july 31, 2019 – system issues and status€¦ · 1 july 31, 2019 – system issues and status ....

25
1 July 31, 2019 – System Issues and Status Table 1: PR Status for 07/31/19 (Status as of 07/29/19) Production Request (PR) Satellite Production Strategy Data Product (SS#) PGEs Data Dates PR Status (Unless noted, Statuses apply to all PRs in row) *** Baseline1-QC PRs – Standing AM 249-19 AM 256-19 SCCRs 1498, 1387 Terra Baseline1- QC BDS, BDSI ES8 1.1P10 2.2P1 Standing Request 6/1/2019 – 12/31/2021 Active, Priority 2 PM 250-19 PM 251-19 PM 257-19 SCCRs 1498, 1387 Aqua (FM3, FM4) Baseline1- QC BDS, IES, ES8 1.1P10 2.2P1 Standing Request 6/1/2019 – 12/31/2021 Active, Priority 2 NPP 316-18 NPP 252-19 NPP 258-19 SCCRs 1408, 1498, 1387 NPP Baseline1- QC Eph, Att BDS, IES, ES8 1.0P3 1.1P10 2.2P1 11/1/2018 – 6/1/2019 – 12/31/2021 Active, Priority 2 J01 318-18 SCCR 1408 J01-FM6 Baseline1- QC Eph, Att 1.0P3 11/1/2018 – 12/31/2019 Active, Priority 2 J01 253-19 SCCR 1498 J01-FM6 Baseline1- QC BDS, IES, PRES8, BDSI 1.1P10 6/1/2019 – 12/31/2021 Active, Priority 2 J01 259-19 SCCR 1387 J01-FM6 Baseline1- QC ES8 2.2P2 6/1/2019 – 12/31/2021 Active, Priority 2 AM 254-19 SCCR 1498 Terra- FM1 FFBaseline1 -QC IES 1.1P10 Standing Request 6/1/2019 – 12/31/2021 Active, Priority 2 PM 255-19 SCCR 1498 Aqua- FM3 FFBaseline1 -QC IES 1.1P10 Standing Request 6/1/2019 – 12/31/2021 Active, Priority 2 AM 286-19 AM 305-19 SCCR 1508, 1515 Terra Baseline1- QC BDS, BDSI ES8 1.1P10 2.2P1 Standing Request 8/1/2019 – 12/31/2021 Pending DMT PM Review, Priority 2 PM 287-19 PM 288-19 PM 306-19 SCCRs 1508, 1515 Aqua (FM3, FM4) Baseline1- QC BDS, BDSI ES8 1.1P10 2.2P1 Standing Request 8/1/2019 – 12/31/2021 Pending DMT PM Review, Priority 2

Upload: others

Post on 08-Dec-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

1

July 31, 2019 – System Issues and Status

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

*** Baseline1-QC PRs – Standing AM 249-19 AM 256-19 SCCRs 1498, 1387

Terra

Baseline1-QC

BDS, BDSI ES8

1.1P10 2.2P1

Standing Request 6/1/2019 – 12/31/2021

Active, Priority 2

PM 250-19 PM 251-19 PM 257-19 SCCRs 1498, 1387

Aqua (FM3, FM4)

Baseline1-QC

BDS, IES, ES8

1.1P10

2.2P1

Standing Request 6/1/2019 – 12/31/2021

Active, Priority 2

NPP 316-18 NPP 252-19 NPP 258-19 SCCRs 1408, 1498, 1387

NPP Baseline1-QC

Eph, Att BDS, IES, ES8

1.0P3 1.1P10 2.2P1

11/1/2018 –6/1/2019 – 12/31/2021

Active, Priority 2

J01 318-18 SCCR 1408

J01-FM6 Baseline1-QC

Eph, Att

1.0P3

11/1/2018 –12/31/2019

Active, Priority 2

J01 253-19 SCCR 1498

J01-FM6 Baseline1-QC

BDS, IES, PRES8, BDSI

1.1P10 6/1/2019 – 12/31/2021

Active, Priority 2

J01 259-19 SCCR 1387

J01-FM6 Baseline1-QC

ES8 2.2P2 6/1/2019 – 12/31/2021

Active, Priority 2

AM 254-19 SCCR 1498

Terra-FM1

FFBaseline1-QC

IES 1.1P10

Standing Request 6/1/2019 – 12/31/2021

Active, Priority 2

PM 255-19 SCCR 1498

Aqua-FM3

FFBaseline1-QC

IES 1.1P10

Standing Request 6/1/2019 – 12/31/2021

Active, Priority 2

AM 286-19 AM 305-19 SCCR 1508, 1515

Terra

Baseline1-QC

BDS, BDSI ES8

1.1P10 2.2P1

Standing Request 8/1/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

PM 287-19 PM 288-19 PM 306-19 SCCRs 1508, 1515

Aqua (FM3, FM4)

Baseline1-QC

BDS, BDSI ES8

1.1P10 2.2P1

Standing Request 8/1/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

Page 2: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

2

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

NPP 289-19 NPP 307-19 SCCR 1508, 1515

NPP Baseline1-QC

BDS, BDSI ES8

1.1P10 2.2P1

Standing Request 8/1/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

J01 290-19 SCCR 1508

J01-FM6 Baseline1-QC

BDS, BDSI 1.1P10 Standing Request 8/1/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

