jun-jun ( my resume )

7
Jun-Jun A. Alcantara Roseville Subdivision Blk-8 Lot-1 Amuntay Road, Zone III, Dasmarinas, Cavite Philippines Mobile no. +974 66829187 (Qatar Mobile No.) E-mail: [email protected] CAREER OBJECTIVE To build up my career as an Engineer or Supervisor and a challenging position in engineering sectors where my creative talent and innovative capabilities can be efficiently utilized and improved. WORK EXPERIENCED: Consolidated Gulf Company LP – HMC Project P.O. Box 1231, 4 th Floor, Jafco Tower Al Muntaza, Doha – Qatar Tel. +974 4405 9111 OSP Supervisor ( July 12, 2014 up to present ) DUTIES and RESPONSIBILITIES: Doing site survey for possible location of proposed cctv. Measuring the distance and possible cable route. Responsible for the supervision in the implementation in the installation of fiber optics both for civil and cable works. Ensure that the works are in accordance with standard procedures and specifications set by the client.

Upload: jun-jun-alcantara

Post on 17-Aug-2015

103 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jun-Jun ( my resume )

Jun-Jun A. AlcantaraRoseville Subdivision Blk-8 Lot-1 Amuntay Road, Zone III,

Dasmarinas, Cavite PhilippinesMobile no. +974 66829187 (Qatar Mobile No.)

E-mail: [email protected]

CAREER OBJECTIVE

To build up my career as an Engineer or Supervisor and a challenging position in engineering sectors where my creative talent and innovative capabilities can be efficiently utilized and improved.

WORK EXPERIENCED:

Consolidated Gulf CompanyLP – HMC ProjectP.O. Box 1231, 4th Floor, Jafco Tower Al Muntaza, Doha – QatarTel. +974 4405 9111

OSP Supervisor ( July 12, 2014 up to present )

DUTIES and RESPONSIBILITIES:

Doing site survey for possible location of proposed cctv. Measuring the distance and possible cable route.Responsible for the supervision in the implementation in the installation of fiber optics both for civil and cable works. Ensure that the works are in accordance with standard procedures and specifications set by the client.

Responsible in securing necessary permits in government and private entities needed for the project. Monitor the supply of manpower, materials, construction equipments needed to meet the

implementation schedule. Monitor FOC splicing, terminations and testing. Installation test results must be as per the

requirements set by clients. Submit Progress Report/Billing for completed lengths Prepare red- line drawing for completed project needed for pre-acceptance testing. Also prepares as-

built.

Page 2: Jun-Jun ( my resume )

Project handled:

Site Survey of all Hamad Hospital

Finished for survey:

Al Wakra Hospital

Cuban Hospital

Al Khor Hospital ( on going )

Consolidated Gulf CompanyTPD – Central OSP P.O. Box 1231, 4th Floor, Jafco Tower Al Muntaza, Doha – QatarTel. +974 4405 9111

OSP Supervisor ( February 26, 2014 up July 11, 2014 )

DUTIES and RESPONSIBILITIES:

Responsible for the supervision in the implementation in the installation of fiber optics both for civil and cable works. Ensure that the works are in accordance with standard procedures and specifications set by the client.

Responsible in securing necessary permits in government and private entities needed for the project. Monitor the supply of manpower, materials, construction equipments needed to meet the

implementation schedule. Monitor FOC splicing, terminations and testing. Installation test results must be as per the

requirements set by clients. Submit Progress Report/Billing for completed lengths Prepare red- line drawing for completed project needed for pre-acceptance testing. Also prepares as-

built.

Project handled:

Barwa Al Baraha Project Distribution of fiber oftic cable, internal and external lay-out for cctv.Drum testing.FOC splicing, termination and testing.

