J TOMLINSON LIMITED Your Complete Building Solution

Company Profile

Page 2: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

J Tomlinson is a £50 million business with 350 directly employed staff and operatives. Our services encompass every aspect of the construction life cycle.

J Tomlinson’s business is split into three main operating centres:

Construction One of our key business strengths is our public sector experience. J Tomlinson project teams have successfully completed projects for Education, Healthcare, Leisure, Commercial, Industrial and High Security clients, ranging from School extensions to Divisional Police Headquarters.

…INTRODUCTION

M&E Installations Maintenance

Page 3: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Unit 9 Newmarket CourtNewmarket DriveDerbyDE24 8NW

Unit 40 Thurnscoe Business CentrePrincess DriveThurnscoeRotherhamS63 0BL

Scimitar House, 100 Lilac Grove, Beeston, NottinghamNG91PF

…ORGANISATIONAL & STRUCTURE

21 Scholes LaneScholesCleckheatonBD19 6NS

…Offices …Management

Pat CassidyManaging Director

Dave YatesSenior

Estimator

Karl ReiterSenior Design

Engineer

Carl DerrickDirector M&E

Projects

Glen DowningSenior

Contracts Engineer

Gary DraperProject

Manager

Martin Gallagher

Construction Director

Support Services

Estimating, Surveying &

Buying

Adam DraperOperations Mgr

Construction Projects

Peter WoodsOperations Mgr

Construction Partnering

Project Operations

Peter JubbBusiness

Development DirectorProjects

Pat CassidyManaging Director

Dave YatesSenior

Estimator

Karl ReiterSenior Design

Engineer

Carl DerrickDirector M&E

Projects

Glen DowningSenior

Contracts Engineer

Gary DraperProject

Manager

Martin Gallagher

Construction Director

Support Services

Estimating, Surveying &

Buying

Adam DraperOperations Mgr

Construction Projects

Peter WoodsOperations Mgr

Construction Partnering

Project Operations

Business Development

Page 4: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

No.58964

Gold Level, No. QE6639

No.F381500/HV004670

No. 68132

No. 003943000

No. 184592

Joint Industry Board for the ElectricalContracting Industry No. Y1329000

No.86274

No. 1543

No. C3541

ISO 9001 GB 16364

ISO 14001 GB 16365

…PROFESSIONAL MEMBERSHIP

Page 5: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Company Registration Number:3168455England & Wales

Full Company Name:J Tomlinson Limited

Year Established:Formation: 1950 Registration: 1996

Registered OfficeScimitar House, 100 Lilac Grove, Beeston, Nottingham NG9 1PF

Contact Names:Callum Stewart – Business Development ExecutiveJeremy Warman – Business Development Executive

Telephone:01159 574 390

Email Address:[email protected]@jtomlinson.co.uk

Main Office Telephone:01159 574 300

Office Facsimile:01159 431 079

Office Email Address:[email protected]

Company Web Site:http://www.jtomlinson.co.uk

…KEY COMPANY DETAILS

Page 6: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Statement of Turnover:2009 - £41m2008 - £40m2007 - £33m2006 - £26m

Bank Details: Yorkshire Bank plc 1st Floor Lock HouseCastle Meadow RoadNottinghamNG2 1AG

Insurance Details Employers Liability

Name of Insurer Allianz Cornhill

Policy No. 38/CS/11544424/04

Expiry Date 31/3/10

cover held £10M

Insurance Details Contractors all Risks

Name of Insurer Allianz Cornhill

Policy No. 38/CS/11544424/04

Expiry Date 31/3/10

cover held £10M

Insurance Details Professional Indemnity

Name of Insurer Hiscox Insurance

Policy No. HU P16 1300217

Expiry Date 31/3/10

cover held £10M

…FINANCIAL DETAILS

Insurance Details Public Liability

Name of Insurer Ace Europe/ QBE Insurance

Policy No. 46UKC08921/A7033326

Expiry Date 31/3/10

cover held £25M

Page 7: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

At J Tomlinson Ltd we are proud of the fact we have never had any notices served.

