jnpc-ramky- presentation5-06-08
TRANSCRIPT
Welcome toWelcome to
Jawaharlal Nehru Pharma CityJawaharlal Nehru Pharma CityParawadaParawada
VisakhapatnamVisakhapatnam
LOCATIONLOCATIONRamky Pharmacity site is located between 17˚37’ 30”N &17˚42’ 30” N &83˚02’ 30”E &83˚07’30”ESituated in Parawada Mandal, 33 KM’s South ofVisakhapatnam Town
Airport : Visakhapatnam (25 KM)
Major Port(VPT) : Visakhapatnam (30 KM)Minor Port : Gangavaram (20KM)
Railway Station : Duvvada (8KM)
INTRODUCTIONINTRODUCTION Jawaharlal Nehru Pharma City (JNPC) is India’s Jawaharlal Nehru Pharma City (JNPC) is India’s
first Sector Specific industrial park to house first Sector Specific industrial park to house Bulk Drug, Pharmaceutical & allied Fine Bulk Drug, Pharmaceutical & allied Fine Chemical manufacturing Industries.Chemical manufacturing Industries.
RAMKY GROUP is the developer for this RAMKY GROUP is the developer for this prestigious project.prestigious project.
The Project is under Public – Private The Project is under Public – Private partnership model on BOO basis.partnership model on BOO basis.
APIIC is a partner from Government of Andhra APIIC is a partner from Government of Andhra PradeshPradesh
INTRODUCTIONINTRODUCTION The Park is being developed in an The Park is being developed in an
extent of 2140 Acres of Landextent of 2140 Acres of Land
611 acres of the total land is being 611 acres of the total land is being allotted for Setting up a Sector Specific allotted for Setting up a Sector Specific Special Economic Zone.Special Economic Zone.
RAMKY PHARMACITY (INDIA) LIMITED is RAMKY PHARMACITY (INDIA) LIMITED is the developer for Special Economic the developer for Special Economic Zone.Zone.
LAND USE ANALYSISLAND USE ANALYSISLAND USE (2142.02 Acres)LAND USE (2142.02 Acres) ACRESACRES %%
Special and Hazardous Industrial ZoneSpecial and Hazardous Industrial Zone 1427.001427.00 66.7766.77
Commercial Hub & Services AreaCommercial Hub & Services Area 47.1047.10 2.20 2.20
CETP & Hazardous Waste Management CETP & Hazardous Waste Management facilityfacility
93.8493.84 4.384.38
WTP/UG AreaWTP/UG Area 7.907.90 0.360.36
RoadsRoads 207.12207.12 9.679.67
Green Buffer - Open SpacesGreen Buffer - Open Spaces 221.21221.21 10.2810.28
Green Buffer under HT CorridorGreen Buffer under HT Corridor 72.1572.15 3.373.37
Green Buffer along Site boundaryGreen Buffer along Site boundary 58.9558.95 2.752.75
Non Processing Area (SEZ)Non Processing Area (SEZ) 4.754.75 0.180.18
Our Partners in DevelopmentOur Partners in Development JTC Jurong, Singapore – Master Plan DesignersJTC Jurong, Singapore – Master Plan Designers
Price Water house Coopers – Advisors and Price Water house Coopers – Advisors and Consultants for SEZConsultants for SEZ
Ernst & Young – Marketing Associates to deal with Ernst & Young – Marketing Associates to deal with clientele across the worldclientele across the world
Bureau Veritas – Design Review and Inspection of Bureau Veritas – Design Review and Inspection of Park development and to support environmental Park development and to support environmental infrastructure & also acting as our quality checkinginfrastructure & also acting as our quality checking
agencyagency
Bulk Drug Manufacturers Association – Setting up Bulk Drug Manufacturers Association – Setting up unitsunits
COMMON FACILITIESCOMMON FACILITIES Uninterrupted Quality Power Supply by Uninterrupted Quality Power Supply by
APEPDCLAPEPDCL
Treated Water through Water Treatment PlantTreated Water through Water Treatment Plant
Wide Roads with blistering street lightingWide Roads with blistering street lighting
Common Effluent Treatment PlantCommon Effluent Treatment Plant
Hazardous Waste Management FacilityHazardous Waste Management Facility
Marine Outfall for disposal of treated effluentsMarine Outfall for disposal of treated effluents
Effluent & Storm water ConveyanceEffluent & Storm water Conveyance
COMMON FACILITIESCOMMON FACILITIES Logistics hub, Chemical Feedstock, Container Logistics hub, Chemical Feedstock, Container
terminals & Common Warehouse facilityterminals & Common Warehouse facility
A dedicated Telephone Exchange connected with A dedicated Telephone Exchange connected with
high speed data transfer internet facilityhigh speed data transfer internet facility
Central Fire Protection ServicesCentral Fire Protection Services
Emergency Medical CentreEmergency Medical Centre
Amenities viz., Bank, ATM, Food Courts, Club House Amenities viz., Bank, ATM, Food Courts, Club House
& Post office& Post office
Conference/Seminar hallConference/Seminar hall
COMMON FACILITIESCOMMON FACILITIES Mini Convention CentreMini Convention Centre
Housing ProjectHousing Project
An exclusive Petrol & Diesel dispensing outletAn exclusive Petrol & Diesel dispensing outlet
Police out postPolice out post
A full fledged State-of-the-art laboratory to A full fledged State-of-the-art laboratory to
undertake simple to complex analysis. undertake simple to complex analysis.
