March 2-4, 2004 MEIT-2004 / Section 3 / Page 1 Payload Developer and Principal Investigator Interfaces to the ISS Program Payload Developer and Principal Investigator Interfaces to the ISS Program Presented by: Jim Scheib, International Space Station Payloads Office Mission Management 281 244-7786 Presented by: Jim Scheib, International Space Station Payloads Office Mission Management 281 244-7786 NASA Microgravity Environment Interpretation Tutorial (MEIT), March 2-4, 2004 Payload Developer and Principal Investigator Interfaces to the ISS Program

Upload: dinhphuc

Post on 07-Feb-2019

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 1

Payload Developer and Principal Investigator Interfaces to the ISS Program

Payload Developer and Principal Investigator Interfaces to the ISS Program

Presented by:Jim Scheib, International Space Station

Payloads Office Mission Management281 244-7786

Presented by:Jim Scheib, International Space Station

Payloads Office Mission Management281 244-7786

NASA Microgravity Environment Interpretation Tutorial (MEIT), March 2-4, 2004

Payload Developer and Principal Investigator Interfaces to the ISS Program

Page 2: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 2

Increment Research TeamManages research changes and resolves conflicts during incrementpreparation and operations.

Research Program and Integration OfficesAssists in formulation phase; manages payload development; provides Research Planning Working Group member; Increment Scientist for the discipline.

Payload DeveloperDevelops payload to meet research requirements; develops flight products for payload certification.

TrainingDefines, plans, and conducts training for flight crew and ground operators. In some cases, Principal Investigator conducts science specific training of crew.

OperationsPrepares for and implements experiments on ISS from payload control center. Principal Investigators actively participate, usually remotely from home institution.

Payload Integration ManagerPrimary interface for payload integration; develops payloadintegration schedules and verifies flight products.

PrincipalInvestigator

HQ Enterprise Scientists and ManagersSponsors Principal Investigators and manages Grants.

The Principal Investigator Interfaces

Page 3: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 3

NASA’s Researcher and Customer Entry Pathways

Commercial Customers

InternationalArrangements

ResearchIntegration

Offices

Research Planning Working Group

Research

Proposals

Several Initial Entry Pathways Single Flight Assignment Pathway

Research Partnership

Centers

CUSTOMERS

Space Science

SpaceFlight

Earth Science

Biological & Physical Research

NASA HQ EnterprisesResearch

Announcements

U.S. Inter-Agency Arrangements

Page 4: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 4

The Principal Investigator Interfaces

Increment Research TeamManages research changes and resolves conflicts during incrementpreparation and operations.

Payload DeveloperDevelops payload to meet research requirements; develops flight products for payload certification.

TrainingDefines, plans, and conducts training for flight crew and ground operators. In some cases, Principal Investigator conducts science specific training of crew.

OperationsPrepares for and implements experiments on ISS from payload control center. Principal Investigators actively participate, usually remotely from home institution.

Payload Integration ManagerPrimary interface for payload integration; develops payloadintegration schedules and verifies flight products.

PrincipalInvestigator

HQ Enterprise Scientists and ManagersSponsors Principal Investigators and manages Grants.

Research Program and Integration OfficesAssists in formulation phase; manages payload development; provides Research Planning Working Group member; Increment Scientist for the discipline.

Page 5: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 5

• These offices perform the following functions:– Assist Principal Investigators and Payload Developers in the

formulation phase

– Manage development of NASA-provided payloads

– Represent Principal Investigators and Payload Developers during tactical planning (~T-2 years) and real-time replanning

• Each Office focuses on specific research disciplines– Bioastronautics RIO

– Fundamental Space Biology RIO

– Cellular Biotechnology RIO

– Fluids and Combustion RIO

– Astronomy and Fundamental Physics RIO

– Space Product Development RIO

– Earth and Space Sciences RPO

– Office of Space Flight RPO (Education, Inter-Agency activities, International activities)

Research Program and Integration Offices (RPOs & RIOs)

Page 6: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 6

• The RPWG is responsible for producing cross-discipline research plans, priorities and trade-offs, and for transforming strategic plans into executable plans

• Plans are balanced to allow all research disciplines from all International Partners an opportunity to execute and optimize their required research

• Plans are designed to fit within the resource constraints (e.g., mass to orbit, crew time, power, training time, etc.)

