REFINERY TANK FARM PACKAGE 6 Document No. Doc. Type Discipline System J! No. SA"JER"TFAAA"PSC#"$%6&'$ I T () A $'''*$&+$, ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND PRESS)RE TESTING0  Accept ed witho ut commen t Re1isio n  Rem23 4s Issue5 D2te Retu3n D2te 0 ISSUE FOR REVIEW 28-APR-2010 06-MA-2010 0 ISSUE FOR APPROVA! 2"-MA -2010 10-AU#-2010 0 ISSUE FOR $O%S&RU$&IO% 2"-AU#-2010 WI!SO% SIM ES&'ER (O' SA(I%UR RA'MA% P3ep23e5 !y Cec4e5 !y App3o1e5 !y Issue5 !y

Upload: rakhesh-rajeevan

Post on 04-Jun-2018

308 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 1/24

REFINERY TANKFARM PACKAGE6

Document No. Doc. Type Discipline System J! No.

SA"JER"TFAAA"PSC#"$%6&'$ IT

()A

$'''*$&+$,

ITP FR A!-EGR)ND PIPING META##ICFA!RICATIN/ ERECTIN/ INSTA##ATIN

AND PRESS)RE TESTING0

 Accepted without comment

R i i

Page 2: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 2/24

R i i

IMPRTANT7

 No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by means of

electronic, mechanical, photocopying, recording, or otherwise, without the written permission of Rotary Engineering Limited.

Page 3: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 3/24

REFINERY TANK FARMPACKAGE 6

Re1ision 8isto3y

Re1ision Re1ision 52te P29e Scope o:

00 28-APR-2010 8 ISSUE FOR REVIEW

01 2"-MA-2010 8 ISSUE FOR APPROVA!

02 2"-AU#-2010 8 PA#E " )

Page 4: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 4/24

REFINERY TANK FARMPACKAGE 6

Page 5: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 5/24

REFINERY TANK FARMPACKAGE 6

TA!#E F CNTENTS

P7e

150 #E%ERA! REUIREME%&S99999955599999999999999999999553

250 PIPI%# PRE-FARI$A&IO%955955999999999999999999999999553

50 PIPI%# FARI$A&IO% .S'OP9995959959999999999999999999556

"50 ERE$&IO% .FIE!*999999999555999999999999999999999558

350 FI%A! I%SPE$&IO% : *O$UME%&A&IO%955555555555555555555555555555559995999995995555;

ATTACHMENTS

Page 6: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 6/24

REFINERY TANK FARM PACKAGE6

ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN ERECTIN INSTA##ATIN

E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+ Au9 *'%'

Document No.7SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*

Page 7: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 7/24

%.' SCPE

&hi< In<pection nd te<t p,n .I&P i< $on<t=uction I&P/ nd it de>ine< the e?tent o> $ont=cto=@</ it@< Sucont=cto=@<:4endo=@< .i> nB nd $ompnB o= $ompnB Rep=e<entti4eC< in4o,4ement >o=

in<pection =eDui=ed 7in<t ech cti4itB o> o4e7=ound Met,,ic Pipin7 .F=iction/ e=ection/ in<t,,tion ) p=e<<u=e te<tin7 ope=tion >o= Re>ine=B &n F=m Pc7e 65 &hi< i< p=ep=ed in

cco=dnce with the Schedu,e- nd P=oect Speci>iction< o> Re>ine=B &n F=m Pc7e 65 &he In<pecto=< in4o,4ed in thi< witne<< nd =e4iew cti4itie< wi,, e 7ene=,,B nown < Inspection

Rep3esent2ti1e IR05

*.' DEFINITINS INSPECTIN REPRESENTATI-E=S IN-#-EMENT

&he e?tent nd ntu=e o> in4o,4ement o> $ont=cto= o= it< Sucont=cto=:4endo= nd $ompnB@< Rep=e<entti4e 7in<t ech cti4itB o> ,<tin7 nd cotin7 ope=tion wi,, e indicted on the I&P

B men< o> the ,ette=</ 8/ >/ R 2n5 I/ < de>ined in the >o,,owin7+

8 ? 8ol5 Point7  At 8ol5 Point/ the <peci>ied cont=o,< nd te<t< <h,, not e c==ied out without the p=e<ence o> $ont=cto=C< o= $ompnBC< .< pp,ic,e pe= I&P In<pecto=5 Witne<<in7 B