J Tomlinson places the highest importance on health and safety as it believes that no company can truly be successful without ensuring good health and safety for its employees, clients and the general public.A positive approach to health, safety and quality and mitigation of risk is central to everything that J Tomlinson does and this permeates from the Directors and the Health, Quality & Environmental Manager right down to our site operatives.

Our current AIR is 133, which is well below industry average for the Construction Industry. However we recognise the need for improvement and are actively striving to reduce it even further.We have detailed below accidents to J Tomlinson employees and our subcontractors reportable under the statutory requirements of RIDDOR 1995.HSE Enforcement ActionNo enforcement action has been taken against J Tomlinson in the last 5 years.

…HEALTH & SAFETY

0

0

2

0

2009 2008 2007 2006 2005 2004

Fatal Accidents 0 0 0 0 0

Major Accidents 2 5 2 1 0

> 3 Days off Work 2 4 5 10 7

Dangerous Occurrences 0 0 0 1 1

0

0

0

0

2009 2008 2007 2006 2005 2004

Prosecutions 0 0 0 0 0

Prohibition Notices 0 0 0 0 0

Improvement Notices 0 0 0 0 0

Section 60 0 0 0 0 0

Page 8: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

J Tomlinson is renowned for the highest standard of building and maintenance service within the UK construction industry. We operate a fully compliant system to standard BS EN ISO 9001: 2000, and have achieved full accreditation

The principal aims of the company are:

To have a real understanding of clients and their businessrequirements / objectives.To strengthen relationships and encourage repeat business with existing clients.To win work not solely on price but through innovation andby adding real value.To continually strive to improve our performance throughanalysis and continuous improvement of our processes.To develop staff potential through the provision ofappropriate training.To engender a positive commitment to quality and createan environment of teamwork, efficiency and co-operation.To support staff in their day-to-day work by developing anintegrated management system that links all businessactivities within the organisation and is documented tomeet the requirements of BS EN ISO 9001:2000.

…QUALITY ASSURANCE

BEST PRACTICE / QUALITY MANAGEMENT

SYSTEM(BS EN ISO 9001:2000)

BEST PRACTICE / QUALITY MANAGEMENT

SYSTEM(BS EN ISO 9001:2000)

PRODUCE UNIQUE PROJECT QUALITY

PLANS / SET QUALITY

CHALLENGE

PRODUCE UNIQUE PROJECT QUALITY

PLANS / SET QUALITY

CHALLENGE

PROVIDE HIGH CALIBRE PROJECT

TEAMS / DEDICATED QA MANAGER

PROVIDE HIGH CALIBRE PROJECT

TEAMS / DEDICATED QA MANAGER

UNDERTAKE SYSTEMATIC CHECKS AND

AUDITS

UNDERTAKE SYSTEMATIC CHECKS AND

AUDITS

PROVIDE SAMPLE AREAS OF WORKS / SAMPLE BOARDS

PROVIDE SAMPLE AREAS OF WORKS / SAMPLE BOARDS

PROTECT COMPLETED WORKS / MONITOR EXISTING

RETAINED FEATURES

PROTECT COMPLETED WORKS / MONITOR EXISTING

RETAINED FEATURES

IMPLEMENTZERO DEFECTS METHODOLOGY

EARLY INTRODUCTION OF OUR CUSTOMER

CARE TEAM

IMPLEMENTZERO DEFECTS METHODOLOGY

EARLY INTRODUCTION OF OUR CUSTOMER

CARE TEAMUSE ONLY APPROVED

SUBCONTRACTORS (QUALITY NOT LOWEST

PRICE)

USE ONLY APPROVED

SUBCONTRACTORS (QUALITY NOT LOWEST

PRICE)

USE ONLY APPROVED MATERIALS

(QUALITY NOT LOWEST PRICE)

USE ONLY APPROVED MATERIALS

(QUALITY NOT LOWEST PRICE)

APPROACH TOQUALITY

ASSURANCE

Page 9: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

J Tomlinson is proud of its environmental standards. We operate a fully compliant system to standard BS EN ISO 14001:2004, and have achieved full accreditation. We are proud of our environmental record, having NEVER received any improvement or prohibition notices.

