LIST OF HANDLED PROJECTS INDUSTRY: OIL & GAS PROJECTS Year Project Client Description 1980 Alexandria Petroleum CO. Lub Oil Complex Chiyoda Chemical Engineering & Construction CO. Handling of 65,000 FRT including 22,000 FRT of Heavy Haul up to 185 tons 1982 Ras Badran Oil Field Development Suez Oil CO. (SUCO) Handling of 60,000 FRT including Heavy Haul up to 150tons/piece 1982 Ras Fanar Project Suez Oil CO. (SUCO) Handling of 5,000 FRT of General Cargo 1982 Nasr Petroleum CO. Plant Technipetrol SPA Handling of 20,000 FRT of General Cargo 1984 Zeit Bey LPG Facilities Suez Oil CO. (SUCO) Handling of 45,000 FRT including Heavy & O.D Cargoes 1984 Petrobel Water Treatment Plant Fergal SPA Handling of 8,000 FRT of General Cargo 1986 Zeit Bay Gulf of Suez Project Suez Oil CO. (SUCO) Handling of 65,000 FRT of G.C plus Heavy Haul up to 120tons/piece 1987 El-Obayed Gas Development Badr El-Din Petroleum CO. (BAPETCO) Handling of 250,000 FRT of G.C plus Heavy & OD Cargo 1989 North Abu Kir Gas Production Plant II Enppi & WEPCO Handling of 2,700 FRT of General Cargo 1990 Nidoco, El-Qaraa Project Belayim Petroleum CO. (Petrobel) Handling of 45,700 FRT of G.C plus Heavy & OD Cargo 1993 Ras Gara Field Development Belayim Petroleum CO. (Petrobel) Handling of 5,500 FRT of General Cargo 1993 Marine Incremental Recovery Belayim Petroleum CO. (Petrobel) Handling of 1,500 FRT of General Cargo 1996 Western Desert Gas Development Project Samsung Engineering CO. Ltd Handling of 50,000 FRT including 17,000 FRT Heavy & OD Cargo 1998 El-Obayed Gas Development Petrojet Handling of 62,245 FRT of G.C plus Heavy & OD Cargo 1998 Egyptian Natural Gas CO. Gas Complex Enppi Handling of 45,000 FRT of G.C 1998 Amereya Petroleum Refining CO. / Gas Oil Dewaxing Enppi Handling of G.C 1999 MIDOR Refinery Technip, TTIL + Saga & Palumbo Handling of 200,000 FRT of G.C including 50,000FRT (240pcs) Heavy & OD Cargo up to 850Tons 2000 Cairo Oil Refining CO./ Light Nafta Isomerization Enppi Handling of General Cargo 2000 Amereya Petroleum Refining CO. Nafta Isomerization Enppi Handling of General Cargo

Upload: others

Post on 05-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

LIST OF HANDLED PROJECTS INDUSTRY: OIL & GAS PROJECTS

Year Project Client Description 1980 Alexandria Petroleum CO.

Lub Oil Complex Chiyoda Chemical Engineering & Construction CO.

Handling of 65,000 FRT including 22,000 FRT of Heavy Haul up to 185 tons

1982 Ras Badran Oil Field Development

Suez Oil CO. (SUCO) Handling of 60,000 FRT including Heavy Haul up to 150tons/piece

1982 Ras Fanar Project Suez Oil CO. (SUCO) Handling of 5,000 FRT of General Cargo 1982 Nasr Petroleum CO. Plant Technipetrol SPA Handling of 20,000 FRT of General Cargo 1984 Zeit Bey LPG Facilities Suez Oil CO. (SUCO) Handling of 45,000 FRT including Heavy & O.D