• The Research Planning Working Group ensures cohesive, integratedresearch aboard ISS. It includes members from:

– CSA, ESA, NASDA, and Rosaviacosmos (observer participation)

– NASA’s Research Integration Offices for Physical Sciences, Bioastronautics, Space Product Development, Fundamental Space Biology, Space Flight, and Earth and Space Sciences

• The RPWG Members ensure that the Principal Investigators are represented and the priorities of each research discipline are adhered to

Research Planning Working Group (RPWG)

Page 7: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 7

Flight Resources

Research Planning Working Group

Physical Sciences Bioastronautics Space Product

DevelopmentFundamental

Space Biology NASDA ESA CSA RSASpace Flight

Earth and Space Sciences

Research PlanningWorking Group

TacticalPlan

RPWG Key Functions:Determines flight resource availability with ISS & Shuttle Operations and IntegrationAllocates resources to International Partners per MOUsApplies HQ-determined allocations to US membersConducts resource trades to develop Integrated Tactical Plan

MOUAllocations

Research Plans

StrategicPlans

Page 8: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 8

Baseline ISS Utilization Management Combined Utilization Assignment Process

TacticalStrategic

RPWGOZ

ISS Flights

Non-ISS Flights

Resources from VIPeR

OM

Resources from CAWG

MT3

IP MOU Allocations

Agency allocations

Agency guidelines

RPO Resource

Allocations RPO’sRPO’sRPO’sRPO’sRPO’sRPO’s

RFA’sRFA’sRFA’sRFA’sRFA’sQuestion-

naires

Common

Common

RPWGOZ

PTP

MPCB approval

OZ

ICB approval

MA

Resource update from IMT/LPT/IPT

OC/MA

ReplanCycle

LegendSSP Process/Product

HQ Product

ISSP Process/Product

Page 9: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 9

The Research Planning Timeline

PP-36 I-24 I-12 I-0

Flight resource allocations per year given to RPWG

members

– Middecks– Upmass– Crew Time on Orbit– Energy– Stowage– Training Hours– Others?

Allocations per Increment

given(I-18)

ApproveIntegrated IncrementPayload Tactical Plan

(I-16)

Majorincrement replan.Often combinesreplan of several

incrementsTrading occursduring TacticalPlan development

IncrementOps

ISS Execute Preparation

ISS Increment PreparationNote: Late manifest changes are reviewedin the Execute Preparation phase and operations phase to accommodate late requirements changes from researchers, payload engineers or operations personnel

Operations

Research Planning Working Group (RPWG)

I-18

Replanningby IRT asnecessary

Increment Research Team(IRT)

Page 10: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 10

Research Program and Integration OfficesAssists in formulation phase; manages payload development; provides Research Planning Working Group member; Increment Scientist for the discipline.

The Principal Investigator Interfaces

Increment Research TeamManages research changes and resolves conflicts during incrementpreparation and operations.

Payload DeveloperDevelops payload to meet research requirements; develops flight products for payload certification.

TrainingDefines, plans, and conducts training for flight crew and ground operators. In some cases, Principal Investigator conducts science specific training of crew.

OperationsPrepares for and implements experiments on ISS from payload control center. Principal Investigators actively participate, usually remotely from home institution.

Payload Integration ManagerPrimary interface for payload integration; develops payloadintegration schedules and verifies flight products.

PrincipalInvestigator

HQ Enterprise Scientists and ManagersSponsors Principal Investigators and manages Grants.

