job order cost system chapter 21 prepared by naomi karolinski monroe community college and and...

46
Job Order Cost System Job Order Cost System Chapter 21 Chapter 21 Prepared by Naomi Karolinski Prepared by Naomi Karolinski Monroe Community College Monroe Community College and and Marianne Bradford Marianne Bradford Bryant College Bryant College Accounting Principles Accounting Principles 7 th th Edition Edition Weygandt Weygandt • Kieso Kieso • Kimmel Kimmel

Upload: natalie-murphy

Post on 24-Dec-2015

218 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

Job Order Cost SystemJob Order Cost System

Chapter 21Chapter 21

Prepared by Naomi KarolinskiPrepared by Naomi KarolinskiMonroe Community CollegeMonroe Community College

andandMarianne BradfordMarianne Bradford

Bryant CollegeBryant College

Accounting PrinciplesAccounting Principles77thth Edition Edition

Weygandt Weygandt •• Kieso Kieso •• Kimmel Kimmel

Page 2: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

After studying this chapter, you should be able to:1 Explain the characteristics and purposes of

cost accounting.2 Describe flow of costs in a job order cost

accounting system.3 Explain the nature and importance of a job

cost sheet.

CHAPTER 21 JOB ORDER COST ACCOUNTING

Page 3: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

CHAPTER 21 JOB ORDER COST ACCOUNTING

4 Indicate how the predetermined overhead rate is determined and used.

5 Prepare entries for jobs completed and sold.6 Distinguish between under- and overapplied

manufacturing overhead.

After studying this chapter, you should be able to:

Page 4: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

• Cost accounting – The measuring, recording, and reporting of

product costs.

• Both the total cost and the unit cost of each product is determined from the accumulated data.

• A cost accounting system consists of accounts for the various manufacturing costs. These accounts are fully integrated into the general ledger of a company.

COST ACCOUNTING SYSTEMS

STUDY OBJECTIVE 1

Page 5: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

•An important feature of a cost accounting system is the use of a perpetual inventory system. Such a system provides immediate, up-to-date information on the cost of a product.

• There are 2 basic types of cost accounting systems:

1) a job order cost system

2) a process cost system

COST ACCOUNTING SYSTEMS

Page 6: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

• Under a job order cost system, costs are assigned to each job.

• An example of a job would be the manufacture of a high-speed drilling machine.

• An example of a batch would be the printing of 225 wedding invitations.

• The objective is to calculate the cost per job.

COST ACCOUNTING SYSTEMS

Page 7: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

Job Order Cost System

Page 8: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

COST ACCOUNTING SYSTEMS

• Process costing accounts for and accumulates product-related costs for a period of time.

• A process cost system is used when a series of connected manufacturing processes or departments produce a large volume of similar products.

Page 9: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

PROCESS COST SYSTEMS

Page 10: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

Cost accounting involves the measuring, recording, and reporting of:

a. product costs.

b. future costs.

c. manufacturing processes.

d. managerial accounting decisions.

Chapter 21

Page 11: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

Cost accounting involves the measuring, recording, and reporting of:

a. product costs.

b. future costs.

c. manufacturing processes.

d. managerial accounting decisions.

Chapter 21

Page 12: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

• The flow of costs in job order cost accounting parallels the physical flow of the materials as they are converted into finished goods.

• There are 2 major steps in the flow of costs:1) accumulating the manufacturing costs incurred 2) assigning the accumulated costs to the work done

JOB ORDER COST FLOWSTUDY OBJECTIVE 2

Page 13: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

FLOW OF COSTS IN JOB ORDER COST ACCOUNTING

Page 14: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB ORDER COST ACCOUNTING SYSTEM

Job Order Cost AccountingJob Order Cost Accounting

Accum ulation Assignm ent1. Purchase raw m aterials 4. Raw m aterials are used2. Incur factory labor 5. Factory labor is used3. Incur m anufacuring 6. O verhead is applied

overhead 7. Com pleted goods arerecognized

8. Cost of goods sold isrecognized

Key to EntriesKey to Entries::

R a w M a te r ia ls In v e n t o r y( 1 ) P u r c h a s e s ( 4 ) M a t e r ia l s

u s e d

Factory Labor (2) Factory labor (5) Factory labor incurred used

M a n u f a c t u r i n g O v e r h e a dA c t u a l O v e r h e a d ( 6 ) O v e r h e a di n c u r r e d : a p p l i e d