$ont=cto=@< o= $ompnB@< Rep=e<entti4e i< mndto=B t @'o,d Point@/ un,e<< documented wi4e=/ <ttin7 tht $ont=cto=@< o= $ompnB@< =ep=e<entti4e wi,, not e

p=e<ent/ h< een i<<ued5 &he $ont=cto= o= it< Sucont=cto=:Vendo= <h,, not p=oceed to ne?t cti4itB un,e<< thi< cti4itB h< een pe=>o=med to the <ti<>ction o> the

$ont=cto=@< o= $ompnB@< IR5 At 'o,d Point/ the $ont=cto= o= it< Sucont=cto= .whiche4e= i< pp,ic,e/ mu<t <umit the In<pection %oti>iction in d4nce < <tted

e,ow5

> ? >itness Point7  At >itness Point/ the <peci>ied cont=o,< nd te<t< to e witne<<ed B $ont=cto=@< o= $ompnB@< IR5 'owe4e=/ i> $ont=cto=@< o= $ompnB@< IR i< not p=e<ent t the <peci>ied

dte nd time pe= In<pection %oti>iction/ the $ont=cto= o= it< Sucont=cto=:Vendo= .< pp,ic,e/ cn p=oceed to the ne?t <tep5 In tht c<e/ $ont=cto=@< o= $ompnB@< IR

wi,, =e4iew the documenttion =e,ted to thi< cti4itB t de>ined dte5 When pe=cent7e 4,ue i< indicted 7in<t nB witne<< cti4itB e575/ W .10G/ then tht p=ticu,= 

in<pection cti4itB wi,, e witne<<ed < pe= pe=cent7e indicted within the =cet/ othe=wi<e/ the in<pection wi,, e con<ide=ed < 100G5 &he <e,ection o> in<pection

<mp,e< nd the noti>iction time/ >o= the c<e o> pe=cent7e in<pection/ wi,, e 7=eed upon etween the $ont=cto=@< nd $ompnB@< IR5 At Witne<< Point/ the $ont=cto=

o= it< Sucont=cto= .whiche4e= i< pp,ic,e/ mu<t <umit the In<pection %oti>iction in d4nce < <tted e,ow5

R ? Re1ie@ Point7  At Re1ie@ Point the Du,itB document< .=eco=d</ =epo=t< etc5 wi,, e =e4iewed B the =e,e4nt IR<5 &he IR< wi,, <i7n the Du,itB document< i> it comp,B the pu=ch<e o=de= o=

p=oect <peci>iction< in Due<tion5 &he $ont=cto= o= it< Sucont=cto= <h,, not <umit In<pection %oti>iction >o= nB Re4iew Point to the $ompnB o= it< Rep=e<entti4e/ nd

the cti4itB cn e c==ied out without the p=e<ence o> $ompnB@< IR5 &he =e,e4nt document< >o= tht cti4itB <h,, e mintined B the $ont=cto= o= it< Sucont=cto= ndwi,, e mde 4i,,e >o= =e4iew $ompnB IR t n 7=eed dte nd time5

I ? In:o3m2tion Point7 &he In:o3m2tion Point i< intended to p=o4ide in>o=mtion on nB cti4itB5 &he IR mB o<se31e tht p=ticu,= cti4itB t thei= di<c=etion5 &he $ont=cto= o= it< Sucont=cto=

<h,, not <umit In<pection %oti>iction >o= nB In>o=mtion Point to the $ompnB o= it< Rep=e<entti4e5

&he In<pection %oti>iction .ReDue<t >o=  In<pection <h,, e i<<ued to $OMPA% o=  it< Rep=e<entti4e 2t le2st *+ 63s. in 25 1 2nce :o3 inspect ion on no3m2l @ o34in9 52y s/ 2n5 +, 63s in 25 1 2nce :o3

inspection on @ ee4en5s 2n5 6oli52y s.

