john davies. fp7 planning meeting, ukatc june 2006. opticon fp7 networking plans john davies opticon...
TRANSCRIPT
John Davies. FP7 Planning Meeting, UKATC June 2006.
OPTICON
FP7 Networking Plans
John Davies
OPTICON Project Scientist
John Davies. FP7 Planning Meeting, UKATC June 2006.
FP6 Networking• Proposal. 39,160 Keuro
11 Networks. Euro 6,680K (17%)
• Contract. 19,200 Keuro
6 Networks. Euro 3,718 (19%)
John Davies. FP7 Planning Meeting, UKATC June 2006.
Management• Clearly needed.
• Distributed model works.
• Impossible to define until. shape/size/membership of consortium is clearer
• Assume FP6 cost *1.25 = 1,500Keuro
John Davies. FP7 Planning Meeting, UKATC June 2006.
ELT Network FP7 Deliverables
– Updated Science case documents (2 over FP7 period)
– Science simulations in each key science area– Regular, small, focussed meetings (~4 per year)– 1 major community science meeting per year
John Davies. FP7 Planning Meeting, UKATC June 2006.
ELT FP7 Network Resources
• Effort– 4 People working full-time on ELT science case
• IMH (lead) + 3 postdoc-level scientists• Distributed around Europe• Coordinated with other FP7 activity (e.g. AO or
instrumentation)• Costs per year
– FTE: ~ 200kE– Meetings: 25kE + (4 x 10kE) = 65kE– Publication of documents: 20kE (e.g. 2 x 50kE over 5 yrs) – Total per year: ~ 285 kE (~1,500 Keuro over FP7)
John Davies. FP7 Planning Meeting, UKATC June 2006.
NUVA (UV-Net) FP6 Progress
Roadmap in good shape and on-schedule:- “Fundamental problems in astrophysics. Requirements for UV
observatories”, Kluwer-Springer, in press.
- Joint Discussion during the IAU GA on the impact of stellar (UV) astronomy on cosmological studies and on the understanding of how life-sustainable systems are generated.
- Conference in “El Escorial”, May 2007 to analyze the instrumentation required to achieve some fundamental goals of modern astronomy.
John Davies. FP7 Planning Meeting, UKATC June 2006.
NUVA FP7 objectives• Identification of the key technologies for future UV
instrumentation.
• Identification of key VO compliant tools for the analysis and interpretation of UV data in connection with other spectral domains.
• Keeping the UV community connected Europe-wide until the end of the HST mission and in the advent of WSO/UV mission.
John Davies. FP7 Planning Meeting, UKATC June 2006.
NUVA FP7 deliverables1. Assessment study of the relevant new
technologies (gratings, narrow band filters, high sensitivity spectral-imaging techniques, integral field spectroscopy, spectropolarimetry).
2. VO tools to analyze UV data and integrate them within the high redshift UV Universe targeted by the 10-m and ELT telescopes (e.g. characteristic structure scales in matter beams from z=0 to z=6-9).
John Davies. FP7 Planning Meeting, UKATC June 2006.
NUVA FP7 Budget & Participants
Meetings 120 keuro
Publications 40keuro
Trips & Conferences 40keuro
-------------------------------------------------------GRAND TOTAL 200 keuro
PARTICIPANTS: PI and budget at UCM (Madrid) otherwise as in FP6
John Davies. FP7 Planning Meeting, UKATC June 2006.
HTRA FP7 Network Costs, PI’s & Participants
• Estimated costs of ~ €192K for 4 to 5 year project
• Networks PI’s– Don Phelan & Andrew Shearer
• Key Participants– HTRA JRA– wider HTRA community including non-EU members
John Davies. FP7 Planning Meeting, UKATC June 2006.
Key Technology Network, FP6 Progress
• Core team – 13 Members, including JRA chairs– 3 Meetings held
• Associate team formed – 26 members• Communications via Email & Twiki web pages• Workshops on
– Optics for ELT Instruments in Rome – published in Astron. Nach.– Deformable Mirrors & WHT test-bed in Paris– Use of WHT as technology test-bed at ESO
• Plenary talk at SPIE 2006 in Orlando on Novel Technology for Optical & IR Astronomy
• Draft Roadmap produced
John Davies. FP7 Planning Meeting, UKATC June 2006.
KTN: Objectives for FP7• Act as focus for Optical and IR Technology
development planning• Use themes or JRAs to feed information in
– JRAs develop their theme networks • Filter this information and form linkages for
added–value R&D• Develop industry links and links to European
space and worldwide R&D programmes
John Davies. FP7 Planning Meeting, UKATC June 2006.
KTN, Deliverables & Costs• Deliverables
– Series of workshops
– Capabilities database
– Updated Technology Roadmaps on 2-yearly cycle
– Developed interactive website for teams
– Public webpages
• Costs
– As in FP6 with adjustment for inflation (315 Keuro)
– Lead Agency UKATC
John Davies. FP7 Planning Meeting, UKATC June 2006.14
FASE. (Future Astronomical Software Environment) FP6 progress
Monthly phone meetings, Semi-annual face-to-face meetings, Documentation and minutes on Twiki Web site
• Three main deliverables:– High-level requirements. ( Draft version available fall 2005, Internal,
written review spring 2006, Final version fall 2006 after community wide review)
– Achitectural concept document ( Draft available spring 2005, Review expected late 2006 with final version early 2007)
– Interface specifications (Draft version in spring 2007 based on proto-type work, Final version after review during fall 2007)
• Documents will be delivered • by end 2007
John Davies. FP7 Planning Meeting, UKATC June 2006.15
FASE: FP7 objectives• Next natural step is a basic implementation
of FP6 derived specifications providing:– Single-user, desk-top version with scalability
– Command line execution of application tasks
– Links to Python scripting language
– Easy interface to applications written in C and Fortran
– Access to legacy applications from IRAF, MIDAS, ...
