Independent Validation and Verification for the Pennsylvania Digital Government Summit

Upload: nguyenbao

Post on 13-Mar-2018

235 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

Independent Validation and Verification

for thePennsylvania Digital Government Summit

Page 2: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

2

Agenda

• Speaker Introduction• IV&V Session Goals• Material Review• References

Page 3: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

3

IntroductionsWill Hurley

– Service Director IT Quality Management– Domain Expert Quality Management– CISCO PIX Firewall for SOHO Cable modem– Fidelity FMR SEPG– Joint Service Common Operating Environment – USAF Electronic Systems Center Data Administrator– CMM Assessment Lead Theater Battle Management

Contingency Planning Source Selection Early adopter

• Blended assessments• Practical Software Measurement• Aspects for testing• Java, open source, XML

Page 4: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

4

Session Goals

• Definitions and perspective• Key concepts• Case studies• Application and techniques• Final thoughts

Page 5: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

5

Definitions

Independent Verification & Validation A systems engineering process employing rigorous methodologies for evaluating the correctness and quality of the product throughout the life cycle.

Page 6: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

6

Definitions

Independent– Technically: IV&V prioritizes its own

efforts within specialty– Managerially: Independent reporting

route to program management, sponsor or acquiring agency

– Financially: Budget is allocated and controlled at high level such that IV&V effectiveness is not compromised

Page 7: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

7

DefinitionsVerification: The process of determining that an

implementation and its associated data accurately represent the conceptual description and specifications.

Validation: The process of determining the degree to which an implementation and its associated data accurately represent of the real world from the perspective of the intended uses of the system.

Accreditation: The official certification that a model, simulation, or federation of models and simulations and its associated data is acceptable for use for a specific purpose.

Page 8: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

8

Definitions

English please!– Verification – Did I build the thing right?– Validation – Did I build the right thing?– Accreditation ‑ Should it be used?

Also, there is an underlying implicit principle, and its key question:– Credibility – Should it be trusted?

Page 9: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

9

PerspectiveWhy do IV&V?

– Timely identification of errors and defects (via associated failures)

– Provide accurate counsel regarding the quality and readiness of the project to advance

– Deliver product with very high confidence

On Time

Build the System Right

Build the Right System

Strategy

Scope

Knowledge

Staff

Too little testing is a crime,

too much testing is a sin.

Page 10: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

10

Perspective

• IV&V activities derive their importance from the intended use of the project to which it will be applied.

Key thought: Probability of an undesired event and its consequence drive IV&V

GRAVE SUBSTANTIAL MARGINAL INSIGNIFICANT

Page 11: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

11

Key Concepts

IV&V ≠ Software Quality Assurance

1

23 N N+1

Ris

k

Features (Any Project Phase)

IV&V candidates

SQA Baseline

Page 12: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

12

Key Concepts

• IV&V employs rigorous methodologies– Frameworks

• CMMI, CoBIT, RUP– Measurement

• Design of Experiments• ISO/IEC 15939 • Confidence Intervals

– Models, simulations, surveys

Page 13: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

13

IV&V

Key Concepts

• IV&V is effective in preventing ‘defect leakage’ in all common frameworks and development lifecycles

Planning & Organization Acquisition & Implementation Delivery & Support

RequirementsDesign

ConstructionQA

AcceptanceWarranty

Page 14: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

14

Key Concepts

Importance of IV&V– Reduce system lifecycle risk– Increase customer satisfaction/retention– Increase the long-term success of a project

and the long-term health of an organization– Reduce Total Cost of Ownership (TCO)– Improve vendor selection/relation– Repeatability– Predictability– Manageability– Usability– Etc.

Page 15: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

15

Case Studies

Good projects gone bad or Snatching defeat from the jaws of victory.

Plus;IV&V success stories

You make the call…

Page 16: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

16

BT Case Study

• Seeking to reduce costs and deploy a standard helpdesk system for both internal and external users, BT evaluated a number of commercial solutions before selecting Remedy®.

• More than half of the proposed users were equipped with 21” screens and drivers that did not support the Remedy deployment.

Page 17: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

17

XRT Case Study• XRT, the Cross Retail Workstation, will provide

Financial phone representatives a complete view of client positions and statutory guidance. Using this information representatives will cross sell products and deliver accurate actionable recommendations. Although technologically new in all respects (OOA, OOD, distributed transactions, GUI) the decision was made to bypass performance testing during the first release.

• Institutional customers, managed 1000’s of positions and regularly called representatives using XRT. XRT screens could take more than 30 minutes to populate the callers positions.

Page 18: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

18

Hubble Case Study

• When the Hubble Space Telescope was being constructed, a decision was made to save costs by not assembling it on the ground to check all the alignments before sending it into space.

• After launch “…NASA announced that the telescope suffered from spherical aberration … the problem concerned two excellent yet mismatched mirrors …”

Page 19: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

19

Digital Archive Case Study

• Digital assess under management were doubling every three months. Projections show managed storage exceeding 200 terabytes (1,000,000,000,000 bytes –

10004 or 1012 = 1 terabyte) However customer commitments were consistently missed and defect queues were growing at 2:1.

