june 25-26, 2002d&d lessons learned workshop1 overview of the tftr d&d project erik d. perry...

15
June 25-26, 2002 D&D Lessons Learned Workshop 1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

Upload: damon-young

Post on 12-Jan-2016

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 1

Overview of the TFTR D&D Project

Erik D. PerryD&D Lessons Learned Workshop

June 25-26, 2002

PPPL

Page 2: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 2

Overview of TFTR D&D

• Schedule: October 1999 through September 2002

• Original Estimated Project Cost: $40.3M

• Projected Project Cost at Completion: $36.8M

• Objectives:– Remove activated and/or contaminated components from

the TFTR Test Cell, Test Cell Basement and Tritium Area. (Tritium Area later changed to mothball)

– Provide data for the decommissioning of future fusion projects.

Page 3: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 3

TFTR D&D Summary Schedule

Page 4: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 4

TFTR Before D&D

Page 5: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 5

Overview of TFTR D&D cont

• Not a typical decontamination and decommissioning (D&D) project

• Will not be returned to “green field” conditions

• Facility will not be released for unrestricted use

• Not a capital project - funded with operating money

Page 6: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 6

TFTR D&D Organization

TFTR D&D Project Organization

PPPL Director

Engineering

Department

Head

TFTR D&D

Project

Manager

Planning and

Control

Engineering Construction HP /

Radwaste

Page 7: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 7

Management of TFTR D&D Project

• Used existing PPPL Project Control Systems (PCS)

• Cost - Performance Measurement System employed utilizing earned value techniques

• Schedule - PC based “Primavera” System

• Management Meetings / Project Reports

Page 8: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 8

Work Breakdown Structure

• 1.0 Engineering• 1.1 Oversight & Planning

• 1.2 Area Preparations

• 1.3 Non-Tokamak Removals

• 1.4 Tokamak Removal Engineering

• 2.0 Field Operations• 2.1 Oversight & Support (Field Ops)

• 2.2 Area Preparations (Field Ops)

• 2.3 Non-Tokamak Removals (Field Ops)

• 2.4 Tokamak Removals (Field Ops)

Page 9: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 9

Work Breakdown Structure cont

• 3.0 Project Management• 3.1 Project Office

• 3.2 Work Control Center

• 3.3 Configuration and Document Control

• 4.0 Health Physics and Safety• 4.1 HP Oversight

• 4.2 Safety Oversight

Page 10: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 10

Work Breakdown Structure cont

• 5.0 Radwaste Operations• 5.1 Radwaste Management

• 5.2 Containers and Supplies

• 5.3 Transportation and Disposal

• 5.4 Mixed Waste

Page 11: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 11

Conduct of Operations

• Worker safety highest priority

• Protecting environment from tritium release

• Different set of hazards than TFTR operations

• Centralized control of work activities

• Procedure compliance mandatory

• Clear responsibility and accountability

Page 12: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 12

Work Package Process• Engineering

» Define work scope

» Conduct Peer Reviews and Design Reviews

» Prepare installation/removal procedure

» Define prerequisites for field work

» Update or void drawings after removal is complete

Page 13: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 13

Work Package Process cont

• Work Control Center» Review Engineering Package for completeness

» Ensure prerequisites are completed prior to issuing package for work

» Arrange for all permits

» Release work package to field per schedule

» Arrange for resolution of field problems

» Return completed work package to Engineering for drawing update/voiding

Page 14: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 14

Work Package Process cont

• Construction» Verify and/or perform safing / lockout/tagout per

PPPL procedures as required

» Perform field work per procedure

» Return completed work package to Work Control Center

Page 15: June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL

June 25-26, 2002 D&D Lessons Learned Workshop 15

Summary

• The TFTR D&D Project has been performed safely, on time and within budget