TABLE OF CONTENTS SECTION 1. PROJECT INTRODUCTION 1.1. Project Description. 1.2. Scoop of works. 1.3. Project strategy. SECTION 2. EXECUTIVE SUMMARY 2.1. Overall activities project performance (Plan & actual Percentage table). 2.2. Deliverables SECTION 3. CRITICAL ISSUES & CHALLENGES. 3.1. Approvals 3.2. Long lead Items 3.3 Deliverables SECTION 4. PROGRAM 4.1. Baseline program with actual. (V6). 4.2. Recovery program 4.3. S-curve SECTION 5. FINANCIAL 5.1. Financial S-curve. 5.2. Payment status 5.3. Variation status SECTION 6. PROJECT IMAGES 6.1. Photographs. Telephone: 44 22 120 Fax: 44 22 150 P.O. Box 9811 Doha, Qatar : 4422120 : 4422150 . 9811  email: [email protected] GULF ENGINEERING & INDUSTRIAL CONSULTANCY   

Upload: mahmod-awad

Post on 05-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: June 2010 - Monthly Report

7/31/2019 June 2010 - Monthly Report

http://slidepdf.com/reader/full/june-2010-monthly-report 1/6

TABLE OF CONTENTS

SECTION 1. PROJECT INTRODUCTION1.1. Project Description.

1.2. Scoop of works.

1.3. Project strategy.

SECTION 2. EXECUTIVE SUMMARY2.1. Overall activities project performance

(Plan & actual Percentage table).

2.2. Deliverables

SECTION 3. CRITICAL ISSUES & CHALLENGES.3.1. Approvals

3.2. Long lead Items

3.3 Deliverables

SECTION 4. PROGRAM4.1. Baseline program with actual. (V6).

4.2. Recovery program

4.3. S-curve

SECTION 5. FINANCIAL5.1. Financial S-curve.

5.2. Payment status

5.3. Variation status

SECTION 6. PROJECT IMAGES

6.1. Photographs.

Telephone: 44 22 120 Fax: 44 22 150 P.O. Box 9811 Doha, Qatar :4422120:4422150.9811 

email: [email protected]

GU L F EN G I N EER IN G &

INDUSTRIAL CONSULTANCY   

Page 2: June 2010 - Monthly Report

7/31/2019 June 2010 - Monthly Report

http://slidepdf.com/reader/full/june-2010-monthly-report 2/6

SECTION 1. PROJECT INTRODUCTION

The LVQ PROJECT -

1.1 Project Description.

The LVQ PROJECT: PHASE 1 - Construction of Warehouses at Logistic

Village Qatar at Wukair.

Owner/Employer : GULF WAREHOUSING COMPANY

Client : Gulf Warehousing Company (GWC)

Consultant : Gulf Engineering and Industrial Consultancy (GEIC)

Main Contractor : AL ALIA Trading and Contracting Co. w.l.l. (ATC).

Contract Value : QR 59,818,000.00

Variation Order :QR 

Approved by the Client

 

1.2 Scoop of Works.

Construction and Completion Warehouses Type (FA – 1no.), FB-3nos. and

H2C-1 no. and their connections to the Utilities network at LVQ Project – 

Phase 1 at Al Wukair.

Telephone: 44 22 120 Fax: 44 22 150 P.O. Box 9811 Doha, Qatar :4422120:4422150.9811 

email: [email protected]

GU L F EN G I N EER IN G &

INDUSTRIAL CONSULTANCY   

Page 3: June 2010 - Monthly Report

7/31/2019 June 2010 - Monthly Report

http://slidepdf.com/reader/full/june-2010-monthly-report 3/6

1.3 Project Strategy.

a. Contract Time – 14 months

 

 b. Commencement date – 1st November 2009

 

c. Completion date – 31st January 2011

 

d. Time elapsed – 8 months as of 30th June 2010

e. Time delays – _____ days as of 30th June 2010

 

f. Schedule accomplishment base on Program of Work – for 

end of June 2010 – _____%

 

g. Contractor accomplishment base on Claims up to end of 

June 2010 – _____%

h. Current Contractor claims (end of May 2010) - received 00 June

2010 and under review of Consultant).

SECTION 2. EXECUTIVE SUMMARY

2.1. Overall activities project performance(Plan & actual Percentage table).

Cumulative Progress of site work as of 30 June 2010. 

(see attached copy)

2.2. Deliverables (see attached copy)

Telephone: 44 22 120 Fax: 44 22 150 P.O. Box 9811 Doha, Qatar :4422120:4422150.9811 

email: [email protected]

GU L F EN G I N EER IN G &

INDUSTRIAL CONSULTANCY   

Page 4: June 2010 - Monthly Report

7/31/2019 June 2010 - Monthly Report

http://slidepdf.com/reader/full/june-2010-monthly-report 4/6

SECTION 3. PROGRAM

3.1. Baseline program with actual. (V6).

(see attach copy)

3.2. Recovery program

(see attach copy)

3.3. S-curve

(see attach copy)

SECTION 4. CRITICAL ISSUES & CHALLENGES.

4.1. Approvals (see attached copy)

4.2. Long lead Items (see attached copy)

SECTION 5. FINANCIAL

5.1. Financial S-curve

(see attach copy)

Telephone: 44 22 120 Fax: 44 22 150 P.O. Box 9811 Doha, Qatar :4422120:4422150.9811 

email: [email protected]

GU L F EN G I N EER IN G &

INDUSTRIAL CONSULTANCY   

Page 5: June 2010 - Monthly Report

7/31/2019 June 2010 - Monthly Report

http://slidepdf.com/reader/full/june-2010-monthly-report 5/6

5.2. Payment Status 

S.No.

ATC Payment No.upto

Date of Receipt of Certified Invoice

from GEIC

Date of Payment

Number of Days

Number of days

Gain/Loss

CertifiedAmount in Qrs

by GEICRemarks

  Advance Payment 10.12.2009 11,963,600.00 Paid

1 Inv. # 1-R3 15.02.2010 2,334,363.91 Paid

2 Inv. # 2 17.03.2010 2,452,236.43 Paid

3 Inv. #3 06.04.2010 5,378,156.56 Paid

4 Inv. # 4 15.04.2010 4,645,358.10 Paid

5

6claims until end30.04.2010

under review

7

8

9

 

10

11

12

13

14

15

16

1726,773,715.00

5.3. Variation status

S.No.

LEC Payment No.upto

Date of Receipt of Certified Invoice

from GEIC

Date of Payment

Number of Days

Number of days

Gain/Loss

CertifiedAmount in Qrs

by GEICRemarks

 

1 Variation #

2

3

4

5

6

7

8

9

000.00

Telephone: 44 22 120 Fax: 44 22 150 P.O. Box 9811 Doha, Qatar :4422120:4422150.9811 

email: [email protected]

GU L F EN G I N EER IN G &

INDUSTRIAL CONSULTANCY   

Page 6: June 2010 - Monthly Report

7/31/2019 June 2010 - Monthly Report

http://slidepdf.com/reader/full/june-2010-monthly-report 6/6

SECTION 6. PROJECT IMAGES6.1. Photographs.

  (SEE ATTACHED)