J01 308-19 SCCR 1387

J01-FM6 Baseline1-QC

ES8 2.2P2 8/1/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

AM 291-19 SCCR 1508

Terra-FM1

FFBaseline1-QC

IES 1.1P10

Standing Request 8/1/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

PM 292-19 SCCR 1508

Aqua-FM3

FFBaseline1-QC

IES 1.1P10

Standing Request 8/1/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

*** Edition1-CV PRs – Standing NPP 323-18 SCCR 1408

NPP Edition1-CV Eph, Att

1.0P3

9/30/2018 –12/31/2019

Active, Priority 2

J01 325-18 SCCR 1408

J01-FM6 Edition1-CV Eph, Att

1.0P3

9/30/2018 –12/31/2019

Active, Priority 2

AM 224-19 SCCR 1498

Terra Edition1-CV BDS, IES, PRES8, BDSI

1.1P10 4/30/2019 – 12/31/2021

Active, Priority 2

PM 225-19 SCCR 1498

Aqua-FM3

Edition1-CV BDS, IES, PRES8, BDSI

1.1P10 4/30/2019 – 12/31/2021

Active, Priority 2

PM 226-19 SCCR 1498

Aqua-FM4

Ed1-CV-NoSW

BDS, IES, PRES8, BDSI

1.1P10 4/30/2019 – 12/31/2021

Active, Priority 2

NPP 227-19 SCCR 1498

NPP-FM5 Edition1-CV BDS, IES, PRES8, BDSI

1.1P10 4/30/2019 – 12/31/2021

Active, Priority 2

J01 228-19 SCCR 1498

J01-FM6 Edition1-CV BDS, IES, PRES8, BDSI

1.1P10 4/30/2019 – 12/31/2021

Active, Priority 2

AM 229-19 SCCR 1406

Terra Edition1-CV GAIN 1.4P2 Standing request 5/2019 – 12/2021

Active, Priority 2

PM 230-19 SCCR 1406

Aqua-FM3

Edition1-CV GAIN 1.4P2 Standing request 5/2019 – 12/2021

Active, Priority 2

PM 231-19 SCCR 1406

Aqua-FM4

Ed1-CV-NoSW

GAIN 1.4P2 Standing request 5/2019 – 12/2021

Active, Priority 2

Page 3: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

3

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

NPP 232-19 SCCR 1406

NPP-FM5 Edition1-CV GAIN 1.4P2 Standing request 5/2019 – 12/2021

Active, Priority 2

J01 233-19 SCCR 1406

J01-FM6 Edition1-CV GAIN 1.4P2 Standing request 5/2019 – 12/2021

Active, Priority 2

AM 234-19 PM 235-19 PM 236-19 NPP 237-19 J01 238-19 SCCR 1387

Terra Aqua-3 Aqua-4 NPP J01

Edition1-CV Ed1-CV-NoSW Edition1-CV

ERBE-like

2.2P1 2.2P2

Standing Request 5/1/19 – 12/31/21

Active, Priority 2

AM 239-19 PM 240-19 PM 241-19 NPP 242-19 J01 243-19 SCCR 1387

Terra Aqua-3 Aqua-4 NPP J01

Edition1-CV Ed1-CV-NoSW Edition1-CV

ERBE-like

2.3P1

Standing Request 5/1/19 – 12/1/21

Active, Priority 2

AM 244-19 PM 245-19 PM 246-19 NPP 247-19 J01 248-19 SCCR 1387

Terra Aqua-3 Aqua-4 NPP J01

Edition1-CV Ed1-CV-NoSW Edition1-CV

ERBE-like

2.3P2

Standing Request 4/30/19 – 10/31/21

Active, Priority 2

AM 344-18 PM 345-18 PM 346-18 NPP 347-18 J01 348-18 SCCR 1356

Terra Aqua-3 Aqua-4 NPP-FM5 J01-FM6

Edition1-CV Ed1-CV-NoSW Edition1-CV

ERBE-like

3.1P1

Standing Request 10/2018 – 11/2019

Active, Priority 2

AM 293-19 SCCR 1508

Terra Edition1-CV BDS, IES, PRES8, BDSI

1.1P10 6/30/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

PM 294-19 SCCR 1508

Aqua-FM3

Edition1-CV BDS, IES, PRES8, BDSI

1.1P10 6/30/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

PM 295-19 SCCR 1508

Aqua-FM4

Ed1-CV-NoSW

BDS, IES, PRES8, BDSI

1.1P10 6/30/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

NPP 296-19 SCCR 1508

NPP-FM5 Edition1-CV BDS, IES, PRES8, BDSI

1.1P10 6/30/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

J01 297-19 SCCR 1508

J01-FM6 Edition1-CV BDS, IES, PRES8, BDSI

1.1P10 6/30/2019 – 12/31/2021

Pending DMT PM Review, Priority 2

Page 4: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

4

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

AM 298-19 SCCR 1406

Terra Edition1-CV GAIN 1.4P2 Standing request 7/2019 – 12/2021

Pending DMT PM Review, Priority 2

PM 299-19 SCCR 1406

Aqua-FM3

Edition1-CV GAIN 1.4P2 Standing request 7/2019 – 12/2021

Pending DMT PM Review, Priority 2

PM 300-19 SCCR 1406

Aqua-FM4

Ed1-CV-NoSW

GAIN 1.4P2 Standing request 7/2019 – 12/2021

Pending DMT PM Review, Priority 2

NPP 301-19 SCCR 1406

NPP-FM5 Edition1-CV GAIN 1.4P2 Standing request 7/2019 – 12/2021

Pending DMT PM Review, Priority 2

J01 302-19 SCCR 1406

J01-FM6 Edition1-CV GAIN 1.4P2 Standing request 7/2019 – 12/2021

Pending DMT PM Review, Priority 2

AM 312-19 PM 313-19 PM 314-19 NPP 315-19 J01 316-19 SCCR 1516, 1387

Terra Aqua-3 Aqua-4 NPP J01

Edition1-CV Ed1-CV-NoSW Edition1-CV

ERBE-like

2.2P1 2.2P2

Standing Request 10/1/18 – 12/31/21 7/1/19 – 12/31/21

Pending DMT PM Review, Priority 2

AM 318-19 PM 319-19 PM 320-19 NPP 321-19 J01 322-19 SCCR 1387

Terra Aqua-3 Aqua-4 NPP J01

Edition1-CV Ed1-CV-NoSW Edition1-CV

ERBE-like

2.3P1

Standing Request 7/1/19 – 12/1/21

Pending SS Review, Priority 2

AM 323-19 PM 324-19 PM 325-19 NPP 326-19 J01 327-19 SCCR 1387

Terra Aqua-3 Aqua-4 NPP J01

Edition1-CV Ed1-CV-NoSW Edition1-CV

ERBE-like

2.3P2

Standing Request 6/30/19 – 10/31/21

Pending SS Review, Priority 2

AM 328-19 PM 329-19 PM 330-19 NPP 331-19 SCCR 1356

Terra Aqua-3 Aqua-4 NPP-FM5 J01-FM6

