itp for aboveground piping metallic (fabrication, erection, installation and pressure testing)
TRANSCRIPT
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 1/24
REFINERY TANKFARM PACKAGE6
Document No. Doc. Type Discipline System J! No.
SA"JER"TFAAA"PSC#"$%6&'$ IT
()A
$'''*$&+$,
ITP FR A!-EGR)ND PIPING META##ICFA!RICATIN/ ERECTIN/ INSTA##ATIN
AND PRESS)RE TESTING0
Accepted without comment
R i i
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 2/24
R i i
IMPRTANT7
No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by means of
electronic, mechanical, photocopying, recording, or otherwise, without the written permission of Rotary Engineering Limited.
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 3/24
REFINERY TANK FARMPACKAGE 6
Re1ision 8isto3y
Re1ision Re1ision 52te P29e Scope o:
00 28-APR-2010 8 ISSUE FOR REVIEW
01 2"-MA-2010 8 ISSUE FOR APPROVA!
02 2"-AU#-2010 8 PA#E " )
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 4/24
REFINERY TANK FARMPACKAGE 6
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 5/24
REFINERY TANK FARMPACKAGE 6
TA!#E F CNTENTS
P7e
150 #E%ERA! REUIREME%&S99999955599999999999999999999553
250 PIPI%# PRE-FARI$A&IO%955955999999999999999999999999553
50 PIPI%# FARI$A&IO% .S'OP9995959959999999999999999999556
"50 ERE$&IO% .FIE!*999999999555999999999999999999999558
350 FI%A! I%SPE$&IO% : *O$UME%&A&IO%955555555555555555555555555555559995999995995555;
ATTACHMENTS
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 6/24
REFINERY TANK FARM PACKAGE6
ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN ERECTIN INSTA##ATIN
E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+ Au9 *'%'
Document No.7SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 7/24
%.' SCPE
&hi< In<pection nd te<t p,n .I&P i< $on<t=uction I&P/ nd it de>ine< the e?tent o> $ont=cto=@</ it@< Sucont=cto=@<:4endo=@< .i> nB nd $ompnB o= $ompnB Rep=e<entti4eC< in4o,4ement >o=
in<pection =eDui=ed 7in<t ech cti4itB o> o4e7=ound Met,,ic Pipin7 .F=iction/ e=ection/ in<t,,tion ) p=e<<u=e te<tin7 ope=tion >o= Re>ine=B &n F=m Pc7e 65 &hi< i< p=ep=ed in
cco=dnce with the Schedu,e- nd P=oect Speci>iction< o> Re>ine=B &n F=m Pc7e 65 &he In<pecto=< in4o,4ed in thi< witne<< nd =e4iew cti4itie< wi,, e 7ene=,,B nown < Inspection
Rep3esent2ti1e IR05
*.' DEFINITINS INSPECTIN REPRESENTATI-E=S IN-#-EMENT
&he e?tent nd ntu=e o> in4o,4ement o> $ont=cto= o= it< Sucont=cto=:4endo= nd $ompnB@< Rep=e<entti4e 7in<t ech cti4itB o> ,<tin7 nd cotin7 ope=tion wi,, e indicted on the I&P
B men< o> the ,ette=</ 8/ >/ R 2n5 I/ < de>ined in the >o,,owin7+
8 ? 8ol5 Point7 At 8ol5 Point/ the <peci>ied cont=o,< nd te<t< <h,, not e c==ied out without the p=e<ence o> $ont=cto=C< o= $ompnBC< .< pp,ic,e pe= I&P In<pecto=5 Witne<<in7 B
$ont=cto=@< o= $ompnB@< Rep=e<entti4e i< mndto=B t @'o,d Point@/ un,e<< documented wi4e=/ <ttin7 tht $ont=cto=@< o= $ompnB@< =ep=e<entti4e wi,, not e
p=e<ent/ h< een i<<ued5 &he $ont=cto= o= it< Sucont=cto=:Vendo= <h,, not p=oceed to ne?t cti4itB un,e<< thi< cti4itB h< een pe=>o=med to the <ti<>ction o> the