Page 11: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 11

Payload Developers and Payload Integration Managers

• Principal Investigators’ level of interaction with their PayloadDevelopers varies widely

– Some Principal Investigators are also Payload Developers

– Many Principal Investigators interact primarily through their Payload Developer

• The Payload Integration Manager is the primary interface between the Payload Developer and the ISS Program

– Represents the Payload Developer to the ISS Program when it is advantageous to the Payload Developer

– Facilitates a direct link to a Program expert when most advantageous to the Payload Developer

Page 12: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 12

Payload Developer and Principal Investigator

NASA Payload Integration Manager (PIM)

PL Development

Phases

Training Operations Planning and Execution

Software Engineering

Hardware Engineering

Verification

Concept Design Build Verification Delivery to KSC Flt Ops Return

The Payload Integration Manager (PIM) is the primary interface and ombudsman for the Payload Developer and Principal Investigator

Launch Site Support

Mission Development and Integration

Payload Integration Manager

Page 13: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 13

Manager: D. Hartman (A)Deputy Manager: K. Laurini

Secretaries: R. Madrigal (MEI), A. Cox (MEI)OE Student: K. Epie (USRA)

Hardware Engineering Integration

Manager: M. Horkachuck

OZ111

OZ311

– V. Cooley– A. Holt– W. Williams

(Adm Fellow)

– N. Penley (IPA to Montana)

– J. Comella– M. Read– D. Szatkowski

OZ211

Payload Mission ManagementManager: J. Scheib

Deputy: V. FengMission Integration: R. LoftonPIM/EXPRESS: M. Danford

– M. Bowman – G. Cook– M. Miller– B. Rhone

– J. Cochrane– TBD

Research Program Manager: J-D. Bartoe Tech Asst/Customer Special Asst for Research: J. Rhatigan Support: M. Culp

(Detailed to SA) COTR: K. Watts

Research Planning

Manager: J. UriOZ411

Software Engineering Integration

Manager: G. EsquivelOZ511

Multiuse Hardware (MSFC)Acting Manager: A. Sledd

– J. Bartlett

Operations Integration (MSFC)

Manager: R. Cissom

Launch Site Integration (KSC)

Manager: C. McPhillips

Operations Center (MSFC)

Manager: D. Bailey

International Space Station Payloads Office

Page 14: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 14

ISS Payload Integration Philosophy

• ISS Payloads Office (ISSPO) based the integration documentation and the Payload Integration Manager (PIM) on the Shuttle model

– Payload Integration Agreements (PIA) and PIA Data Sets are the ISS equivalent to the Payload Integration Plan (PIP) and PIP Annexes

– Each ISS Payload is assigned a PIM to act as the primary point of contact for the Payload Developer (PD)

• The ISS documentation is designed to cover both the on-orbit and transportation phases (i.e., ISS and SSP)

– The Payload Tactical Plan for each increment contains ascent and descent requirements and on-orbit resource allocations

– The Pressurized Payload Interface Requirements Document (IRD) contains requirements for ISS Laboratories and the Multi Purpose Logistics Module (MPLM)

– The EXPRESS Interface Definition Document (IDD) contains EXPRESS Rack, EXPRESS Transportation Rack and Middeck IDD requirements

• The goal is to eliminate a dual process, one for Station and one for Shuttle– Unless the PD has unique Shuttle requirements, no interaction with the SSP is

required

Page 15: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 15

ISS Payload Integration Philosophy (cont.)

• ISSPO has adopted the approach where facility owners are responsible for integrating the rack requirements– Subrack integration is the responsibility of the facility owner– Payload Integration Agreements with the ISS are cut at the facility level

• The EXPRESS Rack Project integrates the subrack lockers and drawers– The EXPRESS Rack Office (ERO) at MSFC assigns an EXPRESS

Payload Integration Manager (PIM) for each subrack payload– The EXPRESS Pallet and Window Observation Research Rack

(WORF) also integrate their sub-pallet and subrack payloads• The Principle Investigator’s (PI) interface with the ISS is through the

PD/facility developer; for example:– The Human Research Facility is comprised of the racks plus some

distributed hardware

Page 16: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 16

ISS Payload Integration Philosophy (cont.)