Edition1-CV Ed1-CV-NoSW Edition1-CV

ERBE-like

3.1P1

Standing Request 7/2019 – 11/2021

Pending SS Review, Priority 2

*** Snow and Ice Products PRs – Standing M 392-17 SCCR 1262

CERES NSIDC SNOW 2.1P1 Standing Request 5/2017 – 12/2019

Active Priority 2

Page 5: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

5

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

M 55-18 SCCR 1309

CERES NSIDC-CLASS

EICE ESNOW

4.1-4.0P2 Standing Request 4/1/18 – 12/31/19

Active Priority 2

M 56-18 SCCR 1309

CERES NSIDC-AFWA-Mesh16th

ESNOW EICE

4.1-4.0P3 Standing Request 4/1/18 – 12/31/19

Active Priority 2

*** MOA/PMOA Products PRs – Standing M 96-19 SCCR 749

CERES GMAO-G541-Ed4

MOA 12.1P2 Standing request 2/2/19 thru 2/1/21

Active, Priority 2

M 97-19 SCCR 1018

CERES GMAO-G541-Ed4

PMOA 9.1P2 Standing Request 2/19 – 1/21

Active, Priority 2

The PRs that follow are the Non-Standing PRs that can be processed

*** Edition 4 Instrument & ERBElike PRs 309-19 SCCR 1515

Terra Edition4 ES8 2.2P1 6/1/18 – 4/30/19 Pending SS Review, Priority 2

310-19 SCCR 1515

FM3 Edition4 ES8 2.2P1 6/1/18 – 4/30/19 Pending SS Review, Priority 2

311-19 SCCR 1515

FM4 Ed4-NoSW ES8 2.2P1 6/1/18 – 4/30/19 Pending DMT PM Review, Priority 2

*** Edition 1 NPP Instrument and ERBE-like PRs 317-19 SCCR 1516

FM5 Edition1 ES8 2.2P1 9/1/18 – 5/31/19 Pending SS Review, Priority 2

**** Beta2-Ed4 SSFi --> SSF, Edition4 SSF 358-16 SCCR 1075

Aqua-MODIS

Edition4A SSF1deg-month

10.0P5 10/2004 Review Complete Priority 2

AM 303-19 SCCR 1368

FM1, FM2

Beta2-Ed4 SSFi 4.1-4.1P6 7/1/19 – 12/31/20 Pending DMT PM Review, Priority 2

PM 304-19 SCCR 1368

FM3, FM4

Beta2-Ed4 SSFi 4.1-4.1P6 7/1/19 – 12/31/20

Pending DMT PM Review, Priority 2

AM 165-19, 105-19, 107-109-19 SCCR 1368

FM1, FM2

Beta2-Ed4 SSFi 4.1-4.1P6 4.1-4.2P5 4.1-4.2P4 4.1-4.3P3

5/1/19 – 12/31/20 1/1/19 – 12/31/20 1/1/19 – 12/31/20 1/1/19 – 12/31/20

Active, Priority 2

Page 6: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

6

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

PM 166-19, 106-19, 108-110-19 SCCR 1368

FM3, FM4

Beta2-Ed4 SSFi 4.1-4.1P6 4.1-4.2P5 4.1-4.2P4 4.1-4.3P3

5/1/19 – 12/31/20 1/1/19 – 12/31/20 1/1/19 – 12/31/20 1/1/19 – 12/31/20

Active, Priority 2

AM 111-19 SCCR 1220

Terra-MODIS

Edition1-CV SSF 4.5-6.0P6 1/2019 – 12/2020 Active, Priority 2

PM 112-19 SCCR 1220

Aqua-FM3 MODIS

Edition1-CV SSF 4.5-6.0P6 1/2019 – 12/2020 Active, Priority 2

AM 113-19 AM 116-19 AM 119-19 SCCRs 1252, 1218, 1219

Terra-MODIS

Edition1-CV SSF 4.5-6.1P6 4.5-6.2P3 4.5-6.4P2

1/1/19 – 12/31/20 1/2019 – 12/2020

Active, Priority 2

PM 114-19 PM 117-19 PM 120-19 SCCRs 1252, 1218, 1219

Aqua-FM3 MODIS

Edition1-CV SSF 4.5-6.1P6 4.5-6.2P3 4.5-6.4P2

1/1/19 – 12/31/20 1/2019 – 12/2020

Active, Priority 2

PM 115-19 PM 118-19 PM 121-19 SCCRs 1252, 1218, 1219

Aqua-FM4 MODIS

Ed1-CV-NoSW

SSF 4.5-6.1P6 4.5-6.2P3 4.5-6.4P2

1/1/19 – 12/31/20 1/2019 – 12/2020

Active, Priority 2

216-19, 218-19, 220-19 SCCR 1336

Terra-MODIS

Edition4A SSF-1deg 9.2P3 9.3P3 9.4P3

1/1/19 – 4/30/2019 1/2019 – 4/2019

Active, Priority 2

217-19, 219-19, 221-19 SCCR 1336

Aqua-MODIS

Edition4A SSF-1deg 9.2P3 9.3P3 9.4P3

1/1/19 – 4/30/2019 1/2019 – 4/2019

Active, Priority 2

222-19 SCCR 1177

Terra-MODIS

Edition4A SSF1deg-month

10.0P5 1/2019 – 4/2019 Active, Priority 2

223-19 SCCR 1177

Aqua-MODIS

Edition4A SSF1deg-month

10.0P5 1/2019 – 4/2019 Active, Priority 2

*** Edition 4A PMOA, TSI --> SYNI --> SYN1deg

Page 7: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

7

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

260-19 SCCR 1121

Aqua Edition4A TSI 7.3.1P2 12/2018 – 3/2019 Active, Priority 2

261-19 SCCR 1121

Terra +Aqua

Edition4A TSI 7.3.1P3 12/2018 – 3/2019 Active, Priority 2

262-19 SCCR 1121

Terra +Aqua

Edition4A TSI 7.3.1P4 12/2018 – 3/2019 Active, Priority 2

263-19 SCCR 1185

Terra +Aqua

Edition4A SYNI 7.2.1P2 12/2018 – 3/2019 Active, Priority 2

264-19 SCCR 1410

Terra +Aqua

Edition4A SYN1deg 8.1P2 12/2018 – 3/2019 Active, Priority 2

*** Edition 1 NPP Clouds, Inversion, and TISA PRs

*** ISCCP-D2like Stream (all the ISCCP-D2like products)

**** ValRx PRs for newly delivered PGEs 1002-14 SCCR 1028

FM1, FM2

ValR1028 SAH 5.0P3 7/2004 ValRx Review Priority 2

1003-14 SCCR 1028

FM3, FM4

ValR1028 SAH 5.0P3 7/2004 ValRx Review Priority 2

1004-14 SCCR 1041

FM1 FM2

ValR1041-P6 IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review Priority 2

1005-14 SCCR 1041

FM3 ValR1041-P6 IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review Priority 2

1006-14 SCCR 1041

FM4 ValR1041-P6 IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review Priority 2

1007-14 SCCR 1041

FM5 ValR1041-P6 IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review Priority 2