By adopting a pro-active approach to environmental safety on site, we have achieved and continue to maintain a zero improvement and prohibition notice record.

J Tomlinson follow the Constructing Excellence Toolkit which covers:- Corporate Social Responsibility- Economic Sustainability- Social Sustainability- Environmental Sustainability

J Tomlinson personnel have completed numerous BREEAM ‘Excellent’ rated projects.

… SUSTAINABILITY

USE OF KPI’SSet Environmental KPI’s

Implement Environmental PlansUndertake Waste Audits

RECYCLESegregate Waste

Identify Waste Streams Early

RENEWAL ENERGYEmploy the most efficient technology to hit the KPI

Targets

REDUCE / RESTRICT CONSUMPTION

Set Targets < CO2 EmissionsWater Usage

Transport Movements

EFFICIENT MANAGEMENT

Materials Ordering / StorageGood Housekeeping

Employ a Project ChampionTraining

Learning ExperienceProvide viewing facilities

Demonstration rooms

PROCUREMENTUse Managed & Approved

Material SourcesFollow Codes of Practice

MATERIALSIncrease the use of

Sustainable Materials / Technology / Prefab Items

ACHIEVING SUSTAINABILITYOUR APPROACH

Page 10: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

KEY SECTORS

Education

Health Care

High Security

Commercial

Industrial

Social Housing

Leisure

… PREVIOUS EXPERIENCE

KEY CLIENTS

Page 11: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Client:East Midlands Property Alliance

Value:£400m

Duration:4 years

Contract:NEC

J. TOMLINSON LTD

EMPA CONSTRUCTION PARTNERING FRAMEWORK

Key features/AchievementsNew build ECO Homes.Design & Build Projects.Logistically Complex Sites.Value Engineering / Whole Life Costing.

This framework is available for use by any East Midlands public sector organisation.The projects covered by the frameworks are for contracting work and include new build, extensions and refurbishment projects.

The framework will run for 4 years. All projects are based on the NEC family of contracts.

Page 12: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Client:Quantum Consortium

Value:£100.0m

Duration:4 years

Contract:PPC 2000 (2003 amended)

J. TOMLINSON LTD

J. TOMLINSON LTD

QUANTUM CONSORTIUM HOUSING FRAMEWORK

Key features/AchievementsNew build ECO Homes.Design & Build Projects.Logistically Complex Sites.Value Engineering / Whole Life Costing.

J Tomlinson are delighted to be a member of the £100 million Quantum Consortium housing framework. Development partner status currently comprising of Derwent Living, East Midlands Housing Association and Futures Housing Group. The consortium currently operates in the East and West Midlands ranging from Sheffield to Milton Keynes.

Page 13: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Client:Alliance Boots Plc

Value:£2m

Duration:4 years

Contract:PPC 2000

J. TOMLINSON LTD

J. TOMLINSON LTD

BOOTS CONSTRUCTION PARTNERSHIP

Key features/AchievementsDesign & Build Projects.Logistically Complex Sites.Value Engineering / Whole Life Costing.Live sterile production & office environment

Building and civil engineering maintenance and small projects Framework Agreement. Projects include the Structural Alterations to grade 2 listed D10 Building.

Page 14: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Client:Rotherham Construction Partnership

Value:£4.0m

Duration:4 years

Contract:PPC 2000

J. TOMLINSON LTD

J. TOMLINSON LTD

ROTHERHAM CONSTRUCTION PARTNERSHIP

Key features/AchievementsDesign & Build Projects.Logistically Complex Sites.Value Engineering / Whole Life Costing.