• Defect histograms were mapped to ClearCase file changes. A high correlation between 40% of defects observed and 5 files was established. The five files in question, and their functionality, are currently part of a re-architecture effort to establish a single archive asset format. A major client was lost to a competitor due to feature delay.

Page 20: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

20

World Wide Rollout Case Study• The Project Manager for the world wide rollout

of Oracle Financials, at large financial firm, has lost confidence in his System Test team. The team was unable to express how the second three week cycle of system testing had gone nor could the team express how future cycles of testing could ensure a smooth delivery.

• Recovery includes developing standard methods to track and assess progress and predictive modeling to establish the reliability of the system.

Page 21: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

21

Predictive Modeling• Improves counsel regarding quality and

readiness– More than a gut feel– Deliver critical systems with very high

confidence• Part science; part art

– Lots of curves (equations)– Experience helps– Context of project required

• Process centric– Good data; good models– Everything looks like a nail when you only

have a hammer

Page 22: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

22

Modeling ProcessStep 1. Log past failures.Step 2. Organize failure data to support modeling

and context.Step 3. Copy or enter data using SMERFS3Step 4. Execute models and plot the failures.Step 5. Determine curve(s) that best fit project

context.Step 6. Copy curve data to MS Excel and project

using polynomial trend line. Step 7. Measure accuracy of curve models.Step 8. Predict the future using the model.Step 9. Repeat as necessary.

Page 23: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

23

ResultsCritical System Failure Predictions

y = -3E-05x4 + 0.0019x3 - 0.0488x2 + 0.5064x - 0.2344

y = -0.0003x3 + 0.0218x2 - 0.6117x + 6.9529

0

1

2

3

4

5

6

7

1 3 5 7 9 11 13 15 17 19 21 23 25

Interval (7 days)

Crit

ical

Fai

lure

s

Yamada Curve

Schneidewind'sTreatment 2 CurvePoly. (Yamada Curve)

Poly. (Schneidewind'sTreatment 2 Curve)

Page 24: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

24

Analysis• Predicting 13.3 critical faults remain in the

system.• 5 additional weeks should allow us to remove

approximately 4.4 more critical faults.• For the next testing period of 7 days, the

probability of operation without a critical failure is 0.4.

• For now we’ll use Yamada’s curve for prediction.– Software only models tend to under predict due to

differences in software and hardware reliability.– Earlier Yamada models delivered accurate measures

with statistical strength. – Details

Standard Deviation1.59

95% Confidence IntervalTotal Number of Faults (TNOF) (25.0, 64.5)

TNOF Remaining (0.0, 39.5)

Page 25: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

25

Application

• How do we start?– Start with a know high priority problem– Develop relationships with one or more

IV&V contractors– Build-out a Probability Risk Factors

table and apply• Repeat the process for each domain or

phase

Page 26: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

26

Application

Grave

Substantial

Marginal

Insignificant

16 32 64 128 250

96

IV&V

IV&V

IV&V

Con

sequ

ence

of S

yste

m F

ailu

re

Total Likelihood of Failure based on Analysis.High Risk - IV&V Required Intermediate Risk - Evaluate for IV&V

Page 27: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

27

ApplicationWho’s on the team?

– Phase and scope determines team composition and size

• Minimum team must include– Senior Sponsor– IV&V Lead– Two domain experts (one if Project Lead is trained)

Key thought– Executive sponsorship is required to champion

both the project and the findings and recommendations developed by the team

Page 28: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

28

Application

What dose it cost?– Plan on 5 to 7 person months per 1K

Function Points• Don’t use FPs Java users can multiply FPs

by 68.

Key thought– Block IV&V activities throughout the

lifecycle to achieve highest ROI

Page 29: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

29

Final Thoughts

• IV&V is a powerful and proven approach to reduce delivery risks

• Executive\Senior management support is essential

• Proper planning prevents poor performance

Page 30: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

30

Final Thoughts

• Quality of results increase with organizational process maturity

• IV&V offers stakeholders impartial evaluations and recommendations as to how to best proceed in difficult situations

• Schedule Slips• Cost Increases• Project Termination

Page 31: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

31

Final Thoughts

• “The leading driver for cost savings was internal process improvement, not the vendor resource costs.”*

Source: Ventoro Offshore Outsourcing Research Report, Oct 11, 2004

Page 32: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

32

References• Dr. Linda H. Rosenberg, Software Quality

Assurance, NASA V&V presentation 10/2002

• Rogers, McCaugherty and Martin, Case Study of IV&V Return on Investment (ROI), NDIA presentation, 11/2000

• Hurley, Predictive Failure Arrival Modeling to Support System Readiness, Ajilon Presentation 2005

• Ventoro Offshore Outsourcing Research Report, Oct 11, 2004

Page 33: IV&V Best Practices - media.govtech.netmedia.govtech.net/Events/2006Events/2006Pennsylvania/… · PPT file · Web viewIndependent Validation and Verification for the Pennsylvania

33

Thank you for attending.

Will HurleyService DirectorIT Quality Management800.654.2748