    Angola Block 15/06 West HUB Development Project

    Inspection and Test Plan (ITP) for ENI Angola 1506Mpungi HFL

    EX-CO 02 01.06.15Final Issue

    Oceaneering Oceaneering UEzeanyika J Attree

    EX-CO 01 14.04.15Issued ForApproval

    Oceaneering Oceaneering UEzeanyika J Attree

    EX-CO 00 05.03.15Issued ForApproval

    Oceaneering Oceaneering UEzeanyika J Attree

    ValidityStatus

    Rev.number Date Description

    Preparedby

    Checkedby

    Approvedby

    ContractorApproval

    CompanyApproval

    Revision Index

    Company logo and business name Project name

    Angola Block 15/06 WestHUB Development

    Company Document ID

    361201CUQBMC132

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    2/15

    Company Document Identification

    361201CUQBMC132

    Revision Index Sheet ofSheets

    2 / 15

    ValidityStatus

    Rev.

    EX-CO 02

    REVISION HISTORY

    Rev. Date Nr. ofsheets

    Description

    EX-CO-00 05.03.15 13 Issued for Approval

    EX-CO-01 14.04.15 15 Issued for Approval

    EX-CO-02 01.06.15 15 Final Issue

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    3/15

    JOB No.152766 Houston /162423 Angola

    CLIENT GEGENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpung i HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 1 OF 13

    INSPECTION AND TEST PLAN (ITP) FORMANUFACTURING OF MPUNGI HFLs

    QP-0599592

    F 5/27/2015 H. SOUZA A. OLIVAREZ F. ZAPATA A. OLIVAREZ H. SOUZAUpdated per GE comment

    sheet ALD-41300-03-401from26/05/2015

    Pages 2, 3, 4 and 5 as well sections 4.1, 4.2,4.3, 4.4, 5.2, 6.1, 6.2 and 7.1

    E 4/08/2015 H. SOUZA A. OLIVAREZ F. ZAPATA A. OLIVAREZ H. SOUZAUpdated per Customer email

    comments amended in the GEcomment sheet

    Pages 3, 4 and 5 as well sections 1.4, 1.6,1.7, 4.2, 4.3, 4.4, 5.2, 6.1, 7.1 and 9.1

    D 4/02/2015 H. SOUZA A. OLIVAREZ F. ZAPATA A. OLIVAREZ H. SOUZAUpdated per CustomerComments Sheet from

    31/03/2015

    Pages 4 and 5 as well sections 1.4, 1.6, 4.2,4.4, 5.2 and 10 (moved to the end)

    C 3/27/2015 H. SOUZA R. PEREZ F. ZAPATA A. OLIVAREZ H. SOUZAUpdated per CustomerComment Sheet from

    18/03/2015All

    B 1/23/2015 H. SOUZA R. PEREZ F. ZAPATA A. OLIVAREZ M. SMITHINCORPORATED CUSTOMER

    COMMENTSAll

    A 07/01/2014 R. PEREZ N/A N/A N/A N/A INTERNAL REVIEW --

    REVDATE

    (mm/dd/yyyy)PREPARED CHECKED

    ENG PM QAREMARKS

    SECTION(S)AFFECTEDAPPROVED

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    4/15

    JOB No.152766 Houston /162423 Angola

    CLIENT GEGENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpung i HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 2 OF 13

    FOREWORD

    1 All QMS and non-project specific procedures will be available for review upon request, at any Oceaneering site. Oceaneeringreserves the right to revise these documents without prior notice. All other project specific procedures can only be implementedupon revision, after prior approval by GE and ENI, as laid out in section 1 of this ITP. Oceaneering will record all quality relatedincidents through its non-conformance and concession procedure. All such non-conformities, request for deviation to technicalspecifications and technical queries arising from the works shall be processed in accordance with section 9 of GE projectsupplier Quality Requirements document ALD-20100-00-419.

    2 Verification documents will be endorsed by the Oceaneering Quality Department.

    3 Oceaneering defined inspection code definitions:

    A = Approval required (Documents are submitted to client for approval and required customer endorsement)

    R = Review (These records shall be made available to client or their representative upon request)

    M = Monitor Activity (Activities that will process as scheduled, without advance notification)

    W = Witness Point (Client notification is required prior to the start of the operation, but if not in attendance, work may

    proceed).5 working days notice.