• Deliverables for a FP7 activity would be:– Detailed design and specifications for environment
– User level documentation and tutorials
– Basic implementation of environment as source
code with installation procedures for Linux systems
John Davies. FP7 Planning Meeting, UKATC June 2006.16
FASE: FP7 Resources.• Implementation requires actual man-power!
• Estimate of resources (with high uncertainties):– 20-40 FTE for software development assuming
• Major parts of central framework can be obtained from other open source projects (e.g. OpenRTE). This will be checked by proto-types forseen for fall 2006 and winter 2007.
• Environment is made available for a Linux platform only
– 20-50% adminstrative software overhead depending on how distributed the developments will be.
– 10-20 person scientific oversight committee
– With 50% FP7 funding, this suggests at least 1-2 Meuro
• Potential participants
ESO plus Institutes in Germany, Italy, Netherlands
UK, Spain, Finland, and France (plus USA)
John Davies. FP7 Planning Meeting, UKATC June 2006.
Interferometry• Included in Interferometry presentation.
• Natural Continuation of FP6 work
Networking component 575 KEuro
John Davies. FP7 Planning Meeting, UKATC June 2006.
Telescope Directors Forum. FP6 Progress
• Annual Directors Meetings
• Oversight of Access programme
• First steps to Common proposal Software
• Requirements matrix for new members
• Promotion of Access programme in CEE
• Successful Access Office at IAC
John Davies. FP7 Planning Meeting, UKATC June 2006.
TDF. FP7 PlansObjectives
• Continue Annual Directors Meetings and Oversight of Access programme
• More efforts at integration and rationalisation in conjunction with Access programme
Resources • about the same as FP6 + inflation (~200 Keuro) +
cost of access office if required.• Lead agency and budget holders TBD
John Davies. FP7 Planning Meeting, UKATC June 2006.
‘Research Enhancement’. FP6 Progress
• Successfull submission of Marie-Curie program (Neon schools: 6 planned 2005-8)
• Set-up of WG to identify the needs
• Preliminary plans for specialised training workshops in « new observing techniques » (second half of FP6)
John Davies. FP7 Planning Meeting, UKATC June 2006.
EnhancementFP7 Objectives:
• Develop the programme further, with support to observing schools of various types
• More emphasis on life-long training (workshops)• Better use of archives (demos…)• Organise some events in the East of Europe.
FP7 ResourcesLead Agency IAP
Similar to FP6 plus inflation. ~150Keuro
John Davies. FP7 Planning Meeting, UKATC June 2006.
New Outreach NetworkObjectives1. Promote role of OPTICON in
strengthening European Astronomy.2. Form a network of outreach professionals
to share ideas, tools, contacts, resources3. Develop a critical mass of media contacts
across EU so a ‘single button press’ reaches all European media
John Davies. FP7 Planning Meeting, UKATC June 2006.
New Outreach NetworkDeliverables
1. Presence at IAU, JENAM etc backed up by suitable hardcopy (brochures, DVDs).
2. EU wide workshops of Outreach professionals
3. Fire and forget PR ‘cluster munition’
John Davies. FP7 Planning Meeting, UKATC June 2006.
New Outreach NetworkResources
1-2 FTE/year distributed across several sites as ‘part-people’
50Keuro/year consumables/travel
Total ~0.5-1 MEuro
Lead Participants; Project Office (WP1) UKATC (WP2), IAC (WP3)
John Davies. FP7 Planning Meeting, UKATC June 2006.
Second Generation Proposal and Observing Preparation tools
Abstract:• Exploit power of new Web technologies• Standardise European (and World?) pre-observation data models• Build on “Northstar” proposal tool to spread through Opticon and Radionet
partners.• Bring review/referee process into the web-based workflow• Explore possibilities of standards for Observing Preparation.
Proposer: UKATC Partners: ASTRON + TDF USA: NRAO + ?
Funding: € 500000 over 5 years (want enough effort to do something, not just talk about doing something)
In very early stages – discussions with ASTRON next month.
John Davies. FP7 Planning Meeting, UKATC June 2006.
New AO network Described in AO presentation• Two Networks to strengthen an Science-
instrument-AO integrated approach:– AO specification/performance & instrument designs:
150k€– AO facilities performance versus science performance:
150k€
• One specific AO Network: AO workshops/meetings on hot topics: 250k€
John Davies. FP7 Planning Meeting, UKATC June 2006.
Project Office 1500 (Keuro)
ELT 1500
NUVA 200
HTRA 192
KTN 315
FASE 1500
Interferometry 545
TDF 200
Access Admin 400
Enhancement 150
Outreach 750
Proposal tools 500
Adaptive Optics 550
Site Characterisation 250
Solar Network ?
TOTAL 8552 + Solar
John Davies. FP7 Planning Meeting, UKATC June 2006.
FIN