Cargoes 1984 Petrobel Water Treatment

Plant Fergal SPA Handling of 8,000 FRT of General Cargo

1986 Zeit Bay Gulf of Suez Project Suez Oil CO. (SUCO) Handling of 65,000 FRT of G.C plus Heavy Haul up to 120tons/piece

1987 El-Obayed Gas Development Badr El-Din Petroleum CO. (BAPETCO)

Handling of 250,000 FRT of G.C plus Heavy & OD Cargo

1989 North Abu Kir Gas Production Plant II

Enppi & WEPCO Handling of 2,700 FRT of General Cargo

1990 Nidoco, El-Qaraa Project Belayim Petroleum CO. (Petrobel)

Handling of 45,700 FRT of G.C plus Heavy & OD Cargo

1993 Ras Gara Field Development Belayim Petroleum CO. (Petrobel)

Handling of 5,500 FRT of General Cargo

1993 Marine Incremental Recovery

Belayim Petroleum CO. (Petrobel)

Handling of 1,500 FRT of General Cargo

1996 Western Desert Gas Development Project

Samsung Engineering CO. Ltd

Handling of 50,000 FRT including 17,000 FRT Heavy & OD Cargo

1998 El-Obayed Gas Development Petrojet Handling of 62,245 FRT of G.C plus Heavy & OD Cargo

1998 Egyptian Natural Gas CO. Gas Complex

Enppi Handling of 45,000 FRT of G.C

1998 Amereya Petroleum Refining CO. / Gas Oil Dewaxing

Enppi Handling of G.C

1999 MIDOR Refinery Technip, TTIL + Saga & Palumbo

Handling of 200,000 FRT of G.C including 50,000FRT (240pcs) Heavy & OD Cargo up to 850Tons

2000 Cairo Oil Refining CO./ Light Nafta Isomerization

Enppi Handling of General Cargo

2000 Amereya Petroleum Refining CO. Nafta Isomerization

Enppi Handling of General Cargo

Page 2: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

2000 Alexandria Petroleum CO./ Naphta Reformer

Technip & Danzas Handling of 45,000 FRT of G.C including Heavy & OD Cargo

2001 Meleha Field Upgrading / Agiba Petroleum CO.

Enppi Handling of General Cargo

2001 Gulf of Suez Petroleum CO./ Ha’py Offshore Development Project

Agip, Amoco & Danzas Handling of 80,000 FRT of G.C plus Heavy & OD Cargo

2001 AMOC Project Foster Wheeler France, Shenker & BTL

Handling of 50,000 FRT of G.C including Heavy & OD Cargo (up to 427 tons)

2002 Scarab Saffron Development Project/ Burullus Petroleum CO.

Bechtel / K&N Handling of 35,000 FRT of G.C including Heavy & OD Cargo

2002 Esh El-Malaha Petroleum CO. (ESHPETCO)

ESHPETCO Jacking up/down & Inland Transportation of 1x80tons Oil Tank (Height: 14m; Diameter: 17m)

2003 Damietta LNG Project Transcar Inland Transportation of 1x350 tons Heat Exchanger plus Jacking Down & Reloading for Temporary Storage

2003 Egyptian Liquefaction Natural Gas Project (ELNG) Train I & II

Bechtel Overseas Corporation

Handling of 400,000 FRT of General Cargo plus 1x200 tons Absorber

2003 Egyptian Liquefaction Natural Gas Project (ELNG) Train I & II / LNG TANKS

Mitsubishi Heavy Industries / Tomen Corporation

Handling of 25,000 FRT of Nickel Steel Sheets plus G.C

2003 NGL Project UGDC / Mammoet Fostrans Egypt

Loading & Inland Transportation of 3 Columns (160tons, 320 tons & 350 tons)

2003 NGL Project UGDC / Petrojet Inland Transportation of 11 Heavy & OD Cargoes (up to 136 tons)

2004 Damietta LNG Project SEGAS / DLC Inland Transportation of Ethane Gas 2004 El-Qasr Petroluem Project Khalda Petroleum CO. Handling of 40,000tons of pipes 2005 El-Bakr Base Development Enppi Handling of 25,000 FRT of G.C & OD Cargo 2007 Saqqara Project Saving

Egypt/Panalpina Energy & Projects Solutions—KBR / BP

Handling of all general cargo & over dimensional/weight cargo including: - Amine Reboiler Skid (120tons;

12.0x5.1x9.5m) - Teg Regeneration Skid (80tons;