    H = Hold point (Client notification is required prior to the start of the operation. The process may not proceed withoutthe presence of the notified party. A HOLD point cannot be waived unless confirmed in writing by the client). 5 workingdays notice.

    4 To make it easier to manage all Witness and Hold points during the assembly and testing of HFLs, a formal NOI for eachWitness & Hold point with minimum notice needs to be issued for the f irst HFL. For the assembly of subsequent HFL

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    5/15

    JOB No.152766 Houston /162423 Angola

    CLIENT GEGENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpung i HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 3 OF 13

    Notification can be managed locally between Oceaneering, GE and ENI QC inspectors. Notification for witness and Hold pointsmay be issued at minimum the day before start-up of the activity but for routine inspection at least an hour, prior to start of thesame activity.

    ITP ACTIVITY INDEX

    Operation / Inspection Activity Heading

    1. Project Engineering

    2. Supplier Pre-Production Activities3. Receiving Inspection4. Welding Pressure Containing5. Assembly6. Factory Acceptance Testing7. Final Inspection8. Packing & Storage9. Manufacturing Record Book10. Shipping

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19

    Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    6/15

    JOB No.152766 Houston /162423 Angola

    CLIENT GEGENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpung i HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 4 OF 13

    LIST OF REFERENCED DOCUMENTS

    Doc ENI Document No. Description

    ALD-41300-03-401 (OII QP-0599592) 361201CUQBMC132Inspection and Test Plan (ITP) for ENI Angola 1506Mpungi HFL

    ALD-41300-10-060 (OII 0444887) 361201DUDGMD102Flying Lead Hydraulic Thermoplastic General

    Arrangement Drawing

    D-0598777 N/A Master Document Register

    QP-0632742 N/A Quality Plan for Mpungi

    D-0632808 N/A Project Execution Plan for Mpungi

    D-0444859 N/A Scope of Supply

    Q-038 N/A Assembly Check List Procedure

    ALD-41300-00-018 361201DUMIGE009 HFL, Operating and Handling ProcedureAS016475 361201DUDAGD086 GA - Male (16 way) Fixed Test & Flushing Stabplate

    PR001262 361201DUPTGD089 MQC Plate Factory Acceptance Test Procedure

    D-0612480 361201DUMIGD092 Hydraulic Stabplate Operating / Handling Procedure

    N/A361201CUQSMD084361201CUQSMD085

    ASME Section IX - Welder Performance Qualification(WPQ)

    WPS OII-MT-8-014 N/A ASME - Welding Procedure Specification (WPS)

    D-0352868 N/AManagement of Customer Owned and CustomerCustomer-Furnished Items

    D-0413145 N/AOriginating and Maintaining Weld Traceability forTubing

    ALD-41300-10-200 (OII D-0627433) 361201DUPTMD089 FAT - Factory Acceptance Test

    D-0637313 N/APMI - Positive Material Identification Procedure SDS-A

    GE VGS2.19.14 N/APositive Material Identification (PMI) philosophy andpractice

    D-0598450 361201DUQSMD091 Weld Matrix

    D-0637213 N/A Visual Examination Procedure GE SBT

    D-0636994 N/A Penetrant Procedure GE SBT

    D-0636995 N/A Computerized Radiography Procedure GE SBT

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    7/15

    JOB No.152766 Houston /162423 Angola

    CLIENT GEGENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpung i HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 5 OF 13

    GE VGS2.19.4 N/ASpecification for Welding and Non DestructiveExamination of GE Oil and Gas Controls Equipment

    D-0636992 N/A ASME Radiographic Examination Procedure GE SBT

    GE VGS 2.19.3 N/A Vendor Supply and Packaging Specification

    GE VGS 3.5.12 N/A Small Bore Tubing Welding RequirementsALD-20100-00-419 (OII D-0612944) N/A GE Supplier Quality Requirements

    GE S127090 and S127091 (D-0208894).