( 3 ) D e p r e c i a t i o nI n s u r a n c eR e p a i r s

( 4 ) I n d i r e c tm a t e r i a l s u s e d

( 5 ) I n d i r e c tl a b o r u s e d

W o r k i n P r o c e s s I n v e n t o r y( 4 ) D i r e c t ( 7 ) C o s t o f

m a t e r i a l s u s e d c o m p l e t e d( 5 ) D i r e c t j o b s

l a b o r u s e d( 6 ) O v e r h e a d

a p p l i e d

F i n i s h e d G o o d s I n v e n t o r y( 7 ) C o s t o f ( 8 ) C o s t o f g o o d s

c o m p l e t e d s o l dj o b s

C o s t o f G o o d s S o l d( 8 ) C o s t o f g o o d s

s o l d

4 7

5

6

8

Page 15: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB ORDER COST FLOW

In a job order cost system, manufacturing costs are recorded in the period in which they are incurred.

The costs of raw materials purchased are debited to Raw Materials Inventory when the materials are received.

No effort is made at this point to associate the cost of materials with specific jobs or orders.

On January 4, Wallace Products Inc. purchases 2,000 handles at $5 per unit ($10,000) and 800 modules at $40 per unit ($32,000) for a total cost of $42,000.

D a t e A c c o u n t T i t l e s a n d E x p l a n a t i o n D e b i t C r e d i t( 1 )

J a n . 4 R a w M a t e r i a l s I n v e n t o r y A c c o u n t s P a y a b l e ( P u r c h a s e o f r a w m a t e r i a l s o n a c c o u n t )

42,00042,000

Page 16: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

MATERIALS INVENTORY CARD

Item: Handles Part No: AA2746Receipts Issues Balance

Date Units Cost Total Units Cost Total Units Cost Total1/4 2,000 $5 $10,000 2,000 $5 $10,000

• Raw Materials Inventory is a control account. The subsidiary ledger consists of individual records – in the form of:

1) mechanically or manually prepared accounts or cards or2) data files maintained electronically on disks or magnetic tape The card for Stock No. AA2746 following the purchase is

shown below.

Page 17: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB ORDER COST FLOW

• In a manufacturing company, the cost of factory labor consists of

1) gross earnings of factory workers

2) employer payroll taxes on such earnings

3) fringe benefits incurred by the employer

• Labor costs are debited to Factory Labor when they are incurred.

• Wallace Products incurs $32,000 of factory labor costs, of which $27,000 relates to wages payable and $5,000 relates to payroll taxes payable in January. The entry is:

D a t e A c c o u n t T i t l e s a n d E x p l a n a t i o n D e b i t C r e d i t( 2 )

J a n . 3 1 F a c t o r y L a b o r F a c t o r y W a g e s P a y a b l e E m p l o y e r P a y r o l l T a x e s P a y a b l e ( T o r e c o r d f a c t o r y l a b o r c o s t s )

32,000 27,000 5,000

Page 18: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB ORDER COST FLOW

Overhead costs may be recognized daily, as in the case of machinery repairs and the use of indirect materials and indirect labor.

Overhead costs may also be recorded periodically through adjusting entries. Property taxes, depreciation, and insurance are recorded periodically.

A summary entry for January overhead for Wallace Products Company is:

D a te A c c o u n t T it le s a n d E x p la n a t io n D e b it C re d it(3 )

J a n . 3 1 M a n u fa c tu r in g O v e rh e a d U t i l i t ie s P a y a b le P re p a id In s u ra n c e A c c o u n ts P a y a b le ( fo r re p a irs ) A c c u m u la te d D e p re c ia t io n P ro p e r ty T a x e s P a y a b le (T o re c o rd o v e rh e a d c o s ts )

13,8004,8002,0002,6003,0001,400

Page 19: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB COST SHEETSTUDY OBJECTIVE 3

A job cost sheet is a form used to record the costs chargeable to a specific job and to determine the total and unit cost of the completed job. Postings to job cost sheets are made daily.