$.' REFERENCES

51 P=oect u,itB P,n .SA-ER-&FAAA-PS$!-";6301

52 In<pection P=ocedu=e .SA-ER-&FAAA-PS$!-306663

5 Mte=i, u,itB $ont=o, nd Mte=i, &=cei,tiB P=ocedu=e .SA-ER-&FAAA-PS$!-306313

5" Pipin7 F=iction P=ocedu=e .SA-ER-&FAAA-PS$!-308182

53 Pipin7 E=ection t Site P=ocedu=e .SA-ER-&FAAA-PS$!-30818

56 'Bd=o<ttic &e<t P=ocedu=e >o= Pipin7 .SA-ER-&FAAA-PS$!-308181

5H !imittion< on Pipe oint< ) $omponent< .ERES-!-110

+.' #EGENDS

"51SA&ORP men< SAU*I ARAM$O &O&A! Re>inin nd Pet=ochemic, $om n 5 In the I&P/ SA&OPR =e =e<ent< $om n In< ection Re =e<entti4eDoc. No. SA-JER-TFAAA-PSCL-316503 Rev. 0 Page No.! 4 of

9

Page 8: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 8/24

REFINERY TANK FARM PACKAGE 6

ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND

PRESS)RE TESTING0

E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+"A)G"*'%'

Document No.7 SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*

ACTI-ITY

No.

DESCRIPTIN

F

ACTI-ITIES

PERSNNE

#

RESPNSI!

APP#ICA!#E

PRCED)RES

()A#ITY CNTR#

RE()IREMENT  

-ERIFYING

ACCEPTAN

CE

CRITERI

INSPECTI

N

STAGE

INSPECTIN PINTS :o3 RFI

S)!"CN

PSC# (C SATRP

%.' GENERA# RE()IREMENTS

151 P=e-In< pect ionMeetin7

.PIM on Pipin7

$on<t=uction

Mn7ement

PIM A7end Minute< o> PIM Schedu,e e>o=e <t=t o>1<t

F=iction

"   -   8   -   8   -

152 Ve=i >Bin7 the pp=o4,o> 

*ocument< o>

Speci>iction</

P=ocedu=e</

$ Mn7e= )$

In<pecto= 

P=oect u,itBP,n

.SA-ER-&FAAA-PS$!-";6301

P=ocedu=e< :

Speci>iction:*=win7<>o= 

Re>ine=B &n F=m

$ompnB App=o4, e>o=e <t=t o>1<t

In<pection

"   -   R   -   R   -

*.' PIPING PRE"FA!RICATIN

251 Recei4in7 In<pect iono> 

Mte=i,<

$ In<pecto=)

W=ehou<eSupe=4i<o= 

Mte=i, u,itB $ont=o,nd

Mte=i, &=cei,tiB

P=ocedu=e .SA-ER-&FAAA-

PS$!-306313/ In<pectionP=ocedu=e .SA-ER- &FAAA-

PS$!-30630"/ Pcin7 !i<t/

Mi,, &e<t$e=ti>icte /

Mte=i, Recei4in7 )Sto=7e

In<pectionRepo=t

PS$!-SA&ORP-#E%-002

22H1-AAA-SM-80"

e>o=eF=iction

  "   -   8   -   >   -

252 Sto=7e o> Mte=i,< W =ehou<eSupe=4i<o= 

SA-ER-&FAAA-PS$!-306313/

Pcin7 !i<t/ *=win7 )*t

Sh

Mi,, &e<t$e=ti>icte /

Mte=i, Recei4in7 )Sto=7e

In<pection

22H1-AAA-SM-80"