    N/ASupplier Document Requirements List SupplierTemplate.

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    8/15

    JOB No.152766 Houston /

    162423 AngolaCLIENT GE

    GENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpungi HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    OPERREF

    OPERATION /INSPECTIONACTIVITY

    STANDARDS /SPECIFICATIONS

    ACCEPTANCE CRITERIA DOCSAMPLESIZE %

    INSPECTION CODES

    OII GE ENI

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 6 OF 13

    1 PROJECT ENGINEERING / PRE-PRODUCTION ACTIVITIES

    1.1 Contract Review

    Project Specifics: N/A

    Project Execution PlanD-0632808

    Document is approvedContract /

    PON/A H A N/A

    1.2 Design Activities

    Project Specifics: N/A

    Scope of Supply0444859

    Document(s) Released in PLMWeld

    Matrix,MDL

    N/A H A N/A

    1.3ProcurementSpecifications

    Project Specifics: N/A

    D-0612944(GE ALD-20100-00-419)

    Document(S) Released In PLMProcurement

    SPECN/A A R N/A

    1.4 Weld procedures

    Project Specifics: N/A

    D-0598450, WPS OII-MT-8-014

    (GE VGS2.19.14, VGS 3.5.12,VGS2.19.4)

    Document(s) Released in PLM WPS N/A H A A

    1.5 Test Procedures

    Project Specifics: N/A

    D-0627433(GE ALD-41300-10-200)

    Document(s) Released in PLM FAT N/A H A A

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    9/15

    JOB No.152766 Houston /

    162423 AngolaCLIENT GE

    GENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpungi HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    OPERREF

    OPERATION /INSPECTIONACTIVITY

    STANDARDS /SPECIFICATIONS

    ACCEPTANCE CRITERIA DOCSAMPLESIZE %

    INSPECTION CODES

    OII GE ENI

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 7 OF 13

    1.6 NDE Procedures

    Project Specifics: N/A

    D-0636995, D-0637213, D-0636994, D-0636992

    (GE VGS2.19.14, VGS2.19.4)

    Document(s) Released in PLM NDE N/A H A A

    1.7 Inspection & Test Plan

    Project Specifics: N/A

    QP-0599592

    (GE ALD-41300-03-401)Document(s) Released in PLM ITP N/A H A A

    1.8 Pre-Production Meeting

    Project Specifics: Pre-Production Meeting

    N/A Standard GE PPM Agenda (Minutes of Meeting)PPM - MoMSignature

    N/A H H W

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    10/15

    JOB No.152766 Houston /

    162423 AngolaCLIENT GE

    GENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpungi HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    OPERREF

    OPERATION /INSPECTIONACTIVITY

    STANDARDS /SPECIFICATIONS

    ACCEPTANCE CRITERIA DOCSAMPLESIZE %

    INSPECTION CODES

    OII GE ENI

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 8 OF 13

    2 SUPPLIER PRE-PRODUCTION ACTIVITIES

    2.1Supplier Inspection and

    Test Plan

    Project Specifics: N/A

    Supplier Procedure /OII PO / WI-33

    1) Supplier to submit ITP for approval and incorporation of commentsprior to start of manufacturing.

    2) Supplier to implement adequate trigger mechanisms to enable aprogressive documentation review, prior to production start, thusallowing culmination of MRB.

    3) Approved ITP to be used as a basis of validation for process andproduct integrity.

    4) If no ITP is required then, the OII Inspection and Test Plan shall beconsidered during manufacturing.

    SupplierITP

    100% H R R

    3 RECEIVING INSPECTION

    3.1 Receiving

    Project Specifics: N/A

    WI-21(Parts Card, PO, Print)

    Verify all documentation as per WI-21. Supplier Quality Documentationmeets the requirements of D-0364632 as identified on the Parts Cardand/or PO.