12.0x5.1x8.5m) 2008 Salam Gas Train III Saving Egypt/

Panalpina Energy & Projects Solutions --Petrofac

Handling of all general cargo & over dimensional/weight cargo

2008 Methanol Project Techint Cimi Montubi Customs Clearance & Inland Transportation of 120,000FRT of G.C including: 2x300tons Boilers (19.0m high); 1x350tons column (71.0m length

2009 Salam Gas Train III Khalda Petroleum CO. Transportation of 2x280 tons Slug Catchers

Page 3: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

2012 Egyptian Polypropylene Panalpina Energy & Projects Solutions /UHDE

1x284 tons (70m long) absorber

2012 Sumed Sukhna Plant Development

Enppi Customs Clearance & Inland Transportation

2013 Assil & Karam Project

Enppi / BAPETCO / Shell

Customs Clearance & Inland Transportation of 16 Amine Packages max. height 10m with weight 170tons from Dekheila Port up to Western Desert Field

2014-2016

ERC Mustorod Refinery GS E&C / Pantos Logistics

Customs Clearance & Inland Transportation of 322,197.00 FRT of general cargo, ODC (101 units), heavy cargos (109 units) including 198tons drum 31.4x7.8x9.5m, 11Silos 21.0x11.0x9.5m

2016-2017

Zohr Gas Plant Phase I Petrobel / Eni / ISS Palumbo / Saga Italia

Customs Clearance & Inland Transportation of 200,000 FRT of general cargo, ODC, heavy cargo including - 3x220 tons Boilers (18x11x12m) - 3x280 tons Gas Sour Absorbers

(30x4.35x4.65m) - 1x250 tons Umbilical Reel (12.0m

diameter) 2016-2017

West Nile Delta Gas Plant Bechtel / BP Handling of 100,000FRT of general cargo, containers, ODC and heavy cargo including: - 4x395tons Absorption Towers

(21x5.4x6m) - 1x207 tons HP Separator (18x3.7x4.2m) - 1x138 tons HP Separator (16x3x3.5m)

2017 Zohr Gas Plant Phase I Saipem / ISS Palumbo Handling of 140,000 of coated pipes at Damietta Port (receiving at port storage area/stacking on racks/reloading on trucks/shifting inside port/loading on vessel/lashing)

2018 Zohr Gas Plant Phase II Petrobel / Eni / ISS Palumbo / Saga Italia

Customs Clearance & Inland Transportation of 200,000 FRT of general cargo, ODC, heavy cargo including - 3x280 tons Gas Sour Absorbers

(30x4.35x4.65m) 2019 Assiut Refinery

(Utilities/CCR) ASORC/ENPPI Customs Clearance & Inland Transportation of

100,000 FRT of general cargo, ODC, heavy cargo including - 1x Deisohexanizer Column 135 tons

65x5.4x6.15m

Page 4: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

- 1x Splitter Column 76 tons 44.15x3.65x4.1 m

- 2x Boiler 110 tons - Plus other columns and heavy cargo

Industry: Power Station Projects

Year Project Client Description 1981 Shoubra El-Kheima

Power Station Mitsubishi Heavy Industries

Handling of 4,000 FRT of Piping Material

1985 Rehabilitation of Aswan II Power Plant

Agat Handling of 38,000FRT of G.C including Heavy & OD Cargo

1985 Petrobel Abu Redeis Power Station

Turbo Technica SPA Handling of 6,000 FRT of G.C

1995 Assyut Power Station Mitsubishi Heavy Industries

Handling of 38,000 FRT of G.C including Heavy & OD Cargo

1994 Al Arish Power Station (2x30MW)

Fuji Electric / Tomen Corporation

Handling of 2,700 FRT of G.C plus Heavy & OD Cargo up to 108 tons/piece

1996 El-Kureimat Power Station (2x600MW / Boiler Package)

Nouva Cimi Montubi / Babcock & Wilcox

Handling of 160,000 FRT of G.C plus Heavy & OD Cargo (max. 320 tons/pc & max. length 28m)

