j< pit.nann inter department ^--j a:orrtdlrnty transmittal

6
piT.nann Ergineerirrg a:orrtdlrnty Inter Department Document Transmittal ^--J .-6.ilal6- aikll=:,rti J"< @ a- alrnl-o aiLi From (Dept) : Bridge/ Tunnel Date : l3-July- 2011 To (Dept) : QA/QC Ref. No. : SAFA WP-0011, Transmittal #00012 Project Name: Madina Road & Al Amal Road Intersection Please check appropriate box: O As Built O Bill of Quantities O Certificate O Drawing O EngineeringCalculation D InspectiurRequest [] Joborder D Request for krformation (RFI) [] Schedule O Shop Drawing fJ Test Reports O Procedrre/ Methodology C Bank Wananty D Others (please specifr) r ,. Purpose: D For Your Informatim v For Your Review & Approval [] As Requested Subject : OVM-MENA for Pre-stressing System Pot Bearing Expansion Joint Document Description: Sr. No. i Document Number OVM-MENA for Pre-stressing System Pot Bearing Expansion Joint {P.M,) 4 Name : Shakil Ahmed/ Department Manager Receiving Department Review & Approval Status D Approved As Submitted (workmay proceed) O Approved As Noted (work may proceed as noted) O Re-submittal Required f] Submittal tncomplete D D t] { Comments: - AVM- mEtUA 1 FoyL ?trt ks p f,-v|'€ur SP€ eATt C*"il c^Lc . Date: i 0 J

Upload: others

Post on 15-Jun-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: J< piT.nann Inter Department ^--J a:orrtdlrnty Transmittal

piT.nannErgineerirrg a:orrtdlrnty

Inter DepartmentDocument Transmittal

^--J.-6.ilal6-aikll=:,rti

J"<

@a- alrnl-o aiLi

From (Dept) : Bridge/ Tunnel Date : l3-July- 2011

To (Dept) : QA/QC Ref. No. : SAFA WP-0011, Transmittal #00012

Project Name: Madina Road & Al Amal Road Intersection

Please check appropriate box:O As BuiltO Bill of Quantities

O Certificate

O Drawing

O EngineeringCalculation

D InspectiurRequest

[] Joborder

D Request for krformation (RFI)

[] Schedule

O Shop Drawing

fJ Test Reports

O Procedrre/ Methodology C Bank Wananty

D Others (please specifr) r ,.

Purpose:

D For Your Informatim v For Your Review & Approval [] As Requested

Subject : OVM-MENA for Pre-stressing System Pot Bearing Expansion Joint

Document Description:

Sr. No. i Document Number

OVM-MENA for Pre-stressing System Pot BearingExpansion Joint

{P.M,) 4Name : Shakil Ahmed/ Department Manager

Receiving DepartmentReview & Approval Status

D Approved As Submitted (workmay proceed)

O Approved As Noted (work may proceed as noted)

O Re-submittal Required

f] Submittal tncomplete

DDt]{

Comments: - AVM- mEtUA 1 FoyL ?trt

ks p f,-v|'€ur SP€ eATt C*"il c^Lc .

Date: i 0 J

Page 2: J< piT.nann Inter Department ^--J a:orrtdlrnty Transmittal
Page 3: J< piT.nann Inter Department ^--J a:orrtdlrnty Transmittal
Page 4: J< piT.nann Inter Department ^--J a:orrtdlrnty Transmittal
Page 5: J< piT.nann Inter Department ^--J a:orrtdlrnty Transmittal
Page 6: J< piT.nann Inter Department ^--J a:orrtdlrnty Transmittal