its upgrade meeting gruppi infn v. manzari – cern, 6 novembre 2012
TRANSCRIPT
ITS upgradeMeeting Gruppi INFN
V. Manzari – CERN, 6 Novembre 2012
Upgrades: status
On September 27 after the third round of discussions with ALICE, the LHCC has endorsed our Upgrade LoI and ITS CDR. Minutes are not out yet, but there is a statement which we can quote issued by the LHCC chair:“There is an interest amongst the collider experiments (ALICE, ATLAS and CMS) for a continued heavy ion programme that gives access to rare final states. This programme will extend well into the 20ies assuming the current HI running mode of one month per year.The physics programmes of the two general purpose detectors and ALICE are complementary: while the former may focus on selected hard probes ALICE will be optimized for particle identification at low transverse momenta. The experiments are hence sensitive to different ”messenger“ signals and phases of the evolution of the quark gluon plasma.This increase in sensitivity for ALICE entails an upgrade of the rate capability of the TPC, a high resolution ITS, and a major upgrade of the online system and the read-out electronics.The LHCC commends this joint approach to heavy ion physics and endorses the upgrade plans of the ALICE collaboration. The committee is looking forward to the seeing detailed technical solutions presented in the respective TDRs..”
RRB 29 Oct -1 Nov
oExtension of the construction MoUoGeneral Endorsement of the Upgrade
TDRs to be prepared in O(1 year)
oWill define the construction design oWill contain the specific commitments of the Institutions to the projectsoFollowed by MoU addendum (or addenda)
R&D
oWill have to continue vigorously throughout the process, with substantial funding, agreed within each project
Target date for ITS TDR August 2013 for submission to LHCC in September 2013
Upgrades: next steps
• Pb–Pb • int. luminosity per year 2.85 nb-1 (peak L = 7x1027 cm-2s-1)• needed int. luminosity 10 nb-1, statistics 8x1010 events• 3.5 month of running • +1 month of special run at low field for dileptons
• p–Pb• max event rate 200 kHz, flat (L = 1029 cm-2s-1)• needed int. luminosity 50 nb-1, statistics 1011 events• 0.5 month of dedicated p–Pb run
• pp• max event rate 200 kHz, flat (L = 3x1030 cm-2s-1)• needed int. luminosity 6 pb-1, statistics 4x1011 events• 2 month of dedicated pp run, assumed in 1 year
The list above fulfills the ALICE physics program as presented in the LoI. A run with lower mass nuclei (e.g. Ar) could be considered in addition, if a
physics case for it would emerge.
Running scenario after the upgrades
• ALICE plans to run 6 years with upgraded detector, i.e. until 2026 (assuming start in 2019 and 2 years break of LS3)
• Possible scenario:• 2019 – Pb–Pb 2.85 nb-1
• 2020 – Pb–Pb 2.85 nb-1 (low magnetic field)• 2021 – pp reference run
• 2022 – LS3• 2023 – LS3
• 2024 – Pb–Pb 2.85 nb-1
• 2025 – ½ Pb–Pb 1.42 nb-1 + ½ p–Pb 50 nb-1
• 2026 – Pb–Pb 2.85 nb-1
• This would not require pp running during high-luminosity runs, only a short time before a heavy-ion run for setting up and commissioning.
Upgrades: a possible running scheme
Organization, Timeline and Cost
Participating Institutes (subject to funding)• CERN• China (Wuhan, SINAP)• Czech Republic (Prague)• France IN2P3-CNRS (Strasbourg)• Italy INFN (Bari, Cagliari, Catania, Frascati, Legnaro, Padova, Roma, Torino, Trieste)• Korea (Yonsei University Seoul)• Pakistan (Islamabad COMSATS)• Russia (St. Petersburg)• Slovakia (Kosice IEP)• UK STFC (Univ. of Birmingham, Daresbury Lab, RAL)• Ukraine (Kharkov, Kiev)
Cost Estimate (Option A and B) (*)
R&D 4 MCHF
Option A (All pixels) 10 MCHF
Option B (pixels + strips) 16 MCHF
Already members of ITS project
New members of ITS project
(*) detailed cost breakdown in Table 6.2 of CDR
Upgrade Timeline 2012–2014 R&D 2012 evaluation of technologies & prototyp• 2013 selection of technologies, eng. Design,
TDR• 2014 final design and validation
• 2015-18 Construction and Installation• 2015-16 production, construction and test of
detector modules• 2017 assembly and pre-commissioning• 2018 installaiton in the cavern
Contribution of Institutes to be defined within
the next 8 months
7
ITS UpgradeBreakdown of the CORE Cost Estimate
V. Manzari - INFN Bari CSN III – 18 Settembre 2012
Option 1: 7 layers of monolithic pixel detectors, which would provide excellent standalone tracking efficiency and pt resolution, but limited PID capability.