e>o=eF=iction

  "   -   >   -   R   -

25 We,d Mp : Pipe Spoo,

M=in7 : App=o4,

$ In<pecto= P)I*/ ISO dw7 P)I*/ ISO dw7 P)I*/ ISO dw7 e>o=eF=iction

  "   -   8 >

$.' PIPING FA!RICATIN

51 *imen<ion, $hec

.e>o=e cuttin7 )we,din7

$ In<pecto= IF$ *=win7</In<pection

P=ocedu=e .SA-ER-&FAAA-

PS$!-30630"/ Pipin7F=iction P=ocedu=e .SA-

ER-

&FAAA-PS$!-308182/

V ) *Repo=t

PS$!-SA&ORP-A$-

003

IF$ *=win7</In<pection

P=ocedu=e .SA-ER-

&FAAA-PS$!-30630"/ Pipin7

F=iction

P=ocedu=e .SA-ER-

P=io= to We,din7

Wo=<  "   -   >   -   >   -

52 Fit-up chec $ In<pecto= IF$ *=win7</In<pection

P=ocedu=e .SA-ER-&FAAA-

PS$!-30630"/ Pipin7

F=iction P=ocedu=e .SA-

ER-

&FAAA-PS$!-308182/

V ) *Repo=t

PS$!-SA&ORP-A$-003

IF$ *=win7</In<pection

P=ocedu=e .SA-ER-

&FAAA-PS$!-

30630"/ Pipin7

F=iction

P=ocedu=e .SA-ER-

P=io= to We,din7

Wo=<  "   -   >   -   >   -

Page 9: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 9/24

SA-ER-&FAAA-PS$!-1630Re45 02 P7e 3 o> ;

Page 10: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 10/24

REFINERY TANK FARM PACKAGE 6

ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND PRESS)RE

TESTING0

E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+"A)G"*'%'

Document No.7 SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*

ACTI-ITY No.

DESCRIPTIN F PERSNNE#

APP#ICA!#E PRCED)RES

()A#ITY CNTR#

RE()IREMENT

ACCEPTANCE INSPECTIN INSPECTIN PINTS :o3 RFI

ACTI-ITIES RESPNSI!#E

-ERIFYING DC)MENTS

CRITERIA STAGE S)!"CN PSC# (C SATRP

5 We,dment Vi<u,

In<pection

$ In<pecto= IF$ *=win7</ We,din7 $ont=o,

P=ocedu=e .SA-ER-&FAAA-

PS$!-30630"/ In<pection

P=ocedu=e .SA-ER-&FAAA-

PS$!-30630"/ ERES-!-110/

ERES-W-011

V ) * Repo=t

PS$!-SA&ORP-A$-003

IF$ *=win7</ We,din7

$ont=o, P=ocedu=e .SA-

ER-&FAAA-PS$!-

30630"/ In<pection

P=ocedu=e .SA-ER-

&FAAA-PS$!-30630"/

ERES-!-110/ ERES-W-

011

 A>te= Fit-up $hec" - > - > -

5" %*E on we,ded oint<

.Pe=cent7e =eDui=ement

o> %*E wi,, e < pe= ,ine

,i<t : ISO *w7

=eDui=ement<

$ In<pecto= %*E P=ocedu=e %*E Repo=t %*E P=ocedu=e A>te= We,din7 wo=<8 - 8 - 8 -

53 PW'& .A< pp, ic,e pe= 

,ine c,<<

$ In<pecto= PW'& Fo= u,,et &n Pipin7

.!oc,iJed .SA-ER-&FAAA-

A$ In<pection Fo=m .Fo=m

%o+ &55A

PW'& Fo= u,,et &n

Pipin7 .!oc,iJed .SA-

 A>te= %*E

comp,eted " - 8 - 8 -

56 '=dne<< &e<t .A<

pp,ic,e pe= ,ine c,<<

PS$!-308061 ER-&FAAA-PS$!-

308061$ In<pecto= Su-$ont=cto= P=ocedu=e Su-$ont=cto= Fo=m Su-$ont=cto=  

P=ocedu=e

 A>te= PW'&8 - 8 - 8 -

5H Fie,d V,4e &e<tin7 .A< $ In<pecto= IF$ *=win7</ In<pection A$ In<pection Fo=m .Fo=m IF$ *=win7</ In<pection e>o=e Shop

" - 8 8pe= <tnd=d

=eDui=ement

02

P=ocedu=e .SA-ER-&FAAA-

PS$!-30630"/ 'Bd=o<ttic &e<t

P=ocedu=e >o= Pipin7 .SA-ER-

&FAAA-PS$!-308181

%o+ &55A P=ocedu=e .SA-ER-

&FAAA-PS$!-30630"/

'Bd=o<ttic &e<t

P=ocedu=e >o= Pipin7 .SA-

ER-&FAAA-PS$!-

308181

Re,e<e

58 Shop In<pect ion e>o=e $ In<pecto= IF$ *=win7</ In<pect ion #ene=, In<pection Repo=t IF$ *=win7</ In<pect ion A>te= ,, F=ict ion