J Tomlinson are proud to have be one of ten contractors selected for the Rotherham Construction Partnership for the provision of Building works and mechanical and electrical installation works for public buildings.

Page 15: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesSustainable construction (e.g. solar panels)New build, alterations and refurbishmentLong working relationship with client

New offices, involving new build, structural alteration and refurbishment, for East Midlands Housing increasing their Coalville based operations.

Client:

East Midlands Housing

Value:

£1.2 million

Duration:

26 weeks

Contract:

JCT 2005 Standard Without Quantities

Contract Administrator:

rg+p

EAST MIDLANDS HOUSING OFFICES

Page 16: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesGrade 1 Listed BuildingClose liaison with English HeritageConservation workUse of traditional construction materials and techniques

Refurbishment and renovation of 60 ornate roof lights and roof structure on a Grade 1 Listed building.

Client:

Welbeck Estates

Value:

£500k

Duration:

26 weeks

Contract:

JCT 2005 Standard Without Quantities

Contract Administrator:

Church Lukas

WELKBECK ESTATE ROOFLIGHTING, WORKSOP

Page 17: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

As part of our clients strategic property plan we successfully completed the construction of a new Extra Care Facility and full refurbishment of Listed Buildings whilst retailing the clients use of the remainder of the complex.

Client:

The Retail Trust

Value:

£10.0 m

Duration:

65 weeks

Contract:

JCT 2005 with Contractors Design

Architect:

Howard Fairbairn & Partners

Structural Engineer:

Howard Cavanna

Key FeaturesNew Build Nursing HomeMajor refurbishment & extension to grade 2 listed buildings Restricted site (Logistically complex)Phased workingPiled foundations / basement constructionSensitive siteExacting finishes

LEYLAND’S ESTATE, EXTRA CARE COMPLEX, DERBY

Page 18: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

LEYLAND’S ESTATE, EXTRA CARE COMPLEX, DERBY

Page 19: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

The construction of a new therapy centre with soft play room, multi sensory room, hydrotherapy pool, dual-purpose surround-sound cinema and training room. Their will also be a new young people’s wing with six extra children’s bedrooms, The existing 10 room’s will undergo full refurbishment .

Client: Rainbows Children’s Hospice

Value: £4.0m

Duration: 50 weeks

Completion: December 2009

Contract: JCT 2005 Design & Build

Architect: B3 Architects

Structural Engineer: Diamond Wood Partnership

Key Features:Specialist acoustic considerationsHighly serviced buildingHydrotherapy PoolPhased working to minimums DisruptionHighly Sensitive Operational Environment

J. TOMLINSON LTD

J. TOMLINSON LTD

RAINBOWS CHILDREN’S HOSPICE EXTENSION, LOUGHBOROUGH

Page 20: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Major refurbishment comprising all external envelope elements – re-roof, ornate lead work, brickwork repairs cleaning and re-pointing, replacement windows and insulated render system, and renewal of mechanical and electrical systems.

Client:University of Derby

Value:£1.7m

Duration:26 weeks

Completion:December 2008

Contract:JCT 2005 Design & Build

Architect:Tombs Associates

Structural Engineer:

Collis Hall & Greeny

Key Features:

Maintain IT suite during worksWork in occupied buildingExtensive structural alterationsIntricate phased workingRe-roofing including movable roof systemKey architectural featuresContractors Design

BRITANNIA MILL, UNIVERSITY OF DERBY

Page 21: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

BRITANNIA MILL, UNIVERSITY OF DERBY

Page 22: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesSensitive ecological siteLive University campusUse of reclaimed materialsMatching new to existing construction

Refurbishment of a single dwelling hunters lodge into multi-occupancy self contained units for University lecturers and demolition, reclamation and new build construction of bungalow.

The works involved the reclaiming of materials from the old stable block to be used on the bungalow.

