join us for the active transportation strategic plan...

4

Click here to load reader

Upload: buitruc

Post on 05-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Join us for the Active Transportation Strategic Plan ...sanpedrocity.org/wp-content/uploads/2015/11/ATSP-Workshop-Flyer... · Join us for the Active Transportation Strategic Plan

THE WORKSHOPS WILL: Gather input on the proposed regional network of bicycle and multi-use path facilities Discuss strategies for first last mile improvements to key transit stops and stations Seek feedback on performance measures Discuss roadmap towards implementation of these projects and programs

THE WORKSHOPS ARE DESIGNED FOR:Practitioners who implement walking/bicycling/transit improvements; applicable agency representatives; planners;engineers; traffic safety professionals; public health and injury prevention professionals; advocates; non-profit organizations;decision-makers; and other interested stakeholders.

PLEASE JOIN US AT ONE OF THE FOLLOWING SESSIONS:

Thursday, December 3, 20154:00pm-6:00pm (4:15pm presentation)

North Hollywood Senior Citizen Center11430 Chandler Boulevard

North Hollywood, CA 91601

Monday, December 7, 20154:00pm-6:00pm (4:15pm presentation)

Norwalk Community Meeting CenterSproul Room

13200 Clarkdale AvenueNorwalk, CA 90650

Tuesday, December 8, 20154:00pm-6:00pm (4:15pm presentation)

Torrance Cultural Arts CenterGeorge Nakano Theatre3330 Civic Center Drive

Torrance, CA 90503

Wednesday, December 9, 20154:00pm-6:00pm (4:15pm presentation)

Julia McNeill Senior CenterCelebration Hall

4100 Baldwin Park BoulevardBaldwin Park, CA 91706

Monday, December 14, 20159:00am-11:00am (9:15am presentation)

Roy A. Anderson Recreation CenterComrie Hall

3980 Bill Robertson LaneLos Angeles, CA 90037

Tuesday, December 15, 20155:00pm-7:00pm (5:15pm presentation)

Santa Clarita Activities CenterSycamore Room

20880 Centre Pointe ParkwaySanta Clarita, CA 91350

Join us for the Active Transportation Strategic PlanStakeholder WorkshopsThe Los Angeles County Metropolitan Transportation Authority (Metro) is developing an Active Transportation Strategic Plan(Plan) to identify needs, resources and strategies to improve and increase walking, bicycling and transit use in LA County. Weheld the first round of stakeholder workshops and launched an online survey in August 2015 to gather input. Please join usfor a second round of workshops to learn about the status of the Plan, provide additional critical feedback, and ask questions.

Please register early since space is limited! Register here:https://www.metro.net/projects/active-transportation/strategic-plan/

ADA accommodations and translations are available by calling 213.922.2606 at least 72hours before the meeting. For more information, visit www.metro.net/walkbikeroll or contactTham Nguyen at [email protected] or 213.922.2606.

All sessions will cover the same topics. Please choose the session that is most convenient for you. There will be an openhouse during the first 15 minutes of the workshop. A presentation will start 15 minutes after the listed start time.

Page 2: Join us for the Active Transportation Strategic Plan ...sanpedrocity.org/wp-content/uploads/2015/11/ATSP-Workshop-Flyer... · Join us for the Active Transportation Strategic Plan

LOS TALLERES VAN A: Colectar información sobre la propuesta red regional de bicicleta y de las instalaciones de paseo de uso múltiple Discutir estrategias para mejoramientos de ultima/primera milla en paradas principales Obtener información sobre medidas de desempeño Discutir el mapa de implementación hacia estos proyectos y programas

LOS TALLERES ESTÁN DISEÑADOS PARA:Profesionales que implementan mejoramientos de transportación activa; representativos de agencias aplicables;planificadores; ingenieros; profesionales de seguridad de trafico; profesionales de la salud publica y de la prevención delesiones; abogados; organizaciones no lucrativas; oficiales; y otros partidos interesados

POR FAVOR ACOMPÁÑENOS DURANTE LAS SIGUIENTE SESIONES:

Jueves, Diciembre 3, 20154:00pm-6:00pm (4:15pm presentación)

North Hollywood Senior Citizen Center11430 Chandler Boulevard

North Hollywood, CA 91601

Lunes, Diciembre 7, 20154:00pm-6:00pm (4:15pm presentación)

Norwalk Community Meeting CenterSalón: Sproul

13200 Clarkdale AvenueNorwalk, CA 90650

Martes, Diciembre 8, 20154:00pm-6:00pm (4:15pm presentación)

