jnpc-ramky- presentation5-06-08

33
Welcome to Welcome to Jawaharlal Nehru Jawaharlal Nehru Pharma City Pharma City Parawada Parawada Visakhapatnam Visakhapatnam

Upload: api-3711757

Post on 10-Apr-2015

855 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: JNPC-Ramky- Presentation5-06-08

Welcome toWelcome to

Jawaharlal Nehru Pharma CityJawaharlal Nehru Pharma CityParawadaParawada

VisakhapatnamVisakhapatnam

Page 2: JNPC-Ramky- Presentation5-06-08

LOCATIONLOCATIONRamky Pharmacity site is located between 17˚37’ 30”N &17˚42’ 30” N &83˚02’ 30”E &83˚07’30”ESituated in Parawada Mandal, 33 KM’s South ofVisakhapatnam Town

Airport : Visakhapatnam (25 KM)

Major Port(VPT) : Visakhapatnam (30 KM)Minor Port : Gangavaram (20KM)

Railway Station : Duvvada (8KM)

Page 3: JNPC-Ramky- Presentation5-06-08

INTRODUCTIONINTRODUCTION Jawaharlal Nehru Pharma City (JNPC) is India’s Jawaharlal Nehru Pharma City (JNPC) is India’s

first Sector Specific industrial park to house first Sector Specific industrial park to house Bulk Drug, Pharmaceutical & allied Fine Bulk Drug, Pharmaceutical & allied Fine Chemical manufacturing Industries.Chemical manufacturing Industries.

RAMKY GROUP is the developer for this RAMKY GROUP is the developer for this prestigious project.prestigious project.

The Project is under Public – Private The Project is under Public – Private partnership model on BOO basis.partnership model on BOO basis.

APIIC is a partner from Government of Andhra APIIC is a partner from Government of Andhra PradeshPradesh

Page 4: JNPC-Ramky- Presentation5-06-08

INTRODUCTIONINTRODUCTION The Park is being developed in an The Park is being developed in an

extent of 2140 Acres of Landextent of 2140 Acres of Land

611 acres of the total land is being 611 acres of the total land is being allotted for Setting up a Sector Specific allotted for Setting up a Sector Specific Special Economic Zone.Special Economic Zone.

RAMKY PHARMACITY (INDIA) LIMITED is RAMKY PHARMACITY (INDIA) LIMITED is the developer for Special Economic the developer for Special Economic Zone.Zone.

Page 5: JNPC-Ramky- Presentation5-06-08

LAND USE ANALYSISLAND USE ANALYSISLAND USE (2142.02 Acres)LAND USE (2142.02 Acres) ACRESACRES %%

Special and Hazardous Industrial ZoneSpecial and Hazardous Industrial Zone 1427.001427.00 66.7766.77

Commercial Hub & Services AreaCommercial Hub & Services Area 47.1047.10 2.20 2.20

CETP & Hazardous Waste Management CETP & Hazardous Waste Management facilityfacility

93.8493.84 4.384.38

WTP/UG AreaWTP/UG Area 7.907.90 0.360.36

RoadsRoads 207.12207.12 9.679.67

Green Buffer - Open SpacesGreen Buffer - Open Spaces 221.21221.21 10.2810.28

Green Buffer under HT CorridorGreen Buffer under HT Corridor 72.1572.15 3.373.37

Green Buffer along Site boundaryGreen Buffer along Site boundary 58.9558.95 2.752.75

Non Processing Area (SEZ)Non Processing Area (SEZ) 4.754.75 0.180.18

Page 6: JNPC-Ramky- Presentation5-06-08

Our Partners in DevelopmentOur Partners in Development JTC Jurong, Singapore – Master Plan DesignersJTC Jurong, Singapore – Master Plan Designers

Price Water house Coopers – Advisors and Price Water house Coopers – Advisors and Consultants for SEZConsultants for SEZ

Ernst & Young – Marketing Associates to deal with Ernst & Young – Marketing Associates to deal with clientele across the worldclientele across the world