$ont=cto=@< o= $ompnB@< IR5 At 'o,d Point/ the $ont=cto= o= it< Sucont=cto= .whiche4e= i< pp,ic,e/ mu<t <umit the In<pection %oti>iction in d4nce < <tted
e,ow5
> ? >itness Point7 At >itness Point/ the <peci>ied cont=o,< nd te<t< to e witne<<ed B $ont=cto=@< o= $ompnB@< IR5 'owe4e=/ i> $ont=cto=@< o= $ompnB@< IR i< not p=e<ent t the <peci>ied
dte nd time pe= In<pection %oti>iction/ the $ont=cto= o= it< Sucont=cto=:Vendo= .< pp,ic,e/ cn p=oceed to the ne?t <tep5 In tht c<e/ $ont=cto=@< o= $ompnB@< IR
wi,, =e4iew the documenttion =e,ted to thi< cti4itB t de>ined dte5 When pe=cent7e 4,ue i< indicted 7in<t nB witne<< cti4itB e575/ W .10G/ then tht p=ticu,=
in<pection cti4itB wi,, e witne<<ed < pe= pe=cent7e indicted within the =cet/ othe=wi<e/ the in<pection wi,, e con<ide=ed < 100G5 &he <e,ection o> in<pection
<mp,e< nd the noti>iction time/ >o= the c<e o> pe=cent7e in<pection/ wi,, e 7=eed upon etween the $ont=cto=@< nd $ompnB@< IR5 At Witne<< Point/ the $ont=cto=
o= it< Sucont=cto= .whiche4e= i< pp,ic,e/ mu<t <umit the In<pection %oti>iction in d4nce < <tted e,ow5
R ? Re1ie@ Point7 At Re1ie@ Point the Du,itB document< .=eco=d</ =epo=t< etc5 wi,, e =e4iewed B the =e,e4nt IR<5 &he IR< wi,, <i7n the Du,itB document< i> it comp,B the pu=ch<e o=de= o=
p=oect <peci>iction< in Due<tion5 &he $ont=cto= o= it< Sucont=cto= <h,, not <umit In<pection %oti>iction >o= nB Re4iew Point to the $ompnB o= it< Rep=e<entti4e/ nd
the cti4itB cn e c==ied out without the p=e<ence o> $ompnB@< IR5 &he =e,e4nt document< >o= tht cti4itB <h,, e mintined B the $ont=cto= o= it< Sucont=cto= ndwi,, e mde 4i,,e >o= =e4iew $ompnB IR t n 7=eed dte nd time5
I ? In:o3m2tion Point7 &he In:o3m2tion Point i< intended to p=o4ide in>o=mtion on nB cti4itB5 &he IR mB o<se31e tht p=ticu,= cti4itB t thei= di<c=etion5 &he $ont=cto= o= it< Sucont=cto=
<h,, not <umit In<pection %oti>iction >o= nB In>o=mtion Point to the $ompnB o= it< Rep=e<entti4e5
&he In<pection %oti>iction .ReDue<t >o= In<pection <h,, e i<<ued to $OMPA% o= it< Rep=e<entti4e 2t le2st *+ 63s. in 25 1 2nce :o3 inspect ion on no3m2l @ o34in9 52y s/ 2n5 +, 63s in 25 1 2nce :o3
inspection on @ ee4en5s 2n5 6oli52y s.
$.' REFERENCES
51 P=oect u,itB P,n .SA-ER-&FAAA-PS$!-";6301
52 In<pection P=ocedu=e .SA-ER-&FAAA-PS$!-306663
5 Mte=i, u,itB $ont=o, nd Mte=i, &=cei,tiB P=ocedu=e .SA-ER-&FAAA-PS$!-306313
5" Pipin7 F=iction P=ocedu=e .SA-ER-&FAAA-PS$!-308182
53 Pipin7 E=ection t Site P=ocedu=e .SA-ER-&FAAA-PS$!-30818
56 'Bd=o<ttic &e<t P=ocedu=e >o= Pipin7 .SA-ER-&FAAA-PS$!-308181
5H !imittion< on Pipe oint< ) $omponent< .ERES-!-110
+.' #EGENDS
"51SA&ORP men< SAU*I ARAM$O &O&A! Re>inin nd Pet=ochemic, $om n 5 In the I&P/ SA&OPR =e =e<ent< $om n In< ection Re =e<entti4eDoc. No. SA-JER-TFAAA-PSCL-316503 Rev. 0 Page No.! 4 of
9
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 8/24
REFINERY TANK FARM PACKAGE 6
ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND
PRESS)RE TESTING0
E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+"A)G"*'%'
Document No.7 SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*
ACTI-ITY
No.