Power Infrastructure
The Power is being supplied through 220KVA/133KVA/33KVA Substation.
Present Consumption – 40 MVA Total Demand – 130 MVA Completed the Stinging of 33 KVA – 67 km 11 KVA – 44 KM
Police Out PostPolice Out Post
Emergency Medical CentreEmergency Medical Centre
Club HouseClub House
ServicesServices
COMMON EFFLUENT COMMON EFFLUENT TREATMENT PLANTTREATMENT PLANT
A State-of-the-art common Effluent A State-of-the-art common Effluent Treatment Plant to treat effluents Treatment Plant to treat effluents before disposal through a marine before disposal through a marine outfall to sea.outfall to sea.
Well designed Network of closed Well designed Network of closed conduit Sewerage lines for efficient conduit Sewerage lines for efficient collection and discharge of industrial collection and discharge of industrial effluents, sewage and storm water .effluents, sewage and storm water .
Land FillLand Fill
LANDFILLLANDFILL
A highly secured Landfill as per State A highly secured Landfill as per State and Ministry of Environment and Ministry of Environment guidelinesguidelines
Facility for hazardous waste Facility for hazardous waste collection in the site premisescollection in the site premises
WATER TREATMENT PLANTWATER TREATMENT PLANT
To Treat Raw water received from To Treat Raw water received from Yeleru canal and supply of potable Yeleru canal and supply of potable water.(The water is being drawn water.(The water is being drawn from perinnial river Godavari.from perinnial river Godavari.
Capacity: 20 MLDCapacity: 20 MLD Distribution: Through Distribution: Through HDPEHDPE pipe pipe
line network.(line network.(30KM30KM Length Length Completed out of Completed out of 33.50KM33.50KM) Up to ) Up to the receiving point of industry.the receiving point of industry.
ClarifloculatorClarifloculator
Environment Infrastructure at JNEnvironment Infrastructure at JNPharma City Pharma City
Effluent ConveyanceEffluent Conveyance Common Effluent Treatment Common Effluent Treatment
PlantPlant Marine OutfallMarine Outfall
Common Effluent Treatment Common Effluent Treatment Plant (C.E.T.P.)Plant (C.E.T.P.)
To treat Segregated Effluents To treat Segregated Effluents received from Industries at received from Industries at Pharmacity to Discharge Pharmacity to Discharge StandardsStandards
Total Length of pipe line 40Total Length of pipe line 40
KMKM(Completed (Completed 22KM22KM ,Work in ,Work in progress progress 18 KM)18 KM)
Effluent TanksEffluent Tanks
IncienratorIncienrator
Guard PondGuard Pond
Air Stripping ProcessAir Stripping Process
Salient Features of JN Pharma Salient Features of JN Pharma City - CETPCity - CETP
Separate Low TDS & High TDS effluent Separate Low TDS & High TDS effluent conveyance Pipe Line Network.conveyance Pipe Line Network.
Air Strippers for removal of VOC’sAir Strippers for removal of VOC’s
Providing Submersible Mixers in Providing Submersible Mixers in equalization tanks for homogeneous equalization tanks for homogeneous mixingmixing
Incinerator / regenerative thermal Incinerator / regenerative thermal Oxidiser for destruction of VOC’sOxidiser for destruction of VOC’s
Fully automated Cyclic Biological Fully automated Cyclic Biological Activated Sludge Treatment Plant Activated Sludge Treatment Plant
Separate Treatment for Cyanides, Heavy Separate Treatment for Cyanides, Heavy Metals & other wastes.Metals & other wastes.
All Environmental Infrastructure Facilities All Environmental Infrastructure Facilities within the Park – Effluent Conveyance, within the Park – Effluent Conveyance, CETP, Marine Outfall, Incinerator, TSDF CETP, Marine Outfall, Incinerator, TSDF etc..etc.. Bureau Veritas (BVQI) as Third Party Bureau Veritas (BVQI) as Third Party inspection agency for Designs verification inspection agency for Designs verification
MARINE OUTFALLMARINE OUTFALL
A World class highly secured A World class highly secured 16 KM 16 KM (355mm) (355mm) length cross country two length cross country two way way HDPEHDPE pipeline up to the shore pipeline up to the shore and and 1.7 KM (315mm) 1.7 KM (315mm) in to the sea bedin to the sea bed
A diffuser at a water depth of about A diffuser at a water depth of about 18m in the Bay of Bengal for effluent 18m in the Bay of Bengal for effluent disposal with high dispersion.disposal with high dispersion.
MOF PIPE LINEMOF PIPE LINEENTERING IN TO ENTERING IN TO
SEASEA
Thank You