jerime enriquez molina-2 (2)

3

Click here to load reader

Upload: rowel-magbanua

Post on 03-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jerime Enriquez Molina-2 (2)

7/29/2019 Jerime Enriquez Molina-2 (2)

http://slidepdf.com/reader/full/jerime-enriquez-molina-2-2 1/3

Jerime Enriquez Molina92 Doctora’s Compound, Mayapa, Calamba city 0906-2775660

 [email protected] [email protected]

WORK EXPERIENCE

Technical Service Engineer : DHL Excel Supply ChainLISP I Cabuyao, Laguna

 April 25, 2012- PresentDuties and Responsibilities :

Monitors the equipment ( ASRS, Full Pallet Delivery System, Full case Conveyors,Palletizers Radio Display Terminals.

Quickly coordinates the status of Equipment to the Owner and Supervisor for immediate resolution of any problem

Ensure to meet the Equipment Safety, Reliability, and Availability and escalate any

issue encountered within the shift. Responsible for maintaining the Health of Housekeeping, Tools, and CIL audit on the

assigned equipment and able to perform the Gap Analysis on the result.

Manage and assign Improvement Projects on the Team

Participate/Lead on the Execution of AM and PM Pillar activities.

Facilities Engineer : Hoya Glass Disk Philippines Inc.,Laguna Technopark ,Biñan, Laguna

 August 31, 2010 – April 23, 2012Basic Function

Supervise the Shift Operations Group in the operation and maintenance of plant utilitiesequipment, such as Water Treatment Facilities, Air Compressor, Steam Boiler, etc. to ensurecontinuous and stable supply of utility to the factory. 

Duties and Responsibilities :

Plan and organize maintenance resources during the shift.

Ensure that the approved standard operating procedures are being followed.

Coordinate with other section regarding the status and condition of plant utilitysupply.

Provide solutions to operations problems during the shift.

Determines priorities based on production requirements and efficient utilization of manpower.

Decide schedule and proper method of repair on the facilities equipment. Analyze operating data and make necessary corrective action.

Maintain necessary spares and materials needed on the operations of utilitiesequipment.

Make report and countermeasures in the problems to improve the operatingconditions.

Train and develop subordinates.

Page 2: Jerime Enriquez Molina-2 (2)

7/29/2019 Jerime Enriquez Molina-2 (2)

http://slidepdf.com/reader/full/jerime-enriquez-molina-2-2 2/3

Maintenance/Equipment Engineer : Ionics EMS. Inc.Carmelray Industrial Park II,Brgy. Tulo,Calamba City

 August 10, 2009 – August 30, 2010

2nd level machine trouble shooting

Monthly preventive maintenance

Spare parts control and monitoring Feeder repair and calibration

Recommend approval of external machine repair and calibration

production support in the smt line

Cadet Engineer : EMS Components Assembly Inc. 117- A Technology Avenue, Laguna Technopark, Biñan, LagunaOctober 13 - December 31, 2008

On-the-Job Trainee : Philips Semiconductor Philippines Inc. Light Industry and Science Park I, Cabuyao, LagunaPreventive Maintenance (Electrical Department)

March 25 – June 25, 2006

EDUCATIONAL ATTAINMENT

Tertiary : Polytechnic University of the Philippines Sto. Tomas, Batangas

Major : Bachelor of Science in Electrical Engineering June 2003 – April 2008

Secondary : Rizal Institute Don BoscoCanlubang, Calamba City (March 29, 2003 graduate)

Primary : Canlubang Elementary School

Canlubang, Calamba City (April 07, 1999 graduate)

ACHIEVEMENTRegistered Electrical Engineer License No. 0042205September 2008

SEMINARS ATTENDED

June 04-08, 2012 : Allen Bradley Logix 500 (Programmable Logic Controller)

DHL Excel Supply ChainFebruary 20, 2011 : Fire Brigade and Disater Awareness 

Hoya Glass Disk Large Con/Camp Vicente Lim ( Sponsored by : Hoya Glass Disk Philippines)February 20, 2011 : Smart Grid Technology 

Balibago,Sta. Rosa Laguna (Sponsored by: IIEE Norther Laguna Chapter)

September 22, 2010 : Energy Efficiency Opportunity Through Vibration analysis  – Motor ApplicationBalibago,Sta. Rosa Laguna (Sponsored by: IIEE Norther Laguna Chapter)

July 21, 2010 : Guide for Electrical Testing and InspectionBalibago,Sta. Rosa Laguna (Sponsored by: IIEE Norther Laguna Chapter)

Page 3: Jerime Enriquez Molina-2 (2)

7/29/2019 Jerime Enriquez Molina-2 (2)

http://slidepdf.com/reader/full/jerime-enriquez-molina-2-2 3/3

 May 19, 2007 : MAK-BAN Geothermal Power Plant Operations

MBGPPC Science Information Center 

AFFILIATIONS

Vice-President (Internal) : Junior Institute of Integrated Electrical Engineers of the Philippines, Inc. (2007-2008Public Relation Officer : Society of Electrical Engineering Student (2005-2006)Member : Institute of Integrated Electrical Engineers of the Philippines, Inc. (2008- Present)

HIGHLIGHTS OF QUALIFICATIONS

1.  Knowledgeable in MS Office applications.2.  Skilled in electrical designs, troubleshooting, motor control and installations.

3.  Strong Interpersonal Skills.4.  Good Communication Skills.5.  Knowledgeable in Surface Mount Technology6.  Basic knowledge on PLC

PERSONAL DETAILS

Birth date : May 16, 1986 Age : 26 years old Citizenship: Filipino

Birthplace : Canlubang, Calamba City Civil Status : SingleHeight : 5 ft. 7 in. Religion : Roman CatholicWeight : 63Kg. Language Spoken : English and Filipino

CHARACTER REFERENCE

 Available Upon Request 

I hereby certify that the above information and records are true and correct to the best of my knowledge, belief and ability.

Jerime E. Molina Applicant