Page 1: JPA Meeting Joint Planning Agreement

1

JPA Meeting

Joint Planning Agreement

Western Area Power AdministrationDesert Southwest Region

July 13, 2005

Page 2: JPA Meeting Joint Planning Agreement

2

JPA Agenda

• Welcome / Introductions / Logistics• Power Marketing Updates (Oretta/Gray)

– O&M Agreements (Oretta)– Remarketing Efforts (Gray)

• WALC OASIS (Steward)• 10 Year Plan (Byron)

– HDR161KV – BLY161KV Reconductoring – South of Phoenix

• Study Updates (York)– River System Study– Southern Arizona Study

• JPA 2005-2006 Goals (Moulton)• Action Items

Page 3: JPA Meeting Joint Planning Agreement

3

JPA Meeting

Power Marketing Updates

Mary Oretta Jean Gray

(602) 605-2639 (602) 605-2555

[email protected] [email protected]

Page 4: JPA Meeting Joint Planning Agreement

4

Power Marketing Updates

• O & M Agreements

• Remarketing Efforts

Page 5: JPA Meeting Joint Planning Agreement

5

JPA Meeting

WALC OASIS

http://www.oatioasis.com/walc/index.html

John Steward(602) 605-2774

[email protected]

Page 6: JPA Meeting Joint Planning Agreement

6

WALC OASIS

•Definitions•Webpage Links•Registration Process to obtain Login•View Business Practices•View Transmission Offerings•View Transmission Reservations•Summary•Questions

Page 7: JPA Meeting Joint Planning Agreement

7

Definitions

Open Access Same-time Information System (OASIS)

Open Access Technology International (OATI)

WestTTrans

Transmission Services Information Network (TSIN)

Page 8: JPA Meeting Joint Planning Agreement

8

Webpage Links

http://reg.tsin.com/

http://www.westtrans.net/

http://www.oatioasis.com/cwo_default.htm

Page 9: JPA Meeting Joint Planning Agreement

9

Registration ProcessREGISTRATION PROCESS

1. Obtain a NERC acronym – Once an acronym is obtained proceed to step (Takes approximately 1 to 2 Days).

2. Register Company with OATI, Email Company Registration form to OATI. Once OATI verifies your company is registered proceed to step 3.

3. Obtain OATI’s security certificate Registration – Contact OATI to start the registration process. When a security certificate is obtained proceed to step 4.

4. Register with OATI as an OASIS user – Email user registration form to OATI. When user account is activated proceed to step 5.

5. Contact Western to activate you as a valid customer – Western will verify if customer is eligible to purchase transmission. Customer will be notified if they met eligibility requirements. Proceed to step 6.

6. Log on to WestTTrans and submit transmission request.

7. How to Purchase WALC Transmission Services Flowchart

Page 10: JPA Meeting Joint Planning Agreement

10

Western’s Business PracticesWeb Site: http://www.oatioasis.com/walc/index.html

Page 11: JPA Meeting Joint Planning Agreement

11

Example of Offerings

Page 12: JPA Meeting Joint Planning Agreement

12

Transmission Offerings

• Knowledge of transmission provider’s path

• View the price associated with a path

• Most important view ATC (both firm and non-firm) on a given path during a specific time period

Page 13: JPA Meeting Joint Planning Agreement

13

Transmission Reservations

• View transmission market tendencies

• View the status of your transmission request

• View queued position of your request

Page 14: JPA Meeting Joint Planning Agreement

14

Example of Reservations

Page 15: JPA Meeting Joint Planning Agreement

15

Summary

• Registration Process

• View Western’s Business Practice & News

• Tutorials – Transmission Offerings & Transmission Reservations

Page 16: JPA Meeting Joint Planning Agreement

16

JPA Meeting

10 Year Plan Updates

Don Byron(602) 605-2685

[email protected]

Page 17: JPA Meeting Joint Planning Agreement

17

10 Year Plan Updates

• Headgate Rock 161-kV Substation to Blythe 161-kV Substation Reconductoring– (HDR161KV – BLY161KV Reconductoring)

• South of Phoenix– Completed Upgrades– Future Projects

• Ten Year Plan Link

Page 18: JPA Meeting Joint Planning Agreement

18

JPA Meeting

Transmission Study Updates

Leonard York(602) [email protected]

Page 19: JPA Meeting Joint Planning Agreement

19

Update - River System Study

• Purpose– Evaluate Three 230kV Transmission Projects– Expect Each to Substantially Increase River System ATC– Each To Require About a Three-Year Lead Time– Focus on Year 2008 Load-Serving in Mohave County

• Projects– Reconductor Mead-Davis-Topock Line– Reconductor Gavilan Peak/Peacock Line– Build Griffith-North Havasu Line