" - > - > -=e,e<e P=ocedu=e .SA-ER-&FAAA-PS$!-30630"/ Pipin7 F=iction

P=ocedu=e .SA-ER- &FAAA-

PS$!-308182/ ERES-!-

110

.PS$!-SA&ORP-A$-011 P=ocedu=e .SA-ER-&FAAA-PS$!-30630"/

Pipin7 F=iction

P=ocedu=e .SA-ER-

&FAAA-PS$!-308182/

ERES-!-110

wo=< in<pected ndpp=o4ed5

5; Re,e<e %ote . i> nB

>=om Shop

$ In<pecto= P=oect u,itB P,n

.SA-ER-&FAAA-PS$!-";6301/

Re,e<e %ote $ompnB App=o4, A>te= ,, F=iction

wo=< in<pected nd

pp=o4ed5"

-8

-R

-

+.' ERECTIN FIE#D0

"51 Site Recei4in7 In<pection $ In<pecto= IF$ *=win7</ In<pection

Mi,, &e<t $e=ti>icte / IF$ *=win7</ In<pection *u=in7 Site

Page 11: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 11/24

" - > - > - P=ocedu=e .SA-ER-&FAAA-

PS$!-30630"

Mte=i, Recei4in7 ) Sto=7e

In<pection Repo=t

PS$!-SA&ORP-#E%-002 )

00

P=ocedu=e .SA-ER-

&FAAA-PS$!-30630"

Recei4in7

Page 12: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 12/24

REFINERY TANK FARM PACKAGE 6

ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND

PRESS)RE TESTING0

E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+"A)G"*'%'

Document No.7 SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*

ACTI-ITY

No.

DESCRIPTIN

F

ACTI-ITIES

PERSNNE

#

RESPNSI!

APP#ICA!#E

PRCED)RES

()A#ITY CNTR#

RE()IREMENT  

-ERIFYING

ACCEPTAN

CE

CRITERI

INSPECTI

N

STAGE

INSPECTIN PINTS :o3 RFI

S)!"CN

PSC# (C SATRP

"52 *imen<ion, $hec

.e>o=e we,din7

$ In<pecto= IF$ *=win7</ In<pection

P=ocedu=e .SA-ER-&FAAA-

PS$!-30630"/ Pipin7

E=ection t Site P=ocedu=e

.SA-ER-&FAAA- PS$!-

30818/ ERES-!-110

V ) *Repo=t

PS$!-SA&ORP-A$-003

IF$ *=win7</

In<pection P=ocedu=e

.SA-ER- &FAAA-

PS$!-30630"/ Pipin7

E=ection t Site

P=ocedu=e .SA-ER-

&FAAA-PS$!-

30818/ ERES-!-

P=io= We,din7wo=<

  "   -   >   -   >   -

"5 !e4e,/ E,e4tion nd

 A,i7nment chec o>

the <<em,ed

pipe<

$ In<pecto= IF$ *=win7</In<pection

P=ocedu=e .SA-ER-&FAAA-

PS$!-30630"/ Pipin7

E=ection t Site P=ocedu=e

.SA-ER-&FAAA- PS$!-

30818/ ERES-!-110

#ene=, In<pectionRepo=t

.PS$!-SA&ORP-A$-011

IF$ *=win7</In<pection

P=ocedu=e .SA-ER-

&FAAA-PS$!-

30630"/ Pipin7

E=ection t Site

P=ocedu=e .SA-ER-

&FAAA-PS$!- 

 A>te= *imen<ion,

$hec  "   -   8   -   >   -

"5" Fit-up o> F ie,d we,ded

 oint<

$ In<pecto= IF$ *=win7</In<pection

P=ocedu=e .SA-ER-&FAAA-

PS$!-30630"/ Pipin7

E=ection t Site P=ocedu=e

.SA-ER-&FAAA- PS$!-

30818/ ERES-!-110

V ) *Repo=t

PS$!-SA&ORP-A$-003

IF$ *=win7</In<pection

P=ocedu=e .SA-ER-

&FAAA-PS$!-

30630"/ Pipin7

E=ection t Site

P=ocedu=e .SA-ER-

&FAAA-PS$!-

 