• This philosophy requires the ISSPO documentation to cover all scenarios associated with ISS for both ascent and return

– Pressurized interfaces and carriers:» MPLM Racks • US Lab Racks • IP Lab Racks» Crew Transfer Bags (CTB) • M-01 & M-02 Bags» Resupply Stowage Platform (RSP) • Resupply Stowage Racks (RSR)» Orbiter Middeck • ISIS Drawers • Zero-g Stowage Racks (ZSR)» Spacehab • EXPRESS Transportation Rack (ETR)

– Unpressurized interfaces and Carriers» Truss Attach Sites • JEM Exposed Facility • Orbiter Bay» Orbiter Sidewall • EXPRESS Pallet • Spacehab ICC» Unpressurized Logistics Carrier (ULC) • Bay 13 Carrier» Spacelab Pallet (SLP)

– Alternate Launch Vehicles» STS • Progress • Soyuz» Araine Transfer Vehicle (ATV) • H2 Transfer Vehicle (HTV)

Page 17: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 17

Increment Preparation Phase

• Points of Contact– Payload Integration Manager: Primary point of contact between the PD and

the ISS Program responsible for establishing schedules and resolving issues– Increment Payload Manager: Responsible for the coordination and

integration of the utilization objectives for a given increment through the PMIT

– Lead Increment Scientist: Responsible for payload research/activities requirements and priority plan based on guidelines from the RPOs

– Payload Training Integrator: Coordinate the Training Strategy Team (TST) meetings with the PD to determine specific training plans for the crew and Ground Support Personnel

– Interface Control Document Engineer: Responsible for the negotiation of the applicable interface requirements and development of the payload unique ICD

Page 18: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 18

Increment Preparation Phase (continued)

• Integration Products– IDRD Annex 5, Payload Tactical Plan (PTP): ISSPO research direction

for each Increment– Payload Integration Agreement: ISS Programmatic agreement with PD

at the Project level– Hardware Interface Control Document and Verification Plan: Agreed to

interface design and verification requirements and schedule– Payload Training Data Set: Detail flight crew and ground support

personnel requirements

Page 19: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 19

Increment Preparation Phase (continued)

• Boards, Panels and Reviews– Payloads Control Board: Top level multilateral board for research

management on Station– Research Planning Working Group: Manages multilateral research priorities

and optimization– Payload Mission Integration Team: Responsible for the integrated payload

activities, issue resolution across increments– Payload Operations Integration Working Group: Forum for PDs and Payload

Operations to coordinate all aspects of ISS payload operations– PIRN Technical Review Team: Develop and document the ISS interface

requirements, unique hardware ICDs, PVPs and to control the exceptions– EXPRESS Rack Payload Coordination Telecon: Forum to address

EXPRESS Rack processes, schedules, flight and increment status– Training Strategy Team (TST): Formed as payloads are identified and

designed to coordinate the payload through the training process

Page 20: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 20

Execute Preparation Phase

• Points of Contact– Payload Operations Director (POD): leads the pre-increment operations

activities and supervises the execution of integrated payload operations on the ISS during an increment

– Customer Integration Manager (CIM): Responsible for mission integration management for the pre-launch and post-landing segments of ISS payloads ground processing

– KSC Technical Integration Manager (TIM): Supports the development and baseline of the KSC Technical Requirements Data Set and assures compatibility with SSP, ISS Program, and KSC resources

Page 21: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 21

Execute Preparation Phase (continued)

• Integration Products– On-orbit Operations Summary (OOS): A high-level plan for an increment

where activities are planned for a specific day but not a specific time– Payload Planning Requirements Data Set: Detailed planning requirements

for ascent/descent, transfer operations, as well as onboard resources such as crew time, power, thermal, commanding, and data and video downlink

– Flight Rules - Guidelines for real-time decision making that can be generic, increment and flight specific

– Execute Planning Ground Rules and Constraints (GR&C) - Guidelines used to create the OOS, Short Term Plan (STP) and other planning functions

– Payload Operations Data File (PODF) - Collection of procedures and reference material required to operate and maintain the ISS payloads

– Payload Operations Data Set: Detailed payload flight rules and regulations, operational actions, decisions and video/photo requirements