DESCRIPTIN
F
ACTI-ITIES
PERSNNE
#
RESPNSI!
APP#ICA!#E
PRCED)RES
()A#ITY CNTR#
RE()IREMENT
-ERIFYING
ACCEPTAN
CE
CRITERI
INSPECTI
N
STAGE
INSPECTIN PINTS :o3 RFI
S)!"CN
PSC# (C SATRP
%.' GENERA# RE()IREMENTS
151 P=e-In< pect ionMeetin7
.PIM on Pipin7
$on<t=uction
Mn7ement
PIM A7end Minute< o> PIM Schedu,e e>o=e <t=t o>1<t
F=iction
" - 8 - 8 -
152 Ve=i >Bin7 the pp=o4,o>
*ocument< o>
Speci>iction</
P=ocedu=e</
$ Mn7e= )$
In<pecto=
P=oect u,itBP,n
.SA-ER-&FAAA-PS$!-";6301
P=ocedu=e< :
Speci>iction:*=win7<>o=
Re>ine=B &n F=m
$ompnB App=o4, e>o=e <t=t o>1<t
In<pection
" - R - R -
*.' PIPING PRE"FA!RICATIN
251 Recei4in7 In<pect iono>
Mte=i,<
$ In<pecto=)
W=ehou<eSupe=4i<o=
Mte=i, u,itB $ont=o,nd
Mte=i, &=cei,tiB
P=ocedu=e .SA-ER-&FAAA-
PS$!-306313/ In<pectionP=ocedu=e .SA-ER- &FAAA-
PS$!-30630"/ Pcin7 !i<t/
Mi,, &e<t$e=ti>icte /
Mte=i, Recei4in7 )Sto=7e
In<pectionRepo=t
PS$!-SA&ORP-#E%-002
22H1-AAA-SM-80"
e>o=eF=iction
" - 8 - > -
252 Sto=7e o> Mte=i,< W =ehou<eSupe=4i<o=
SA-ER-&FAAA-PS$!-306313/
Pcin7 !i<t/ *=win7 )*t
Sh
Mi,, &e<t$e=ti>icte /
Mte=i, Recei4in7 )Sto=7e
In<pection
22H1-AAA-SM-80"
e>o=eF=iction
" - > - R -
25 We,d Mp : Pipe Spoo,
M=in7 : App=o4,
$ In<pecto= P)I*/ ISO dw7 P)I*/ ISO dw7 P)I*/ ISO dw7 e>o=eF=iction
" - 8 >
$.' PIPING FA!RICATIN
51 *imen<ion, $hec
.e>o=e cuttin7 )we,din7
$ In<pecto= IF$ *=win7</In<pection
P=ocedu=e .SA-ER-&FAAA-
PS$!-30630"/ Pipin7F=iction P=ocedu=e .SA-
ER-
&FAAA-PS$!-308182/
V ) *Repo=t
PS$!-SA&ORP-A$-
003
IF$ *=win7</In<pection
P=ocedu=e .SA-ER-
&FAAA-PS$!-30630"/ Pipin7
F=iction
P=ocedu=e .SA-ER-
P=io= to We,din7
Wo=< " - > - > -
52 Fit-up chec $ In<pecto= IF$ *=win7</In<pection
P=ocedu=e .SA-ER-&FAAA-
PS$!-30630"/ Pipin7
F=iction P=ocedu=e .SA-
ER-
&FAAA-PS$!-308182/
V ) *Repo=t
PS$!-SA&ORP-A$-003
IF$ *=win7</In<pection
P=ocedu=e .SA-ER-
&FAAA-PS$!-
30630"/ Pipin7
F=iction
P=ocedu=e .SA-ER-
P=io= to We,din7
Wo=< " - > - > -
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 9/24
SA-ER-&FAAA-PS$!-1630Re45 02 P7e 3 o> ;
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 10/24
REFINERY TANK FARM PACKAGE 6
ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND PRESS)RE
TESTING0
E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+"A)G"*'%'
Document No.7 SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*
ACTI-ITY No.
