TQM Models
WORLD CLASS
THROUGH CONTINUOUS
IMPROVEMENTS
TOTAL EMPLOYEE INVOLVEMENT
(TEI)
LEADERSHIP, TEAMWORK, CONSENSUS,EMPOWERMENT.
TOTAL QUALITY
CONTROL (TQC)
SYSTEMS, SPC,
PDCA, PROBLEMSOLVING TOOLS
JUST IN TIME /
WASTE
ELIMINATION
PROBLEM
EXPOSURE
-
8/10/2019 ITM - JIT.ppt
2/16
TQM Models continued
-
8/10/2019 ITM - JIT.ppt
3/16
PILLARS OF TQM
ORGANISATION
WORKING
VISIONMISSION
CORE
COMPETENCY
STRATEGIES
GOALS /
OBJECTIVES
7 QC / SPC
BM
6 Sigma
ISO 9000
ISO 14000
QS 9000
5S
KAIZEN
JIT
TPM
SGAS
QCS
CFTS
CONCURRENT WORKING
TOOLS &
TECHNIQUESSYSTEM WCMS PEOPLE
-
8/10/2019 ITM - JIT.ppt
4/16
TQM vs Problem
Inventory Levels
Manufacturing Problems*
* Unreliable Supply, Rework/Reject, Untrained Staff.
-
8/10/2019 ITM - JIT.ppt
5/16
JIT exposes the problems and Controls
Waste in material, capacity and labour.
Inventory Level
Waste Removed..
-
8/10/2019 ITM - JIT.ppt
6/16
-
8/10/2019 ITM - JIT.ppt
7/16
Responding to Market Demand
Requires a change in the way .
we think about manufacturing
The consumers act of buying activates the process of manufacturing.
FROM
TO
PUSH
MAKE
MAKE
BUY
BUYPULL
-
8/10/2019 ITM - JIT.ppt
8/16
JUST-IN-TIME( JIT )
A structural approach followed by an organization, focusing on
improving:
Timeliness.
Flexibility. Productivity.
Quality.
By utilizing various methods of work
simplification andwaste reduction.
-
8/10/2019 ITM - JIT.ppt
9/16
JIT Continued.
JIT means to manufacture and deliver:
Finished Goods just in time to be sold.
Arrange/ Manufacture Sub- assemblies just in time forassembling into finished goods.
Arrange/ Manufacture parts and components just in time to betransformed into subassemblies.
-
8/10/2019 ITM - JIT.ppt
10/16
-
8/10/2019 ITM - JIT.ppt
11/16
Seven Wastes in Operational
Environment
Overproduction.
Waiting for something ( Instruction, material, equipment readiness).
Material Transport.
Inventory
Inspection, Rework and Scrap.
Equipment Downtime
Set- up Time for Machine/ Facility.
-
8/10/2019 ITM - JIT.ppt
12/16
Five Wastes in Office Environment
Lack Of Planning
Absence of System for Working.
Cumbersome procedures.
Information Storage and Retrieval
Inconclusive style of Working.
-
8/10/2019 ITM - JIT.ppt
13/16
The Seven Elements that addresses Elimination of Waste are:
Focused Factory
Group Technology
Quality at Source
J I T Production
Uniform plant loading
KANBAN Production Control System
Minimized Set-up Times
-
8/10/2019 ITM - JIT.ppt
14/16
Quality at Source :
Right first time.
Do not accept reject
Do not produce reject
Do not deliver reject
Self inspection
Stop line & use of Pokayoke
ANDON for trouble indication
Team problem solving
-
8/10/2019 ITM - JIT.ppt
15/16
JIT Methods
Good Housekeeping.
Visual Control. Total Productive maintenance. ( TPM )
Pokayoke .i.e. Mistake Proofing
Andon/ Jidoka.
Cellular Layout.
Modern Material handling and transportation.
Lot Size reduction.
Operation with Minimum Stock. Self Certified Vendors.
Demand Pull and Kanban.
Multiskilled and Flexible workforce.
-
8/10/2019 ITM - JIT.ppt
16/16
JIT People
Do not accept reject.
Do not produce reject.
Do not send reject.
Can stop the Line.
Team Member and Flexible.
Understand products and processes.
Measure Selfs output .i.e. Quantity and Quality.