Job Cost SheetJob No. _________________________________ Quantity ________________________________Item ___________________________________ Date Requested __________________________For ____________________________________ Date Completed __________________________

Direct Direct ManufacturingDate Materials Labor Overhead

Cost of completed job Direct materials $ Direct labor Manufacturing overheadTotal cost $

Unit cost (total dollars ÷ quantity) $

Page 20: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

MATERIALS REQUISITION SLIP

The authorization for issuing raw materials is made on a prenumbered materials requisition slip. As shown below, the requisition should indicate whether (1) the quantity and type of materials (direct or indirect) withdrawn and (2) the amount to be charged.

Wallace Manufacturing Company Materials Requisition Slip Deliver to: Assembly Department Req. No. R247 Charge to: Work in Process – Job No. 101 Date 1/6/02 Quantity Description Stock No. Cost Per Unit Total 200 Handles AA2746 $5.00 $1,000 Requested by: Received by: Approved by: Costed by:

Page 21: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB ORDER COST FLOW

•The requisition is prepared in duplicate. A copy is retained in the storeroom as evidence of the materials released; the original is sent to accounting, where the cost per unit and total cost of the materials used are determined.

•If $24,000 of direct materials and $6,000 of indirect materials are used in Wallace Products in January, the entry is as shown below.

D a t e A c c o u n t T i t l e s a n d E x p l a n a t i o n D e b i t C r e d i t( 4 )

J a n . 3 1 W o r k i n P r o c e s s I n v e n t o r yM a n u f a c t u r i n g O v e r h e a d R a w M a t e r i a l s I n v e n t o r y ( T o a s s i g n m a t e r i a l s t o j o b s a n d o v e r h e a d )

24,000 6,000 30,000

Page 22: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB COST SHEETS- DIRECT MATERIALS

The requisition slips show total direct materials costs of $12,000 for Job No. 101, $7,000 for Job No. 102, and $5,000 for Job No. 103. The posting of requisition slip R247 and other postings to the job cost sheets are shown in this illustration.

Page 23: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

MATERIALS INVENTORY CARD FOLLOWING ISSUANCES

The materials inventory record for Part No. AA2746, shows the posting of requisition slip R247 and an assumed requisition slip for 760 handles costing $3,800 on January 10 for Job 102, is shown below.

Item: Handles Part No: AA2746Receipts Issues Balance

Date Units Cost Total Units Cost Total Units Cost Total1/4 2,000 $5 $10,000 2,000 $5 $10,0001/6 200 $5 $1,000 1,800 $5 9,0001/10 760 $5 3,800 1,040 $5 5,200

Page 24: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

TIME TICKET

Factory labor costs are assigned to jobs on the basis of time tickets prepared when the work is performed. The time ticket should indicate the employee, the hours worked, the account and job to be charged, and the total labor cost. Work in Process Inventory is debited for direct labor and Manufacturing Overhead is debited for indirect labor.

Bob Kadler M.Cher

Page 25: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB ORDER COST FLOW

If the $32,000 total factory labor cost incurred in January consists of $28,000 of direct labor and $4,000 of indirect labor, the entry is as shown below.

D a t e A c c o u n t T i t l e s a n d E x p l a n a t i o n D e b i t C r e d i t( 5 )

J a n . 3 1 W o r k i n P r o c e s s I n v e n t o r yM a n u f a c t u r i n g O v e r h e a d F a c t o r y L a b o r ( T o a s s i g n l a b o r t o j o b s a n d o v e r h e a d )

28,000 4,000 32,000

Page 26: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB COST SHEETS - DIRECT LABOR

The labor costs chargeable to the three jobs are $15,000, $9,000, and $4,000. The postings to the direct labor columns of the job cost sheets should equal the posting of direct labor to Work in Process Inventory.

Page 27: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

FORMULA FOR PREDETERMINED OVERHEAD RATE

Study Objective 4

Estimated Annual Overhead Costs

Expected Annual Operating Activity÷ = Predetermined

Overhead Rate

• Manufacturing overhead is estimated and assigned to work in process and to specific jobs on an estimated bases through a predetermined overhead rate.

• This rate is established by the beginning of the year and is based on the relationship between estimated annual overhead costs and expected annual operating activity.

• This relationship is expressed in terms of a common activity base such as direct labor costs, direct labor hours, machine hours, or any other measure that will provide an equitable basis for applying overhead costs to jobs.

• The formula for the predetermined overhead rate is shown below.

Page 28: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB ORDER COST FLOW

At Wallace Products, direct labor cost is the activity base. Annual overhead costs are expected to be $280,000 and $350,000 of direct labor costs are anticipated. The overhead rate is 80% ($280,000 ÷ $350,000). Overhead applied for January is $22,400 ($28,000 X 80%) This application is recorded through the entry below.