1996 El-Kureimat Power Station (2x600MW / Condensers & Heaters Package)

Korean Heavy Industries / Nouva Cimi Montubi

Handling of 20,000 FRT including Heavy & OD Cargo up to 81 tons / 24m length / 5.4m height

1996 El-Kureimat Power Station (2x600MW / Chimney Package)

Saving Italy / Nouva Cimi Montubi

Handling of 11,250 FRT of G.C

1994 Overhead Transmission Line Towers

Metra Handling of 7,500 FRT of General Cargo

1998 Sidi Krir Power Station (2x230MW) / Boiler Package

Babcock & Wilcox / Techint Cimi Montubi

Handling of 48,000 FRT of G.C including 189tons Steam Drum (17.4m length)

1998 Sidi Krir Power Station (2x230MW) / Critical Piping Package

Mecanica De La Pena Handling of 7,000 FRT of G.C

2000 Ayoun Mousa Power Station (2x230MW) / Boiler Package

Babcock & Wilcox / Techint Cimi Montubi

Handling of 48,000 FRT of G.C including 182tons Steam Drum (17.4m length)

Page 5: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

2000 Ayoun Mousa Power Station (2x230MW) / Critical Piping

Mecanica De La Pena Handling of 7,000 FRT of G.C

1997 El-Ezz Sub-Station / Sadat City

ABB Transformatori / Saving

Handling of G.C plus Transformers 98 tons/pc

1998 Egyptian Petrochemical CO. Sub-Station II

ABB / Danzas Handling 6,000 FRT of G.C including Heavy & OD Cargo

2000 Sidi Krir Power Station 3&4

Bechtel Power Corp. / Intergen

Handling of 50,000 FRT of G.C including Heavy & OD Cargo (2 x 290 tons Trafos.)

2000 Sidi Krir Power Station 3&4 / Boiler Package

Bechtel Power Corp. / Intergen

Handling of 40,000 FRT of G.C including 250 tons Boiler

2000 Sidi Krir Power Station 3&4 / Turbine Package

ABB / Alstom U.K Handling of 30,000 FRT of G.C including Heavy & O.D Cargo

2001 East Port-Said Power Station

EDF / CFTI / Saving Egypt Handling of G.C, Heavy & O.D Cargo plus Inland Transportation & Skidding of 3x230 tons Trafos.

2001 Ain El-Sukhna Power Station

EDF / CFTI / Saving Egypt Handling of G.C, Heavy & O.D Cargo plus Inland Transportation & Skidding of 3x230 tons Trafos.

2003 Ein EL-Seira Power Station

Saving Egypt Customs clearance, Inland Transportation & Skidding of 3x120 tons Trafos. Plus G.C

2002 Cairo North Power Station I / Gas Turbine Package

Mitsubishi Heavy Industries / Tomen Corporation

Handling of 25,000 FRT of G.C, Heavy & O.D Cargo plus 2x205tons Turbine

2003 Cairo North Power Station I / Transformers Package

Conisys Customs clearance, Inalnd Transportation & Skidding of 3x180 tons Trafos. Plus G.C

2004 El-Kureimat Power Station

Saving Egypt / Tomen Corporation / MHI

Customs clearance, Inalnd Transportation & Skidding of 1x125 tons Trafos. Plus G.C

2004 Naga Hamadi Power Station

Transcar / Tomen Corporation / MHI

Customs clearance, Inalnd Transportation & Skidding of 3x110 tons Trafos. Plus G.C

2005 Cairo North Power Station II / Transformers Package

Techint Cimi Montubi Customs clearance, Inalnd Transportation & Skidding of 2x180 tons Trafos. Plus G.C, Heavy & O.D Cargo

2005 Nubaria Power Station / Steam Turbine Package

Mitsubishi Heavy Industries / Tomen Corporation

Handling of G.C, Heavy & O.D Cargo including 2x205tons STG

Page 6: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

2005 Nubaria Power Station

Mammoet Fostrans Egypt / DSD Ferrometalco

Inland Transportation of 250 Harps (23tons/piece, 21.0x3.6x0.7m)