1008-14 SCCR 1041

FM1 FM2

ValR1041-X86

IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review Priority 2

1009-14 SCCR 1041

FM3 ValR1041-X86

IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review Priority 2

1010-14 SCCR 1041

FM4 ValR1041-X86

IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review Priority 2

Page 8: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

8

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

1011-14 SCCR 1041

FM5 ValR1041-X86

IES, BDS 1.1P8 6/30/14 – 7/1/14 ValRx Review Priority 2

1150-15 1152-15 1154-15 1156-15 SCCR 919

Terra ValR1-P6 SSFi 4.1-4.1P4 4.1-4.2P2 4.1-4.2P3 4.1-4.3P2

4/13 On Hold - Preproduction - ValRx Review Priority Level 2

1151-15 1153-15 1155-15 1157-15 SCCR 919

Aqua ValR1-P6 SSFi 4.1-4.1P5 4.1-4.2P2 4.1-4.2P3 4.1-4.3P2

4/13 On Hold - Preproduction - ValRx Review Priority Level 2

290-13 thru 292-13 SCCR 913

Terra ValR1-P6 SSF 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1

4/13 On Hold - Preprod - ValRx Review Priority Level 2

293-13 thru 295-13 SCCR 913

Aqua ValR1-P6 SSF 4.5-6.1P3 4.5-6.2P2 4.5-6.4P1

4/13 On Hold - Preprod - ValRx Review Priority Level 2

296-13 297-13 298-13 SCCR 913

Terra ValR1-X86 SSF 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1

4/13 On Hold - Preprod - ValRx Review Priority Level 2

299-13 thru 301-13 SCCR 913

Aqua ValR1-X86 SSF 4.5-6.1P3 4.5-6.2P2 4.5-6.4P1

4/13 On Hold - Preprod - ValRx Review Priority Level 2

1803-15 SCCR 1025

Terra+ Aqua

ValR1-X86 SYN1deg 8.1P2 10/2009 Review Complete Priority 2

5-16 SCCR 1097

Terra+ Aqua

ValR1-X86 SYN1deg 8.1P2 7/2008 Review Complete Priority 2

79-16 80-16 81-16 82-16 83-16 84-16 85-16 SCCR 1110

NPP Terra FM3 FM4 Terra FM3 FM4

ValR-Ed1 ValR-Ed3 ValR-Ed4

BDS, IES 1.4P3 6/1/15 – 6/2/15 On Hold – Pre Production - ValRx Review Priority 2

Page 9: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

9

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

648/649/650-17 SCCR 1237

GEO-MODIS

ValR-Fall CldTypHist 9.0P6 9.0P7 9.0P8

10/2001

Ready Final, Priority 2 Review Complete (3rd)

651/652/653-17 SCCR 1237

GEO-MODIS

ValR-Winter CldTypHist 9.0P6 9.0P7 9.0P8

12/2008

Ready Final, Priority 2 Review Complete (3rd)

