to the IEEE / APS journal

– Multiple talks at two meetings in Manchester, England

Page 3: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 3

Page 4: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 4

Page 5: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 5

Page 6: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 6

Feed / Optics Analysis

• Conclusion: Wideband feed performance dominates overall antenna performance

• Conclusion: More than one wideband feed will be required

• Improved wideband feed models under development and test

• Need to include corrugated horns in the optics trade-off analysis

Page 7: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 7

Initial Planning For DVA-1 Project

• DVA-1 prototype Antenna will be a 15 meter shaped offset, Gregorian design– Choice of diameter driven by system cost considerations

– Choice of shaped offset from previous studies of performance and cost.

– Initial optical, mechanical design work underway

• Project is planned as a partnership between TDP, DRAO, NRAO, SPDO– TDP is contributing optical and mechanical design, wideband feeds

– DRAO is contributing composite reflector design and fabrication, possibly a PAF

– NRAO is contributing the site at the EVLA, narrowband feeds, back end electronics

– SPDO is contributing system level analysis, testing plan development

Page 8: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 8

Preliminary Optics Choice For DVA-1

Page 9: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 9

Page 10: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 10

Page 11: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 11

Feed Indexer Concept

Page 12: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 12

Cobham/Patriot Proposal

• Cobham/Patriot is proposing to build a 15 meter offset antenna– Cobham/Patriot has seed money to pursue the design and construction of prototype(s).

– The design would include TDP shaped optics and TDP advanced mount concepts

– The antenna would meet SKA prototype specifications

– Reflectors would be panelized using Patriot stretch forming technology

– The drive systems would be standard Patriot components

– If another customer can be identified, the cost to the TDP is approximately $750,000

• A second mount would be provided to support a composite, single shell reflector– The mounts would have a common interface to support different reflectors

• Proposal would expedite the construction of a first prototype– A single shell composite prototype antenna would follow this first prototype

Page 13: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 13

Page 14: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 14

Page 15: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 15

Typical Panel From Primary

Page 16: June 3,4 2010Lynn Baker USSKA Consortia Washington, DC1 TDP / AWG Update Lynn Baker USSKA Consortia Meeting Washington DC June 3,4, 2010

June 3,4 2010 Lynn Baker USSKA Consortia Washington, DCLynn Baker USSKA Consortia Washington, DC 16

Broadband Feed Development

• Multiple feeds being developed, 3 funded by TDP, others in-kind

• QSC (Cortes,Cornell), Log-Periodic (ATA), Lindgren (CalTech) feeds in the TDP

• “11” (Kildal,Chalmers) feeds being developed in-kind

• Second generation models of the feeds are designed and analyzed. Several are fabricated and under test

• A corrugated horn is being designed and analyzed for modeling in optics