DESCRIPTIN F PERSNNE#
APP#ICA!#E PRCED)RES
()A#ITY CNTR#
RE()IREMENT
ACCEPTANCE INSPECTIN INSPECTIN PINTS :o3 RFI
ACTI-ITIES RESPNSI!#E
-ERIFYING DC)MENTS
CRITERIA STAGE S)!"CN PSC# (C SATRP
5 We,dment Vi<u,
In<pection
$ In<pecto= IF$ *=win7</ We,din7 $ont=o,
P=ocedu=e .SA-ER-&FAAA-
PS$!-30630"/ In<pection
P=ocedu=e .SA-ER-&FAAA-
PS$!-30630"/ ERES-!-110/
ERES-W-011
V ) * Repo=t
PS$!-SA&ORP-A$-003
IF$ *=win7</ We,din7
$ont=o, P=ocedu=e .SA-
ER-&FAAA-PS$!-
30630"/ In<pection
P=ocedu=e .SA-ER-
&FAAA-PS$!-30630"/
ERES-!-110/ ERES-W-
011
A>te= Fit-up $hec" - > - > -
5" %*E on we,ded oint<
.Pe=cent7e =eDui=ement
o> %*E wi,, e < pe= ,ine
,i<t : ISO *w7
=eDui=ement<
$ In<pecto= %*E P=ocedu=e %*E Repo=t %*E P=ocedu=e A>te= We,din7 wo=<8 - 8 - 8 -
53 PW'& .A< pp, ic,e pe=
,ine c,<<
$ In<pecto= PW'& Fo= u,,et &n Pipin7
.!oc,iJed .SA-ER-&FAAA-
A$ In<pection Fo=m .Fo=m
%o+ &55A
PW'& Fo= u,,et &n
Pipin7 .!oc,iJed .SA-
A>te= %*E
comp,eted " - 8 - 8 -
56 '=dne<< &e<t .A<
pp,ic,e pe= ,ine c,<<
PS$!-308061 ER-&FAAA-PS$!-
308061$ In<pecto= Su-$ont=cto= P=ocedu=e Su-$ont=cto= Fo=m Su-$ont=cto=
P=ocedu=e
A>te= PW'&8 - 8 - 8 -
5H Fie,d V,4e &e<tin7 .A< $ In<pecto= IF$ *=win7</ In<pection A$ In<pection Fo=m .Fo=m IF$ *=win7</ In<pection e>o=e Shop
" - 8 8pe= <tnd=d
=eDui=ement
02
P=ocedu=e .SA-ER-&FAAA-
PS$!-30630"/ 'Bd=o<ttic &e<t
P=ocedu=e >o= Pipin7 .SA-ER-
&FAAA-PS$!-308181
%o+ &55A P=ocedu=e .SA-ER-
&FAAA-PS$!-30630"/
'Bd=o<ttic &e<t
P=ocedu=e >o= Pipin7 .SA-
ER-&FAAA-PS$!-
308181
Re,e<e
58 Shop In<pect ion e>o=e $ In<pecto= IF$ *=win7</ In<pect ion #ene=, In<pection Repo=t IF$ *=win7</ In<pect ion A>te= ,, F=ict ion
" - > - > -=e,e<e P=ocedu=e .SA-ER-&FAAA-PS$!-30630"/ Pipin7 F=iction
P=ocedu=e .SA-ER- &FAAA-
PS$!-308182/ ERES-!-
110
.PS$!-SA&ORP-A$-011 P=ocedu=e .SA-ER-&FAAA-PS$!-30630"/
Pipin7 F=iction
P=ocedu=e .SA-ER-
&FAAA-PS$!-308182/
ERES-!-110
wo=< in<pected ndpp=o4ed5
5; Re,e<e %ote . i> nB
>=om Shop
$ In<pecto= P=oect u,itB P,n
.SA-ER-&FAAA-PS$!-";6301/
Re,e<e %ote $ompnB App=o4, A>te= ,, F=iction
wo=< in<pected nd
pp=o4ed5"
-8
-R
-
+.' ERECTIN FIE#D0
"51 Site Recei4in7 In<pection $ In<pecto= IF$ *=win7</ In<pection
Mi,, &e<t $e=ti>icte / IF$ *=win7</ In<pection *u=in7 Site
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 11/24
" - > - > - P=ocedu=e .SA-ER-&FAAA-
PS$!-30630"
Mte=i, Recei4in7 ) Sto=7e
In<pection Repo=t
PS$!-SA&ORP-#E%-002 )
00
