jawaharlal nehru technological university …hipointcollege.com/mdhipoint.pdf · ·...
TRANSCRIPT
COMPLIANCE REPORT FOR A.Y 2010-11
1
eUNIVERSITY ACADEMIC AUDIT CELL
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
Name and Address of the Institution: Hi-Point College Of Engineering and Technology
Chilkoor(V), Moinabad(M), R.R. Dist. Hyd 501 504
Tel: 08413 235144 / 145, Fax: 08413 235166
Email: [email protected]
Website: www.hipointcollege.com
Name of the Educational Society : Hi Point Educational Society
Status : Non-Minority
Number and names of the College(s) run by the Society: No
If yes, give details
Number and names of the College(s) run by the society in the same premises:
(If more than one college, give details)
Name of University to which the College(s) is/are affiliated: JNTUH, KUKATPALLY
Whether the same premises is used to run the colleges / courses affiliated to different
Universities: No
If yes give the details :
Type of the Institution : Engg. &Tech. (Co-Ed) (Pl. tick categories)
College Code : D8
Courses with specialization for which affiliation is sought, with AICTE/PCI sanctioned intake:
S. No. Name of the
Degree*
Specialization** 4th
Year
2007-08
3rd
Year
2008-09
2nd
Year
2009-10
AICTE
Sanctioned
1st Year intake
2010-11
Whether
NBA/NAAC
Accredited. If so,
mention Grade
1 B.Tech Civil Dept. - - - - - - 60 - -
2 B.Tech EEE Dept. - - 60 60 60 - -
3 B.Tech ECE Dept. 60 60 60 120 - -
4 B.Tech CSE Dept. 30 30 60 60 - -
5 B.Tech IT Dept. 30 30 60 60 - -
6
7.
8.
9.
TOTAL INTAKE YEARWISE 120 180 240 360
TOTAL EXISTING INTAKE SSUG= SSPG= SSUG+SSPG=
UG B.Tech
SSUG Total approved UG intake for all years put together; SSPG Total approved PG intake for all years put together * Name of the Degree: B.Tech.
COMPLIANCE REPORT FOR A.Y 2010-11
2
ESSENTIAL REQUIREMENTS:
A. LAND:
i) Land Area: ___16___acres __7____ guntas;
ii) Land Registration:
Date of Registration: _____06.07.1994________________
iii) Land Conversion Certificate: Issued by __Tahsildar, Chilkoor(V), Moinabad(M)_____ on
dated _02.09.2010___ for __Engineering College__ purpose.
iv) Building Plan in the name of the proposed institution prepared by Architect and Approved by
Competent authority: Issued by __Structural Engineers & Architects_ on
dated _28.03.2002_.
v) Whether the said land is demarcated by Compound wall/fencing for the institution: Yes
vi) All weather Approach Road Available: Earthen Rd
vii) Power & Water supply:
viii)Drinking Water Availability: Municipal water/ bore well water (pl. tick).