614-19 SCCR 1464

Terra-FM1/2

ValR-24hr BDS, IES, BDSI

1.1P10 2/1/2019 Active, Priority 2

615-19 SCCR 1464

Aqua-FM3

ValR-24hr BDS, IES, BDSI

1.1P10 1/14/2019 Active, Priority 2

616-19 SCCR 1464

Aqua-FM4

ValR-24hr BDS, IES, BDSI

1.1P10 1/14/2019 Active, Priority 2

617-19 SCCR 1464

NPP-FM5 ValR-24hr BDS, IES, BDSI

1.1P10 2/1/2019 Active, Priority 2

618-19 SCCR 1464

J01-FM6 ValR-24hr BDS, IES, BDSI

1.1P10 2/1/2019 Active, Priority 2

619-19 SCCR 1464

Terra-FM1/2

ValR-6hr BDS, IES, BDSI

1.1P10 2/1/2019 Active, Priority 2

632-19 SCCR 1464

Aqua-FM3

ValR-6hr BDS, IES, BDSI

1.1P10 1/14/2019 Active, Priority 2

633-19 SCCR 1464

Aqua-FM4

ValR-6hr BDS, IES, BDSI

1.1P10 1/14/2019 Active, Priority 2

634-19 SCCR 1464

NPP-FM5 ValR-6hr BDS, IES, BDSI

1.1P10 2/1/2019 Active, Priority 2

635-19 SCCR 1464

J01-FM6 ValR-6hr BDS, IES, BDSI

1.1P10 2/1/2019 Active, Priority 2

637-19 SCCR 1498

Terra-FM1/2

ValR-6hr BDS, IES, BDSI

1.1P10 5/14/2019 Active, Priority 2

638-19 SCCR 1498

Aqua-FM3

ValR-6hr BDS, IES, BDSI

1.1P10 5/14/2019 Active, Priority 2

639-19 SCCR 1498

Aqua-FM4

ValR-6hr BDS, IES, BDSI

1.1P10 5/14/2019 Active, Priority 2

640-19 SCCR 1498

NPP-FM5 ValR-6hr BDS, IES, BDSI

1.1P10 5/14/2019 Active, Priority 2

641-19 SCCR 1498

J01-FM6 ValR-6hr BDS, IES, BDSI

1.1P10 5/14/2019 Active, Priority 2

Page 10: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

10

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

642-19 SCCR 1498

Terra-FM1/2

ValR-6hr BDS, IES, BDSI

1.1P10 5/14/2019 Active, Priority 2

643-19 SCCR 1498

Aqua-FM3

ValR-6hr BDS, IES, BDSI

1.1P10 5/14/2019 Active, Priority 2

644-19 SCCR 1498

Aqua-FM4

ValR-6hr BDS, IES, BDSI

1.1P10 5/14/2019 Active, Priority 2

645-19 SCCR 1498

NPP-FM5 ValR-6hr BDS, IES, BDSI

1.1P10 5/14/2019 Active, Priority 2

646-19 SCCR 1498

J01-FM6 ValR-6hr BDS, IES, BDSI

1.1P10 5/14/2019 Active, Priority 2

666-19 SCCR 1508

Terra-FM1

ValR BDS, IES, BDSI

1.1P10 7/4/2005 Active, Priority 2

667-19 SCCR 1508

Terra-FM2

ValR BDS, IES, BDSI

1.1P10 12/21/2011 Active, Priority 2

668-19 SCCR 1508

Aqua-FM3

ValR BDS, IES, BDSI

1.1P10 7/4/2005 Active, Priority 2

669-19 SCCR 1508

Aqua-FM4

ValR BDS, IES, BDSI

1.1P10 7/4/2005 Active, Priority 2

670-19 SCCR 1508

NPP-FM5 ValR BDS, IES, BDSI

1.1P10 2/20/2012 Active, Priority 2

671-19 SCCR 1508

J01-FM6 ValR BDS, IES, BDSI

1.1P10 1/31/2018 Active, Priority 2

**** The PRs are for PGEs that have not completed pre-op testing and been promoted to the production environment

**** The PRs that follow are for PGEs that are pending delivery or other future event.

**** The PRs that follow have completed processing 744-14 SCCR 1016

Terra ValR1016 SSF1deg-month

10.0P4 12/2013 Review Complete Should be Complete

745-14 SCCR 1016

Aqua ValR1016 SSF1deg-month

10.0P4 12/2013 Review Complete Should be Complete

746-14 747-14 SCCR 1016

Terra+ Aqua

ValR1016 TSI 10.0P3 7.3.1P1

12/2013 Complete Review Complete Should be Complete

Page 11: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

11

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

750-14 SCCR 801

Terra+ Aqua

ValR1016 SYN1deg 8.1P1 12/2013 Review Complete Should be Complete

987-14 SCCR 947

Terra ValR1040-Ed4

SSFi 4.1-4.1P6 7/1/2007 Pending SS Review Should be complete

988-14 SCCR 947

Aqua ValR1040-Ed4

SSFi 4.1-4.1P6 7/1/2007 Pending SS Review Should be complete

1568-15 SCCR 1025

Terra+ Aqua

ValR1-X86 SYN1deg 8.1P2 10/2002 Review Complete Priority 2, ran 7/13/15

1396-15 SCCR 1047

FM5 Edition1A SSFi 4.1-4.1P7

1/1/13 – 3/31/14 P6 PR Rejected by SS, replaced w/ 1448-15

188-19 SCCR 1407

Terra Edition4 BDS, IES, PRES8

1.4P3

1/1/19 – 4/30/19 Complete

189-19 SCCR 1407

FM3 Edition4 BDS, IES, PRES8

1.4P3

1/1/19 – 4/30/19 Complete

190-19 SCCR 1407

FM4 Ed4-NoSW BDS, IES, PRES8

1.4P3

1/1/19 – 4/30/19 Complete

191/192-19 SCCR 1330

FM1 FM2

Edition4 SCCD SCCN

2.4P1 1/1/19 – 4/30/19 Complete

193-19 SCCR 1330

FM3 Edition4 SCCD SCCN

2.4P1 1/1/19 – 4/30/19 Complete

194-19 SCCR 1330

FM4 Ed4-NoSW SCCD SCCN

2.4P1 1/1/19 – 4/30/19 Complete

195-19 SCCR 1387

Terra Edition4 ES8 2.2P1 1/1/19 – 4/30/19 Complete

196-19 SCCR 1387

FM3 Edition4 ES8 2.2P1 1/1/19 – 4/30/19 Complete

197-19 SCCR 1387

FM4 Ed4-NoSW ES8 2.2P1 1/1/19 – 4/30/19 Complete

198-19 SCCR 1387

Terra Edition4 CXDR 2.3P1 1/1/19 – 4/1/19 Complete

199-19 SCCR 1387

Aqua Edition4 CXDR 2.3P1 1/1/19 – 4/1/19 Complete

Page 12: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

12

Table 1: PR Status for 07/31/19 (Status as of 07/29/19)

Production Request

(PR) Satellite Production

Strategy

Data Product

(SS#) PGEs Data Dates

PR Status (Unless noted,

Statuses apply to all PRs in row)

200-19 SCCR 1387

Terra Edition4 CXDR 2.3P2 11/30/18 – 2/28/19 Complete

201-19 SCCR 1387

Aqua Edition4 CXDR 2.3P2 11/30/18 – 2/28/19 Complete

202-19 SCCR 1356

Terra Edition4 ES4, ES9 3.1P1 12/2018 – 3/2019 Complete

203-19 SCCR 1356

Aqua Edition4 ES4, ES9 3.1P1 12/2018 – 3/2019 Complete

204-19 SCCR 1337

Terra+ Aqua

Edition4 ES4, ES9 3.2P1 12/2018 – 3/2019 Complete

205-19 208-19 211-19 SCCRs 1252, 1218, 1219

Terra-MODIS

Edition4A SSF 4.5-6.1P6 4.5-6.2P3 4.5-6.4P2

1/1/2019 – 4/30/2019 1/2019 – 4/2019

Complete

206-19 209-19 212-19 SCCRs 1252, 1218, 1219

Aqua-FM3 MODIS

Edition4A SSF 4.5-6.1P6 4.5-6.2P3 4.5-6.4P2

1/1/2019 – 4/30/2019 1/2019 – 4/2019

Complete

207-19 210-19 213-19 SCCRs 1252, 1218, 1219

Aqua-FM4 MODIS

Ed4A-NoSW SSF 4.5-6.1P6 4.5-6.2P3 4.5-6.4P2

1/1/2019 – 4/30/2019 1/2019 – 4/2019

Complete

214-19 SCCR 1394

Terra-MODIS

Edition4A SAH 5.0P3 1/2019 – 4/2019 Complete

215-19 SCCR 1394

Aqua-MODIS

Edition4A SAH 5.0P3 1/2019 – 4/2019 Complete

Page 13: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

13

Table 2. July 31, 2019 – System Issues and Status

Activity Lead Status

SEC Miller • No new updates. (Miller - [email protected]) CM/Docu-mentation

Ayers (Saunders)

• See Table 3 for SCCR activity since the last DMT meeting. (Ayers - [email protected])

• SCCR 1508 – Testing is complete. Scheduled to release for promotion to production on August 2. (Keyes – [email protected])

• SCCR 1514 – Installed the Edition4 Terra and Aqua SRFs for March 1, 2019, through April 30, 2019 in SSIT and PPE before releasing the delivery for promotion to production. (Keyes)

• SCCR 1515 - Installed the Edition4 Terra and Aqua gains for March 1, 2019, through April 30, 2019 in SSIT and PPE before releasing the delivery for promotion to production. (Keyes)

• SCCR 1512 – Testing the PR Tool in the OpenShift environment. (Ayers, Keyes)

Page 14: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

14

Table 3. SCCR Activity July 16 at 6:00 p.m. – July 30 at 2:00 p.m. (SCCRs to be reviewed are in bold. Total to be reviewed: 2)

SCCR S U A C D SS Delivery Type Comments

1510 X X Archiver Automation

1513 X X X Synoptic SARB Dropbox

1514 X X X X ERBE-like Coefficient

1515 X X X Instrument Coefficient

1516 X ERBE-like PGE

S=Submitted; U=Updated; A=Approved; C=Closed; D=Disapproved; SS=Subsystem

Page 15: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

15

Table 4. July 31, 2019 – Subsystem Issues and Status

SS No.

SS Lead Status Problems

Toolkit Issues

Hillyer (Wilkins)

• Working with users to migrate to the TK20/GCC8.2 development environment. (Hillyer - [email protected]))

CERES- lib

Hillyer (Wilkins)

• Working with CERES AMI users to migrate to the new cerx86b environment. (Hillyer)

• Helping members of the FlashFlux and SRB teams to migrate their modified PGEs into the TK20 CERES Environment. (Hillyer)

• SCCR 1479 – Working on UMM metadata for CERES HDF5 data products. (Hillyer)

• Addressing issues with CERES environment users switching to new RHEL7 platform. (Hillyer)

• Addressing issues with CERES users in switching from PowerPC to x86 platform. (Hillyer)

• Working with Josh Wilkins and the TISA Gridding team to create C++ libraries to support PGE development. (Hillyer)

• Working on porting the CERES/Toolkit environment to the OpenShift platform. (Hillyer)

Perl-Lib Hillyer (Wilkins)

• Nothing to report. (Hillyer)

CERES Proc.