P=ocedu=e .SA-ER-
&FAAA-PS$!-30630"
Recei4in7
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 12/24
REFINERY TANK FARM PACKAGE 6
ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND
PRESS)RE TESTING0
E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+"A)G"*'%'
Document No.7 SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*
ACTI-ITY
No.
DESCRIPTIN
F
ACTI-ITIES
PERSNNE
#
RESPNSI!
APP#ICA!#E
PRCED)RES
()A#ITY CNTR#
RE()IREMENT
-ERIFYING
ACCEPTAN
CE
CRITERI
INSPECTI
N
STAGE
INSPECTIN PINTS :o3 RFI
S)!"CN
PSC# (C SATRP
"52 *imen<ion, $hec
.e>o=e we,din7
$ In<pecto= IF$ *=win7</ In<pection
P=ocedu=e .SA-ER-&FAAA-
PS$!-30630"/ Pipin7
E=ection t Site P=ocedu=e
.SA-ER-&FAAA- PS$!-
30818/ ERES-!-110
V ) *Repo=t
PS$!-SA&ORP-A$-003
IF$ *=win7</
In<pection P=ocedu=e
.SA-ER- &FAAA-
PS$!-30630"/ Pipin7
E=ection t Site
P=ocedu=e .SA-ER-
&FAAA-PS$!-
30818/ ERES-!-
P=io= We,din7wo=<
" - > - > -
"5 !e4e,/ E,e4tion nd
A,i7nment chec o>
the <<em,ed
pipe<
$ In<pecto= IF$ *=win7</In<pection
P=ocedu=e .SA-ER-&FAAA-
PS$!-30630"/ Pipin7
E=ection t Site P=ocedu=e
.SA-ER-&FAAA- PS$!-
30818/ ERES-!-110
#ene=, In<pectionRepo=t
.PS$!-SA&ORP-A$-011
IF$ *=win7</In<pection
P=ocedu=e .SA-ER-
&FAAA-PS$!-
30630"/ Pipin7
E=ection t Site
P=ocedu=e .SA-ER-
&FAAA-PS$!-
A>te= *imen<ion,
$hec " - 8 - > -
"5" Fit-up o> F ie,d we,ded
oint<
$ In<pecto= IF$ *=win7</In<pection
P=ocedu=e .SA-ER-&FAAA-
PS$!-30630"/ Pipin7
E=ection t Site P=ocedu=e
.SA-ER-&FAAA- PS$!-
30818/ ERES-!-110
V ) *Repo=t
PS$!-SA&ORP-A$-003
IF$ *=win7</In<pection
P=ocedu=e .SA-ER-
&FAAA-PS$!-
30630"/ Pipin7
E=ection t Site
P=ocedu=e .SA-ER-
&FAAA-PS$!-
A>te= A,i7nment
$hec " - > - >
"53 We,dment In<pection $ In<pecto= IF$ *=win7</ We,din7$ont=o,
P=ocedu=e .SA-ER-
&FAAA- PS$!-30630"/
In<pection P=ocedu=e
.SA-ER-&FAAA- PS$!-
V ) *Repo=t
PS$!-SA&ORP-A$-003
IF$ *=win7</We,din7
$ont=o, P=ocedu=e
.SA- ER-&FAAA-
PS$!-
30630"/ In<pection
A>te= Fit-up
In<pection " - > - > -
"56 #<et Ve=i>iction $ In<pecto= ISO *=win7</
In<pectionP=ocedu=e .SA-ER-
*=win7</
In<pectionP=ocedu=e .SA-
" -
8 -
> -
"5H W e,din7 Vi<u,
In<pection .>te=we,din7
$ In<pecto= IF$ *=win7</In<pection
P=ocedu=e .SA-ER-
&FAAA- PS$!-30630"
V ) *Repo=t
PS$!-SA&ORP-A$-003
IF$ *=win7</In<pection
P=ocedu=e .SA-
ER- &FAAA-PS$!-
A>te= we,din7wo=<
" - > - 8 -
"58 o,t &o=Duin7 $ In<pecto= " - 8 - 8 -
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 13/24