If bore well water, is water being purified by demineralization plant:
If no, water
B. BUILT UP AREA (Sqmt):
i) Administrative and Amenities Carpet Area in Sqm
Program Number of rooms
required
Number of rooms
available
Defi-ciency
Area required Area available
Deficiency
Main office
Engg / Integrated
01 01 300 410
Others Institutes
01 - - 150 - -
Misc. Office Space Engg/Int/Others 01 01 200 250
Boy’s Common room
Engg / Integrated
01 01 100 100
Others 01 - - 75 - -
Girl’s Common room
Engg / Integrated
01 01 100 100
Others 01 - - 75 - -
Cafeteria Any Program 01 01 150 200
Toilets Engg/Int 01 04 350 360
Others 01 - - 150 - -
Faculty Rooms Any program No of
faculty 05 No of faculty x
05 sqm = 250
Cabin for HOD Any program M = No of
Depts = 05 M x 10 sqm = 100
Total (Admin + Amenities) area 19 1670
COMPLIANCE REPORT FOR A.Y 2010-11
3
ii) Instructional Area & Standby Generator:
Instructional Area Required area in Sq Meters
Available area
Deficiency
Class rooms Engg /Pharmacy/ Management/MCA (SSUG / 60) x 66 = 990 4010
Tutorial Rooms Engg /Pharmacy/ Management/MCA 0.25 x (SSUG / 60) x 33 = 2000
Tutorial Rooms (PG) for PG courses other than MBA, MCA (SSPG / 18) x 33 = - -
Research laboratory (PG) (Engg/Pharmacy/) 66 * Specialization = - -
Workshops for (Mech/Civil/Prod/Electrical/Chemical/ Marine/ Aeronautical and allied)
Min of (3 x No. of courses x 200) or ( 4 x 200) =
600
Workshop (remaining Engg/Tech Circuit courses & for New Colleges)
200
Drawing Hall (Engg) 132 150
Seminar Hall for (MBA) ; D= One Division of 60 Students 132 x (D x 2) / 4 = - -
Seminar Halls for others 132 x No. of Courses =
(For new Institution One hall)
- -
Laboratories (Engg/Tech) * See footnote (for four years) No. of Courses x 10 x 66 = 3403
Laboratories (Pharmacy) * * See footnote (for four years) 12 x 75 = - -
Laboratories (MCA) (for three years) 4 x 66 = - -
Animal House (Pharmacy) @ 75 - -
Computer Centre (Engg/Tech/MBA/PGDM/MCA) 150 180
Computer Centre(Pharmacy) 75 - -
Multimedia PCs, Subscription to e-journals, NPTEL 10 29
Library & Reading Room (Engg) 400
For Intake>420,
Required area=400+ (intake-420)*50/60
426
Library & Reading Room (Pharmacy) B.Pharm/ Pharma.D. No. of Programs x 150= - -
Library & Reading Room (MBA/MCA) No. of Programs x 100= - -
Standby Generator (capacity) 62.5 KVA (one) 15KVA
Additional 5 labs / Course if number of Divisions are more than 2 / Course
* As per JNTUH Syllabus, for First year Engg. Class work, the following labs are required: 1) English Language
Communication Skills Lab [ √ ] 2) Computer Programming Lab [√ ] 3) Physics Lab [√ ] 4) Chemistry Lab [√ ]
5) IT Workshop [√ ], 6) Engineering Workshop [√ ] Pl. tick if available [√ ]
** As per JNTUH Syllabus, for first year class work, the following Pharmacy labs are required: 1) Remedial Biology
Lab [ ] 2) Dispensary & Hospital Pharmacy Lab - I [ ] 3) Pharm. Inorganic Chemistry lab [ ] , 4) Pharmaceutical
Organic Chemistry lab-I [ ] 5) Anatomy and Physiology lab [ ] 6) English Language Communication Skills Lab [ ] .
