it can happen to us stephen lloyd. presentation overview about enbridge marshall response overview...
TRANSCRIPT
It Can Happen to us
Stephen Lloyd
Presentation Overview
• About Enbridge
• Marshall Response Overview
• Actions & Learning's
• Enterprise Exercise
• First Responder Education
ABOUT ENBRIDGE
Operate world’s longest liquids pipeline system and Canada’s largest natural gas distribution company
Interest in 50,000 miles of pipelines
Delivers 2 million barrels/day crude and liquid petroleum
Delivering over 50% of crude oil needs to Great Lakes refineries
Connected to Cushing & Gulf
Handles 5 billion cubic ft/day of natural gas
Employs 6,000 people
Wind development capacity of 270 megawatts
The “Lakehead System” is the crude oil/NGL pipeline in the Great Lakes area
Line 5 (Wisc. to Sarnia through Upper Peninsula) built in 1953
Line 6B (Griffith to Sarnia) built in 1969
Marshall Response Overview
• 20,084 bbls of crude oil released on July 26, 2010
• Spill was on land but entered nearby waterways
• 8,033 bbls entered Talmadge creek
• 2 miles Talmadge Creek
• 38 miles Kalamazoo River
• Flood conditions at time of release
• Over 2000 people at peak of clean up
• 31 Responding agencies
Incident Location
Unified Command
Division A & B – Source Area and Talmadge Creek (08/12)
Division A – Waste Storage Area & Talmadge Creek
Division C – Confluence of Talmadge Creek and Kalamazoo River
(08/02)
Division C– Kalamazoo River (07/29)
THEN: Division C – Island F and Lily Pads (08/14)11
Division C– Staging Area (09/19)
Division E – Morrow Lake Delta (10/08)
Division D – Gabion Baskets – Deployment (08/24)
Division D – Gabion Baskets (10/08)
Division E – Gabion Baskets Removed Panel17
Division C – Aeration North Side Upstream of Ceresco Dam (10/10)
Aeration in Division E – MP 26.25 (09/20)
Division C – Upstream Ceresco Dam (10/08)
Division C – Dewatering Containment Area (10/08)
Division C – DECON (10/08)
Decon Facility
Source Area Restoration – (09/24)
Talmadge Creek Restoration - (9/24)
Talmadge Creek - Late October
NOW: Division B – Talmadge Creek Habitat Stumps (10/15)27
THEN: Division C– Coconut Mat at MP 11.75 (09/20)
NOW: Ceresco Dam without Pond (10/22) 29
Wildlife Centre – News Conference (07/28)
Wildlife Centre Aviary – (9/06)
Turtle Rehabilitation
Wildlife Centre – Turtle Care Area
EPA ‘Final Report ‘ (11/26)
Legacy Site
Kalamazoo River Response
Take full responsibility for the incident, “We will do whatever it takes to make it right” Pat Daniel CEO
Met the EPA’s deadline for clean up of:
Source Area – Aug 27; Talmadge Creek & River – Sept 27; Submerged Oil Oct 31
Actions and Learning's
• The world of Emergency Management and our Industry….has changed
• Organizations are focused
• Preparedness is key
• Industry is connecting more than ever
• Crisis Management
• Resources
• Are we ready?
• What does good / great look like?
Actions and Learning's
• Ability to ramp up
• Internal Support Groups
• External Support (consultants)
• Training, organizational readiness
• Worst case planning scenarios
• Records Management
What has Enbridge done?
• ER Internal Organization
• ER Capability Assessment
• ER Equipment enhancement
• ICS Training
• ICS Support
• Enterprise support E3RT
• First Responder Education
Emergency Response Department
ER Capability Assessment
Items covered in the Review include:•Hazards surveys and emergency planning hazards assessments•Emergency response organization (ERO)•Offsite response interfaces•Categorization and classification of operational emergencies•Notifications and communications•Consequence assessment•Protective actions•Emergency medical support•Emergency public information•Emergency facilities and equipment•Termination and recovery•Program administration, including emergency plans•Performance assurance activities and emergency readiness assurance plans, including feedback and improvement•Training and drills•Development and conduct of exercises
Emergency Response Equipment
• Currently complementing existing equipment resources by an incremental spend of approx 50 million dollars across our system.
• Items include, not limited to:– Boom– Skimmers– Tiger Dams– Boats– Trailers– Rig Mats– Bladders– Much more!
Incident Action Plan (IAP) Tool
• Real-time tracking of response resources
• Built-in requisition / procurement process
• Ability to track and project incident costs and claims liabilities
• ICS forms easily populated
• Response plan integration
• Documentation of significant events
• Security badging enabled
ICS Training and Support
There has been an increased focus on the training and awareness around ICS, initiatives include:
•ICS o Provided to our response teams across LP. The training courses currently offered
include:
ICS 100/200ICS 300Exercise DesignEnvironmental Unit Lead Training.
•Future training will include: Section-specific and Role-specific training, ICS 320 and IAP software User training.
Tiered Response Model
Establish Roster/Roles for Regional Response Teams to Enterprise-Wide Response Team to manage all types of incident responses
ICS Organization
E3RT Model
• Response Organization with depth and talent that is scalable to needs and size of incident
• Positions recruited from existing staff and trained as appropriate
• 90+ people, Enterprise-wide
• Enterprise-Wide functional exercise and training regularly
E3RT ICS Response Drill
• 2 Days (1 day of training, 1 day of exercise)
• 106 participants
• Regulators and Stakeholders - 9
• TRG support staff – 21
• Full JIC was exercised
• 2 media briefings
• 1 full IAP produced
E3RT ICS Response Drill (Day 1)
E3RT ICS Response Drill (Day 2)
E3RT Exercise Planning
• Overall planning = 12 Months
– Identification of team = 3 months
– Inject and final phase planning = 3 months full time
• Countless man hours
• Total cost approx. $500,000
• Largest ER Drill in Enbridge history
• Was seen as a success internally and externally
First Responder Training
EMERGENCY RESPONDER INTERNAL DATABASE
http://publicawareness.enertechxchange.com/index.php
ONLINE PROGRAM
http://www.enbridge.protraining.com/index.cfm
Emergency Response Tips
“Go Big EARLY”
“You don’t want to hand out business cards at a “real” incident!”
“Planning Chief needs to be a strong facilitator”
“Don’t wait to activate Logistics and Finance”
“2 is 1 ….. 1 is none”
“Work the Planning P”
“Feed the beast, CMT, they can help you”
“Win the communications battle”
“If you order something….Better use Logistics” “Prudently over respond”