Client:

University of Nottingham

Value:

£800k

Duration:

26 weeks

Contract:

JCT 2005 Minor Works

Contract Administrator:

King Sturge

EVITON HOUSE, SUTTON BONNINGTON

Page 23: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesTight schedule working during Summer holidaysHistoric Listed Building WorkP.I.R. LightingPrefabricated Material Office Site Construction

Refurbishment of 20 dormitories with the Elfin all in one self contained cooker, microwave, sink and fridge kitchen unit. Bathroom’s were also fully refurbished to provided a completely revitalised and vibrant living environment.

Client:

Trent College

Value:

£100k

Duration:

6 weeks

Contract:

JCT 2005 Minor Works

TRENT COLLEGE REFURBISHMENTS

Page 24: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesAlterations to live control roomsNew air conditioning24 Hour Working to suit Clients specific needsDDA worksSecurity alterations

Alterations to live 24 hour Emergency Response Call Centre to include minor demolition and alterations, electrical and mechanical improvements and installation of air conditioning units.

Client:

Nottinghamshire Police

Value:

£200k

Duration:

9 weeks

Contract:

JCT Minor Works

Contract Administrator:

Focus Consultants (UK) Ltd

SHERWOOD LODGE CONTROL ROOM & MANSFIELD POLICE STATION ALTERATIONS

High Security - Photography Prohibited

Page 25: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesIntensive liaison with statutory undertakersHigh securityEffectively MOD siteOut of hours working24 hour shiftsPlanned and co-ordinated detailed and precise sequencing

Replacement of HV switchgear to multi million pound nuclear facility to include civils, structural alterations, fire upgrade works, and major electrical improvements.

Client:

Rolls Royce

Value:

£1m

Duration:

12 weeks

Contract:

JCT Intermediate with Contractors Design

Contract Administrator

Cundall

ROLLS ROYCE HV SWITCH GEAR UPGRADE, DERBY

High Security - Photography Prohibited

Page 26: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesLive site with vulnerable peopleContaminated sitePhased work to minimise disruption to building usersRestricted M&E break in timesOut of hours workingStringent dust control

New build, refurbishment and large extension to educational facilities to provide foundation care units. Works included glulam timber frame construction, cedar cladding, standing seem zinc, proprietary coloured render systems, feature architectural glazing, environmental lead services.

Client:

Nottingham City Council

Value:

£2.0m

Duration:

26 weeks

Contract:

JCT 2005 Local Authority Edition

Architect

Alan Joyce Architects

Structural Engineer

City Consultants

DUNKIRK & MELLORS PRE-SCHOOL UNITS, NOTTINGHAM

Page 27: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesIntensive liaison with statutory undertakersHigh securityEffectively MOD siteOut of hours working24 hour shiftsPlanned and co-ordinated detailed and precise sequencing

Complete internal and external refurbishment of existing cadet centre, which will including new roof coverings new electrical and mechanical services, new windows and doors and minor demolition.

Client:

East Midlands Reserve Forces

Value:

£500K

Duration:

22weeks

Contract:

JCT Intermediate with Contractors Design

Architect:

Alan Joyce Architects

Structural Engineer:

City Consultants

CADET TRAINING CENTRE, MELTON MOWBRAY

Page 28: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesTimber FrameDDA Compliant (Lift)P.I.R. LightingPrefabricated Material Office Site Construction

Construction of a new Bowling Pavilion facility. The new club house incorporates changing, catering and meeting rooms. Fully DDA compliant with the installation of lifts and ramps.

Client:

Gedling Borough Council

Value:

£200K

Duration:

18 weeks

Contract:

JCT Intermediate with Contractors Design

Architect:

Alan Joyce Architects

Structural Engineer:

City Consultants

ARNOT BOWLS PAVILION, NOTTINGHAM

Page 29: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Client:Trent & Dove Housing

Value:£12.0m

Duration:5 years

Contract:PPC 2000

New kitchens, bathrooms, replacement central heating and disabled adaptations over 5 year partnering contract.