2005 GECOL/ LIBYA International Heavy Transport CO. / Libya

Inland transportation of G.C from Cairo/Egypt up to Derna & Tubruk / Libya

2006 Talkha Power Station CMI Inland transportation of 12 modules (126 tons up to 200 tons) plus 2HP Drums (90tons each)

2007 Kureimat Power Station

CMI Inland transportation of 9 modules (126 tons up to 200 tons)

2007 Kureimat Power Station

Fagioli / General Electric Customs Clearance & Inland Transportation of 2x280tons Gas Turbines, 2x205tons Generators, plus general cargo

2008 Nubaria Power Station

Fagioli / General Electric Customs Clearance & Inland Transportation of 2x280tons Gas Turbines, 2x205tons Generators, plus general cargo

2009 Sidi Krir Power Station

MHI/Toyota Tsusho Corporation

Customs Clearance & Inland Transportation of 2x391tons Gas Turbines, 2x280tons Generators, plus general cargo

2009 Cairo West Power Plant

MHI/Toyota Tsusho Corporation

Customs Clearance & Inland Transportation of 2x276tons Steam Turbines, plus general cargo

2009 6th of October Plant

Siemens/Baggio/Zanninoni Mobilization of 2x97tons mobile stations

2010 Abu Quir Plant Ansaldo/Fagioli Boiler Package including 2x290tons steam drums

2011 Damietta West Power Station

Kharafi National 4x215 tons Gas Turbines + 4x170 tons Generators + other ODC, general cargo, and containers

2011 Damietta East Power Station

Kharafi National 4x215 tons Gas Turbines + 4x170 tons Generators + other ODC, general cargo, and containers

2012 Sukhna Thermal Power Plant

Techint Cimi 90 tons Boiler + other ODC, general cargo, and containers

2012 Sukhna Thermal Power Plant

CFTI/VEOLIA Gas Oil Fired Units heavy cargo and general cargo

2012 Banha Power Station SEPCO III/RESOC 2x280tons Turbines + 2x218tons Generators + 50,000 FRT ODC/General Cargo. The Project involved the reinforcement of 10 bridges

Page 7: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

2013 Banha Power Station Fagioli/Ansaldo Customs Clearance & Inland Transportation of 180 Harps 23m long each

2015 Mobile Stations El-Sewedy/G.E Delivery of 110tons mobile turbines to various locations

2015 West Damietta OC/G.E/Egyptian Armament Authority

Delivery of 4x200 tons G.T, 4x177 tons GTG, 4x125 tons Trafos plus general cargo

2015 Assiut Power Station OC/G.E/Egyptian Armament Authority

Delivery of 8x200 tons G.T, 8x177 tons GTG, 8x125 tons Trafos plus general cargo

2016 Burullus CCPP Siemens/DBS/Mammoet Refurbishing Burullus Fishing Port to receive heavy cargo. Extension of Western Break Water, Dredging navigational chanel and port basin from -2m to -5.5m, reinforcing quay wall, and preparing 6,000sqm storage area. Ship agent and stevedoring works for all heavy lift vessels calling the port

2016 Damietta P.S Ansaldo Energia/Pentagon/Aprile

Customs Clearance & Inland transportation of general cargo, containers, ODC, & 1x230tons Stator, 1x170 tons Trafo (plus skidding on foundation), 1 x 95tons HP IP plus other heavy cargo

2016 Shabab P.S Ansaldo Energia/Pentagon/Aprile

Customs Clearance & Inland transportation of general cargo, containers, ODC, & 2x230tons Stator, 2x170 tons Trafo (plus skidding on foundation), 2 x 95tons HP IP plus other heavy cargo