– Payload Procedures and Displays Data Set: Defines crew, automated, and ground command procedures, onboard crew displays, and payload messages

Page 22: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 22

Execute Preparation Phase (continued)

• Integration Products – Ground Data Services (GDS) Data Set: Definition of voice loop

requirements, real-time data requirements, POIC service requirements, Telescience Resource Kit (TREK) workstation requirements

– Configuration Data Set: Engineering drawings and schematics, and manifest and stowage Data

– Software ICD/Command and Data Handling (C&DH) Data Set: Flight unique software interface requirements between the Payload and the ISS data handling elements

– KSC Support Requirements Data Set (SRDS): Launch and landing site ground processing support requirements necessary to process a payload

– KSC Technical Requirements Data Set: products, activities and interfaces required to develop the Operations and Maintenance Requirements Specification (OMRS) System flight products

Page 23: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 23

Execute Preparation Phase (continued)

• Boards, Panels and Reviews– Increment Research Team (IRT) - Manages research priorities of a specific increment

from the baselining of the PTP throughout operations– NASA Payload Operations Control Board: Establishes the baseline and controls

changes to payload operations and integration requirements and products for increment preparation and real-time operation

– Payload Software Control Panel: Controls the implementation of NASA payload software including ISS payload systems and payload development

– Payload Increment Readiness Review: A comprehensive review of Payload Mission Integration requirements, PD readiness, PEI Analysis and Products, Payload Operations readiness and Launch Site Readiness

– Experiment Integration Readiness Review : Conducted by the EXPRESS Rack Office, the EXPRESS PD and KSC. Used to assess the status of a payload’s verification requirements and flight and ground safety review process

– Ground and Flight Safety Reviews: The same three phase safety process as in the Shuttle Program

– Certification of Flight Readiness (CoFR): A formal certification process to ensure the safety and operational readiness of the payload for flight on the ISS

Page 24: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 24

Real-Time Operations and Post Mission Phases

• Real-Time Operations Integration Products– Short Term Plan: Detailed integrated schedule of activities to be

performed during 1 week of Station operations including U.S. andInternational Partner systems and payload activities

• Real-Time Operations Boards, Panels and Reviews– Increment Mission Management Teams (IMMT): Provides programmatic

oversight and direction during real-time operations of the ISS– International Execute Planning Team (IEPT): Developments the STP

and agrees to a preliminary approach to the distribution of resources, which is consistent with the systems and payload operations

• Post Mission Integration Products – Post Increment Evaluation Report (PIER): Documents an assessment

of the accomplishments of the increment objectives, allocations and requirements after each increment

Page 25: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 25

• The ISS has established an integration process with a documentation structure and Payload Developer support similar to past NASA Programs– PIMs are assigned and Integration Agreements and Data Sets are

developed– The process incorporates requirements for multiple transfer vehicle(s),

carriers and on-orbit laboratories into one process– The ISS has delegated the responsibility for the development of operations

integration products to the Payload Developer• Throughout the integration process, the ISS Payloads Office has

– Defined the integration products– Teams to review and approve the products– Points of contact to support the PD through the process

• ISS Payloads Office acknowledges the complexity of the Integration process and has processes and teams in place for continuous improvement

Integration Process Summary

Page 26: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 26

The Principal Investigator Interfaces

Research Program and Integration OfficesAssists in formulation phase; manages payload development; provides Research Planning Working Group member; Increment Scientist for the discipline.

Increment Research TeamManages research changes and resolves conflicts during incrementpreparation and operations.

Payload DeveloperDevelops payload to meet research requirements; develops flight products for payload certification.

TrainingDefines, plans, and conducts training for flight crew and ground operators. In some cases, Principal Investigator conducts science specific training of crew.

OperationsPrepares for and implements experiments on ISS from payload control center. Principal Investigators actively participate, usually remotely from home institution.

Payload Integration ManagerPrimary interface for payload integration; develops payloadintegration schedules and verifies flight products.

PrincipalInvestigator

HQ Enterprise Scientists and ManagersSponsors Principal Investigators and manages Grants.