System

Hillyer (Wilkins)

• SCCR 1295 – Waiting for feedback from the TISA team. (Hillyer)

• SCCR 1510 – Archiver code is working. This will be delivered with SCCRs 1260 and 1295. (Hillyer)

• Testing fixes for the Operator’s Console to support Java versions 11 and later. The JavaFX GUI library is no longer included in desktop Java installations, therefore must be included in the Operator’s Console distributable. (Hillyer)

• Worked with CM to test deliveries in the PPE area on AMI-P. (Hillyer)

• Provided support for CATALYST in production environment. (Hillyer)

1.0

Cooper (Grepiotis)

• SCCR 1515 – Terra/Aqua Edition4 gains for March and April 2019 have been delivered to CERES CM and promoted to production. (Snyder – [email protected])

Page 16: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

16

SS No.

SS Lead Status Problems

1.0 (Cont’d)

Cooper (Grepiotis)

• SCCR 1508 – The necessary updates have been delivered and are waiting to be promoted to begin Baseline1-QC processing for August 1st and Edition1-CV processing for July 1st. (Cooper – [email protected], Grepiotis – [email protected], Timcoe – [email protected])

• An issue was discovered during CM ValR testing for SCCR 1508 with the CATALYST PGE handler for early NPP ephemeris and attitude data checking. This issue caused the PGE to hang, waiting for NPP ephemeris and attitude data and the PGE had to be force started. This fix only affects data which was run with PGE CER1.0P2 with RDRs as the input. Nelson was able to find where the issue was in the PGE handler and will deliver the fix with the next CATALYST update as this does not have an effect on the current NPP data processing which uses data from PGE CER1.0P3. (Cooper, Hillyer - [email protected])

• Work is continuing creating an HDF5 BDS along with an IES reader. (Grepiotis)

• Continued updating CERES available data processing software to combine two separate available data processors (one for Terra/Aqua, one for S-NPP/J01) into a single processor. (Timcoe)

2.0

Walikainen (Lande)

• SCCR 1514 - Analyzed and delivered Edition4 Terra/Aqua SRFs for next two months of processing (March/April 2019). (Walikainen - [email protected])

• Working on re-delivery of PGE CER2.2P1 to fix ES8 labeling problem introduced in last code delivery of this PGE - SCCR 1387. Fixed problems found in recompilation and verified label fix in place with ViewHDF. Reviewed/approved related new sets of daily PRs (i.e., Baseline1-QC, Ed1-CV). (Walikainen)

• SCCR 1508 - Researched and created the first ValR. Sent link to it to Denise with report of assumptions and results of research done in its creation. After her approval of it, created all remaining ValRs. Tracked their approval, later verified all validated OK with Tammy, then (after discussion with Walt), created all the corresponding Instrument (FF) Baseline1-QC and Ed1-CV PRs and verified approval of all (also verified with Denise no other PRs needed for Instrument). Later,

Page 17: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

17

SS No.

SS Lead Status Problems

2.0 (Cont’d)

Walikainen (Lande)

created corresponding new set of Clouds Beta2-Ed4 hrly and impacted ERBE-like standing PRs, reviewed them with Dale and Sunny, and sent reports to Walt and Dale. (Lande - [email protected])

• Researched/wrote reprocessing PRs to fix the ES8 label problem in Edition4 and Edition1 (Baseline1-QC and Ed1-CV PRs to do same also written, in conjunction with SCCR 1508). New set of downstream Ed1-CV PRs (2.3P1/2, 3.1P1) written as well after research on PGE CER2.2P1 code update (i.e., CC#) impact downstream. Reviewed with Dale (i.e., verified PGE CER2.2P1 fix no impact downstream other than CC code change, no need to do same to PGEs CER2.3P1/CER2.3P2 labels), had him review/approve most (i.e., daily) new ERBE-like PRs, and sent reports (i.e., impact of new PRs on delaying ERBE-like processing). Went over delivery procedures with Dale: suggested he deliver the minimum amount of code to avoid extensive testing of entire PGE, and not possible to recycle tests done with last delivery (SCCR 1387) of PGE CER2.2P1, verified PGEs CER2.3P1/CER2.3P2 not being redelivered (explained need for CC code bump so PGE CER3.1P1 can process them as well as PGE CER2.2P1, needed for Ed1-CV but not Ed4/2). (Lande)

• After two-week vacation, spent time catching up with emails and people (i.e., Carla, Dale, Tammy , and Denise) on what happened in my absence. Tracked progress and decisions/schedule regarding shift of PRDB and PR tool to Openshift and wrote PRs accordingly. Verified URL changes with Tammy as well as PR email list (i.e., Vertley to be taken off). (Lande)

• Continued reviewing/updating the PR Status document and sent to be included in CPOB report (verified with Joanne first July PR status document was included). Reviewed/discussed with Carla all her latest data processing status updates (sent her a report on the last one, verified last Ed1-CV BDS processed was July 1st). Tracked new/updated SCCRs, reviewed latest and checked on upcoming deliveries expected with Carla and Tammy and reprocessing needs with Denise, Susan, Dale, and Walt. Afterward, sent report and convinced Walt to finish the currently Active Ed4 PRs thru April 2019 once the latest (March-April) gains/SRFs are

Page 18: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

18

SS No.

SS Lead Status Problems

2.0 (Cont’d)

Walikainen (Lande)

delivered, and then fix the ES8 labels via reprocessing PRs I had already written (determined start date for this with input from Peter and DPO checks). Kept Dale and Walt informed of PRs being written (had Dale approve the Baseline1-QC and Ed1-CV reprocessing PRs and reviewed the Ed4/1 re-processing PRs with him). Verified production PR freeze with Tammy to wait until given go-ahead before using prod PR tool. (Lande)

• Completed required SATERN course 'LARC Annual Security Brief' awareness training, took extensive notes, printed certificate, and handed the certificate to HR. With help from Thomas, verified my VPN certificate valid well until September. (Lande)

3.0 Walikainen (Lande)

• Combined with above.

