january 23d 20 09 P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

Upload: tyler-francis-cooper

Post on 28-Jan-2016

220 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

1

Rail freight corridor Rotterdam - Genoa

from sea to sea

together for success

Page 2: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

2

Agenda

Background and objectives

goals achieved so far

1

2

3

4

Organisation of programme

Work programme

Page 3: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

3

Agenda

Background and objectives1

Page 4: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

4

Corridor Rotterdam-Genoa

5 IM‘s

Transport volume in 2005: 28.5 bn tkm2020e: 56,6 bn tkm

Corridor lengthGeography: 1.400 kmTotal: 2.100 km

40 Intermodal terminals2 Sea ports6 Inland ports

1. Background, objectives

Page 5: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

5

Densely populated Highly urbanised London, Amsterdam, Brussels, Frankfurt, Basle, Zurich and Milan

Links the most active economic regions in Europe

Major industries

Freight Corridor links economic regions

Source: Wirtschaftsräume in Europa (Klett)Source: Gert-Jan Hospers 2002, 2003.

1. Background, objectives

Page 6: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

6

Strategic objectives

Develop European rail freight

services

Meet market requirements

Shift traffic from road to rail

1. Background, objectives

Reliability+26%

Capacity+52% Time

-20%IM-Cost-10–15%

Expected Achievements

Page 7: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

7

Create interoperability

CP

BR

NS

SNCB/

NMBS

PKP

SNCF

MAVSBB/CFF/FFS ÖBB

CD

DSB

SNCFR

BDZ

FS

OSE

NSB SJ

VR

DB AG

CFL

JZ

HZSZ

RENFE

UZ

EVR

LDZ

LG

CFM

BZD

ZBH

ZSR

IE

HSH

EBICAB 700/L 10000

EBICAB 900

ZUB 123

AWS

ATB/ATB-NG

TVM/KVB

ASFA/LZB

EBICAB 700

SIGNUMZUB

BACC/SCMT

EVM

SHP

IINDUSI / LZB

INDUSI/LZB

TBL

LS 90

Non electrified

Powerrail DC

1,5 kV DC3 kV DC15 kV 16 2/3 Hz 25 kV 50 Hz3 kV DC/ 25 kV 50 Hz

ATC system

One locomotive

One CCS system

Harmonised operational procedures

Harmonised power systems

Enhanced cross border procedures

Simplified procedures for customers C

reat

e In

tero

per

abil

ity

1. Background, objectives

Page 8: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

8

Multicourante E-locs crossing borders

1. Background, objectives

Page 9: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

9

increase competitiveness of rail freight

Source: ERIM interim report, pp. 9, 13, based on TEN-STAC data

300-500 500-700 700-1000

>1000

2005

2020

17.0

15.1 19.5 22.217.3 16.1 22.6 27.1

[km]

[%]

Modal split rail

Traffic increase rail

Throughput sea ports

28.5 bn tkm in 2005

56.6 bn tkm in 2020e

19.6% in 200523.1% in

2020e

Rotterdam 376 Mio. t in 2005

Genoa 50 Mio. t in 2005

1. Background, objectives

Page 10: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

10

Agenda

Organisation of programme 2

Page 11: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

11

Political commitments: LOI

A working group will improve the quality of railtraffic on the Corridor

Establish an EU deployment plan for ERTMS

Implement ERTMS on the freight corridor

+ +

EEIG

Corr

idor

Rott

erd

am

– G

en

oaMinistries of

NL, DE, CH, ITLugano 2003

EC, CER, UIC, EIM, UINIFE,

Brussels 2005

Ministries ofNL, DE, CH, ITBregenz 2006

2. Organisation of programme

Page 12: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

12

Working Programme of EEIG

TAF TSI

- Process Gap Analysis- Monitoring of other TAF projects- Value added services

ERTMS

- Technical Interoperability- Tendering & Rollout- Homologation & Cross Acc.