Page 27: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 27

Increment Research Team (IRT)

• The Increment Research Team ensures proper connectivity with the research community during execution planning and operations.

• The IRT is modeled after the multi-discipline, long-duration structure of the Mir program

• For each increment, a Lead Increment Scientist is selected by the RPWG concurrent with Tactical Plan development

– Lead Increment Scientist is responsible for integrating the research on that increment and leads the IRT

– Represents research community to the Payload Operations Team, Payload Mission Integration Team, and Mission Management Team

– Dispositions (with the IRT) the changes proposed during the execution timeframe

– Coordinates research trade-offs

• The RPWG members select Increment Scientists to represent their specific discipline– Increment Scientists work directly with the Principal Investigators

– The Lead Increment Scientist and the Increment Scientists form the Increment Research Team

• The IRT meets weekly prior to, and daily during, the Increment

• This team can accommodate late replanning when resources are freed up, or when a late change in research requirements is encountered

Page 28: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 28

Increment Scientist Relationships

NASA Increment Scientists

TeamsTeams TeamsTeams TeamsTeams TeamsTeams

POIC

MCC-H

Nominal Operations

Mission Research Trade-OffOutside Nominal Operations

Mission Management Team

Payload Mission Integration Team

IncrementResearch

Team

Lead Increment Scientist

ESAIncrement Scientists

CSAIncrement Scientists

NASDAIncrement Scientists

Principal Investigators and

Payload Developers

Principal Investigators and

Payload Developers

Principal Investigators and

Payload Developers

Principal Investigators and

Payload Developers

Page 29: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 29

The Principal Investigator Interfaces

Research Program and Integration OfficesAssists in formulation phase; manages payload development; provides Research Planning Working Group member; Increment Scientist for the discipline.

Increment Research TeamManages research changes and resolves conflicts during incrementpreparation and operations.

Payload DeveloperDevelops payload to meet research requirements; develops flight products for payload certification.

TrainingDefines, plans, and conducts training for flight crew and ground operators. In some cases, Principal Investigator conducts science specific training of crew.

OperationsPrepares for and implements experiments on ISS from payload control center. Principal Investigators actively participate, usually remotely from home institution.

Payload Integration ManagerPrimary interface for payload integration; develops payloadintegration schedules and verifies flight products.

PrincipalInvestigator

HQ Enterprise Scientists and ManagersSponsors Principal Investigators and manages Grants.

Page 30: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 30

• Principal Investigators and Payload Developers provide training directly to the crew when necessary

– The crews have been very eager to receive research training

• Training time is scarce, so some research training is compressed and delivered by professional trainers

• Before training can begin, procedures and displays for the investigation must be available

• On-board computer-based training has proved to be valuable in several cases, both as refresher and first time training

• Although research training has been sufficient, both the crew members and investigators desire more

• Training opportunities have increased by conducting them in two phases– Investigations already on orbit are trained early

– New investigations are trained later

Training

Page 31: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 31

The Principal Investigator Interfaces

Research Program and Integration OfficesAssists in formulation phase; manages payload development; provides Research Planning Working Group member; Increment Scientist for the discipline.

Increment Research TeamManages research changes and resolves conflicts during incrementpreparation and operations.

Payload DeveloperDevelops payload to meet research requirements; develops flight products for payload certification.

TrainingDefines, plans, and conducts training for flight crew and ground operators. In some cases, Principal Investigator conducts science specific training of crew.

OperationsPrepares for and implements experiments on ISS from payload control center. Principal Investigators actively participate, usually remotely from home institution.

Payload Integration ManagerPrimary interface for payload integration; develops payloadintegration schedules and verifies flight products.

PrincipalInvestigator

HQ Enterprise Scientists and ManagersSponsors Principal Investigators and manages Grants.