 A>te= A,i7nment

$hec  "   -   >   -   >

"53 We,dment In<pection $ In<pecto= IF$ *=win7</ We,din7$ont=o,

P=ocedu=e .SA-ER-

&FAAA- PS$!-30630"/

In<pection P=ocedu=e

.SA-ER-&FAAA- PS$!-

V ) *Repo=t

PS$!-SA&ORP-A$-003

IF$ *=win7</We,din7

$ont=o, P=ocedu=e

.SA- ER-&FAAA-

PS$!-

30630"/ In<pection

 A>te= Fit-up

In<pection  "   -   >   -   >   -

"56 #<et Ve=i>iction $ In<pecto= ISO *=win7</

In<pectionP=ocedu=e .SA-ER-

 

*=win7</

In<pectionP=ocedu=e .SA-

 

"  -

  8  -

  >  -

"5H W e,din7 Vi<u,

In<pection .>te=we,din7

$ In<pecto= IF$ *=win7</In<pection

P=ocedu=e .SA-ER-

&FAAA- PS$!-30630"

V ) *Repo=t

PS$!-SA&ORP-A$-003

IF$ *=win7</In<pection

P=ocedu=e .SA-

ER- &FAAA-PS$!-

 A>te= we,din7wo=<

  "   -   >   -   8   -

"58 o,t &o=Duin7 $ In<pecto=   "   -   8   -   8   -

Page 13: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 13/24

Page 14: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 14/24

REFINERY TANK FARM PACKAGE 6

ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND

PRESS)RE TESTING0

E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+"A)G"*'%'

Document No.7 SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*

ACTI-ITYNo.

DESCRIPTIN

F

ACTI-ITIES

PERSNNE

#

RESPNSI!

APP#ICA!#EPRCED)RES

()A#ITY CNTR#

RE()IREMENT  

-ERIFYING

ACCEPTAN

CE

CRITERI

INSPECTI

N

STAGE

INSPECTIN PINTS :o3 RFI

S)!"CN

PSC# (C SATRP

"510 PW'& .A< pp,ic,e

pe= ,ine c,<<

$ In<pecto= PW '& Fo= u,,et &n

Pipin7 .!oc,iJed .SA-

ER-&FAAA- PS$!-

308061

A$ In<pection Fo=m.Fo=m

%o+&55A

PW'& Fo= u,,et

&n Pipin7

.!oc,iJed .SA-

ER-&FAAA-PS$!-

 A>te= %*E

comp,eted  "   -   8   -   8   -

"511 '=dne<< &e<t .A<

pp,ic,e pe= ,inec,<<

$ In<pecto= Su-$ont=cto= P=ocedu=e Su-$ont=cto= Fo=m   Su-$ont=cto= 

P=ocedu

 A>te= PW'& "   -   8   -   8   -

"512 &e<t Pc7e4e=i>iction

$ In<pecto= P)I*/ ISO dw7 &e<t Pc !i<t P)I*/ ISO dw7 A>te= %*E

comp,eted

nd

"   -   >   -   "   -

"51 !ine $hec =e4iewe>o=e

=e,e<e >o= 'Bd=o<ttic

$ In<pecto= P)I*/ ISO dw7 P)I*/ ISO dw7 P)I*/ ISO dw7 A>te= &e<tPc7e

4e=i>ied ndc,e=ed

"   -   >   -   >   -

"51

!ine Modi>iction i> nB

>te= Acceptnce .,t

$ In<pecto= P)I*/ ISO dw7 P)I*/ ISO dw7 P)I*/ ISO dw7 e>o=e =e,e<e

>o= 'Bd=o<ttic &e<t

"   -   >   -   8   -

"51" 'Bd=o<ttic &e<t $ In<pecto= IF$ *=win7</In<pection

P=ocedu=e .SA-ER-&FAAA-

PS$!-30630"/ 'Bd=o<ttic

&e<t P=ocedu=e >o= Pipin7

.SA-ER- &FAAA-PS$!-

308181/ &e<t Pc

A$ In<pection Fo=m.Fo=m

%o+&55A

IF$ *=win7</In<pection

P=ocedu=e .SA-ER-

&FAAA-PS$!-

30630"/ 'Bd=o<ttic

&e<t P=ocedu=e >o=

Pipin7 .SA- ER-

&FAAA-PS$!-

 

 A>te= %*E

comp,eted

nd

ccepted

"   -   8   -   8   -

"513 F,u<hin7 $ In<pecto= IF$ #A *w7/ ISO *w7/P)I*/

 

A$ In<pection Fo=m.Fo=m

 

IF$ #A *w7/ ISO*w7/

 

