ismail wehbe cv nf 15 aug 2016 meublerie moderne projects

1
1993 – 2005 Meublerie Moderne Est. / Finishing & Decoration Hadath, Lebanon Wood and Steel work, Carpentry, Joinery, Furniture Manufacturing Projects Faculty of Sciences (Old Building), Lebanese University, Hadath Main Contractor: C.E.T/ Wood & Steel Work 850, 000$ Edde & Moawad/ Saifi Residence/ Solidere/ Site Offices JV with Mr Adnan ARAKJI Company Planet Hollywood/ 3 Floors Restaurant Project, Starco Building/ All Decoration & Furniture KOHINOR/ Verdun 730 Shopping Center/ All Decoration & Furniture/ Dec. Gilbert Gebrayel Formwork Project for Sinik Bridge/ Saida/ 204 000 $/ Main Contractor : CEW s.a.r.l Buildings to the order of Eng. Wissam Achour/ Bir Hassan/ Wood & Steel Work Buildings to the order of Mr. Mohamad Jaafar/ Bir Hassan/ Wood & Steel Work Buildings to the order of Mr. Ahmad Wazneh/ Bir Hassan/ Wood & Steel Work T.C.W, Tele Computer World Stores/ Mar Elias & Dekwaneh/ All Decoration & Furniture Power Plant & Pumps Station Buildings Project/ Civ. Work/ AL Ghadir/ 794 500 $/ CEW s.a.r.l Diamond Forever/ Offices/ Jewelry Stores/ Mr.Khalil NASSOUR/Jnah Future Television/Studios/ Outside Broadcasting Vans/ Furniture ZEIN Channel/ Offices & Studios/ Decoration and Furniture CableVision/ Building & Offices/ Beit Meri & Achrafyeh/ All Renovation/ Decoration and Furniture Precious Pieces to the Order of AL JABER Jewelry in Abou Dhabi Golf Health Club/ Lockers Doors and Cabinets Ing. Walid DALLOUL Info Bay Showroom/ Mcharrafyeh/ 750 sqm/ Mr. Mahmoud ASSAD/ All Decoration Work SHERATON 4 Points Hotel/ Mockup Room/ Verdun/ Beam Engineering/ Mr Fahd El Dayekh/ G.M.Architect Crown Plaza Hotel/ Amusement Center/ Hamra// Beam Engineering/ Dec: G.M.Architect/ Decoration Mr. Issam ZEENI Est for steel/ Offices & Show Room/ Bir Hassan/ All Decoration & Furniture B.N.P.I. Bank/ Borj El Ghazal/ Third & Fourth Floor/ Main Cont: MODEC/ Cabinets, Doors and Desks Hibri Yehya Home/ Kraytem/ Main Contractor: Modec Engineering/ All Decoration & Furniture/ Arabesques Villa Hamed Building/ Lot #1481/ Aramoun/ 140 000 $/ Imaar for Building & Contracting/ All Decoration BLOM BANK/Jiitawi, Rawcheh, Ain el Mraysseh Branches Main Contractor: Modec Engineering / All Wood Work/ Cabinets and Desks Doha Hill Project/ Zone C/ Masonry, Plastering, Carpentry/ 387000$/ Daco for Constrution SHERATON Hotel (Four Points), Beirut Lobby Work, Fire Rated Doors/ Kocache Engineering, GM.Architect/ Dec.Ghalal Mahmoud Building Lot # 602/ Aley/ 134 000 $/ Imaar for Building and Contracting/ Doors and Kitchens 33 Retaining Walls/ Ersall/ Baalbek/ Infrastructure Pr. #1 – 200 000 $ / CEW s.a.r.l/ C. D. R Building Lot # 39 Mazraa/ 340 000 $/ Imaar for Building and contracting/ Concrete and masonry Work METROPOLITAN Hotel/Sin El Fil/ Wooden Cladding for Banquet, Main Contractor: Kocache Engineering Khalil Abdelwahab Building / Ramlet el Bayda/ Doors and Kitchen/ 607, 000$/ Main Contractor: Imaar Mosque Bahaaeddine HARIRI/ Saida/ Upholstery Wall Cladding/ Main Contractor: Kocache Engineering Mr. Jamal Itani Home & Office/ Former President C.D.R All Wood and Decoration Work/ Dec. Fadi Hassbani

Upload: ismail-wehbe

Post on 28-Jan-2018

38 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ismail Wehbe CV NF 15 Aug 2016 MEUBLERIE MODERNE Projects

1993 – 2005 Meublerie Moderne Est. / Finishing & Decoration Hadath, Lebanon Wood and Steel work, Carpentry, Joinery, Furniture Manufacturing

Projects Faculty of Sciences (Old Building), Lebanese University, Hadath Main Contractor: C.E.T/ Wood & Steel Work 850, 000$ Edde & Moawad/ Saifi Residence/ Solidere/ Site Offices JV with Mr Adnan ARAKJI Company Planet Hollywood/ 3 Floors Restaurant Project, Starco Building/ All Decoration & Furniture KOHINOR/ Verdun 730 Shopping Center/ All Decoration & Furniture/ Dec. Gilbert Gebrayel Formwork Project for Sinik Bridge/ Saida/ 204 000 $/ Main Contractor : CEW s.a.r.l Buildings to the order of Eng. Wissam Achour/ Bir Hassan/ Wood & Steel Work Buildings to the order of Mr. Mohamad Jaafar/ Bir Hassan/ Wood & Steel Work Buildings to the order of Mr. Ahmad Wazneh/ Bir Hassan/ Wood & Steel Work T.C.W, Tele Computer World Stores/ Mar Elias & