Advanced Technology Solutions, L.L.C.

John Cox

Advanced Technology Solutions, L.L.C

Beth Tshudy Analog Devices, Inc.

Tuesday, September 30, 2014

Page 2: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Reducing Risk, Improving Safety Current Safety Controls at Analog Devices, Inc. Roof-top Silane Gas Pad Design Overview Project Team Participants

Design Phase Considerations

Code and Guidelines Excerpts

Safety Features

Project Milestones

Acknowledgements

Page 3: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Responds to obsolescence of vacuum silane

Recommended for FM Global Insurance

compliance (a ‘Key Exposure’)

Page 4: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Page 5: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

One of the greatest hazards of silane is that its behavior in air is unpredictable. Five things can happen:

– Nothing – Brown or white powder formation – Intermittent popping sounds—”poppers” – Immediate ignition-fire – Delayed Ignition-fire/explosion

Under the same conditions different results can occur

Shutdown or abrupt reduction in flow can cause ignition in atmosphere

Page 6: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

The majority of our systems utilized vac-silane (14 tools).

Page 7: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

ADI Stakeholders: Facilities Environmental, Health and Safety Process Engineers On-site Service Staff (contractor that changes silane cylinders)

Speciality Consultants: Advanced Technology Solutions, LLC—EHS/Code Hallam/ICS---Specialty Gas Piping & Controls External Stakeholders: Connolly Brothers, Inc. Symmes Maini & McKee Associates

Page 8: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Review and develop options for siting the pad

Understand constraints

Understand and explore nature of catastrophic release

Research the current regulations for providing an outside storage facility that incorporate all code, safety, and environmental regulations

Determine actual process needs (present and future)

Page 9: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Finalize conceptual design for filing permits with Town.

Work with local officials to educate them on ADI’s proposed risk reduction initiative (buy-in).

Solicit feedback from town officials.

EDUCATE, Educate, educate.

Page 10: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

ATS identified….

Code requirements (C)

Guideline safety recommendations (G)

Industry Best Practice (IBP)

Page 11: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

ATS identified 168 requirements after a thorough code review. The referenced codes and guidelines pertaining to silane gas storage and distribution are below:

ANSI/CGA-G-13 -- 2006 (American National Standards Institute / Compressed Gas Association) – Storage and Handling of Silane and Silane Mixtures;

FM Global Property Loss Prevention Data Sheets 7-7 – Semiconductor Fabrication SEMI S18 – 1102 – Environmental , Health and Safety Guideline for Silane Family Gases Handling; NFPA 318 -- Standard for the Protection of Semiconductor Fabrication Facilities NFPA 55 -- Compressed Gases and Cryogenic Fluids Code; International Fire Code: Chapter 18 (Semiconductor Fabrication Facilities), Chapter 27 (Hazardous Materials – General Provisions), Chapter 30 (Compressed Gases) and Chapter 41 (Pyrophoric Materials); and Massachusetts Building and Fire Codes. SEMI S18

Page 12: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

46 safety feature recommendations

were developed for use and review for FM Global and other stakeholders.

Page 13: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Restricted Flow Orifices

Automated Cylinder Valve

Excess flow valves

UV/IR detection

Ventilation

Sprinkler protection

Closed Circuit Television

Seismic bracing and anchoring

Emergency Shut Off button

Auxillary blowers

¼” thick steel plates

Damage limiting construction

Auto-purge

Class 1, Div. 2 electrical Water mist to cool Lightening protection Safety systems on UPS

Page 14: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Formal Process Hazard Analysis

Cause/Effect Matrix

Page 15: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Page 16: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Shutdown Conditions: (Typical for each GSM) 1. GSM panel flame verified 2. GSM panel heat detector tripped 3. Silane cylinder temperature > 150°F 4. GSM outlet excess flow - internal GSM safety 5. GSM outlet high delivery pressure - internal GSM safety 6. GSM EPO activation - internal GSM safety 7. VMB exhaust gas detection 8. VMB enclosure flame verified 9. VMB controller EPO activated 10. Roof Pad Exit EPO activated -shutdown all PAD GSMs 11. Security Office Pull Station (via FACP to SGMCS) -shutdown all PAD GSMs 12. Heat detectors beneath PAD in Bldg 2 ceiling tripped

Page 17: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Schematics of exterior fenced structure (shell) Schematics of lower level exterior Schematics of damage limiting construction

requirements Structural support bracing Site preparation plans Utility plan Site details Schematics of all safety controls

Page 18: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Roof steel will be installed during the Christmas shutdown week

Silane process piping will start in January 2011

Concrete slab and site work will begin April 2011

Gas equipment and the elevator should begin in May 2011

System completion and testing by July 2011

Fab tie into equipment TBD

Page 19: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Includes 2 story cylinder elevator, heated slab, exhaust, 14 cylinder positions with silane auto switchover.

Page 20: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Page 21: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Advanced Technology Solutions, L.L.C.

Page 22: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

SILANE ROOF PAD

Page 23: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy
Page 24: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy
Page 25: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy
Page 26: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy
Page 27: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Rack 1

Side A

Side B

Page 28: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Flame

Detector

Ring

Page 29: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Blowers

25%

50%

100%

I.R.

Camera

Page 30: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Heat

Detector

U.V./I.R.

Detector

Storage Rack

Flame

Detector

Ring

Sprinkler

Page 31: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

U.V./I.R.

Sensor

Gas Monitoring

Point

3-1 VMB ROOM (1-5)

Page 32: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

ROOFTOP

At both exits

Page 33: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

First Vision Panels (SCC)

Page 34: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Silane Alarms to ERT…

Rack Hazard Alarms:

• Emergency Gas Off • Excess Flow • UVIR Fault • UVIR Flame Detected • Side A standby cylinder leak • Side B standby cylinder leak • Side A High Cylinder pressure • Side B High Cylinder pressure

Page 35: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy

Regular Regular Thermal Thermal Thermal Thermal

Page 36: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy
Page 37: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy
Page 38: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy
Page 39: John Cox Advanced Technology Solutions, L.L.C Beth Tshudy