    CoC, MTR,MDB, Test

    Reports, etc100% H R N/A

    3.2Receiving

    Customer FurnishedParts

    Project Specifics: N/A

    D-0352868Parts will be inspected per WI-21 for Visual Damage, Identification,

    and/or Parts Card / Print instructions.DeliveryReceipt

    100% H H N/A

    3.3 PMI

    Project Specifics: N/A

    D-0637313

    (GE VGS2.19.14)Perform PMI on Weld filler wire, verify to MTR / PO. PMI Report 1 / Batch H R R

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    11/15

    JOB No.152766 Houston /

    162423 AngolaCLIENT GE

    GENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpungi HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    OPERREF

    OPERATION /INSPECTIONACTIVITY

    STANDARDS /SPECIFICATIONS

    ACCEPTANCE CRITERIA DOCSAMPLESIZE %

    INSPECTION CODES

    OII GE ENI

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 9 OF 13

    4 WELDING (Pressure Contain ing)

    4.1 PMI

    Project Specifics: N/A

    Per OII PrintD-0250511

    (GE VGS2.19.14)

    Perform PMI on all pressure containing components such as Couplers,Tubing, Fitting, Adapters, etc. prior to welding.

    Identify the successfully PMIs parts with PMI / AV.PMI Report 100% H W W

    4.2 Pressure ContainingWelding

    Project Specifics: N/A

    Weld per Weld Matrix

    D-0598450(GE VGS 3.5.12)

    Welding shall be performed with WPS approved by OII and GE.

    Welder Qualifications and Register

    NDE Personnel Qualifications and Register

    Weld Consumable

    Weld Check parameter

    NOTE: The four check points above will be verified onsite by GE and

    ENI site QC, prior to start of welding.

    Weld map /Trace log

    100% H R/A R/A

    D-0413145 Weld Data Collection for pressure containing welds shall be completedper procedure.

    F-0367715(WDCF)

    100% H M / R M / R

    4.3 PMI

    Project Specifics: N/A

    Per OII PrintD-0637313

    (GE VGS2.19.14)

    Perform PMI on all Welds, Tubing, Fitting and Adapters for informationonly. Indentify the successfully PMIs welds with PMI / AV on either

    side of the weld.PMI Report 100% H W W

    4.4 NDE

    Project Specifics: N/A

    Inspect per OII PrintD-0637213 VT,D-0636994 PT,(GE VGS2.19.4)

    All welded joint visual and surface NDE shall meet the requirements asdescribed in ASME B31.3, severe cyclic conditions.VISUAL EXAM: 100% of weldsPENETRANT TEST: 100% of welds

    NDEReport(s)

    100% H W W

    Inspect per OII PrintD-0636992 RT orD-0636995 CRT(GE VGS2.19.4)

    All welded joint radiography shall meet the requirements as described inASME B31.3, severe cyclic service conditions.RADIOGRAPHIC EXAMINATION: 100% of weldsCOMPUTERIZED RADIOGRAPHIC EXAMINATION : 100% of welds

    NDEReport(s)

    100% H H H

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    12/15

    JOB No.152766 Houston /

    162423 AngolaCLIENT GE

    GENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpungi HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    OPERREF

    OPERATION /INSPECTIONACTIVITY

    STANDARDS /SPECIFICATIONS

    ACCEPTANCE CRITERIA DOCSAMPLESIZE %

    INSPECTION CODES

    OII GE ENI

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 10 OF 13

    5 ASSEMBLY

    5.1 Traceability / Set- outProject Specifics: N/A

    OII Assembly Procedure Record required information in ROA. ROA 100% H M M

    5.2 Assemble

    Project Specifics: N/A

    GA DrawingOII D-0444887

    OII Assembly Procedure(Q-038)

    (GE ALD-41300-10-060)

    Assemble per OII procedure PID 100% H W W

    6 FACTORY ACCEPTANCE TESTING

    6.1

    TRR

    (Test ReadinessReview)

    Project Specifics: N/A

    GA DrawingOII D-0444887

    (GE ALD-41300-10-060

    Check NCR/ CR/ TQ register to ensure the close out of all opened item.Should be any open NCR/ CR/ TQ which will not be hindering the FATactivates then the same shall be included in the punch list register andshall be settled and closed during FAT. Ensure that all the punch list

    items have been closed.