Page 32: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 32

Payload Operations

• Payload Operations are supported around the clock

• Principal Investigators and Payload Developers can communicate and/or operate from their home institutions

– 40 remote sites presently connected

• Investigators can use a NASA-provided system for remote operations

– 30 Telescience Resource Kits (TReK) have been deployed to date

• Investigators communicate verbally with the Payload Operations Center using voice over the internet

Page 33: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 33

Research Planning and Execution Principles

The Research Planning and Execution processes accomplish the following:

• Allow close Principal Investigator involvement in every step that affects his or her research

• Allow autonomy to each organization to ensure that they have flexibility to implement research specific to their unique Principal Investigator’s requirements

• Account for the international distribution of research

• Follow the strategic priorities

• Ensure connectivity from strategic planning through execution and operations for all disciplines

– Decisions on one Principal Investigator’s investigation on one increment may affect long-term strategy of one or many other disciplines

• Account for research investigations that spread across several increments

• Account for re-planning of research across and during increments

• Are streamlined to allow quick decisions during operations

• Avoid any conflict of interest

Page 34: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 34

Increment Research Team

Summary

• Principal Investigators are involved throughout the process

• Special effort is made to balance the investigator’s direct involvement– Assure investigators’ direct involvement when beneficial to them

– Minimize the burden on investigators’ time and resources when direct involvement is not necessary

• Feedback from the Investigators shows we are improving– Earliest increments were very burdensome

– Recent increments have significantly improved

- versus -

Research Program and Integration Offices

Payload Developer

Training

Operations

Payload Integration ManagerPrincipalInvestigator

HQ Enterprise Scientist

Page 35: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 35

Backup Material

Page 36: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 36

Useful E-Mail Links

• http://iss-www.jsc.nasa.gov/ss/issapt/ (Space Station Home Page)

• http://iss-www.jsc.nasa.gov/ss/issapt/payofc/payoff.html (ISSPO Home Page)

• http://iss-www.jsc.nasa.gov/ss/issapt/payofc/OZ2/pmi.html (Payload Mission Integration Team)

• http://iss-www.jsc.nasa.gov/ss/issapt/rpwg/rpwg.html (Research Planning Working Group)

• http://stationpayloads.jsc.nasa.gov/pd/ (ISS Payloads Information Source)

• http://stationpayloads.jsc.nasa.gov/pd/custfb/index.cfm (ISSPO Customer Service Center)

• http://pdl.hosc.msfc.nasa.gov/ (Payload Data Library)

Page 37: ISS Program Payload Developer and Principal Investigator ... · Payload Developer and Principal Investigator Interfaces to the ISS Program ... Software Engineering ... (PIM) is the

March 2-4, 2004 MEIT-2004 / Section 3 / Page 37

Level 1 Payload Integration Process Flow

Safety Data Ph 0/1

Verification Rpts

CoFREndorsement

Reqts Exceptions

Stage CompatibilityAnalysis Report U

C&DH Data Set PSafety Phase 3

IntegratedExperiment HazardAssessment input

IDRD Annex 5:PTP (Increment) B

PL OperatingProcedures

POIF Flight RulesVol B&C input

Integrated PayloadPlanning DS B

Weekly Look-Ahead Plan

Short Term Plan

Onboard ShortTerm Plan

Integrated Grd DataServices DS(Voice/Data) B

KSC SupportRqts Data SetKSC TechnicalRqts Data Set

STRATEGIC TACTICAL OPERATIONSPayload

Manifested LaunchSORR

SW ICD P

On Orbit Summary(Final)

PDR CDR

Design Data Pckg

PIM Schedule BPIA/WIA P

Hardware ICVD P PIM Schedule SPIA/WIA AddendaPHardware ICVD U

Safety Data Ph 2Design Data Pckg

PIA Addenda P

PIA Addenda input

Geometric Model(Attached PLs) FGeometric Model

(Attached PLs) P

Thermal Model(Attached PLs) P

Thermal Model(Attached PLs) F

Review ItemDiscrepancies

Review ItemDiscrepancies

Training StrategyTeam input

Configuration DS U

Phase 2

Hardware ICVD BIDRD Annex 1

(Flight) B

Procedures andDisplays DS P

Export ControlLetter

Multi-IncrementTraining Plan B

ITRR

Grd Data ServicesData Set

Proc & DisplaysOPS NOM U

Procedures andDisplays DS U

Integrated Grd DataServices DS

(POIC/USOC/TSC) B

Reqts Exceptions

Training StrategyTeam input

Stage CompatibilityAnalysis Report F

Guidelines andConstraints F

Guidelines andConstraints U

Payload VerificationReport F

CoFR(MI, PEI, PSI, POIF)