Operations

- Operational Rules- Traffic Management- Training of Personnel

Capacity

- Corridor Traffic Forecast - Elimination of Bottlenecks- Infrastructure Parameters

Traffic Quality

- OSS Optimization- Traffic Performance- Improving Quality- Int. Capacity Allocation

Terminal Studies

- Performance Parameters- Criteria of Terminals- Criteria of Ports- Improvement Options

2. Organisation of programme

Page 13: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

13

ProRail

DB RFISBB*BLS*

WGCsPIMs

Programme Management Office

Management Committee

Executive Board

CER & ERFAandtwo

designated RU’s from

each country

RUAdvisory

Board

ProRail

DB RFISBB*BLS*

WGCsPIMs

Programme Management Office

Management Committee

Executive Board

ProRail DB RFISBB*BLS*

WGCs

Committee of IM

Executive Board of IM , MoT

&

Cooperation of Infra Managers & RU’s

2. Organisation of programme implementation and the EEIG

Page 14: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

14

Agenda

goals achieved so far3

Page 15: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

15

Organisational results

Integrated working organisation set up

for the corridor

Strategic business plan developed as the

starting point of all activities

Corridor working groups established

Implementation plan which contains all

actions and measures

Monitoring and reporting process

3. goals achieved so far

Page 16: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

16

• April 2007 = 8.7 days

• May 2008 = 6.4 days

time for international ad hoc train pathtime for international ad hoc train path

Quality of services has been improved:

by reducing response time

3. goals achieved so far

Page 17: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

17

by streamlining train paths

2007 2009Annual time table process

3. Work programme and goals achieved so far

Page 18: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

18

by harmonising the timetable adjustments

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

200612 intermediate adjustm

20075 intermediate adjustments

AnnualTime table change

3. goals achieved so far

Page 19: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

19

Betuweline in NL: 2007

4.8 b €

Page 20: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

20

Lötchberg base tunnel in CH: 2007

4.7 b €

Page 21: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

21

Agenda

Work programme4

4. Work programme

Page 22: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

22

Debottleneck capacity to meet future demands

Rotterdam

Köln

Basel

BelDo

Milano

No

Genova

EmmerichVenlo

Mainz/Wiesbaden

Mannheim

Rotterdam

Köln

Basel

BelDo

Milano

No

Genova

EmmerichVenlo

Mainz/Wiesbaden

Mannheim

Rotterdam

Köln

Basel

BelDo

Milano

No

Genova

Emmerich

Mainz/Wiesbaden

Mannheim

Rotterdam

Köln

Basel

BelDo

Milano

No

Genova

2020

EmmerichVenlo

Mainz/Wiesbaden

Mannheim

ChiLi Li LiLi

ChiChiChi

Betuweroute16.06.2007 / 4580 M

Lötschberg15.06.2007 / 2800 M

Piattaf. Luino2007 / 445 M

Katzenberg

2012 / 340 M

3 tr. RütiCastione,

Giubiasco

Oberhausen2004

Osterpai2007

Ka-Offenbg4 track 2004

Blocksection2011 / 90 M

Gotthard 2017 / 5900 M

Ceneri 2019 / 1400 M

Ok – use < 80% Critical - use 80 – 100 %

Bottleneck - use > 100 %

2015 2010 2008

Venlo

Offbg.-Kenzgn. 2019

Rastatt Süd 2015

3. Track E-O

2013

4. Work programme

Page 23: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

23

Total future investments

0

1000

2000

3000

4000

5000

6000

7000

NL=213 DE=4558 CH=5742 IT=6781

2008

2009-2025

19221 166

4392

382

5360

16,5

6764

Total = 17.3 b €2008 = 0.586 b €2008 = 0.586 b €

Figures in [Mio. €]

4. Work programme

Page 24: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

24

Capacity enlargements in near future

Gotthard base tunnel

Karlsruhe - Basel

4. workpgromme

Page 25: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

25

scope includes terminals and end-customers

4. Work programme

Page 26: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

26

ETCS operations on the corridor in 2015

Train borneTrack side

2.3.0 d

3

3*

3

≥ 2.3.0

d

3

3

3

4. workprogramme

Page 27: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

27

Corridor: part of EU masterplan freight

Page 28: January 23d 2009P. Brugts 1 Rail freight corridor Rotterdam - Genoa from sea to sea together for success

january 23d 2009 P. Brugts

28

Thank you for your attention

EEIG CorridorRotterdam-GenoaStefan Wendel

Managing Director

Phone +49-(0)69-265-45440Fax +49-(0)69-265-45442Mobil +49-(0)[email protected]

EEIG CORRIDOR EEIG CORRIDOR ROTTERDAM- ROTTERDAM-

GENOAGENOA

Peter Brugts

Ministry of Transport Netherlands

[email protected]

+31(0)652596045