4.1

Sun-Mack (Brown)

• SCCR 1512 - Developed Test Plan for CERES PR Tool v 4.0.0 delivery. (Heckert - [email protected])

• Completed set up of Openshift Pipeline for CERES PR Tool and promoted through production (but will not actually be live until DNS switch in the next 1-2 weeks). (Heckert)

• Developing solutions for transferring data files from existing WebRA shared_data area to IWG’s Openshift Persistent Volume on an ongoing basis. (Heckert)

• Created Cloud Height Time Series Plots from Aqua, Terra (up to May of 2019) and CALIPSO (up to December of 2018). (Chen - [email protected])

• Calculated BTemps and TAU vs. Viewing Zenith angles by processing Aqua July 2008 CloudVis data. (Chen)

• Updated QC time series of Aqua, Terra, and NPP to May of 2019. (Chen)

• Continue to move codes from P6 to x86b. (Chen) • ClearSky Maps were generated for Aqua and Terra

Beta2-Ed4 and NPP Edition1A for 201905. Global images were produced and posted on the Web. (Brown - [email protected])

• Global images and statistics for NPP Edition1A – Aqua Ed4 and NPPEd1A – Terra Ed4 from 201901 through 201905 were generated and posted on the Web. (Brown)

• Updated validation Web page and viewer Web pages for Aqua and Terra. Worked on submitting Revision 121 and 122 to svn. (Brown)

Page 19: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

19

SS No.

SS Lead Status Problems

4.1 (Cont’d)

Sun-Mack (Brown)

• Processing QC results for Aqua and Terra Beta2-Ed4 201906 and 2019Spring. Results were posted on the Web. (Brown)

• Worked on updates to Python GUI Map Processor. (Smith - [email protected])

• Updated specialized Python libraries. (Smith) • Tested 1P6 and 1P7 on x86b. (Smith) • Worked with group members on various tasks. (Sun-

Mack - [email protected]) • Worked on VIIRS Ed2. (Sun-Mack) • Worked on P6 to x86b conversions and x86a to x86b

conversions. (Sun-Mack) • Worked on neural network for Pat’s SPIE presentation.

(Sun-Mack) 4.2 Sun-Mack • Combined with above. 4.3 Sun-Mack • Combined with above. 4.4 Miller

(Antropov) • Closed Terra and Aqua Edition4 ERBElike and

Edition4A SSF1deg PRs for January through April 2019. (Miller - [email protected])

• Added new variable into the FluxByCldTyp attribute files to include them in the Masterfile. (Miller)

• Generated Terra and Terra-Aqua FluxByCldTyp Masterfile for the entire period of record. (Miller)

• Added four more months to the EBAF Masterfile. (Miller)

• Reviewed final layout of The Earth Observer CERES Science Team Meeting article. (Miller)

• Developed a schedule for FLASHFlux P6 to x86 migration. (Miller)

• Maintained Confluence pages in support of production. (Miller)

• Worked with the SIT on continuing CERES production. (Miller)

• Worked on matching BDS data with GEO cloud for a given hour in convolution. (Antropov - [email protected])

4.5

Sothcott (Caldwell)

• Worked with FLASHFLUX to help them resolve issues with their MOA and Clouds subsystems and get them running on the x86 blades. (Sothcott- [email protected])

• Assisting FLASHFLUX with getting the TISA Grid and TISA Avg code compiled on the x86. (Sothcott)

Page 20: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

20

SS No.

SS Lead Status Problems

4.5 (Cont’d)

Sothcott (Caldwell)

• Continued to support Nitchie Smith’s efforts to incorporate the ADM SW code with the CLARREO PF data. (Sothcott)

4.6 Sothcott (Caldwell)

• Combined with above.

5.0 Caldwell (Sothcott)

• No new updates. (Caldwell - [email protected])

7.2 Caldwell (Sothcott)

• No new updates. (Caldwell)

12.0 Caldwell (Sothcott)

• Working on validation of new netCDF MOA files. (Caldwell)

7.1 Nguyen (Kizer)

• No new updates. (Nguyen - [email protected])

8.0 Nguyen (Kizer)

• Continued to meet with TISA team to do Event Storming on new TISA Edition5 processing. (Kizer - [email protected])

• The new GCC 8.2 presented several warnings during compilation. Warnings continued to be addressed. (Kizer)

10.0 Nguyen (Kizer)

• Completed the P6 to x86 SSF1deg Lite code. Present the work and results to the science team. (Nguyen)

• Ran March and April 2019 SSF1deg Lite and compared with P6 data. Present the comparison results to the science team. (Nguyen)

• Completed P6 to x86 SYN1deg Lite code conversion. Tested using January, May, and July 2018 data. Present the work and results to the science team. (Nguyen)

• Put SSF1deg and SYN1deg Lite x86 code on GIT. (Nguyen)

9.0

J. Wilkins

• SCCR 1260 – Ran the entire record waiting for it to be put up on the subsetter Website in order to be viewable for validation. Updated the code to make adjustments to the monthly product. Fixed and expanded the number of observations variables and coded in a proper monthly mean sza. (Wilkins - [email protected])

• Attended weekly TISA meetings. (Wilkins) • Attended TISA code review meetings. (Wilkins) • Working out C++ TISA framework design discussing

design ideas with Nelson back and forth, and ongoing work writing framework code. Meeting periodically with Katie to discuss design ideas. (Wilkins)

Page 21: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

21

SS No.

SS Lead Status Problems

9.0 (Cont’d)

J. Wilkins • Continued managing GIT repositories and assisting TISA team members as needed. (Wilkins)

11.0 J. Wilkins • GGEO – N/A. (Wilkins)

Page 22: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

22

Table 5. July 31, 2019 – Subsystem Issues and Status

Activity Status Production Processing Database/ Automation (Grune)

• OpenShift Environment (PR-Tool/PRDB): o SCCR 1512 - Move the PR-Tool Website into the production environment

of OpenShift. (Heckert – [email protected]) IT-3115 – transition the PR-Tool to OpenShift (DNS switchover to

point to the internal production Openshift Website); requested 9AM 7/29/19. (Heckert)

IT-3117 – Coordinate with Elizabeth and the ASDC DBA when to obtain the final copy of the production PRDB on dsrvr205 and apply to the OSE DB servers. (Grune – [email protected])

• OpenShift Environment (CERES_PMDB, CERES_WEB): o Restore the CERES_ORDERING_STATS_PROD to CERES_WEB and

ceres_cc_test to CERES_PMDB in dev, test, and production DB environments: (Kizer - [email protected], Grune) IT-2987 - Restored by the ASDC DBA on 7/15/19. CERES_PMDB and CERES_WEB access verified. (Grune) CERES Website access to be verified. (Kizer)

• WebRA (CERES Website, CERES_WEB, CERES_PMDB): o Restore the CERES_ORDERING_STATS_PROD to CERES_WEB and

ceres_cc_test to CERES_PMDB in dev, test, and production DB environments: (Grune) IT-3084 – Restored by the ASDC DBA on 7/22/19. (Grune) CERES_PMDB and CERES_WEB verified (Grune)

• CERES Data Processing emails – Provided data dates for new processing of CERES data products from the Production Monitoring DB (PMDB) to Jeremie Lande and Walt Miller. (Grune, Lande - [email protected], Miller - [email protected])

CERES Websites (Kizer)

• Continue to work with the ASDC on promoting the WebRA version of the CERES Website (https://ceres.larc.nasa.gov) to the OSE. (Kizer)

• The ceres-erbelike site was promoted with the PHP version upgrade. (Kizer) • The Cloud-Object Website has been promoted with the PHP version upgrade.

