DANIEL SMITH INDUSTRIES LTD JOB PROFILE Awatere River SH1 Road Bridge & Seddon Rail Underpass Bridge. Seddon, Marlborough, South Island, NZ. Client: Transit NZ Design Engineer: Bloxam Burnett Oliver Main Contractor: HEB Structrues Contract Value: NZ $12 million DSI Subcontract Value: NZ $1.7 million Date of Construction: January 2006 to April 2007 __________________________________________________ General Description. Awatere River Road Bridge - 2 lane, 275 metre bridge consisting of 11 no. 25 metre spans, precast U beams and insitu deck bridge founded on 1900mm diameter x 14 metre deep drilled cassion piles, opened holed in papa / sandstone formation, and constructed over alluvial river. Seddon Rail Underpass – precast components constructed rail over bridge with precast pier cap at 140 ton, abutment at 400 ton, and L beams of 700 ton. Foundations consisted of 6 no. 900mm diameter x 32 metre deep drilled piles. Rail bridge was assembled on a 48 hour rail closure. Daniel Smith Industries Equipment Resources. Liebherr LR1400 400 ton crawler crane IHI CCH 1000 100 ton crawler crane Hitachi TH55 rotary drill rig Delmag D33 diesel hammer Merlo Telehandler Hitachi EX2000 Excavator Daniel Smith Industries Personnel. Piling Project Manager: Mason Teira Concrete Project Manager: Paul O’Connor Operators: Mike Bell, Matthew Fletcher and Shae Cullen Project was completed on time, under budget, with zero accident / incidents and to the requirements of the specification. Daniel Smith Industries Subcontract / involvement. Manufacture of steel pile cassion, rolling and submerged arc welding Installation of 1200mm diameter x 14 – 32 metre deep drilled piles, through greywacke alluvial gravels and with open hole papa rock sockets Construction of insitu concrete pier stems Supply of 400 and 100 ton crawler cranes, and the transport and placement of all precast concrete componentry, including cranage of the 400 ton rail bridge transverse beams

Upload: others

Post on 20-Feb-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JOB PROFILE - NZ Crane Hire, Bridge Construction, Wind

DANIEL SMITH INDUSTRIES LTD

JOB PROFILE

Awatere River SH1 Road Bridge & Seddon Rail Underpass Bridge.

Seddon, Marlborough, South Island, NZ.

Client: Transit NZ Design Engineer: Bloxam Burnett Oliver Main Contractor: HEB Structrues Contract Value: NZ $12 million DSI Subcontract Value: NZ $1.7 million Date of Construction: January 2006 to April 2007 __________________________________________________ General Description. Awatere River Road Bridge - 2 lane, 275 metre bridge consisting of 11 no. 25 metre spans, precast U beams and insitu deck bridge founded on 1900mm diameter x 14 metre deep drilled cassion piles, opened holed in papa / sandstone formation, and constructed over alluvial river.

Seddon Rail Underpass – precast components constructed rail over bridge with precast pier cap at 140 ton, abutment at 400 ton, and L beams of 700 ton. Foundations consisted of 6 no. 900mm diameter x 32 metre deep drilled piles. Rail bridge was assembled on a 48 hour rail closure.

Daniel Smith Industries Equipment Resources. � Liebherr LR1400 400 ton crawler crane � IHI CCH 1000 100 ton crawler crane � Hitachi TH55 rotary drill rig � Delmag D33 diesel hammer � Merlo Telehandler � Hitachi EX2000 Excavator

Daniel Smith Industries Personnel. Piling Project Manager: Mason Teira Concrete Project Manager: Paul O’Connor Operators: Mike Bell, Matthew Fletcher and Shae Cullen

Project was completed on time, under budget, with zero accident / incidents and to the requirements of the specification.

Daniel Smith Industries Subcontract / involvement. � Manufacture of steel pile cassion, rolling and

submerged arc welding � Installation of 1200mm diameter x 14 – 32 metre

deep drilled piles, through greywacke alluvial gravels and with open hole papa rock sockets

� Construction of insitu concrete pier stems � Supply of 400 and 100 ton crawler cranes, and the

transport and placement of all precast concrete componentry, including cranage of the 400 ton rail bridge transverse beams