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 14/24
REFINERY TANK FARM PACKAGE 6
ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND
PRESS)RE TESTING0
E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+"A)G"*'%'
Document No.7 SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*
ACTI-ITYNo.
DESCRIPTIN
F
ACTI-ITIES
PERSNNE
#
RESPNSI!
APP#ICA!#EPRCED)RES
()A#ITY CNTR#
RE()IREMENT
-ERIFYING
ACCEPTAN
CE
CRITERI
INSPECTI
N
STAGE
INSPECTIN PINTS :o3 RFI
S)!"CN
PSC# (C SATRP
"510 PW'& .A< pp,ic,e
pe= ,ine c,<<
$ In<pecto= PW '& Fo= u,,et &n
Pipin7 .!oc,iJed .SA-
ER-&FAAA- PS$!-
308061
A$ In<pection Fo=m.Fo=m
%o+&55A
PW'& Fo= u,,et
&n Pipin7
.!oc,iJed .SA-
ER-&FAAA-PS$!-
A>te= %*E
comp,eted " - 8 - 8 -
"511 '=dne<< &e<t .A<
pp,ic,e pe= ,inec,<<
$ In<pecto= Su-$ont=cto= P=ocedu=e Su-$ont=cto= Fo=m Su-$ont=cto=
P=ocedu
A>te= PW'& " - 8 - 8 -
"512 &e<t Pc7e4e=i>iction
$ In<pecto= P)I*/ ISO dw7 &e<t Pc !i<t P)I*/ ISO dw7 A>te= %*E
comp,eted
nd
" - > - " -
"51 !ine $hec =e4iewe>o=e
=e,e<e >o= 'Bd=o<ttic
$ In<pecto= P)I*/ ISO dw7 P)I*/ ISO dw7 P)I*/ ISO dw7 A>te= &e<tPc7e
4e=i>ied ndc,e=ed
" - > - > -
"51
!ine Modi>iction i> nB
>te= Acceptnce .,t
$ In<pecto= P)I*/ ISO dw7 P)I*/ ISO dw7 P)I*/ ISO dw7 e>o=e =e,e<e
>o= 'Bd=o<ttic &e<t
" - > - 8 -
"51" 'Bd=o<ttic &e<t $ In<pecto= IF$ *=win7</In<pection
P=ocedu=e .SA-ER-&FAAA-
PS$!-30630"/ 'Bd=o<ttic
&e<t P=ocedu=e >o= Pipin7
.SA-ER- &FAAA-PS$!-
308181/ &e<t Pc
A$ In<pection Fo=m.Fo=m
%o+&55A
IF$ *=win7</In<pection
P=ocedu=e .SA-ER-
&FAAA-PS$!-
30630"/ 'Bd=o<ttic
&e<t P=ocedu=e >o=
Pipin7 .SA- ER-
&FAAA-PS$!-
A>te= %*E
comp,eted
nd
ccepted
" - 8 - 8 -
"513 F,u<hin7 $ In<pecto= IF$ #A *w7/ ISO *w7/P)I*/
A$ In<pection Fo=m.Fo=m
IF$ #A *w7/ ISO*w7/
A>te= 'Bd=o<ttic
&e<tin7 " - > - > -
"513
!B up $ In<pecto= P)I*/ ISO dw7 P)I*/ ISO dw7 P)I*/ ISO dw7 A>te= F,u<hin7 " - > - > -
"516 Re-in<ttement $ In<pecto= P)I*
A$ In<pection Fo=m.Fo=m
P)I*
A>te= F,u<hin7 " - > - > -
"51H Pintin7 Pintin7 In<pecto= Re>e= to I&P FOR PIPI%# !AS&I%# A%* PAI%&I%# + SA-ER-&FAAA-PS$!-1666"
SA-ER-&FAAA-PS$!-1630Re45 02P e 8 o> ;
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 15/24
REFINERY TANK FARM PACKAGE 6
ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND
PRESS)RE TESTING0
E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+"A)G"*'%'
Document No.7 SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*
ACTI-ITYNo.