Pl. tick if available [√]
COMPLIANCE REPORT FOR A.Y 2010-11
4
C. COMPUTERS:
Total No. of Computers available: _140_
Computers /Students ratio:
Norms: Available ratio Deficiency
Engg (UG): 1: 4; _____1:3_______ ______- -_____
Pharma (UG/PG): 1: 6; ______- -_______ ______- -_____
MBA/MCA: 1: 2 ______- -_______ ______- -_____
M.Tech: 1: 2 _______________ _____________
D. INTERNET BANDWIDTH:
Norms: Actually available Deficiency
Engg: 2 Mbps/intake of 240 ___2 MBPS__ _____- -______
MBA/MCA: 2 Mbps/intake of 240; _____ - -_____ _____- -______
Pharm: 1 Mbps/intake of 240 _____- -______ _____- -______
(This is excluding exam branch internet connectivity)
E. NO. OF LEGAL SOFTWARE (System s/w and Application s/w):
Norms: Actually Available Deficiency
Engg (UG) /MCA: 3 System s/w / 20 application s/w ______4_______ _____- -_____
MBA : 1 / 10 ______- -_____ _____- -_____
Pharma (UG/PG) : 1 / 10 ______- -_____ ____- -_____
F. FACULTY:
i) Principal Name : Dr. Syed Fazal Mehdi
Director’s Name (in case of Integrated Campus):
Date of Birth : 30.03.1946 Age: _64_ yrs. _10_ months (age < 70 yrs. Engg Ph.D’s)
Qualifications: Ph.D in Sciences (Pl. tick)
Date of appointment in the present institution: 20.09.2010
Principal appointment University Ratified : No [ ]
(LETTER SUBMITTED TO JNTU FOR RATIFICATION)
COMPLIANCE REPORT FOR A.Y 2010-11
5
Details of Teaching staff members (Permanent Faculty only). Passport Size Photo Graphs of the Teaching staff members
(department wise) is also to be attached:
S.No Name of staff Member Dept. Designation Qualification Experience
(years)
Date of
Appointment
Scale of
pay Photos
University ratified
Yes/No
1
Syed Bader Anwar EEE
Asso.
Prof. M.Tech 10 01.10.2008
As per
AICTE
No
2 A Hathi Ram
EEE Asst. Prof. M.Tech 3 20.04.2010
As per
AICTE
No
3 N Dilleshwar Rao
EEE
Asst. Prof.
M.E 2 12.07.2010
As per
AICTE
No
4 B Naresh Kumar
EEE
Asst. Prof.
B.Tech 1 20.08.2009
As per
AICTE
No
COMPLIANCE REPORT FOR A.Y 2010-11
6
5 Uday Sai Kiran
EEE
Asst. Prof.
B.Tech 1 30.03.2010
As per
AICTE
No
6.
Shaik Jhani Basha ECE Asso.
Prof. M.Tech 7 06.07.2010
As per
AICTE
No
7. E Sammaiah
ECE
Asso.
Prof. M.Tech 7 01.08.2010
As per
AICTE
No
8. C Chandrashekar
ECE Asst. Prof.
M.Tech 2.5 14.10.2008
As per
AICTE
No
COMPLIANCE REPORT FOR A.Y 2010-11
7
9. D Srikanth
ECE Asst. Prof.
B.Tech 1 06.10.2010
As per
AICTE
No
10. P Krishnamurthy ECE Asst. Prof. M.Tech 2 25.08.2010 As per
AICTE
No
11. V Balasubramanyam
ECE Asst. Prof.
B.Tech 10.5 16.11.2001
As per
AICTE
No
12 S Noor Mohammed ECE Asst. Prof. B.Tech 1 03.11.2010 As per
AICTE
No
13 K Archana
ECE Asst. Prof
B.Tech 2.5
As per
AICTE
No
COMPLIANCE REPORT FOR A.Y 2010-11
8
14 Shaik Mazhar
Hussain
ECE Asst. Prof
M.Tech
As per
AICTE
No
15 Deepamala ECE Asst. Prof. B.Tech As per
AICTE
No
16 Abdul Shahid ECE Asst. Prof. M.Tech 3 03.12.2007 As per
AICTE
No
17 Md Manan Mujahid
ECE Asst. Prof.
B.E 7 09.07.2010
As per
AICTE
No
18 B Kotesh
ECE Asst. Prof.
B.Tech 1 08.09.2010
As per
AICTE
No
19 Syed Zubair Ahmed CSE Asst. Prof. M.Tech 3.8 01.04.2007 As per
AICTE
No
20 Syed Asadullah
Hussaini
CSE Asst. Prof. M.Tech 1.2 06.07.2010
As per
AICTE
No
COMPLIANCE REPORT FOR A.Y 2010-11
9
21 Syed Ghouse
CSE Asst. Prof.
B.Tech 0.2 01.11.2010
As per
AICTE
No
22 Mohammed Zuber
CSE Asst. Prof.