D a t e A c c o u n t T i t l e s a n d E x p l a n a t i o n D e b i t C r e d i t( 6 )

J a n . 3 1 W o r k i n P r o c e s s I n v e n t o r y M a n u f a c t u r i n g O v e r h e a d ( T o a s s i g n o v e r h e a d t o j o b s )

22,400 22,400

Page 29: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

USING PREDETERMINED OVERHEAD

RATES

XActivity Base

Predetermined Overhead Rate

is assigned

to

Work in Process

and specific

jobs

Job 1 Job 2 Job 3

Page 30: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB COST SHEETS MANUFACTURING OVERHEAD

APPLIED

The debit of $22,400 to Work in Process Inventory equals the sum of the overhead assigned to jobs: Job 101 $12,000 Job 102 $7,200 Job 103 $3,200.

Page 31: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

PROOF OF JOB COST SHEETS TO WORK IN PROCESS INVENTORY

• At the end of each month, the balance in Work in Process Inventory should equal the sum of the costs

shown on the job cost sheets of unfinished jobs.• Assuming that all jobs are unfinished, proof of the

agreement of the control and subsidiary accounts in Wallace Products is shown below.

Page 32: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

COMPLETED JOB COST SHEETSTUDY OBJECTIVE 5

When a job is completed, the costs are summarized and the lower portion of the applicable job cost sheet is completed. If Job No. 101 is completed on January 31, the job cost sheet will show the following:

Page 33: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB ORDER COST FLOW

When a job is finished, an entry is made to transfer its total cost to Finished Goods Inventory. The entry for Wallace Products on January 31 is:

D a t e A c c o u n t T i t l e s a n d E x p l a n a t i o n D e b i t C r e d i t( 7 )

J a n . 3 1 F i n i s h e d G o o d s I n v e n t o r y W o r k i n P r o c e s s I n v e n t o r y ( T o r e c o r d c o m p l e t i o n o f J o b N o . 1 0 1 )

39,00039,000

Page 34: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

FINISHED GOODS RECORD•Finished Goods Inventory is a control account. It controls individual finished goods records in a finished goods subsidiary ledger.

•Postings to the receipts columns are made directly from completed job cost sheets.

•The finished goods inventory record for Job No. 101 is shown below.

Date Units Cost Total Units Cost Total Units Cost Total

1/31 1,000 $39 $39,000 1,000 $39 $39,000

Receipts Issues Balance

Item: Magnetic Sensors Job No: 101

Page 35: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

ASSIGNING COSTS TO COST OF GOODS SOLD

•Recognition of the cost of goods sold is made when each sale occurs.

•On January 31 Wallace Products sells Job No. 101, costing $39,000, for $50,000. The entries are:

Date Account Titles and Explanation Debit Credit (8) Jan. 31 Accounts Receivable Sales (To record sale of Job No. 101) 31 Cost of Goods Sold Finished Goods Inventory (To record cost of Job No. 101)

50,00050,000

39,00039,000

Page 36: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB ORDER COST SYSTEM FLOW OF COSTS

Flow of CostsFlow of Costs

Accum ulation Assignm ent1. Purchase raw m aterials 4. Raw m aterials are used2. Incur factory labor 5. Factory labor is used3. Incur m anufacuring 6. O verhead is applied

overhead 7. Com pleted goods arerecognized

8. Cost of goods sold isrecognized

Key to Entries:Key to Entries:

F a c to r y L a b o r( 2 ) 3 2 ,0 0 0 ( 5 ) 3 2 ,0 0 0

R a w M a t e r ia ls In v e n t o r y( 1 ) 4 2 ,0 0 0 ( 4 ) 3 0 ,0 0 0B a l . 1 2 ,0 0 0

M a n u f a c t u r i n g O v e r h e a d( 3 ) 1 3 , 8 0 0 ( 6 ) 2 2 , 4 0 0( 4 ) 6 , 0 0 0( 5 ) 4 , 0 0 0B a l . 1 , 4 0 0

F in is h e d G o o d s In v e n to r y( 7 ) 3 9 ,0 0 0 ( 8 ) 3 9 ,0 0 0

W o r k i n P r o c e s s I n v e n t o r y( 4 ) 2 4 , 0 0 0 ( 7 ) 3 9 , 0 0 0( 5 ) 2 8 , 0 0 0( 6 ) 2 2 , 4 0 0B a l . 3 5 , 4 0 0

