joseph montoya caampus renovations of the … · lab classroom 109 1041 sf conf. room 451 sf ......
TRANSCRIPT
JOSEPH MONTOYA CARENOVATIONS of the RENOVATIONS of the TW (TOM WILEY) & H B
HH
TWTW
AMPUS
BUILDINGS
1
TW Building22
1. PROGRAMa. Building program:
1. Existing Plan2. Proposed Plan3. 100% SD Probable Cost
2 LEED & MEP ENERGY/COST SAVINGS AUDIT2. LEED & MEP ENERGY/COST SAVINGS AUDIT
AREA: 13,321 gross sf
ESTIMATED PROBABALE COST: $3 264 450 00
AREA: 11,811 gross sf
1. PROGRAMa. Building program:
1. Existing Plan2. Proposed Plan3 100% SD Probable Cost3. 100% SD Probable Cost
2. LEED & MEP ENERGY/COST SAVINGS AUD
H Building
IT
AREA: 55
ESTIMAT
‘H’ BUILDING:EPA ‘Target Finder’: 50%EPA ‘Target Finder’: 50%EPA Target Finder : 50% EPA Target Finder : 50%
TW Building 1
23
H Building
. DESIGN PHASES:a. Programmingb Schematic Designb. Schematic Designc. Design Developmentd. Construction/Bid Documents
2. CMR – BIDDING / CONTRAT NEGOTIATION PHA3. CONSTRUCTION / FF&E INSTALLATION PHASE
a. TW Buildingb H Building