J. TOMLINSON LTD

J. TOMLINSON LTD

TRENT & DOVE HOUSING MAINTENANCE FRAMEWORK, BURTON UPON TRENT & UTTOXETER

Key features/AchievementsOriginal programme of 450 kitchens and bathrooms per annum1000th kitchen and 600 bathrooms installed after only 15 monthsExcellent levels of customer satisfaction (latest survey – 100%)7 day installation periods (target was for 10 days)Good site according to Considerate Constructions Auditor

Page 30: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Alterations and extensions to existing catering facilities at the East Midlands Conference Centre doubling the size of the facilities.

This will allow the University to provide a full catering service for up to 500 people.

Client:

University of Nottingham

Value:

£500k

Duration:

22 weeks

Contract:

JCT 2005 Intermediate

Architect:

Cox Freeman

Structural Engineer:

SLS Design Consultants

Key FeaturesTight site constraintsWorking in fully operational building & campusStaged handoverComplicated phasing to suit client’s requirements

EAST MIDLANDS CONFERENCE CENTRE

Page 31: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Client:Melton Borough Council

Value:£1.0m

Duration:4 years

Contract:JCT Minor Works

Housing maintenance including bathroom & kitchen strip out and complete refitting as part of a 4 year Partnering Framework Agreement.

J. TOMLINSON LTD

MELTON BOROUGH COUNCIL HOUSING MAINTENANCE FRAMEWORK

Key features/Achievements

Work in occupied propertiesExcellent customer satisfactionResident liaison officerHigh rise work

Page 32: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

The new building will provide additional space for the increased delivery of courses by the Human Performance Department. The current Human Performance Centre offers state-of-the-art facilities for the delivery of a range of sports courses and subjects including Sport and Exercise Physiology, Sports Biomechanics, Sports Psychology, Coach Education and Sports Nutrition.

Client:

University of Lincoln

Value:

£1.9m

Duration:

36 weeks

Contract:

JCT 2005 Intermediate

Architect:

Stem Architects

Structural Engineer:

Peter Cole Consulting

Key FeaturesTight site constraintsBREEAM RatedWorking in fully operational leisure facilityStaged handoverComplicated phasing to suit client’s requirements

HUMAN PERFORMANCE CENTRE, LINCOLN

Page 33: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

HUMAN PERFORMANCE CENTRE, LINCOLN

Page 34: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Conversion of halls of residence to 117 Houses of Multiple Occupancy including the total refurbishment including remodelling of kitchens and bathrooms, electrical rewiring, central heating installation and roofing works and site wide service infrastructure upgrading.

Client:Morris Properties Ltd

Value:

£4.8m

Duration:

26 weeks

Completion:

April 2008

Contract:

JCT 2005 Intermediate

Architect:

Michael Dyson Associates

Key Features:117 Individual Houses of Multiple OccupancyHMO Regulation compliantSite wide infrastructure upgradeOverall completion in 26 weeksIn-house M&E servicesHigh security

J. TOMLINSON LTD

J. TOMLINSON LTD

NORFOLK PARK STUDENT ACCOMMODATION, UNIVERSITY OF SHEFFIELD

Page 35: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

NORFOLK PARK STUDENT ACCOMMODATION, UNIVERSITY OF SHEFFIELD

Page 36: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

J Tomlinson Ltd successfully completed this state of the art facility for the East Midlands Ambulance Service as part of their strategic plan to provide an up to date service to the public using modern technology – The fit out was completed in sections to allow the client direct specialist installations.