    F- 0468258 100% H N/A N/A

    FAT

    (Factory Acceptance

    Test)

    Project Specifics: N/A

    OII D-0627433

    (GE ALD-41300-10-200)

    Perform Factory Acceptance Test(s) per the approved to OII EngineeringTesting Procedure. Notify customer of anticipated testing schedule

    Acceptance criteria:

    Shall meet all test procedure acceptance criteria Shall show no visible leakage under test pressure (as applicable)

    Note: A chart recorder shall be used on all pressure tests. Chartsshall identify the measuring device (including its calibration date) andshall be signed and dated by all representatives in attendance.

    FATRecord 100% H H W

    6.2 Post-FAT NDEInspect per OII Print

    D-0636994 PT,(GE VGS2.19.4)

    All welded joint visual and surface NDE shall meet the requirements asdescribed in ASME B31.3, severe cyclic conditions.PENETRANT TEST: 100% of welds

    NDEReport(s)

    100% H W W

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    13/15

    JOB No.152766 Houston /

    162423 AngolaCLIENT GE

    GENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpungi HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    OPERREF

    OPERATION /INSPECTIONACTIVITY

    STANDARDS /SPECIFICATIONS

    ACCEPTANCE CRITERIA DOCSAMPLESIZE %

    INSPECTION CODES

    OII GE ENI

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 11 OF 13

    7 FINAL INSPECTION

    7.1Final Acceptance

    Verification

    Project Specifics:

    GA DrawingOII D-0444887

    (GE ALD-41300-10-060

    WI-1 (OII)

    GE SICD (Source InspectionCompletion Dossier) and

    MCCR (Mechanical

    Completion Check Record)

    Project Management and Quality Assurance are to complete FAVProcess. Part(s) meet Drawing(s) / Specifications /

    Data book approved

    GE SICD and Project MCCR signed off by OII, GE QA inspector and ENIinspector

    Q-002

    GE SICDand MCCR

    100% H W W

    8 PACKAGING & STORAGE

    8.1Packaging, Marking, &

    Storage

    Project Specifics:

    D-0630838 (OII)

    GE (VGS 2.19.3) VendorSupply and Packaging

    Specification

    Oceaneering shall package completed HFLs in the original cratereceived in. Oceaneering shall maintain the crate, such repair any

    damage regardless of cause. Crate shall be marked with Oceaneering &Company PN and SN.

    Marking will be required for parts that have protection to critical surfaces,such as caps on the couplers. Mark with text REMOVE PRIOR TO

    INSTALLATION.

    N/A 100% H M M

    BOM Customer POCustomer

    PO100% H M M

    REVISION PENDING: NO APPROVED BY: Abiodun Aromasodu APPROVED ON: 2015/06/01 10:30:18 DOCUMENT: ALD-41300-03-401 | NCSTATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    14/15

  • 7/25/2019 ITP _ 361201CUQBMC132_EXCO02_15

    15/15

    JOB No.152766 Houston /

    162423 AngolaCLIENT GE

    GENUMBER

    ALD-41300-03-401ENINUMBER

    361201CUQBMC132 PROJECT Mpungi HFLs

    This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the priorwritten authorization of Oceaneering International Services Limited.

    OPERREF

    OPERATION /INSPECTIONACTIVITY

    STANDARDS /SPECIFICATIONS

    ACCEPTANCE CRITERIA DOCSAMPLESIZE %

    INSPECTION CODES

    OII GE ENI

    TITLE INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

    PO 2100000094

    DOCUMENT No. QP-0599592 REV F OWNER QUALITY PAGE 13 OF 13

    LIST OF PART NUMBERS

    GE Part NumberALD-41300-30

    ALD-41300-32

    ALD-41300-35

    ALD-41300-36

    ALD-41300-38ALD-41300-39

    ALD-41300-40

    ALD-41300-41

    ALD-41300-42

    ALD-41300-43

    ALD-41300-44

    ALD-41300-45

    ALD-41300-46

    ALD-41300-47

    ALD-41300-48

    STATE: RELEASED REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED ON: 2015/06/01 09:00:34 VIEWED: 2015/06/01 10:34:19Security Level: CONFIDENTIAL