Introduction Office of County Executive Steven R. Schuh
• Michelle Corkadel, Constituent Services Officer
Anne Arundel County Department of Public Works• Masoud Ghatineh, P.E., Project Manager
Design Consultant – BayLand Consultants & Designers, Inc.• Sepehr Baharlou, P.E., Project Manager
Meeting Purpose• Increase Community Awareness of the Project• Provide Project Overview and Status Update• Respond to Questions
2
Project Goals Protect park from shoreline erosion
Enhance water quality of the Chesapeake Bay
Address County MS4/TMDL permit requirements
Improve public access to the waterway
Support recreational boating dredging program
3
Project Overview Shoreline Protection
• Living shoreline
Waterway Access• Soft (natural) canoe/kayak launch
Dredged Material Placement• Place dry material from Idlewilde DMP Site
4
Jack Creek Park
58 acres
5
Shoreline Protection 1994 Aerial Photo
6
Shoreline Protection 2014 Aerial Photo
7
Shoreline Protection 2014 VS 1994 Aerial Photo
• 6 acres lost due to erosion
8
Shoreline Protection Existing shoreline conditions
9
Bay Front Jack Creek
Along the Point
Shoreline Protection Living Shorelines
• Controls shoreline erosion• Provides a productive, natural shoreline• Strategic placement of plants, stone, sand fill and other
structural and organic materials• Implemented through a variety of shoreline protection
methods
10
Shoreline Protection Stone structures provide erosion protection Sand fill provides planting terrace Marsh plantings provide flood protection and habitat
enhancement
11
Shoreline Protection Protects 1,488 LF of
shoreline Restores 58,811 SF of
tidal marsh
12Preliminary Concept Plan
Waterway Access Access Road
13
Parking Launch Area
Preliminary Concept Plan
Waterway Access Launch Area
• Soft (natural) canoe/kayak launch• Natural shoreline
14
Waterway Access Access shoreline through existing trail Provide ADA compliant surface Incorporate launch area into living shoreline design
15
Waterway Access Parking
• 20 car parking spots (no trailers)• Permeable grass paving
16
Waterway Access Access Road
• Follow existing gravel road• Gravel surface to the parking area• Trail to water will be permeable gravel (ADA compliant)• Controlled access (gate) will remain
17
Dredged Material Placement Place dry material from Idlewilde DMP Site
18
Dredged Material Placement Idlewilde DMP Site primarily used for South County
recreational dredging projects such as:• Parish Creek (Federal and County channels)• Rockhold Creek Jetty • Broadwater Creek• Church Creek• West River, etc…
All materials are tested before dredging• Metals• Pesticides & PCBs• Priority pollutants volatiles & semi-volatiles• Total of 149 parameters
19
Dredged Material Placement Jack Creek Park placement area
20
Dredged Material Placement Place dry material from Idlewilde DMP Site
• 14,000 cubic yards• 3-acre area• Amend soil with lime and fertilizer• Cover with 6 inches of topsoil• Shape to form natural land features• Re-seed with meadow mix
Create small wetlands (rain garden) Restore to existing use and vegetative cover
21
Dredged Material Placement Truck Route
• Idlewilde Road to Snug Harbor Road – ½ mile
22
Dredged Material Placement Example
23
During Placement After
Schedule
Project has been split into two phases
Phase 1: Dredged Material Placement• Under construction – to be completed in 2 months
Phase 2: Living Shoreline & Waterway Access• Design completed• Federal, State and County permitting underway• To be constructed in 12 to 18 months
24
Discussion
25