Page 3: Jun-Jun ( my resume )

MG-Exeo TelecomOSP DepartmentPasong Tamo Ext. Makati CityPhilippines

OSP Engineer – ( Nov. 14, 2011 – Dec. 28, 2013 )

DUTIES and RESPONSIBILITIES:

Conduct field survey for possible cable distribution in recommended areas. Design cable route and preparation of cable plan for cable distribution (underground and aerial

installation for copper and fiber optic cable). Design and preparation of cable plan for cable relief and cable rehabilitation. Preparation of budgetary estimates for the proposed project. Preparation of work order for outside plant project. Acceptance of work and testing of complete cable distribution ( fiber optic cable and copper cable. )

Philippine Telegraph and Telephone Corporation (PT&T)Network Engineering and Technical ServicesOutside Plant and Engineering Maintenance ( Local Exchange )Along National Highway Binan, Laguna, Philippines

OUTSIDE PLANT ENGINEER – Implementation (Nov. 30, 2008 – Oct. 2, 2011)

DUTIES and RESPONSIBILITIES:

Responsible for the supervision in the implementation in the installation of fiber optics both for civil and cable works. Ensure that the works are in accordance with standard procedures and specifications set by the client.

Responsible in securing necessary permits in government and private entities needed for the project. Monitor the supply of manpower, materials, construction equipments needed to meet the

implementation schedule. Monitor FOC splicing, terminations and testing. Installation test results must be as per the

requirements set by clients. Submit Progress Report/Billing for completed lengths Prepare red- line drawing for completed project needed for pre-acceptance testing. Also prepares as-

built

Page 4: Jun-Jun ( my resume )

Philippine Telegraph and Telephone Corporation (PT&T)Network Engineering and Technical ServicesOutside Plant and Engineering Maintenance2/F SJS Bldg. Casino Street corner South Super HighwayBarangay Palanan Makati, Philippines

OUTSIDE PLANT ENGINEER – Implementation (Sept 5, 1996 - Nov. 30, 2008)

DUTIES and RESPONSIBILITIES:

Responsible for the supervision in the implementation in the installation of fiber optics both for civil and cable works. Ensure that the works are in accordance with standard procedures and specifications set by the client.

Responsible in securing necessary permits in government and private entities needed for the project. Monitor the supply of manpower, materials, construction equipments needed to meet the

implementation schedule. Monitor FOC splicing, terminations and testing. Installation test results must be as per the

requirements set by clients. Submit Progress Report/Billing for completed lengths Prepare red- line drawing for completed project needed for pre-acceptance testing. Also prepares as-

built

EE/ME Engineering Works and Design ServicesAguinaldo Hi-way Zone 1-A Dasmarinas, Cavite, Philippines

LINEMAN SUPERVISOR (June 1993 - August 1996)

DUTIES and RESPONSIBILITIES:

Erection of poles (wooden and concrete pole) Installation of pole lines for electrical facilities. Lay-out of messenger wire and electrical cable. Splicing of electrical cable. Installation of power meter to Meralco subscribers. Prepares daily, weekly and monthly-accomplished project.

SEMINARS ATTENDED

Outside plant Operation(Installation & Maintenance)SJS Bldg. Casino Street Makati City, PhilippinesApril 22-24, 1998

Fiber Optic Cabling Infrastructure(Installation & Maintenance)Telecommunication Training InstituteMarch 17 to 21, 1997

Page 5: Jun-Jun ( my resume )

Instruments knows to operate:

OTDRFusion MachinePower MeterPower Source

Special Skills:

Knowledge in pole erection, pole line, layout and splicing of electrical cable. Knows how to operate boom truck. Knowledge in underground cable lay-out (FOC and copper), telephone and power cable. Knowledge in fiber optic splicing, testing, trouble shooting. Knows how to drive, with Qatar driving license.

EDUCATIONAL BACKGROUND

BACHELOR of SCIENCE in ELECTRICAL ENGINEERINGCollege: Polytechnic University of the Philippines Sta mesa, Manila, Philippines 1987-1993

Secondary: Epifanio Delos Santos College Bernales Street, Malabon, Metro Manila,Philippines 1983-1987

PERSONAL DATA

Date of Birth: 25 September 1970Sex: MaleCivil Status: MarriedAge: 44Nationality: Filipino

REFERENCES

Available upon request