ittina progress
TRANSCRIPT
As on 27-March-2009
Basket ball court, some men finishing the plaster work
Some Beautification work in front of G and I block
Between G and I block H Block Basement, looks better than before,
Pipe work in progress
Some of the water tanks are yet to be completed- This is G Block
Central amenities area- Fencing work complete
Central amenities area, swimming pool has a lining on the top
This is K Block- Stair case – yet to be finished
M-Block – Pipe work
M-Block – Pipe work (Plastic pipes)
N-Block – Pipe work, All Metal No plasticOuter Road work - M Block
N Block-Pipe work almost finished
N Block Lift Room
Between O and P Block, overlooking the Main Road
Entrance to Ittina Mahavir-Some progress visible
Between A and P Block A- Block Roof- waterproofing in progress
Some furniture work happening in A Block- Private vendor
This flat has got the Wash Basin, Commode (Parryware), and Kitchen table installed
ryw
Furniture Work in A Block
Private vendor
Furniture from the Builder