Bureau Veritas – Design Review and Inspection of Bureau Veritas – Design Review and Inspection of Park development and to support environmental Park development and to support environmental infrastructure & also acting as our quality checkinginfrastructure & also acting as our quality checking

agencyagency

Bulk Drug Manufacturers Association – Setting up Bulk Drug Manufacturers Association – Setting up unitsunits

Page 7: JNPC-Ramky- Presentation5-06-08

COMMON FACILITIESCOMMON FACILITIES Uninterrupted Quality Power Supply by Uninterrupted Quality Power Supply by

APEPDCLAPEPDCL

Treated Water through Water Treatment PlantTreated Water through Water Treatment Plant

Wide Roads with blistering street lightingWide Roads with blistering street lighting

Common Effluent Treatment PlantCommon Effluent Treatment Plant

Hazardous Waste Management FacilityHazardous Waste Management Facility

Marine Outfall for disposal of treated effluentsMarine Outfall for disposal of treated effluents

Effluent & Storm water ConveyanceEffluent & Storm water Conveyance

Page 8: JNPC-Ramky- Presentation5-06-08

COMMON FACILITIESCOMMON FACILITIES Logistics hub, Chemical Feedstock, Container Logistics hub, Chemical Feedstock, Container

terminals & Common Warehouse facilityterminals & Common Warehouse facility

A dedicated Telephone Exchange connected with A dedicated Telephone Exchange connected with

high speed data transfer internet facilityhigh speed data transfer internet facility

Central Fire Protection ServicesCentral Fire Protection Services

Emergency Medical CentreEmergency Medical Centre

Amenities viz., Bank, ATM, Food Courts, Club House Amenities viz., Bank, ATM, Food Courts, Club House

& Post office& Post office

Conference/Seminar hallConference/Seminar hall

Page 9: JNPC-Ramky- Presentation5-06-08

COMMON FACILITIESCOMMON FACILITIES Mini Convention CentreMini Convention Centre

Housing ProjectHousing Project

An exclusive Petrol & Diesel dispensing outletAn exclusive Petrol & Diesel dispensing outlet

Police out postPolice out post

A full fledged State-of-the-art laboratory to A full fledged State-of-the-art laboratory to

undertake simple to complex analysis. undertake simple to complex analysis.

Page 10: JNPC-Ramky- Presentation5-06-08

Power Infrastructure

The Power is being supplied through 220KVA/133KVA/33KVA Substation.

Present Consumption – 40 MVA Total Demand – 130 MVA Completed the Stinging of 33 KVA – 67 km 11 KVA – 44 KM

Page 11: JNPC-Ramky- Presentation5-06-08
Page 12: JNPC-Ramky- Presentation5-06-08

Police Out PostPolice Out Post

Page 13: JNPC-Ramky- Presentation5-06-08

Emergency Medical CentreEmergency Medical Centre

Page 14: JNPC-Ramky- Presentation5-06-08

Club HouseClub House

Page 15: JNPC-Ramky- Presentation5-06-08

ServicesServices

Page 16: JNPC-Ramky- Presentation5-06-08
Page 17: JNPC-Ramky- Presentation5-06-08

COMMON EFFLUENT COMMON EFFLUENT TREATMENT PLANTTREATMENT PLANT

A State-of-the-art common Effluent A State-of-the-art common Effluent Treatment Plant to treat effluents Treatment Plant to treat effluents before disposal through a marine before disposal through a marine outfall to sea.outfall to sea.

Well designed Network of closed Well designed Network of closed conduit Sewerage lines for efficient conduit Sewerage lines for efficient collection and discharge of industrial collection and discharge of industrial effluents, sewage and storm water .effluents, sewage and storm water .

Page 18: JNPC-Ramky- Presentation5-06-08

Land FillLand Fill

Page 19: JNPC-Ramky- Presentation5-06-08

LANDFILLLANDFILL

A highly secured Landfill as per State A highly secured Landfill as per State and Ministry of Environment and Ministry of Environment guidelinesguidelines

Facility for hazardous waste Facility for hazardous waste collection in the site premisescollection in the site premises

Page 20: JNPC-Ramky- Presentation5-06-08

WATER TREATMENT PLANTWATER TREATMENT PLANT

To Treat Raw water received from To Treat Raw water received from Yeleru canal and supply of potable Yeleru canal and supply of potable water.(The water is being drawn water.(The water is being drawn from perinnial river Godavari.from perinnial river Godavari.