M.Tech
As per
AICTE
No
23 Ranjith Choudhry
CSE Asst. Prof.
M.E 1.5 15.07.2009
As per
AICTE
No
24 K Lal Bahadur
CSE Asst. Prof.
B.Tech 2 06.07.2010
As per
AICTE
No
25 V Mary
CSE Asst. Prof.
(M.Tech)
As per
AICTE
No
COMPLIANCE REPORT FOR A.Y 2010-11
10
26 Zia ul Haq
CSE Asst. Prof.
B.Tech 0.4 08.09.2010
As per
AICTE
No
27 Waseemuddin
Farooqui
CSE Asst. Prof.
B.Tech 0.7 27.05.2010
As per
AICTE
No
28 Khaja Azamuddin IT
Asst. Prof.
M.Tech 4 25.04.2007
As per
AICTE
No
29 Mohammed Ghouse
Pasha
IT Asst. Prof.
M.Tech 3.5 18.07.2007
As per
AICTE
No
30 M Aruna
IT Asst. Prof.
B.Tech 3.5 13.04.2010
As per
AICTE
No
31 Maheswari
IT Asst. Prof.
B.Tech 1 16.07.2010
As per
AICTE
No
COMPLIANCE REPORT FOR A.Y 2010-11
11
32 Mohammed Akber K
IT Asst. Prof.
B.Tech 1.5 01.12.2010
As per
AICTE
No
33 M Osman toufiq H&S Asso.
Prof.
M.Sc,
M.Phil 10 07.10.2003
As per
AICTE
No
34 M Fayaz Pasha H&S
Asst. Prof.
M.Sc 3 20.02.2010
As per
AICTE
No
35 Mohammed Wasim
H&S Asst. Prof.
M.Sc 3 16.10.2009
As per
AICTE
No
36 Shujath Ahmed Khan
H&S Asst. Prof.
M.B.A 5 15.05.2005
As per
AICTE
No
COMPLIANCE REPORT FOR A.Y 2010-11
12
37 Mujeeb ur Rahman
H&S
Asso.
Prof. M.E 3.5 13.10.2008
As per
AICTE
No
38 Vijay Bhaskar Reddy
H&S Asst. Prof.
B.Tech 1.5 01.12.2010
As per
AICTE
No
39 Rafeeq Uzzama
Siddiqui
H&S Asst. Prof.
M.Sc 2 11.11.2010
As per
AICTE
No
40 Mohammed Minhaj
H&S Asst. Prof.
M.Sc 2 01.11.2010
As per
AICTE
No
41 G Radhika
H&S Asst. Prof.
M.B.A 2 11.03.2010
As per
AICTE
No
COMPLIANCE REPORT FOR A.Y 2010-11
13
42 M Santosh Kumar
H&S Asst. Prof.
M.Li.Sc 7
As per
AICTE
No
43 S.A.S Phani Kumar
H&S Asst. Prof.
M.A
As per
AICTE
No
46 Lalith Kumar
H&S Asst. Prof.
M.Sc
As per
AICTE
No
47 J Padmaja
H&S
Asso.
Prof. M.Sc
As per
AICTE
No
48 As per
AICTE
No
49 As per
AICTE
No
50 As per
AICTE
No
51 As per
AICTE
No
COMPLIANCE REPORT FOR A.Y 2010-11
14
ii) Consolidated Teaching Faculty Position Department wise:
S. No. Department
Courses being offered by
the department
(with AICTE/ JNTUH
sanctioned intake)
No. of Faculty members
available in the Dept. on
full time basis Prof + Assoc Prof + Asst Prof
Total
1 HSS 360 + +
2 EEE 60 + +
3 ECE 120 + +
4 CSE 60 + +
5 IT 60 + +
6 CIVIL 60 + +
7 + +
8 + +
9 + +
10 + +
11 + +
12 + +
13 + +
Faculty Student Ratio :
Norms: Actual Deficiency
Engg (UG) / Pharm=1:15 _______ __ ____ - -_____
Engg/Pharm (PG) =1:12 ____- -___ _____- -____
MBA/MCA = 1:15 ___- -______ ______- -_____
The cadre ratio should be 1: 2: 6 (Professor / Associate Professor / Assistant Professor)
* Faculty to be considered as full time are those who are qualified as per AICTE requirements
** Faculty/ student ratio of a dept. shall not be less than 1: 20 for 2nd
, 3rd
and 4th years of B.Tech
programmes, whereas for four years of B.Tech, the overall ratio should be 1: 15. For PG Courses:
At least two batches of students must have passed out in the relevant discipline with all JNTUH norms and
standards being fulfilled.