(Kizer) • Continued with move ceres-erbelike under the ceres-wg Website with other

working group sites. (Kizer) CERES Ordering Tool (Chu)

• In the process to promote CCCM to the OT public domain. (Chu - [email protected]) o The customer approved the plotting interface. o The function of security is not in place yet.

• Worked with the ASDC to connect cers-subset14-1 and 14-2 to GPFS. (Chu) • Worked with the ASDC to resolve issues on production and internal subset

cluster. (Chu)

Page 23: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

23

Activity Status CERES Ordering Tool (Chu) (Cont’d)

• Successfully merged the code (HRV) with the code (CCCM). The merged code is on ptest for testing. (Chu)

• Working on moving OT to Openshift environment. (Chu) • Compiled CAVE with JAVA 7 and Tomcat 8 successfully. (Chu)

Page 24: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

CERES PGE List - 07/15/2019

Status of PGEs on Each Platform and TK Version used for Compilation1,2

Status of Misc. Item(s) Applicable Satellites Applicable EditionsEdition3 Processing Completed 03/2017

Subsystem ID

PGE ID SCCR (exe)

P6 P6 TK Ver

P7 P7 TK Ver

X86 X86 TK Ver

CATALYST Integration Status (Y / N / Dev / SSI&T) SCCR #

Terra Aqua NPP J01 T, A Ed4

NPP Ed1

T,N Ed1

B1-QC Ed1-CV

Other

Instrument CER1.0P2

911 Y 16 N N/A Y 16 N Y Y Y

1 CER1.1P8

1272 N N/A N N/A Y 18 Y Y Y Y Y

1132 Y

CER1.1P9

1359 N N/A N N/A Y 18 Y Y Y Y

CER1.0P3

1408 N N/A N N/A Y 18 Y Y Y Y Y

CER1.1P10

1508cm N N/A  N  N/A Y 20 Y Y Y Y Y  Y  Y

1498

CER1.4P2

1406 N N/A N N/A Y 18 Y Y Y Y Y Y

CER1.4P3

1407 N N/A N N/A Y 18 Y Y Y Y Y Y

ERBE-like

CER2.1P1

1262 N N/A N N/A Y 16 Y Y

2 CER2.2P1

1387 N N/A N N/A Y 18 Y Y Y Y Y Y Y Y

CER2.2P2

1387 N N/A N N/A Y 18 Y Y  Y  Y

CER2.3P1

1387 N N/A N N/A Y 18 Y Y Y Y Y Y Y Y

CER2.3P2

1387 N N/A N N/A Y 18 Y Y Y Y Y Y Y Y

CER2.4P1

1330 N N/A N N/A Y 18 Y Y Y Y

ERBE-like

CER3.1P1

1356 N N/A N N/A Y 16 Y Y Y Y Y Y Y Y

3

CER3.2P1

1337 N N/A N N/A Y 16 Y Y Y Y

Clouds CER4.1-4.0P2

1309 N N/A N N/A Y 18 Y Y

 4.1-4 CER4.1-4.0P3

1309 N N/A N N/A Y 18 Y Y

CER4.1-4.1P6

1368 N N/A N N/A Y 18 Y Y Y Y

CER4.1-4.2P4

1368 N N/A N N/A Y 18 Y Y Y Y

CER4.1-4.2P5

1368 N N/A N N/A Y 18 Y Y Y Y

CER4.1-4.3P3

1368 N N/A N N/A Y 18 Y Y Y Y

CER4.1-4.1P7

1163 N N/A Y 18 N N/A Y Y Y

CER4.1-4.2P6

1047 N N/A Y 18 N N/A Y Y Y

CER4.1-4.2P7

1047 N N/A Y 18 N N/A Y Y Y

CER4.1-4.3P4

1047 N N/A Y 18 N N/A Y Y Y

Inversion CER4.5-6.0P6

1220 N N/A N N/A Y 18 Y Y Y Y

 4.5-6 CER4.5-6.1P6

1252 N N/A N N/A Y 18 Y Y Y Y Y

CER4.5-6.2P3

1218 N N/A N N/A Y 18 Y Y Y Y Y

CER4.5-6.4P2

1219 N N/A N N/A Y 18 Y Y Y Y Y

CER4.5-6.0P6

1220 N N/A N N/A Y 18 Y Y Y

CER4.5-6.1P7

1347 N N/A N N/A Y 18 Y Y Y

CER4.5-6.2P3

1218 N N/A N N/A Y 18 Y Y Y

CER4.5-6.4P2

1219 N N/A N N/A Y 18 Y Y Y

SARB 5 CER5.0P3

1340 N N/A N N/A Y 18 Y Y Y

Page 25: July 31, 2019 – System Issues and Status€¦ · 1 July 31, 2019 – System Issues and Status . Table 1: PR Status for 07/31/19 (Status as of 07/2 9/19) Production Request (PR)

1394 Y Y Y

TISA Avg CER7.3.1P2

1121 N N/A N N/A Y 18 Y Y Y

7.3  CER7.3.1P3

1121 N N/A N N/A Y 18 Y Y Y Y Y Y

CER7.3.1P4

1121 N N/A N N/A Y 18 Y Y Y Y Y Y

SARB 7.2 CER7.2.1P2

1185 N N/A N N/A Y 18 Y Y Y Y Y Y

TISA Avg 8

CER8.1P2

1410 N N/A N N/A Y 18 Y Y Y Y Y Y

TISA Grid CER9.0P5

1260dev N N/A N N/A Y 18 1295dev Y Y Y

 9 CER9.0P6

1468 N N/A N N/A Y 18 Y Y Y Y

CER9.0P7

1412 N N/A N N/A Y 18 Y Y Y Y

CER9.0P8

1237 N N/A N N/A Y 18 Y Y Y Y

CER9.1P2

1018 N N/A N N/A Y 18 Y Y

CER9.2P3

1400 N N/A N N/A Y 18 Y Y Y Y

1336 Y Y

CER9.3P3

1336 N N/A N N/A Y 18 Y Y Y Y Y Y

CER9.4P3

1336 N N/A N N/A Y 18 Y Y Y Y Y Y

TISA Avg 10

CER10.0P5

1177 N N/A N N/A Y 18 Y Y Y  Y  Y  Y

GGEO 11

Regrid MOA 12

CER12.1P2

1349 N N/A N N/A Y 16 Y Y