itri supply chain initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability...

30
© Kay Nimmo, Manager of Sustainability and Regulatory Affairs ITRI Ltd, St Albans, AL2 2DD, UK, tel: +44(0)1727 871312 [email protected], www.itri.co.uk iPAD conference Kinsahsa, 25 October 2010 ITRI Supply Chain Initiative and ‘conflict minerals’ traceability

Upload: others

Post on 09-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Kay Nimmo, Manager of Sustainability and Regulatory AffairsITRI Ltd, St Albans, AL2 2DD, UK, tel: +44(0)1727 [email protected], www.itri.co.uk

iPAD conferenceKinsahsa, 25 October 2010

ITRI Supply Chain Initiative and ‘conflict minerals’ traceability

Page 2: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Progression of Tin Mining

� Ipoh city in Malaysia.. renowned for rich tin deposits since 16th century... vulnerable to attempts from rival chiefs to seize thethrone and gain control of the lucrative tin trade... 1850’s Chinese immigrants mining by the use of waterwheel...1877 steam engine…

� Typical technological and social issues

Page 3: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Where does tin come from …?

ITRI members ~80% tin productionmines or primary smelterssecondary scrap refiners INDICATION ONLY - NOT TO SCALE

traceability

traceability ?traceability ???

Page 4: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

50% of tin from small scale or artisanal mining

0 20 40 60 80 100

Rest of world

Brazil

DR Congo

Bolivia

Peru

Indonesia

China

2007 mine production, '000t

Big Small

Potential for increased production

� Malaysia has minimal tin mining, but is a major smelter and investor

Page 5: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Forecast supply and tin price

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

1990 1995 2000 2005 2010 2015

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000Weeks' supply

Prices

�Weeks’ supply, price in US$/tonne �Forecast

Page 6: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

DRC Potential vs Current Reductions

� DRC tin value 1,061 tpm x US$ 26,500 = US$28m per month� Global large scale tin projects mainly 2 or more years away

Page 7: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Actions in Tin Supply Chain

miner

solder producer

assembler

retailer

consumer

recycler

concentrate trader

smelter refiner

metal trader

EICC, GeSI

negociants, comptoirs

etc

PHASE 2

PHASE 1

USER AUDITS

Page 8: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

iTSCi Phases and Objectives

� A Phased and Constructive Approach Towards Improved Due Diligence, Governance and Traceability

PHASE 1: LEGITIMACY OF EXPORT – AVAILABLE DATA� Harmonised document requirements on all shipments including written

declarations confirming lack of involvement of illegal armed groups

PHASE 2: TRACEABILITY FROM MINE – NEW CHALLENGE� Developing and implementing a system to ensure mineral traceability from

exporter back to the mine site and develop chain of custody data

PHASE 3: SUSTAINABILITY OF SECTOR – LONGER TERM AIM� Implementing basic social and environmental performance standard

measurement at mine sites and consider improvement plans

� Integrating third party independent audits and checking mechanism

� Priority issue of ‘conflict minerals’ – DRC and Rwanda

Page 9: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

PHASE 1

� Data collection

� Independent confirmation

Page 10: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

PHASE 1: Comptoir Certificate

Implemented from 1 st July 2009

� Requires 8-10 official DRC export docs

And best available information on;� COMPTOIR� DESCRIPTION OF MATERIAL� ORIGIN OF MATERIAL� SUPPLY ROUTE� SUPPLIER� BUYER

� Supply Chain awareness and vigilance improved

� Also required for DRC material via Rwanda

� Smelter auditors statement to ITRI

Page 11: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

PHASE 2

� Field implementation

� Data handling/statistics

� Verification

Page 12: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

PHASE 2: Traceability to Mine Site

MinecertificateReference M1234

NegociantsinformationReference N123

ComptoirsinformationReference C789

NegociantsinformationReference N456

MinecertificateReference M1234

MinecertificateReference M1234

MineinformationReference M123

MinecertificateReference M1234

MinecertificateReference M1234

MinecertificateReference M1234

MineinformationReference M456

export

� Initial pilot trial of Phase 2 started June 2010 at Kalimbi, South Kivu

� Pilot project funding from;– Industry comptoir/smelter levy on cassiterite– Contributions from traders, electronics companies, tinplate sector– Contribution from T.I.C. – Ta association

Page 13: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

At the mine

� Kalimbi, South Kivu• Currently Sn only

� SAESSCAM and miners record; • Date• Time • Tag number • Miner/co-operative• Weight• Price• Negociants/buyer• Destination

Page 14: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

At the negociant

� Nyabibwe, South Kivu

� Negociant and Div. of Mines record; • Date • Time • Mine tag number• Mine name• Weight in• Neg. tag number • Weight out• Sales price• Comptoir/buyer• Transport route

Page 15: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

At the comptoir

� Bukavu, South Kivu

� Comptoir and CEEC record: • Date• Time• Negociant tag

number• Mine name • Weight in • Price• Weight out• Export certificate

number (OFIDA)

Page 16: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

IBM ‘Maximo ’ Database & Reporting

� On-line, traceability, reporting, financial software package links� 10,000 entries = 60% of records so far; future >1 million a year� Critical part of project development

Page 17: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Verification and Audits

� Independent assessment and audit team (Channel Research)• Set up project to define terms of reference and audit method• Monthly monitoring of indicators

1. System integrity– Are suitable key checks made; weight etc – iTSCi database manager– Is tag and book information accurate – assessment team

2. Collection of field information– From iTSCi staff on site– From assessment team – Possible NGO governance network project co-operation

Page 18: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

PHASE 3

� Site conditions

� Co-operation with BGR-CTC

Page 19: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Conflict Free Smelter Program (EICC/GeSI)

� Drafting audit specifications with ITRI members and NGO’s– First audits by end 2010

� Following audit, smelter is deemed conflict or non-conflict– Suppliers/component manufacturers required to source from

those smelters– High percentage of the tin market

� Audit requirements depend on source location;Level 3 = if sourced from DRCLevel 2 = if sourced from countries adjoining the DRC, or any other

Level 1 country with no plausible mine productionLevel 1 = if sourced from other known production countries

Page 20: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

The International Dimension ….