Torrance Cultural Arts CenterGeorge Nakano Theatre3330 Civic Center Drive

Torrance, CA 90503

Miércoles, Diciembre 9, 20154:00pm-6:00pm (4:15pm presentación)

Julia McNeill Senior CenterCelebration Hall

4100 Baldwin Park BoulevardBaldwin Park, CA 91706

Lunes, Diciembre 14, 20159:00am-11:00am (9:15am presentación)

Roy A. Anderson Recreation CenterComrie Hall

3980 Bill Robertson LaneLos Angeles, CA 90037

Martes, Diciembre 15, 20155:00pm-7:00pm (5:15pm presentación)

Santa Clarita Activities CenterSalón: Sycamore

20880 Centre Pointe ParkwaySanta Clarita, CA 91350

Acompáñenos para los Talleres del Plan Estratégico de TransportaciónActivaLa Autoridad de Transportación del Condado de Los Ángeles (Metro) esta desarrollando un Plan Estratégico deTransportación Activa (el Plan) para identificar necesidades, recursos y estrategias para mejorar andar a pie y en bicicleta, yfacilitar el uso de transito en el condado de Los Ángeles. Sostuvimos la primera ronda de talleres y la encuesta por interneten agosto de 2015 para colectar información. Por favor acompáñenos durante la segunda ronda de talleres para aprendermas sobre el estatus del Plan, proveernos mas información critica, y hacernos preguntas.

El espacio es limitado, por favor regístrese temprano! Regístrese Aquíhttps://www.metro.net/projects/active-transportation/strategic-plan/

Acomodaciones ADA y traducciones son disponibles llamando al 213.922.2606 por lo menos72 horas antes del taller. Para mas información, visite www.metro.net/walkbikeroll ocontacte a Tham Nguyen por correo electrónico [email protected] o al 213.922.2606.

Todas las sesiones cubrirán el mismo tema. Por favor atienda la sesión mas conveniente para usted. Habrá unaexhibición durante los primeros 15 minutos del taller. La presentación empezara dentro 15 minutos del taller.

Page 3: Join us for the Active Transportation Strategic Plan ...sanpedrocity.org/wp-content/uploads/2015/11/ATSP-Workshop-Flyer... · Join us for the Active Transportation Strategic Plan

Active Transportation Strategic Plan

What is the Active Transportation Strategic Plan? Why do we need it?

Building on local efforts, the Active Transportation Strategic Plan will provide a cohesive strategy for the county to help realize benefits in access to destinations and services, mobility, quality of life, safety, air quality, health, and economy. These benefits will accrue to people across the county, across all modes. The Plan will serve as Metro’s overall strategy for funding and implementing active transportation facilities and programs, seek to maximize the benefits of our region’s transportation investments, and identify opportunities for supporting local and regional partners to get these projects and programs implemented.

The Active Transportation Strategic Plan (Plan) is a county-wide effort to identify needs, resources, and strategies to improve and increase walking, bicycling and transit use in Los Angeles County. It is led by the Los Angeles County Metropolitan Transportation Authority (Metro). The Plan’s policy and infrastructure recommendations will require collaboration between Metro, local and regional agencies, and other stakeholders to ensure implementation. The Plan will focus on improving first and last mile access to transit and propose a regional network of active transportation facilities, including shared-use paths and on-street bikeways, and develop a funding strategy to get them built.

The Plan builds on local and sub-regional planning efforts. It also serves to update Metro’s 2006 Bicycle Transportation Strategic Plan and to support implementation of Metro’s Complete Streets Policy and Countywide Sustainability Planning Policy. This effort expands on the transit access framework of the agency’s First Last Mile Strategic Plan, and includes rail stations, Bus Rapid transit stops, and other major bus stops throughout the County. Project-level improvements applicable to more than 650 locations will be developed using station access case studies that apply to each type of location in the system. The Plan will also identify projects that promote connectivity between jurisdictions, overcome barriers such as freeways and utility corridors, and close gaps in the regional bikeway network.

THAM NGUYEN, PROJECT MANAGER

[email protected] www.metro.net/walkbikeroll

FOR MORE INFORMATION

ATTEND AWORKSHOP

Metro will hold 3 rounds of public workshops throughout the county to discuss the project.

VISIT THE WEBSITE

Metro will launch a website for people to identify station areas where they support bicycling and walking improvements.

COMMENT ON THE DRAFT PLAN

A draft of the Plan will be available for public comment on Metro’s website.