DESCRIPTIN
F
ACTI-ITIES
PERSNNE
#
RESPNSI!
APP#ICA!#EPRCED)RES
()A#ITY CNTR#
RE()IREMENT
-ERIFYING
ACCEPTAN
CE
CRITERI
INSPECTI
N
STAGE
INSPECTIN PINTS :o3 RFI
S)!"CN
PSC# (C SATRP
&.' FINA# INSPECTIN DC)MENTATIN
351 Fin, In<pect ion e>o=e
=e,e<e
$ In<pecto= IF$ *=win7</In<pection
P=ocedu=e .SA-ER-
&FAAA- PS$!-30630"
#ene=, In<pectionRepo=t
.PS$!-SA&ORP-A$-011
IF$ *=win7</In<pection
P=ocedu=e .SA-
ER- &FAAA-PS$!-
A>te= ,, E=ection
wo=< in<pected
nd pp=o4ed5
" - 8 - > -
352 F in, In<pect ion*o<<ie=<
$ In< pecto= *t oo : < ui,td=win7<
*t oo/ P5O5 *t oo : <ui,t
d=win
A>te= comp,etiono>
,, the o4e
" - 8 - R -
A TT A C8 M EN T S7
PS$!-SA&ORP-#E%-002 - MA&ERIA! I%SPE$&IO% REPOR&
PS$!-SA&ORP-#E%-00 - MA&ERIA!+ RE$EIVI%#/ S&ORA#E A%* 'A%*!I%# I%SPE$&IO%
$'E$(!IS& PS$!-SA&ORP-A$-003 - VISUA! ) *IME%SIO% REPOR&
PS$!-SA&ORP-A$-011 - #E%ERA! I%SPE$&IO%
REPOR& &A - %*E FORM
SA-ER-&FAAA-PS$!-1630Re45 02P e ; o> ;
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 16/24
PE&RO!S&EE! $O !&*>o.,l .......U J., ..>!"u.#
REFINERY TANK FARM PACKAGE 6
MATERIAL INSPECTION REPORT
s$%
fL&'ation()rea(Unit+
RE*&R+ N&.+
*iscipline$
+unbv,e I *ipinv, I tructure I
&thers$-)+E
+
R.)+ER/)L0eatI *lateI 'ast
1+2./N'ER+./3(L-imension4isual
No. )+ER/)L
/5E ,*E'/#/')+/&N
No. *'
)NlJ#)'+/JRER
N&
)''
R
E
)
'
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 17/24
REJ
Remar6s$
.'. /N*E'+&R7*'L8,)+&R*RE*.