2016 West Damietta CCPP OC/G.E/Egyptian Armament Authority

Delivery of heavy cargo: - 12x230 tons HRSG Modules

(24x5.5x3.8m) - 1x230 tons Generator - 1x100 tons steam turbine - 1x150tons Transformer

plus, general cargo, ODC, and containers

2017 Assiut CCPP OC/G. E/Egyptian Armament Authority

Delivery of heavy cargo: - 40x150 tons HRSG Modules

(21x6x3.8m) - 2x230 tons Generator - 2x100 tons steam turbine

Page 8: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

- 2x150tons Transformer plus, general cargo, ODC, and containers

2017 Beni Suef Substation G.E Grid / Geodis Delivery of containers, general cargo and 9x146 tons transformers including placing on foundation

2018 East Ismailia Substation

G.E Grid / Geodis Delivery of containers, general cargo and 10x146 tons transformers including placing on foundation

2018 Temay El-Amdeed Substation

G.E Grid / Geodis Delivery of containers, general cargo and 9x146 tons transformers including placing on foundation

2018 Talkha Substation DHL 1x122.5 tons Trafo- port handling, delivery to site and placing on foundation

2018 Sukhna Substation DHL 1x157 tons Trafo- port handling, & delivery to site

2018 South Helwan Substation

DHL 2x 170 tons Trafo- port handling, delivery to site and placing on foundation

2018 Ras Ghareb Substation

Orascom 3 x 100 tons Trafos- port handling & delivery to site

2019 Hurghada Substation DHL 1x127 tons Trafo- port handling, delivery to site and placing on foundation

2019 15th of May Substation

DHL 1x127 tons Trafo- port handling, delivery to site and placing on foundation

2019 El-Narges Substation DHL 1x157 tons Trafo- port handling, delivery to site and placing on foundation

Page 9: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

Industry: Petrochemicals Projects

Year Project Client Description 1998 Egyptian Petrochemicals CO.

Ethylene Plant Technipetrol SPA Handling of 35,000

FRT of G.C 1998 Egyptian Petrochemicals CO. /

PVC Plant Technipetrol SPA Handling of 25,000

FRT of G.C 1999 Sidi Krir Petrochemicals CO. /

Ethylene & Polyethylene Utilities

Enppi Handling of 15,000 FRT of G.C, Heavy & O.D Cargo

1999 Ethylene Plant Heaters Techint Cimi Montubi / Toyo Engineering Corp.

Handling of G.C, Heavy & O.D Cargo

1999 Sidi Krir Petrochemicals CO. / Polyethylene Utilities

Samsung Handling of G.C, Heavy & O.D Cargo

2008 Egyptian Polyproplene Panalpina Energy & Projects Solutions /Uhde

Customs Clearance & Inland Transportation of 100,000FRT of G.C including: 1x200tons Boilers (10.0 high)

2013/2014 Ethylene Plant Enppi / Toyo/ Panalpina Energy & Projects Solutions

Handling of 100,000 FRT of G.C, Heavy & O.D Cargo including 1x400tons fractionators (101m long) + 2x180tons Boilers (9.5m high) + other pencil towers columns

2014/2015 Polyethylene Plant Enppi / Toyo / Deugro

Handling of 50,000 FRT of G.C, Heavy & O.D Cargo including 2x400tons Reactors (47m length x 9.5m diameter)

2019 Egyptina PolyProplene Plant Jas Projects/Thyssen krupp

Inland transportation of 1x200 tons Boiler plus accessories

Page 10: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

Industry: Ammonia Urea Plants

Year Project Client Description 1998 Suez I / Ammonia Urea Plant Krupp Uhde / VTS Handling of 50,000 FRT of G.C plus 19,000 FRT of

Heavy & O.D Cargo including: - Convertor (248tons; 20.35x4.44x4.18m) - Reactor (254tons; 28.82x3.68x4.2)

2005 Suez II / Ammonia Urea Plant

Krupp Uhde / VTS Handling of 50,000 FRT of G.C plus 19,000 FRT of Heavy & O.D Cargo including: - Convertor (248tons; 20.35x4.44x4.18m)

Reactor (254tons; 28.82x3.68x4.2) 2007 Sukhna Ammonia Plant Orascom

Construction Industries

Handling of 100,000 FRT of G.C, Heavy & O.D Cargo including: - Reactor (450tons; 32.0x5.0x5.0m) - CO2 Stripper (257tons; 72.0x7.3x7.3m) - Ammonia Convertor (330tons; 26.7x5.5x6.3)