How can I get involved?

SUMMER 2015> Workshop Round 1> Website Launch

SPRING 2016> Workshop Round 3> Comment on Plan

SUMMER 2016> Plan Completion

FALL-WINTER 2015> Workshop Round 2

TIMELINE

The project team will be working with people across the county to develop a plan that is meaningful to local cities and communities. Along the way, there will be several opportunities to get involved. Metro will also work with key stakeholders, community leaders, and experts to guide the development of the Plan throughout this process.

Page 4: Join us for the Active Transportation Strategic Plan ...sanpedrocity.org/wp-content/uploads/2015/11/ATSP-Workshop-Flyer... · Join us for the Active Transportation Strategic Plan

Plan Estratégico de Transporte Activo¿Qué es el Plan Estratégico de Transporte Activo?El Plan Estratégico de Transporte Activo (Plan) es un esfuerzo a nivel de todo el Condado para identificar necesidades, recursos yestrategias que mejoren e incrementen los hábitos de caminar, andar en bicicleta y del uso del transporte en el Condado de LosÁngeles. Está encabezado por la Autoridad Metropolitana de Transporte del Condado de Los Ángeles (Metro). Las recomendacionesen políticas e infraestructura del Plan requerirán de la colaboración entre Metro, agencias locales y regionales y otras partesinteresadas para garantizar su instrumentación. El Plan se centrará en la mejora de la primera a la última milla de acceso paratransitar, y en proponer una red regional de instalaciones para el transporte activo, incluyendo caminos de uso compartido yciclovías en las calles, y desarrollar una estrategia de captación de recursos para lograr que se construyan. El Plan se apoya en losesfuerzos de planeación locales y subregionales. También sirve para actualizar el Plan Estratégico de Metro del 2006 para elTransporte Ciclista y para apoyar la instrumentación de la Política Integral de Vialidades y la Política de Planeación Sustentable deMetro. Este esfuerzo se hace extensivo en el marco de acceso de tránsito del Plan Estratégico de la Primera a la Última Milla de laagencia, e incluye a las estaciones de tren, paradas del Autobús Rápido, y las demás paradas principales de autobuses en todo elCondado. Mejoras a nivel de proyecto aplicables a más de 650 localidades se desarrollarán mediante estudios de caso en estacionesque se apliquen a cada tipo de ubicación en el sistema. El plan también identificará los proyectos que promueven la conectividadentre jurisdicciones, que libren obstáculos como autopistas y carriles de servicios públicos, y que cierren las brechas en la red deciclovías regional.

¿Por qué lo necesitamos?Apoyado en esfuerzos locales, el Plan Estratégico de Transporte Activo brindará una estrategia coherente al condado que ayude aconcretar los beneficios en el acceso a los destinos y servicios, movilidad, calidad de vida, seguridad, calidad del aire, salud yeconomía. Estos beneficios serán asimilados por las personas de todo el Condado, mediante todas las modalidades de transporte. ElPlan servirá como la estrategia general de Metro para la obtención de recursos y la instrumentación de instalaciones y programas detransporte activo, buscando maximizar los beneficios de las inversiones de transporte en nuestra región, e identificando lasoportunidades de apoyo a socios locales y regionales para lograr que estos proyectos y programas se pongan en marcha.

PARA MÁS INFORMACIÓN:

THAM NGUYEN,GERENTE DE [email protected]/walkbikeroll

¿Cómo puedo participar?El equipo del proyecto estará trabajando con gente de todo el Condado para desarrollar un plan que sea significativo para lasciudades y para las comunidades locales. En este proceso, habrá varias oportunidades de participación. Metro también trabajará conlas principales personas involucradas, con líderes comunitarios y expertos para que guíen el desarrollo del Plan a lo largo de todoeste proceso.

ASISTA A UNTALLER

Metro tendrá 3rondas detalleres públicospor todo elcondado paradebatir elproyecto.

VISITE ELSITIO WEB

Metro lanzará unsitio web para quelas personasidentifiquen laszonas de la estacióna ser apoyadas enmejoras paraciclistas y peatones.

COMENTEACERCA DELPLAN ENPROCESO

Un borrador delPlan estarádisponible paraque el público locomente en elsitio web deMetro.

CALENDARIO VERANO 2015> Taller Ronda 1> Inicio Sitio Web

OTOÑO-INVIERNO 2015> Taller Ronda 2

PRIMAVERA 2016> Taller Ronda 3> Comentarios acercadel Plan

VERANO 2016> Finalización del Plan