Client:

EMAS NHS Trust

Value:

£3m

Duration:

52 weeks

Contract:

IFC 2005

Architect

Stephen George & Ptnrs

Structural Engineer

BWB Consulting

Key Features:Construction of server room Concurrent with Clients Direct ContractorsSpecialist acoustic considerationsPhased workingHighly serviced buildingExacting finishesAntistatic surfacesStandby generator & UPS systemsDDA compliantMajor civils works

J. TOMLINSON LTD

J. TOMLINSON LTD

EAST MIDLANDS AMBULANCE SERVICE, CONTROL CENTRE

Page 37: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

EAST MIDLANDS AMBULANCE SERVICE CONTROL CENTRE, NOTTINGHAM

From: Lee Merrin [******@mspm.co.uk] Sent: 05 December 2008 15:39To: ADraperSubject: EMAS HQ

Dear AdamIt gives me great satisfaction to enclose the Completion Certificate and Hand Over Snagging Report (which is very minimal indeed).We all know how rare it is for projects to follow their planned timescales and so I must congratulate you, the J Tomlinson team and all of the other key team members with this success.Have a good weekend - I will no doubt speak to you next week.Kind Regards

Lee MerrinDirectorMSPM Ltd

Page 38: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesHigh specification officesIn-house M&E installationOnsite anaerobic digesterRe-use of existing steel frame

Construction of new Headquarter Offices for John Bowler Eggs, one of the UKs largest egg producers.

Client:

John Bowler Group

Value:

£850k

Duration:

22 weeks

Contract:

JCT 2005 with contractors design

Contract Administrator:

Church Lukas

BOWLER EGG HEADQUARTERS, HILTON

Page 39: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

BOWLER EGG HEADQUARTERS, HILTON

Page 40: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Key FeaturesMultiple sitesExacting finishesFast-track construction methods24 hour working to minimise construction period

Refurbishment of head office Training Facility and hair salons in Long Eaton, Ashbourne and Leicester.

Client:

Keith Hall

Value:

£300k

Duration:

6 weeks

Contract:

JCT Minor Works

KEITH HALL TRAINING CENTRE

Page 41: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Alterations and refurbishment of a dilapidated northern light factory unit into multi-use learning and media centre for use by South Leicester College, Muslim Asian TV Network and Central News.

Client: South Leicestershire College

Value: £1.3m

Duration: 24 weeks

Completion: April 2008

Contract: JCT Intermediate with Contractors Design

Architect: Metz Architects

Structural Engineer: Diamond Wood Partnership

Key Features:Specialist acoustic considerationsM&E Contractors DesignHighly serviced buildingExacting finishesDemolition and Asbestos DecontaminationConcurrent with Clients Direct special Audio Visual Contractors

J. TOMLINSON LTD

J. TOMLINSON LTD

ROSS WALK MEDIA INNOVATION CENTRE, LEICESTER

Page 42: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Tried , Tested &Tried , Tested &Regional Project Regional Project

TeamsTeams

Construction Construction SpecialistsSpecialists

Established Established Regional & Supply Regional & Supply

ChainChain

Established Established Regional OfficeRegional Office

FinancialFinancialStrengthStrength

Commitment & Commitment & EnthusiasmEnthusiasm

Able to Provide Able to Provide Innovative & Viable Innovative & Viable

SolutionsSolutions

Design & Build Design & Build SpecialistsSpecialists

OUR STRENGTHS

Trust, Honesty Trust, Honesty & Loyalty& Loyalty

The Clients NeedsThe Clients Needs

The EnvironmentThe Environment

Employees & Employees & SuppliersSuppliers

Hard Work & Hard Work & DedicationDedication

Commitment & Commitment & EnthusiasmEnthusiasm

Innovative Innovative & Continuous & Continuous ImprovementImprovement

Safe Working Safe Working EnvironmentEnvironment

OUR VALUES

…WHY CHOOSE J TOMLINSON

Page 43: J Tomlinson Construction Profile

J TOMLINSON LIMITED Your Complete Building Solution

Scimitar House100 Lilac Grove

BeestonNottingham

NG9 1PFtel: 0115 9574300fax: 0115 9431079