Option 2:a combination of 3 innermost layers of hybrid pixel detectors and 4 outermost layers of strip detectors, which would provide better PID capability but worse standalone tracking efficiency and momentum resolution.
8
ITS UpgradeTimeline
V. Manzari - INFN Bari CSN III – 18 Settembre 2012
9
ALICE UpgradeCORE Cost Estimates
V. Manzari - INFN Bari CSN III – 18 Settembre 2012
Overall cost estimate for the major upgrade projects Detector components and production costs Upgrade items and Common Project
- ZDC included in “Trigger Detectors”, EMCal and HMPID require minor funds- The Offline cost is the investment needed for the offline central services at CERN
10
ALICE UpgradeSpending Profile
V. Manzari - INFN Bari CSN III – 18 Settembre 2012
Memorandum of Understanding An Addendum for each Project to the ALICE MoU Addendum for the Common Projects including M&O A
Cost Estimate
Detector Cost (KCHF)
ITS 6000
VHMPID 1000
TOF 600
Muon 600
ZDC 100
CommonFunds 1000
V. Manzari - INFN Bari CSN III – 20 Marzo 2012 11
ALICE UpgradeINFN Estimated Contributions
Overall cost estimate: ≈ 60 MCHF
Italian Contribution: ≈ 10 MCHF
Cost EstimateContributo INFN all’upgrade
Partecipazione INFN in ALICE: “Scientist” 107/574 (19%)
Costo Totale Upgrade ALICE: 36 - 42 MCHF 30 - 35 M€
Costo Totale Upgrade ITS: 10 - 16 MCHF (+ 4 MCHF per R&D)
Contributo INFN per upgrade ITS: 4.7 - 6.7 MCHF (33%) 3.9 - 5.6 M€
Common Projects: 0.9 M€
TOF: 0.6 M€
Muon: 1.8 M€ x 0.2 0.4 M€
Stima finanziamento globale INFN per upgrade ALICE:
5.8 M€ spalmato su 5-6 anni
Cost EstimateContributi gruppi INFN
Consultazione in corso con i vari gruppi che hanno espresso interesse a partecipare all’upgrade dell’ITS per definire contributi e responsabilità in base alle risorse disponibili (finanziarie, personale e infrastrutture)
Discussione all’IB meeting durante la mini-week in Dicembre
Come procediamo?
Individuare attività/sotto-progetti di interesse comune Salvaguardare contributi, specificità e visibilità dei vari gruppi Leadership in alcuni sotto-progetti Sviluppi tecnologici Utilizzo delle infrastrutture esistenti Negoziazione delle risorse locali con i rispettivi Direttori di Sez/Lab:
tecnici, tecnologi e servizi.