 A>te= 'Bd=o<ttic

&e<tin7  "   -   >   -   >   -

"513

!B up $ In<pecto= P)I*/ ISO dw7 P)I*/ ISO dw7 P)I*/ ISO dw7 A>te= F,u<hin7 "   -   >   -   >   -

"516 Re-in<ttement $ In<pecto=     P)I*

A$ In<pection Fo=m.Fo=m

 

P)I*

 A>te= F,u<hin7 "   -   >   -   >   -

"51H Pintin7 Pintin7 In<pecto= Re>e= to I&P FOR PIPI%# !AS&I%# A%* PAI%&I%# + SA-ER-&FAAA-PS$!-1666"

SA-ER-&FAAA-PS$!-1630Re45 02P e 8 o> ;

Page 15: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 15/24

REFINERY TANK FARM PACKAGE 6

ITP FR A!-EGR)ND PIPING META##IC FA!RICATIN/ ERECTIN/ INSTA##ATIN AND

PRESS)RE TESTING0

E;uipment T29 Num<e37 Met2llic Pipin9 D2te7 *+"A)G"*'%'

Document No.7 SA"JER"TFAAA"PSC#"$%6&'$ Re1.7 '*

ACTI-ITYNo.

DESCRIPTIN

F

ACTI-ITIES

PERSNNE

#

RESPNSI!

APP#ICA!#EPRCED)RES

()A#ITY CNTR#

RE()IREMENT  

-ERIFYING

ACCEPTAN

CE

CRITERI

INSPECTI

N

STAGE

INSPECTIN PINTS :o3 RFI

S)!"CN

PSC# (C SATRP

&.' FINA# INSPECTIN DC)MENTATIN

351 Fin, In<pect ion e>o=e

=e,e<e

$ In<pecto= IF$ *=win7</In<pection

P=ocedu=e .SA-ER-

&FAAA- PS$!-30630"

#ene=, In<pectionRepo=t

.PS$!-SA&ORP-A$-011

IF$ *=win7</In<pection

P=ocedu=e .SA-

ER- &FAAA-PS$!-

 A>te= ,, E=ection

wo=< in<pected

nd pp=o4ed5

"   -   8   -   >   -

352 F in, In<pect ion*o<<ie=<

$ In< pecto= *t oo : < ui,td=win7<

*t oo/ P5O5 *t oo : <ui,t

d=win

 A>te= comp,etiono> 

,, the o4e

"   -   8   -   R   -

A TT A C8 M EN T S7

PS$!-SA&ORP-#E%-002 - MA&ERIA! I%SPE$&IO% REPOR&

PS$!-SA&ORP-#E%-00 - MA&ERIA!+ RE$EIVI%#/ S&ORA#E A%* 'A%*!I%# I%SPE$&IO%

$'E$(!IS& PS$!-SA&ORP-A$-003 - VISUA! ) *IME%SIO% REPOR&

PS$!-SA&ORP-A$-011 - #E%ERA! I%SPE$&IO%

REPOR& &A - %*E FORM

SA-ER-&FAAA-PS$!-1630Re45 02P e ; o> ;

Page 16: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 16/24

PE&RO!S&EE! $O !&*>o.,l  .......U J., ..>!"u.#

REFINERY TANK FARM PACKAGE 6

MATERIAL INSPECTION REPORT

s$%

fL&'ation()rea(Unit+

RE*&R+ N&.+

*iscipline$

+unbv,e I *ipinv, I tructure I

&thers$-)+E

+

R.)+ER/)L0eatI  *lateI  'ast

1+2./N'ER+./3(L-imension4isual

 No. )+ER/)L

/5E ,*E'/#/')+/&N

 No. *'

)NlJ#)'+/JRER

 N&

)''

E

)

'

Page 17: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 17/24

REJ

Remar6s$

.'. /N*E'+&R7*'L8,)+&R*RE*.

i

 Name

 Name

*ale

*ale

 

