joint exchange / interop work group test workgroup

24
Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Eric Heflin/Judith Hutman Aug 29, 2012

Upload: tanisha-dickerson

Post on 31-Dec-2015

20 views

Category:

Documents


1 download

DESCRIPTION

Joint Exchange / Interop Work Group Test Workgroup. John Donnelly /Eric Heflin/Judith Hutman. Aug 29, 2012. Roll. Agenda. Roll Call – Cayla Announcements – John Pilot Status - Eric Pilot Support – Judith / Ed Direct harmonization recap – Judith / Joe Test execution status – Judith - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Joint Exchange / Interop Work Group Test Workgroup

Joint Exchange / Interop Work Group Test Workgroup

John Donnelly/Eric Heflin/Judith HutmanAug 29, 2012

Page 2: Joint Exchange / Interop Work Group Test Workgroup

Roll

2

Name Organization RepresentationNick VanDuyne NYeC StateIvan Handler ILJohn Donnelly NJ Task Group Co-Chair - IWGMarty Prahl SSA

Federal agencyDennis Peterson, Curtus Browning, Elaine Hunolt, Taimur Aslam, Willie Singletary, Monica VanDyke VHA

Kevin Brady NIST NISTDavid Tao, Dan Huber Siemens

EHR VendorDave Cassel, Rob Klootwyk Epic Bill Howard, Charles Parisot GEJeff Cunningham, Tim Dunnington ICA

HIE vendor

Mike LaRocca Intersystems

Vladi Reznikov, Jennifer Puyenbroek CONNECT PMO

Matt Bell, Tom Wilson, Kathy Lin AxolotlTeddy Gedamu MedfxMelissa Owens Marshfield Clinic Health SystemSteve Leighty MedVirginia

Regional HIE Brian Bonnington, Dave Trepanier, Dave Smith, Steve Michael IHIE

Anuj Desai Interop WG Interop WGEric Heflin THSA Task Group Co-Chair - ExchangeMariann Yeager Exchange Exchange Ed O'Connor, Judith Hutman Nitor ONC Testing Contractor

Dennis Wilson, Alisa Ray, Sue Rieber CCHIT

ATCBs and Testing SMEs

Jim St. Clair IHE USA

Amit Trivedi, Kevin Brown, Michella Knighton ICSA Labs

Traci Mapps SLI Global SolutionsKyle Meadors, Timothy Bennett Drummond Group

Milton Padilla, Steve Wilson, Mark Shin, Doublas Biggs, Les Biggs InfoGuard

Page 3: Joint Exchange / Interop Work Group Test Workgroup

• Roll Call – Cayla

• Announcements – John

• Pilot Status - Eric

• Pilot Support – Judith / Ed

• Direct harmonization recap – Judith / Joe

• Test execution status – Judith

• soapUI demo – David

• Open Discussion – All

• Wrap Up/Schedule Review - John

Agenda

3

Page 4: Joint Exchange / Interop Work Group Test Workgroup

• Harmonized PD/QD/RD/MP/AF (aka Patient Record Lookup) Tests Were Ratified Last Week• http://exchange-iwg.wikispaces.com/Test+Artifacts+Harmonization

• Pilot processes to be conducted in Sept

• CTB RFP• Focused discussions with respondents for test tool clarifications

• Evaluations and contract discussions are still under way

Announcements

4

Page 5: Joint Exchange / Interop Work Group Test Workgroup

• Today (Wed 2012/8/29) we released process documents for the pilot

• Documentation includes

• Test Process Guide

• Testing Toolkit User’s Guide

• Test Execution Guide: PD-QD-RD

• Test Execution Guide: Messaging Platform & Authorization Framework 

• Also we’ve created a pilot charter document

Harmonized PRL (PD/QD/RD/MP/AF) Pilot Status

5

Page 6: Joint Exchange / Interop Work Group Test Workgroup

• The pilot has been defined as having two distinct phases• Current phase which is to review and prepare

• Next phase which is to engage with the CTB and execute the pilot proper

• Several organizations are moving forward• We need your help!