2007 Damietta Ammonia Urea Plant / MOPCO

Krupp Udhe / VTS Handling of 50,000 FRT of G.C plus 19,000 FRT of Heavy & O.D Cargo including: - Convertor (248tons; 20.35x4.44x4.18m) - Reactor (254tons; 28.82x3.68x4.2)

2010 E-Agrium Uhde / Panalpina Energy & Projects Solutions

Handling of 100,000 FRT of G.C/Containers/Heavy Cargo including 2x300tons Reactors plus 2x245tons Convertor

2017 Kima Fertilizer Tecnimont / Aprile Handling of 100,000 FRT of G.C/Containers/Heavy Cargo including - 1x494 tons Synthesis Convertor

(29.3x3.8x4.86m) - 1x347 tons Pool Reactor (30.5x3.8x5.4m) - 1x316 tons CO2 Absorber (48.8x6.02x6.6m) - 1x200 tons Boiler (14.5x9.1x7.5m)

Page 11: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

Industry: Miscellaneous Projects

Year Project Client Description 1979 Gezira Sheraton Hotel Geosonda Handling of 20,000 FRT of G.C 1979 Agha Khan Housing

Units Attiki Handling of 10,000 FRT of G.C

1983 Cario Underground Project

SGE Handling of 50,000 FRT of G.C

1988 Novotel Luxor Hotel Feal SPA Handling of 10,000 FRT of G.C 1983 Abumadi Revamping

Project Ingelo SPA Handling of 10,000 FRT of G.C

2000 Arco Steel CO. / Special Steel Mills

Poesc Handling of 40,000 FRT of G.C, Heavy & O.D Cargo

2000 Citro Misr CO. / Citric Acid Plant

Danzas Handling of 5,500 FRT of G.C including 6x45tons Fermentors (30x5.5x5.6m)

1997 Toshka Pumping Station

Kaverner Construction / Transcar

Handling of G.C, Heavy & O.D Cargo

2000 Sheikh Zayed City / Water Supply Project

Balfour Kilpartric Handling of 20,000 FRT of G.C

2000 Kaft Pharmaceutical Factory

Saving Egypt Handling of G.C

2003 El-Merghany Bridge Arab Contractors Inland Transportation of 5x50 tons Beams (30.0x2.0x2.0m)

2003 Kafr El-Zayat Bridge Arab Contractors Inland Transportation of 4x94tons Beams (43m length)

2006 Relocation of Ramsis Statue

Arab Contractor Inland Transportation of King Ramsis II Statue from down town Cairo to the new Egyptian Grand Museum (Pyramids Area) 160 tons, 15.0m high

2010 Helwan Steel Plant EZACO Inland Transportation of 3 Cold Boxes: - 116.2tons; 12.62x9.4ox4.64m - 136.6tons; 39.90x4.30x4.70m - 122.5tons; 51.17x3.60x4.70m

2010 Cairo Airport Metro Marasem/Bin Laden Transportation of 60x80tons bridge (rail way) columns 35.0m each

2011 Cairo Under Ground Metro Line 3

VINCI Transportation of TBM from Abbassia up to Salah Salem Station

2012 Cairo Under Ground Metro Line 3

VINCI Transportation of TBM from Abbassia up to Attaba Station

2014-2015

El-Mosheer Bridge OC Transportation of 20x200tons 55m long bridge beams

Page 12: IST OF ANDLED PROJECTS - Nosco Egypt · Transportation of 2x276tons Steam Turbines, plus general cargo 2009 6th of October Plant Siemens/Baggio/Zanninoni Mobilization of 2x97tons

2016-207

Manar Conference Hall

OC 25,000 FRT of general cargo and containers

International Projects

Year Country Project Client Description 2005 Libya Great Man-Made River CFTI / DSD

FERROMETALCO / VINCI Inland transportation of 3x90 tons (L:21m; Diam.:6m) from Cairo/Egypt up to Asdada/Libya