C o s t o f G o o d s S o ld(8 ) 3 9 ,0 0 0

7

5

84

6

Page 37: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

FLOW OF DOCUMENTS IN A JOB ORDER COST SYSTEM

Flow of DocumentsFlow of Documents

Materials Requisition Slips

Labor Time Tickets

Predetermined Overhead Rate

Job Cost Sheet

Jobs Are Charged Through

Cost of Jobs is Summarized on a

The job cost sheet summarizes the cost of jobs completed and not completed at the end of the accounting period. Jobs completed are transferred to finished goods to await sale.

Page 38: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

COST OF GOODS MANUFACTURED SCHEDULE

WALLACE MANUFACTURING COMPANY Cost of Goods Manufactured Schedule For the Month Ended January 31, 2005 Work in process inventory, January 1 $ –0– Direct materials used $ 24,000 Direct labor 28,000 Manufacturing overhead applied 22,400 Total manufacturing costs 74,400 Total cost of work in process 74,400 Less: Work in process inventory, January 31 35,400 Cost of goods manufactured $ 39,000

The cost of goods manufactured schedule in job order costing is the same as in Chapter 20 with one exception: Manufacturing overhead applied, rather than actual overhead costs, is added to direct materials and direct labor to determine total manufacturing costs. The schedule is prepared directly from the Work in Process Inventory account.

Page 39: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

PARTIAL INCOME STATEMENT

WALLACE PRODUCTS INC. Income Statement For the Month Ended January 31, 2005 Sales $ 50,000 Less: Cost of goods sold Finished goods inventory, January 1 $ –0– Cost of goods manufactured 39,000 Cost of goods available for sale 39,000 Finished goods inventory, January 31 –0– Cost of goods sold 39,000 Gross profit $ 11,000

The cost of goods manufactured ($39,000) agrees with the amount

transferred from Work in Process Inventory to Finished Goods Inventory in journal entry No. 7 in Illustration 21-18.

Page 40: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

UNDER- OR OVERAPPLIED MANUFACTURING OVERHEAD

STUDY OBJECTIVE 6

• Underapplied overhead means that

1) manufacturing overhead has a debit balance.

2) the overhead assigned to work in process is less than the overhead incurred.

• Overapplied overhead means that

1) manufacturing overhead has a credit balance.

2) the overhead assigned to work in process is greater than the overhead incurred.

Page 41: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

UNDER- OR OVERAPPLIED MANUFACTURING OVERHEAD

• The existence of under- or overapplied overhead at the end of a month usually does not require corrective action by management.

• Under- or overapplied overhead is on the monthly balance sheet:

1) underapplied overhead is a prepaid expense (current asset).

2) overapplied overhead is unearned revenue (current liability).

Page 42: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

UNDER- OR OVERAPPLIED OVERHEAD

Page 43: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

UNDER- OR OVERAPPLIED MANUFACTURING OVERHEAD

• Any year-end balance in Manufacturing Overhead is eliminated by an adjusting entry.

• Under- or overapplied overhead is usually considered to be an adjustment to cost of goods sold.

• Thus, underapplied overhead is debited to Cost of Goods Sold and overapplied overhead is credited to Cost of Goods Sold.

• Wallace Products has a $2,500 credit balance in Manufacturing Overhead at December 31. The adjusting entry for the overapplied overhead is shown below.

2,500 2,500

Date Account Titles and Explanation Debit CreditDec. 31 Manufacturing Overhead

Cost of Goods Sold (To transfer overapplied overhead to cost of goods sold)

2,5002,500

Page 44: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

Work in Process Inventory is debited for all of the following except:

a. raw materials used.

b. manufacturing overhead incurred.

c. manufacturing overhead applied.

d. factory labor used.

Chapter 21

Page 45: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

Work in Process Inventory is debited for all of the following except:

a. raw materials used.

b. manufacturing overhead incurred.

c. manufacturing overhead applied.

d. factory labor used.

Chapter 21

Page 46: Job Order Cost System Chapter 21 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College Accounting Principles 7

JOB ORDER COST ACCOUNTING

Copyright © 2005 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that named in Section 117 of the United States Copyright Act without the express written consent of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information contained herein.