Capacity: 20 MLDCapacity: 20 MLD Distribution: Through Distribution: Through HDPEHDPE pipe pipe

line network.(line network.(30KM30KM Length Length Completed out of Completed out of 33.50KM33.50KM) Up to ) Up to the receiving point of industry.the receiving point of industry.

Page 21: JNPC-Ramky- Presentation5-06-08
Page 22: JNPC-Ramky- Presentation5-06-08

ClarifloculatorClarifloculator

Page 23: JNPC-Ramky- Presentation5-06-08

Environment Infrastructure at JNEnvironment Infrastructure at JNPharma City Pharma City

Effluent ConveyanceEffluent Conveyance Common Effluent Treatment Common Effluent Treatment

PlantPlant Marine OutfallMarine Outfall

Page 24: JNPC-Ramky- Presentation5-06-08

Common Effluent Treatment Common Effluent Treatment Plant (C.E.T.P.)Plant (C.E.T.P.)

To treat Segregated Effluents To treat Segregated Effluents received from Industries at received from Industries at Pharmacity to Discharge Pharmacity to Discharge StandardsStandards

Total Length of pipe line 40Total Length of pipe line 40

KMKM(Completed (Completed 22KM22KM ,Work in ,Work in progress progress 18 KM)18 KM)

Page 25: JNPC-Ramky- Presentation5-06-08

Effluent TanksEffluent Tanks

Page 26: JNPC-Ramky- Presentation5-06-08

IncienratorIncienrator

Page 27: JNPC-Ramky- Presentation5-06-08

Guard PondGuard Pond

Page 28: JNPC-Ramky- Presentation5-06-08

Air Stripping ProcessAir Stripping Process

Page 29: JNPC-Ramky- Presentation5-06-08

Salient Features of JN Pharma Salient Features of JN Pharma City - CETPCity - CETP

Separate Low TDS & High TDS effluent Separate Low TDS & High TDS effluent conveyance Pipe Line Network.conveyance Pipe Line Network.

Air Strippers for removal of VOC’sAir Strippers for removal of VOC’s

Providing Submersible Mixers in Providing Submersible Mixers in equalization tanks for homogeneous equalization tanks for homogeneous mixingmixing

Incinerator / regenerative thermal Incinerator / regenerative thermal Oxidiser for destruction of VOC’sOxidiser for destruction of VOC’s

Page 30: JNPC-Ramky- Presentation5-06-08

Fully automated Cyclic Biological Fully automated Cyclic Biological Activated Sludge Treatment Plant Activated Sludge Treatment Plant

Separate Treatment for Cyanides, Heavy Separate Treatment for Cyanides, Heavy Metals & other wastes.Metals & other wastes.

All Environmental Infrastructure Facilities All Environmental Infrastructure Facilities within the Park – Effluent Conveyance, within the Park – Effluent Conveyance, CETP, Marine Outfall, Incinerator, TSDF CETP, Marine Outfall, Incinerator, TSDF etc..etc.. Bureau Veritas (BVQI) as Third Party Bureau Veritas (BVQI) as Third Party inspection agency for Designs verification inspection agency for Designs verification

Page 31: JNPC-Ramky- Presentation5-06-08

MARINE OUTFALLMARINE OUTFALL

A World class highly secured A World class highly secured 16 KM 16 KM (355mm) (355mm) length cross country two length cross country two way way HDPEHDPE pipeline up to the shore pipeline up to the shore and and 1.7 KM (315mm) 1.7 KM (315mm) in to the sea bedin to the sea bed

A diffuser at a water depth of about A diffuser at a water depth of about 18m in the Bay of Bengal for effluent 18m in the Bay of Bengal for effluent disposal with high dispersion.disposal with high dispersion.