�US disclosure from…April 2011 (?)

�OECD agreement Oct 2010... roadtest from Jan 2011

�ICGLR proposed Oct 2010…

�75% of Rwandan minerals by Dec 2010, 100% by April 2011

�DRC… currently under a mining suspension ! No funding ! No tagging ! No expansion !

Page 21: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

US Legislation – timing & impact

� Securities Exchange Commission SEC– Currently considering possible draft ‘rules’– First draft by ‘autumn’ 2010– Final rules by 15th April 2011– Could use OECD guidance as basis for rules

� Possible disclosure by US companies from April 2011– Will NOT buy metal from Africa not under iTSCi scheme f rom

April, probably before

� Comments can be made - Title XV - Miscellaneous Provisions http://www.sec.gov/spotlight/regreformcomments.shtml

Page 22: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

OECD Guidance: supply chains of minerals from conflict affected or high risk areas

� Due diligence Framework document– Supplement on tin, tantalum and tungsten– Supplement on gold (not drafted yet)

• Final draft stage, followed by ‘roadtest’

� Annex I: 5 step framework1. Company management systems

C: Systems of control and transparency through chain of custody, traceability etc

2. Identify and assess riskA: Map risks according to mineral supplement

B: Assess risk against supply chain policy

3. Design and implement risk strategy4. Independent third party audits5. Reporting on due diligence

Page 23: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

OECD Step 1:C1 local mineral exporters

EITI iTSCi phase 2

iTSCiass. team

a) all tax etc payments to government � ��

(phase 1)�

b) other payments made to governmental officials � � �

c) all payments to military or other armed groups � � �

d) ownership of the exporter �? � �

e) the mine of mineral origin � � check

f) quantity, dates and method of extraction � � check

g) locations where consolidated, traded, processed � � check

h) identification of upstream actors � � check

i) transportation routes � � check

Page 24: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

OECD Mitigation

� Annex II : model supply chain policy

• Intolerable risks• Illegal armed groups

• Public or private security forces• Bribery and fraudulent risks• Money laundering• Payments to the Government

Suspension or discontinuation

Measurable mitigation

UNDER WHAT TIMESCALES ?

Page 25: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

CONCLUSION

� Traceability is possible� Traceability and risk management is required� International markets purchase deadline Dec 2010 – April 2011

� iTSCi relevant to tin, tantalum, tungsten– Planning for implementation in Rwanda and Katanga

• Requires significant funding for rapid expansion– Local activity, community involvement– Database development– Full auditing

• Support from other programmes– Capacity building of SAESSCAM and CEEC among others

Page 26: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Thank you!

Further information can be found on ITRI Sustainability webpageswww.itri.co.uk/information/sustainability/default.asp

Page 27: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Issues in the tin market

� China: • Local mine production now well below domestic demand, low

grade/high cost mines� Indonesia:

• Small scale production falling, environmental issues� Peru:

• Reserves will be exhausted in 6-7 years� Bolivia:

• Issues with state-funded projects

� Mine projects in the rest of the world are low grade and 3 years or more away from start-up

Page 28: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Tin prices: back to the 80s!

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

Jan-70

Jan-72

Jan-74

Jan-76

Jan-78

Jan-80

Jan-82

Jan-84

Jan-86

Jan-88

Jan-90

Jan-92

Jan-94

Jan-96

Jan-98

Jan-00

Jan-02

Jan-04

Jan-06

Jan-08

Jan-10

Pric

es in

US

$/to

nne

Nominal Price Real Price

�Real prices expressed in December 2009 US$

Page 29: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Consumption recovers, supply stretched

World Supply/Demand Balances in Refined Tin('000 tonnes) Forecast

2007 2008 2009 2010e 2011WorldWorld Refined Production 344.9 325.6 323.4 324.5 333.5DLA Sales 7.7 3.7 0.0 0.0 0.0World Refined Consumption 355.6 341.1 300.4 344.5 354.2Global Market Balance -3.0 -11.8 23.0 -20.0 -20.7

Reported stocksLME 12.2 7.8 26.8 12.0 5.0Producers 25.7 35.4 28.0 20.0 12.0Consumer/other 13.7 12.5 11.6 12.0 11.0Total 51.6 55.6 66.4 44.0 28.0

World Stock Ratio(weeks consumption) 7.5 8.5 11.5 6.6 4.1

Page 30: ITRI Supply Chain Initiative and ‘conflict minerals ... · ‘conflict minerals’ traceability ... Malaysia has minimal tin mining, but is a major smelter and investor ... Developing

©

Where is tin used …..? (2007)

44.1%

8.8%

16.4%

13.9%

5.5%

2.1%9.2% Solders -

electronic

Solders -industrial

Tinplate

Chemicals

Brass &Bronze

Float glass

Other