LPA

C&DH Data Set IC&DH Data Set F

SW ICD ISW ICD FPL Config Files P PL Config Files I

PL Config Files FHOSC Export B HOSC Export F

Phase 3

PPIL F

PCS Displays IPCS Displays P

PL Planning DS P

IncrementCapabilities Rpt F

CoFR PlanningLetter

PAYLOADDEVELOPER

RESEARCHAND

PAYLOADMISSION

INTEGRATION

PAYLOADENGINEERINGINTEGRATION

PAYLOADSOFTWARE

INTEGRATION

KSCINTEGRATION

PAYLOADOPERATIONSINTEGRATION

PIA/WIA F

FLIGHT INDEPENDENT FLIGHT DEPENDENT

PIA Addenda U

Integrated KSCSpt Rqts DS PIntegrated KSCTech Rqts DS

PDL KSC SRDS/TRDS Rev

LSSP P

MiddeckTGHR Table P LSSP B

MiddeckTGHR Table B

OMRS F8V2 B

OMRS F2V2 P

OMRS F2V2 B

LSSP/OMRS/TGHR Review

KSC ProcessingProcedures

CoFREndorsement

SSCCD B

On Orbit Summary(Basic)

PL Planning DS F

Integrated PayloadPlanning DS F

Procedures andDisplays DS U

PL Display Review

KSC ProcessingSchedules

PAYLOAD INTEGRATIONDATA FLOW DIAGRAM

Revision Date: 12/9/02

Training DS(Crew) P

Training DS(Crew) B

Integrated TrainingPSRD Volume 2

Training LessonPlans&Courseware

PL Training Dry Run

Training DS(GSP) P

Training DS(GSP) F

SODF FPODF F

Procedures andDisplays DS U

Flight Rules P Flight Rules F

PayloadRegulations B

Launch CommitCriteria P

Launch CommitCriteria F

PL TV/PhotoOperations Book

PIM Schedule S

Payload I/F ControlAnnex inputs B

Integrated ConfigData Set

PIM Schedule S

PIM Schedule S

Payload I/F ControlAnnex inputs B

IDRD Annex 1(Flight) U

SSCCD F

Configuration DS UConfiguration DS U

Stage CofigurationDrawings FIntegrated

Schematics F

PIM Schedule S

PPIL I

KSC Procedures PKSC PL Integration

Data Pckg

OMRS F8V2 P

Groundrules andConstraints

LEGENDISS PAYLOAD PRODUCTISS/SSP PRODUCTPRELIMINARY PUPDATE U PD MILESTONEBASELINED B ISS MILESTONEFINAL FSTATUS S COMPLETED C

ACRONYMSCP Control PlanDS Data SetEMI/EMC Electromagnetic Interference/ControlGSP Ground Support PersonnelICA Interface Control AnnexICVD Interface Control and Verification DocumentITRR Integarted Training Readiness ReviewLSSP Launch Site Support PlanMicro-G MicrogravityOMRS Operations & Maintenance Req'ts SummaryPODF Payload Operations Data FilePPIL Payload Product Integrated ListSODF Satation Operations Data FileTGHR Time Critical Ground Handling Req'tsTST Training Strategy Team

Phase 0/1

Integrated PayloadMission Model

Increment Def.Reqt's Doc.

FilenameISS IPIC Level 1 Rev 5

Mission IntegrationPlan

CCCD FIDRD Annex 5:

PTP (Increment) U

BenchReview

PIM Schedule S

ETOV PL ActivitySummary

PL Pre-ship Review

PLTurnover

Data Flow Plan

Ops ConsoleDocumentation