Jan '09 Positron Target Status 1
Positron Target Prototype - Status
Leo Jenner
Jan '09 Positron Target Status 2
Overview
• Then
• Now
• Simulations
• Thermal Calibration
• Project plan
• Outstanding Issues
Jan '09 Positron Target Status 3
ILC
Jan '09 Positron Target Status 4
Jan '09 Positron Target Status 5
Jan '09 Positron Target Status 6
• Magnetic simulations at DL
• Vector Fields Opera with Elektra rotation solver
• Magnet modelled as two coils
• Calculate expected power losses from eddy currents as wheel rotates, and resistive force this generates
• Spoked modelling taking place at RAL ( J. Rochford )
Jan '09 Positron Target Status 7
Jan '09 Positron Target Status 8
The plan is still the same…
• Sweep in parameter space of B-Field, Rotation Speed and Immersion (1 T, 2000 rpm, 50 mm)
• Observation of kicks as spokes traverse field
• Measurement of eddy currents by torque and direct heating ( Lei Zang: PhD student, Liv )
• Study of rotor-dynamics (LLNL: accelerometers)
Jan '09 Positron Target Status 9
Torque measured
480 revolutions per minute reached so far
Jan '09 Positron Target Status 10
1st data with magnet on! ( 300 rpm , 0.1T )