• IWG and Exchange members

• Vendors

• Others

Harmonized PRL Pilot Status (continued)

6

Page 7: Joint Exchange / Interop Work Group Test Workgroup

• Intro to pilot

• Purpose

• Scope

• Approach and the “Ask”

Pilot Charter Document Review

7

Page 8: Joint Exchange / Interop Work Group Test Workgroup

8

ONC Test Team Update

•Pilot Support

•Direct Harmonization Recap

•Test Execution Status

•soapUI Demo

Page 9: Joint Exchange / Interop Work Group Test Workgroup

Pilot Support

Page 10: Joint Exchange / Interop Work Group Test Workgroup

Artifacts Delivered

Documentation• Test Process Guide• Testing Toolkit User’s Guide• Test Execution Guide: PD-QD-RD• Test Execution Guide: Messaging Platform &

Authorization Framework

Test Scripts• soapUI scripts for high priority test cases

Page 11: Joint Exchange / Interop Work Group Test Workgroup

Direct Harmonization: Recap

Page 12: Joint Exchange / Interop Work Group Test Workgroup

Test Approach:Direct only v. Internal actors

Direct Messaging

Internal Actor Messaging

Page 13: Joint Exchange / Interop Work Group Test Workgroup

Internal Actor Testing

Direct Messaging

FR-2SMTP Sender

to HISP

FR-3HISP to SMTP

Receiver

FR-5HISP Sender

to HISP Receiver

FR-7SMTP to SMTP

Page 14: Joint Exchange / Interop Work Group Test Workgroup

Modular ApproachSample Analysis: Edge Protocol EHR-HIE Test Spec FR-2

Page 15: Joint Exchange / Interop Work Group Test Workgroup

FR-2: SMTP Sender to HISP

* Internal actors specified

* Send XDR not proscribed in Direct specs

Page 16: Joint Exchange / Interop Work Group Test Workgroup

FR-2: Applying a Modular Approach

Direct Messaging

DM1 DM2

DM3

Cert Discovery

CD1

CD2

CD3

EHR-HIE ApplicantProduction Participant

Deplmnt A Reqts

FR2

A2

A3

Eve

nt-

Bas

ed

Inte

rop

Tes

tin

g

DM1

DM2

CD1

CD2

FR2

A2

Deplmnt B Reqts

B1 B2

B3

DM3

CD3

A3

Deplmnt X Reqts

X1 X2

X3

XD Conversion

XD1

XD2

XD3

FR-2SMTP to HISP

Page 17: Joint Exchange / Interop Work Group Test Workgroup

Modular ApproachSample Analysis: NormativeEHR-HIE Test Spec FR-5

Page 18: Joint Exchange / Interop Work Group Test Workgroup

FR-5: HISP Sender to HISP Receiver via S/MIME

Page 19: Joint Exchange / Interop Work Group Test Workgroup

FR-5: Applying a Modular Approach

Direct Messagi

ng

DM1 DM2

DM3

Cert Discove

ry

CD1

CD2

CD3

EHR-HIE ApplicantProduction Participant

Deplmnt A Reqts

FR1

A2

A3

Eve

nt-

Bas

ed

Inte

rop

Tes

tin

g

DM1

DM2

CD1

CD2

FR1

A2

Deplmnt B Reqts

B1 B2

B3

DM3

CD3

A3

Deplmnt X Reqts

X1 X2

X3

XD Convers

ion

XD1

XD2

XD3

FR-5Sending HISP to

Receiving HISP

Page 20: Joint Exchange / Interop Work Group Test Workgroup

Test Execution Status

Page 21: Joint Exchange / Interop Work Group Test Workgroup

Automating Test Case Execution: soapUI scripts complete

Priority High Med Low X (untargeted) TOTALS

PD 8 9 4 14

QD 19 15 0 2 34

RD 8 7 1 12

M+A 1 15 16

Direct 18 18

TOTALS 54 31 5 17 107

NEW

NEW

Page 22: Joint Exchange / Interop Work Group Test Workgroup

soapUI Demo

Page 23: Joint Exchange / Interop Work Group Test Workgroup

Open Discussion

Page 24: Joint Exchange / Interop Work Group Test Workgroup

•RFP released — July 2nd 

•Questions received by 6 organizations

•Answers distributed — July 13th

•Bids due — July 20th

•Evaluating

•Expected award — Early Sept

•Contract start — TBD

Schedule Review

24

We are here (running late)