Item No.10.0

STRENGTHENING OF POLLUTION CONTROL BOARDS

AND COMMITTEES

Decisions of the 55th Meeting with PCBs/PCCs( 17.8.2009)

Consolidated requirements on;

(a) Laboratories

(b) Computerisation

(c) Staffing

(d) Infrastructure

(e) Common Waste Management facilities (CETPS, TSDF, CBMWTF)

SUMMARY/ ABSTRACT

TOTAL REQUIREMENT

Rs.1059.3955 crores

COMPONENTS

1 Laboratories : Rs.384.7327 crores

2 Computerisation : Rs.46.9957 crores

3 Infrastructure : Rs.627.6654 crores

Total : Rs.1059.3956 crores

STAFFING NEEDS(ADDITIONAL REQUIREMENTS)

1 Additional requirement

scientific/ Technical / Computer

: 9384

4610

2 Existing staff

Scientific/ Technical

: 6055

1315 + 28791564

COMMON WASTE MANAGEMENT FACILITIES

Facilities Requirements Existing

CETPs 129 147

TSDF 36 27

CBMWTF 86 177

ANALYSIS OF REQUIREMENTS (Rs. in crores){LABORATORY}

<1.0 1-5 5-10 >10Andaman Arunachal Assam Andhra Pradesh

Lakshadweep Bihar Delhi Chhatisgarh

Chandigarh Goa Gujarat

Daman Diu Karnataka Haryana

Himachal Kerala Jammu & Kashmir

Manipur Punjab Jharkhand

Meghalaya Uttrakhand Madhya Pradesh

Mizoram Maharashtra

Nagaland Orissa

Pudducherry Rajasthan

Sikkim Tamil Nadu

Tripura Uttar Pradesh

West Bengal

Groupings of Total Requirement (Rs. in crores)

<1.0 1-10 10-50 >50

Andaman Arunachal Andhra Haryana

Chandigarh Assam Jharkhand

Daman Diu Bihar Madhya Pradesh

Lakshadweep Chhattisgarh Rajasthan

Manipur Goa Tamil Nadu

Meghalaya Delhi Uttar Pradesh

Mizoram Gujarat

Nagaland Himachal

Pudduchery J&K

Sikkim Karnataka

Tripura Kerala

Maharashtra

Orissa

Punjab

Uttrakhand

West Bengal

BLUE PRINTS ON STRENGTHENING

1 Madhya Pradesh 2 Assam

3 Lakshadweep 4 Uttar Pradesh

5 Mizoram 6 Tripura

7 Nagaland 8 Himachal Pradesh

9 Goa 10 Manipur

11 Tamil Nadu

CONTENTS OF BLUE PRINT

1. Introduction

2. Need of the Document

3. Present status of Pollution Control

4. Mandates & Activities

5. Present set-up of Board

6. Goals for Pollution Control

7. Proposal for strengthening

8. Co-ordination with State agencies

9. SPCB and Public involvement

10. Conclusion

BASIS OF ESTIMATESLaboratories : Gradation/ Locational needs

: • Central A• Zonal / Regional B• Need based C

Compliance Monitoring

• Parameters prescribed: source/ Ambient

• Performance of ETP, CETP, APCD, TSDF.

Special Tasks : • Hazard Assessment• Accident management• Ambient monitoring• State-specific R&D

CAPABILITIES OF LABORATORIES

Parameters A – Grade B –Grade C -Grade

Physical 15 14 13

Inorganic General & Non metals 21 18 13

Organic 13 9 4

Trace metals 28 18 9

Microbiological 7 5 2

Bio-assay 5 3 2

Bio-monitoring 8 6 1

Hazardous Waste 6 0 0

Soil, Sludge, Sediment 37 31 15

Ambient Air 15 10 5

Source Emission 18 18 6

Noise + + +

Vehicular emission 4 3 3

COSTING OF LABsIn Crores

A B C

6.45 1.34 0.4590

Instruments Parameters

Water waste water

55148

Hazardous waste

07

Air/ Emission 30 40

BASIS OF ESTIMATESComputerisation 1. Linkages RO HO

CPCB2. Data Management & Reports

Infrastructure : • No rented Premises for Lab•Monitoring vehicles for timely transportation of samples; and enhancing monitoring frequency.• Un-interrupted lab functioning- Power back-up

STAFFING NEEDS

Project Fellows : Analytical support on job training (PG/PhD)

Regular Scientist/ Engineer

: Concentrate on specific jobs, R&D to keep scientific tempo.

Administration & Finance

: Optimal requirement

TOTAL REQUIREMENT

Rs.1059.3955 crores

CURTAILING REQUIREMENTS

OPTIONS

OUT-SOURCING

( may be not possible, Need money again)

DRAFT PROPOSAL(Funding Formula)

• Central Government

• State Government

• Own Resources of SPCB/PCC

• Bilateral programme

Time Frame