One professor with Ph.D. in concerned discipline and two Associate/Asst Professors with minimum
M.Tech qualifications are necessary, exclusive of UG load.
iii) Total Staff Position of the College/Institution
Total No. of Teaching Faculty Total No. Labs & Supporting Staff*
47
7
* Faculty to supporting staff (Programmers/Lab Assistants/Technicians) ratio should be 1:1.25
iv) Appointment/Ratification of Faculty through University Selection Committee.
No.of faculty ratified by University: _0__ out of total ___43____ = ___0___ %
COMPLIANCE REPORT FOR A.Y 2010-11
15
G. LIBRARY BOOKS & JOURNALS:
PP = 500 for Engg , Pharmacy, MBA,, MCA PP = 200 for PG Courses in Engg /Pharmacy
QQ = 250 for Engg:, QQ = 500 for Pharmacy, MBA, MCA QQ = 100 for PG courses in Engg , Pharmacy, RR = 100 for UG and RR = 50 for PG
MM = 6 for for Engg / Pharmacy, MM = 12 for MBA, MCA NN = 3 for Engg NN = 6 for Pharmacy NN = 12 for MBA, MCA
If Second Division starts in a later year than the first Division then PP = 0, RR = 0 in the subsequent divisions of the same course
Digital Library: 15 computer systems; subscription to e-journals and also to NPTEL learning materials.
H. Examination Branch Facility: (Norms)
Computers (Three P4 Configuration and above) : 4
High Speed Copier Machines (One) : 2
Fax and Phones (One and One) : 2
Printers (at least one laser printer) (Two) : 3
Internet Bandwidth (1 Mbps) : 2 MBPS
(Exclusive of Computer lab connectivity)
Confidential room for question paper preparation :
The examination branch should be located adjacent to the Principal’s room.
DESIRABLE REQUIREMENTS:
1) Institute Website: www.hipointcollege.com
2) Transport Facility (for staff and Students): __- -____ buses for staff, _- -_buses for students
3) Potable Drinking water facility (minimum 600 ltrs/day): YES
4) Sports facility (Indoor & Outdoor) : YES
5) Auditorium 1000 capacity : NO
6) Professional chapters such as IEEE, ISTE, etc: NO
Course
Name
D = One Division is 60 students = 1
Division wise Starting Year
No. of Volumes required (PP x D) + (QQ x D) x (2010 – Starting Year)
No. of Volumes available
Deficiency
Total Titles Required
RR + (50 x (2010 – Starting Year))
No. of Titles Available
Deficiency
National Journals required
MM x D
Nat Jour available
Deficiency
Inter National Journals required
NN x D
Int.nat jour available
Deficiency
E Journals
Available
at actual
CIV 3
EEE 5
ECE 3
CSE 3
IT 1
Total 7019 1005 11 18
COMPLIANCE REPORT FOR A.Y 2010-11
16
7) Boys/Girls hostel facility: NO
8) Faculty/Staff Quarters: NO
9) Bank/Post Office/Stores/ Photocopy machine/Public Telephone:
N/ N / Y / Y / N
10) Placement and Training Cell: YES
11) Industry – Institute Interaction Cell and MOU with Industry/ R&D Units: NO
12) Entrepreneurship Development Cell (EDC): NO
13) NSS/ NCC/ YOGA Club: NO
14) Medical & First Aid Facility: YES
ACADEMIC PERFORMANCE: (Documentary Proof is Mandatory)
1. (a). Overall Pass Percentages in First Year ___________ %
(b). Overall Pass Percentage in 2nd
Year ___________ %
(c). Overall Pass Percentage in 3rd
Year ___________ %
<20% / 21-40% / 41-60% / 61-80% / > 80%
2. Overall Pass Percentage in Final Year ___________ %
< 50 % / 51-60 % / 61-70 % / 71-80 % / > 80%
(Data to be verified with Director of Evaluation, JNTUH)
3. No. of students placed on/off campus: (for the past three years)
5-7%
4. No. of seminars/conferences organized by Institution in the past
academic year: NO 5. No. of Teachers deputed for faculty development programmes
in the past academic year:
a) 6 -for Short-Term Programmes
b) 11 -for M.Tech.
