Page 1: Jacobs Vane and top of Gin-Pole Hap welded and rebuilt the pivots on the vane. Hap designed and fabricated the cross arms for the gin-pole

Jacobs Vane and top of Gin-Pole

Hap welded and rebuilt the pivots on the vane.

Hap designed and fabricated the cross arms for the gin-pole.

Page 2: Jacobs Vane and top of Gin-Pole Hap welded and rebuilt the pivots on the vane. Hap designed and fabricated the cross arms for the gin-pole

The first step was to gather all the parts.

Page 3: Jacobs Vane and top of Gin-Pole Hap welded and rebuilt the pivots on the vane. Hap designed and fabricated the cross arms for the gin-pole

Then assemble the parts into something that works.

Page 4: Jacobs Vane and top of Gin-Pole Hap welded and rebuilt the pivots on the vane. Hap designed and fabricated the cross arms for the gin-pole

In position!

Page 5: Jacobs Vane and top of Gin-Pole Hap welded and rebuilt the pivots on the vane. Hap designed and fabricated the cross arms for the gin-pole

Grey

Page 6: Jacobs Vane and top of Gin-Pole Hap welded and rebuilt the pivots on the vane. Hap designed and fabricated the cross arms for the gin-pole

Time to test the system

It Works!

CLICK ON ABOVE BLOCK FOR VIDEO.

Page 7: Jacobs Vane and top of Gin-Pole Hap welded and rebuilt the pivots on the vane. Hap designed and fabricated the cross arms for the gin-pole

Next we will raise the Gin-Pole to the top of the tower.

Finally, we will lower the Jacobs Turbine to the ground.