itrp the building of collaboration march 2009 networks for 21st century learning

11
ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

Upload: aubrey-briggs

Post on 17-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

ITRP the building of Collaboration

March 2009

Networks for 21st Century Learning

Page 2: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

22

The California State University

Biggest higher education system in the US

23 campuses and the chancellor office ~450K Students ~45K faculty and staff

Page 3: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

33

History of the Infrastructure Terminal Resource Project

Phase 1 –Telecommunication Infrastructure Initiative (TII) the bricks and mortar.

Phase 2 Infrastructure Terminal Resource Project (ITRP) the blinking lights, refresh, NMS and training.

Page 4: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

Before TII

44

Page 5: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

After TII

~300 Million

Page 6: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

66

ITRP 1

Integrator selected (remember Pac Bell, SBC and now AT&T)

Recommended Cisco for Switching and Routing

The NTA was formed The birth of collaboration

Section Header

Page 7: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

I will make the decision if you do not come to consensus. (M. Crase)

23 directors (one from each campuses) of Networking and Telecommunication formed the Network and Technology Alliance (NTA)

“Encouraged” to make recommendation

77

Page 8: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

First working group formed

Network Management System – The first bake off

Strategic engineering (SE) working group

2005-6 restructured to get aligned with ITIL

88

Page 9: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

The next generation of WG

ITRP 2 steering group The bake off

– Security – Wireless– NMS

99

Page 10: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

Security

Design Best practices Deployment

1010

Page 11: ITRP the building of Collaboration March 2009 Networks for 21st Century Learning

ITRP 3How we work together and lessoned learned

1111