3 -for Ph.D.
6. No. of International/National Journal papers published by faculty - - -
and students of the institute in the past academic year:
7. No. of International/National conference papers presented by faculty - - -
and students of the institute in the past academic year:
INSTITUTION PARAMETERS: Documentary Proof is Mandatory
1. NO. OF GOVERNING BODY MEETINGS HELD IN THE PAST ONE ACADEMIC YEAR:
(Presence of JNTUH nominee mandatory)
FIVE
OUTCOME OF MEETING: BRIEF WRITE UP.
2. PLEASE ENCLOSE AUDITED INCOME & EXPENDITURE STATEMENT OF COLLEGE FOR
PAST FINANCIAL YEAR:
COMPLIANCE REPORT FOR A.Y 2010-11
17
Please answer the following with either YES (Y) or NO (N)
1. Is the institute sharing the premises with other institute ( N )
2. Is the institute sharing the staff with other institute ( N )
3. Is the institute sharing the laboratory space with other institutes ( N )
4. Is the institute sharing the laboratory equipment with other institute ( N )
5. Is the institute running the courses not approved by the university ( N )
6. Is the institute located at the place for which approval of AICTE,
Government and JNTUH has been sanctioned? ( Y )
7. Are there students studying who are not registered with this institute ( N )
Other Information:
(A) Response on the Complaints received on the College:
(Complaints shall be provided by the University, if any)
(B) Any other Observations/Comments (Not More than 50 words):
COMPLIANCE REPORT FOR A.Y 2010-11
18
DECLARATION
Certified that:
a. The Institute is not offering any academic programme, which is not approved by JNTUH.
b. No other University has been approached for affiliation of the institute/courses mentioned in
this application.
c. All Courses are conducted as per norms, standards and guidelines of the JNTUH and all the
rules and regulations of the university are being followed as specified from time to time.
d. All the physical deficiencies stated in the last approval letter for UG & PG programmes have
been rectified (for existing institutions).
e. The AICTE / PCI scales of pay and allowance have been granted to the teaching faculty and
other staff.
f. The teaching faculty and staff have been recruited as per qualification and experience as laid
down by the AICTE / PCI / JNTUH norms.
g. The tuition and the other fee are charged within the criteria prescribed by the Competent
Authorities.
h. The accounts of the institution are being maintained as per the provisions of relevant statutes
duly audited by a Chartered Accountant.
i. The intake in any of the JNTUH approved courses has not been increased beyond the
sanctioned intake, without prior approval from the University.
j. The building and premises in which the institution is functioning is not being utilized for any
other courses/ programmes which are not approved by the AICTE.
I solemnly declare that information has not been with held and all the information provided in
this application form is true. If any information is found to be incorrect or false, I understand that
the proposal shall be liable for rejection.
Name and Signature of the Name and Signature of the
Chairperson/Secretary of the Society Head of the Institution