Activities People
Development, design and production of front-end electronics
Front-end wafer probing
Sensor development and production (in case of hybrid pixels and/or μstrips)
Wafer thinning &dicing
Detector interconnect technologies (bump-, tab-, wire-bonding, BGA, other)
Development and fabrication of test systems
Characterization and mass production tests of individual detector components
Power and Signal on-detector buses
On-detector readout and interface electronics
Radiation tests
Design and production of the Stave mechanical support
List of activities
Activities People
Design and production of the Integration and Installation mechanics
On-detector cooling
Cooling plant
Stave assembly
Barrel assembly and integration
Power Supply System
Detector Control and Interlock System
Construction Database
Off-detector readout electronics
Power and Signal Connections
Beam tests (hardware, software, analysis)
Online software (monitoring, DAQ, HLT)
Offline (MC, calibration and reconstruction)
Physics performance studies
CSN III – 20 Marzo 2012 16V. Manzari - INFN Bari
Backup
17
Riunione CSN3 28-29/03/2011• R&D activities for the ALICE inner tracker upgrade
http://agenda.infn.it/conferenceDisplay.py?confId=3202 Riunione CSN3 13-14/06/2011
• ALICE Inner Tracking System Upgrade
http://agenda.infn.it/conferenceDisplay.py?confId=3203 Riunione CSN3 19-20/03/2012
• ALICE Upgrade
http://agenda.infn.it/conferenceDisplay.py?confId=4296 Referee meeting 9/05/2012:
• Novità ITS e R&D status http://agenda.infn.it/conferenceDisplay.py?confId=5002
Referee meeting 20/07/2012:• ITS upgrade: consuntivo e richieste
http://agenda.infn.it/conferenceDisplay.py?confId=5291
Link a Presentazioni Precedenti
V. Manzari - INFN Bari CSN III – 18 Settembre 2012
18
Web pages:• Inner Tracking System
http://aliceinfo.cern.ch/ITS/• Inner Tracking System Upgrade
http://aliceinfo.cern.ch/ITSUpgrade/
Conceptual Design Report for the Upgrade of the ALICE ITS – Version: CDR-0, CERN-LHCC-2012-05 / LHCC-G-159; March 6, 2012 https://aliceinfo.cern.ch/ITSUpgrade/sites/aliceinfo.cern.ch.ITSUpgrade/files/
documents/AliceITSupgrade-CDR-0_1.pdf
Progress report on the Conceptual Design Report for the Upgrade of the ALICE ITS; June 18, 2012 https://aliceinfo.cern.ch/ITSUpgrade/sites/aliceinfo.cern.ch.ITSUpgrade/files/
documents/progress_report.pdf
Link a Documenti su Upgrade
V. Manzari - INFN Bari CSN III – 18 Settembre 2012
19
Upgrade of the ALICE Experiment – Letter of Intent; September 7, 2012 CERN-LHCC-2012-012 / LHCC-I-022 https://cdsweb.cer.ch/record/1475243/files/LHCC-I-022.pdf
Upgrade of the ALICE Inner Tracking System – Conceptual Design Report; CERN-LHCC-2012-013 / LHCC-P-005; September 11, 2012 http://cdsweb.cern.ch/record/1475244/files/LHCC-P-005.pdf
Link a Documenti su Upgrade
V. Manzari - INFN Bari CSN III – 18 Settembre 2012
20
Link alla Pagina Web ITS Upgrade
V. Manzari - INFN Bari CSN III – 18 Settembre 2012
1 Marzo 2012 21
P.T. 2013-2015 (draft di piano finanziario, CSN3 30/1/2012)Upgrades : nostre previsioni presentata da Nico in CSN3
Nel 2011-12 per R&D (ITS, VHMPID) : 131, 194.5 K€ (77.5 +117 s.j.) Previsioni costo upgrades (MB e CB meetings del 12/1/2012):ITS : 14 MCHF (CERN, INFN, IN2P3, UK, COMSATS, BMBF, Ukraina, Russia, China,
Slovakia, Czech Republic) 2012-2014 R&D e prototipi2014-2016 Costruzione2016-2017 Integrazione e commissioning in laboratorio2017-2018 Installazione e commissioning VHMPID : 3 (- 4) MCHF (USA, INFN, India, Mexico, Korea, Brazil, Hungary)2011-2012 R&D e prototipi2013-2016 Costruzione e commissioning in lab./testbeam2017-2018 Installazione e commissioning Contributo INFN old HMPID 57.4%Possibile contributo INFN (circa 16.7 %) : 500 KCHF tra 2013 e 2017 (100 KCHF nel 2013, 150 nel 2014, 150 nel 2015) Nuova strategia di upgrade del Central Barrel (MB e CB meetings del 12/1/2012):Stime approssimative dei costi per rivelatori con contributo INFN:TOF : 600 KCHF (100% INFN) → (72 schede DRM) 500 kEuroMuon Trigger : 604 KCHF (IN2P3, INFN) → 160 (rivel.) + 30 (sistema gas) = 190 kEuroMuon Tracking : 967 KCHF (IN2P3, INFN, India?, Russia?) → 200 – 250 kCHFZDC 70 kEuro (100% INFN) Contributo INFN old MUON 9.2% ……
Contributo INFN old ITS 49.1%