i
Name
Name
*ale
*ale
=o=m6,%o5+1-@S$I5- SA&ORI-@- 7".N .02 , tK4-*
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 18/24
REFINERY TANK
FARM PACKAGE
MATERIA#7 RECEI-ING/ STRAGE AND 8AND#ING INSPECTIN C8ECK#IST
Sto3e5 A3e2 #oc2tion 7 Repo3t No. 7
P.. No. 7 D2te 7
Type o: M2te3i2l7
$otin7 : A=<i4e P,te< Pipe< St=uctu=, item< In<t=ument<
Rottin7 EDuipment V,4e< F,n7e< We,din7 $on<um,e< EDuipment<
Othe=<+%ote+ P,e<e ttch de,i4e=B =epo=t ) MIR with thi< =epo=t
App=op=ite 'nd,in7 ) Sto=7e P=oceud=e %o5+
S3. No. Desc3iption o: Cec4 Result Si9n2tu3ePSC# (C0Acce ReBec
1 Ve=i>B tht identi>iction< nd m=in7< =e intct
2 A4i,i,itB o> =e,ted document< on >i,e .e575
M&$/ M)*S/ etc5
Ve=i>B tht co4e=</ p,u7</ nd cp< =e intct
"Ve=i>B tht tempo==B p=e<e=4ti4e< nd cotin7<
=e intct
3
Ve=i>B A4i,i,itB nd condition o> Sto=7e >ci,itie</
u=ntine =e</ mte=i, hnd,in7 eDuipment
) Wethe= p=otection mte=i,<6 Ve=i>B tht the=e i< no e4idence o> phB<ic, dm7e
H Ve=i>B tht p=ope= c,en,ine<< i< ein7 mintined
8 Ve=i>B tht in<t=ument =c< =e ene=7iJed <
;Ve=i>B tht eDuipment h< een te<ted <
<peci>ied nd document< in p,ce
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 19/24
1Ve=i>B tht the=e =e no e?ce<<i4e ,e4e,< o> du<t
nd di=t
11 Ve=i>B tht no contine= item< =e =oen o= ,ein7
1Ve=i>B the <>etB ) <ecu=itB =eDui=ement< >o=
<to=7e =e<
1Ve=i>B tht <to=7e ,e4e, h< een mintined <
pe= pp=op=ite p=ocedu=e
D isc 3 ep2nc i es7
PSC# " SATR
N2me7
Si9n7
D2te7
Fo=mt %o5+ PS$!-SA&ORP-#E%-00 Re451
DESCR"PT"#N RE$D MEAS%RED REMAR&S
REFINERY TANK
FARM PACKAGE
VISUAL & DIMENSION REPORTEquipment Tag No. : Repot No. :
Equipment Tag Name : Date :
Aea ! Unit : Da"ing No. :
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 20/24
Mateia# De$%iption.:
. PLATE IDENTI'I(ATION:
Ma) No.!
T*i%)ne$$
R$D Ac*+a,
!
Tota# S*eet!
MIR Re ot No !
2. VISUAL INSPE(TION:ACCEPTALE%NACCEPTALE !
-. (UTTIN DRA/IN:
C#MMENTS! D"MENS"#NS #SER/ED ARE "TH"N T#LERANCE L"M"TS
0. 1EVELIN
ACCEPTALE %NACCEPTALE !
. ROLLIN
"NS"DE D"AMETER !
C#MMENTS
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 21/24
Rema)$:
+A!+( In$pe%to 3PS(L4 SATORP REP.
Signatue : Signatue
: Name :
Name : Fo1(a* No.! PSCL - SAT#RP - $A$C - 005 Rev.202
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 22/24
REFINERY TANK
FARM PACKAGE
INSPECTION REPORT
Equipment Tag No. : Repot No. :
Equipment Tag Name : Date :
Aea ! Unit : Da"ing No. :
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 23/24
1. TYPE OF INSPECTION
/N*E'+/&N ( +E+ ( E9)/N)+/&N ( '0E':
2. INSPECTION ITEM
3. INSPECTION RESULT
1' )''E*+E- ( 1' REJE'+E-
4. REMARKS
/;N)+URE$
/;N)+URE$
$$ N)E N)E
( PSCL - QC INSPECTOR ) ( SATORP)
8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)
http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 24/24
#ormat No.$ *'L )+&R* 1)1' <"" Rev.=<=