• Participants– APS– CAWCD– MEC– SWTC– TEP/UNS

• Case– Reviewed By Participants

Page 20: JPA Meeting Joint Planning Agreement

20

Update – Southern Arizona Study• Purpose

– Re-rate Path C (South of Phoenix)– Inservice: South of Phoenix Uprate to Casa Grande– Not Inservice: Pinal West/Santa Rosa/Browning 500kV

• Results– Increased Rating from 290 to 660 MW– Critical Outage: Kyrene-Knox 230kV– Critical Overload: Lone Butte-Test Track 230kV

• Report– Non-Simultaneous Import Power Flow Study– Expect Brief Report by September 2005

Page 21: JPA Meeting Joint Planning Agreement

21

JPA Meeting

Joint Planning Agreement 2005-2006 Goals

Ron Moulton(602) 605-2668

[email protected]

Page 22: JPA Meeting Joint Planning Agreement

22

JPA Principles

• Purpose & Objectives– Establish a Planning Committee.– Interactively develop a long-term

“Transmission Plan.”– Review & Revise Transmission Plan

Annually.

Page 23: JPA Meeting Joint Planning Agreement

23

JPA Principles

• Planning Committee– Comprised of Parties to the JPA.– Identify, receive and process planning

information provided by Parties annually.– Prepare Transmission Plan.– Hold Annual Planning Meeting(s)

Page 24: JPA Meeting Joint Planning Agreement

24

JPA Principles

• Annual Planning Meeting– Held in July each year.– Review Transmission Plan– Review, discuss, deliberate other.

Page 25: JPA Meeting Joint Planning Agreement

25

JPA Principles

• Goals 2005-2006– Interactively develop DSW 10 Year Transmission

Plan.• River System• South of Phoenix System

– File DSW 10 Year Transmission Plan with Arizona Corporation Commission (ACC) in January 2006 (as a courtesy).

– Support/Coordinate with Southwest Area Transmission Planning Forum (SWAT).

– Support ACC Biennial Transmission Assessment (next round 2006).

Page 26: JPA Meeting Joint Planning Agreement

26

JPA Meeting

• Any

–Questions?

–Comments?

–Answers?

Page 27: JPA Meeting Joint Planning Agreement

27

JPA Action Items

Page 28: JPA Meeting Joint Planning Agreement

28

JPA Meeting

Thanks for

Attending!!

Page 29: JPA Meeting Joint Planning Agreement

29

JPA Participants

• AGUILA• AK-CHIN INDIAN COMMUNITY• ARIZONA POWER AUTHORITY• ARIZONA POWER POOLING ASSN• ARIZONA PUBLIC SERVICE

COMPANY• AVRA VALLEY IRRAGATION

DISTRICT• BOULDER CITY, CITY OF• BUCKEYE WATER

CONSERVATION DRAINAGE DIST• BUREAU OF RECLAMATION• CENTRAL ARIZONA WATER

CONSERVATION DIST• CHANDLER HEIGHTS CITRUS

IRRAGATION DIST

• COLORADO RIVER COMM OF NEVADA

• CORTARO-MARANA IRRIGATION DISTRICT

• ELECTRICAL DIST NO 3• ELECTRICAL DIST NO 4• ELECTRICAL DIST NO 5

MARICOPA• ELECTRICAL DIST NO 5 PINAL• ELECTRICAL DIST NO 6• ELECTRICAL DIST NO 7• ELECTRICAL DIST NO 8• HARQUAHALA VALLEY POWER

DISTRICT• LINCOLN COUNTY POWER

DISTRICT #1• MARICOPA WATER DISTRICT

Page 30: JPA Meeting Joint Planning Agreement

30

JPA Participants

• MCMULLEN VALLEY WATER CONSERVATION & DD

• NEEDLES, CITY OF• OCOTILLO WATER CONSV DIST• OVERTON POWER DISTRICT NO 5• QUEEN CREEK IRRIGATION DIST• ROOSEVELT IRRIGATION DIST• SAFFORD, CITY OF• SALT RIVER PROJECT• SAN CARLOS IRRIGATION

PROJECT• SAN TAN IRRIGATION DISTRICT• SILVERBELL IRRIGATION

DISTRICT

• THATCHER, TOWN OF• TOHONO O’ODHAM UTILITY

AUTHORITY• TOHOPAH IRRIGATION DISTRICT• UNIT “B” IRRIGATION & DRAINAGE

DISTRICT• UNS ELECTRIC INC• VALLEY ELECTRIC ASSOCIATION• WELLTON-MOHAWK IRRIGATION &

DD• WICKENBURG, TOWN OF• YUMA COUNTY WATER USERS

ASSOC• YUMA IRRIGATION DISTRICT• YUMA PROVING GROUND• YUMA-MESA IRRIGATION & DRAIN