=o=m6,%o5+1-@S$I5- SA&ORI-@- 7".N .02 , tK4-*

Page 18: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 18/24

REFINERY TANK

FARM PACKAGE

MATERIA#7 RECEI-ING/ STRAGE AND 8AND#ING INSPECTIN C8ECK#IST

Sto3e5 A3e2 #oc2tion 7 Repo3t No. 7

P.. No. 7 D2te 7

Type o: M2te3i2l7

$otin7 : A=<i4e P,te< Pipe< St=uctu=, item< In<t=ument<

Rottin7 EDuipment V,4e< F,n7e< We,din7 $on<um,e< EDuipment<

Othe=<+%ote+ P,e<e ttch de,i4e=B =epo=t ) MIR with thi< =epo=t

 App=op=ite 'nd,in7 ) Sto=7e P=oceud=e %o5+

S3. No. Desc3iption o: Cec4 Result Si9n2tu3ePSC# (C0Acce ReBec

1 Ve=i>B tht identi>iction< nd m=in7< =e intct

2 A4i,i,itB o> =e,ted document< on >i,e .e575

M&$/ M)*S/ etc5

Ve=i>B tht co4e=</ p,u7</ nd cp< =e intct

"Ve=i>B tht tempo==B p=e<e=4ti4e< nd cotin7<

=e intct

3

Ve=i>B A4i,i,itB nd condition o> Sto=7e >ci,itie</

u=ntine =e</ mte=i, hnd,in7 eDuipment

) Wethe= p=otection mte=i,<6 Ve=i>B tht the=e i< no e4idence o> phB<ic, dm7e

H Ve=i>B tht p=ope= c,en,ine<< i< ein7 mintined

8 Ve=i>B tht in<t=ument =c< =e ene=7iJed <

;Ve=i>B tht eDuipment h< een te<ted <

<peci>ied nd document< in p,ce

Page 19: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 19/24

1Ve=i>B tht the=e =e no e?ce<<i4e ,e4e,< o> du<t

nd di=t

11 Ve=i>B tht no contine= item< =e =oen o= ,ein7

1Ve=i>B the <>etB ) <ecu=itB =eDui=ement< >o=

<to=7e =e<

1Ve=i>B tht <to=7e ,e4e, h< een mintined <

pe= pp=op=ite p=ocedu=e

D isc 3 ep2nc i es7

PSC# " SATR

N2me7

Si9n7

D2te7

Fo=mt %o5+ PS$!-SA&ORP-#E%-00 Re451

DESCR"PT"#N RE$D MEAS%RED REMAR&S

REFINERY TANK

FARM PACKAGE

VISUAL & DIMENSION REPORTEquipment Tag No. : Repot No. :

Equipment Tag Name : Date :

Aea ! Unit : Da"ing No. :

Page 20: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 20/24

Mateia# De$%iption.:

. PLATE IDENTI'I(ATION:

Ma) No.!

T*i%)ne$$

R$D Ac*+a,

 !

Tota# S*eet!

MIR Re ot No !

2. VISUAL INSPE(TION:ACCEPTALE%NACCEPTALE !

-. (UTTIN DRA/IN:

C#MMENTS! D"MENS"#NS #SER/ED ARE "TH"N T#LERANCE L"M"TS

0. 1EVELIN

ACCEPTALE %NACCEPTALE !

. ROLLIN

"NS"DE D"AMETER !

C#MMENTS

Page 21: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 21/24

Rema)$:

+A!+( In$pe%to 3PS(L4 SATORP REP.

Signatue : Signatue

:  Name :

Name  : Fo1(a* No.! PSCL - SAT#RP - $A$C - 005 Rev.202

Page 22: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 22/24

REFINERY TANK

FARM PACKAGE

INSPECTION REPORT

Equipment Tag No. : Repot No. :

Equipment Tag Name : Date :

Aea ! Unit : Da"ing No. :

Page 23: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 23/24

1. TYPE OF INSPECTION

/N*E'+/&N ( +E+ ( E9)/N)+/&N ( '0E': 

2. INSPECTION ITEM

3. INSPECTION RESULT

1' )''E*+E- ( 1' REJE'+E-

4. REMARKS

/;N)+URE$

/;N)+URE$

$$ N)E N)E

( PSCL - QC INSPECTOR ) ( SATORP)

Page 24: Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

8/13/2019 Itp for Aboveground Piping Metallic (Fabrication, Erection, Installation and Pressure Testing)

http://slidepdf.com/reader/full/itp-for-aboveground-piping-metallic-fabrication-erection-installation-and 24/24

#ormat No.$ *'L )+&R* 1)1' <"" Rev.=<=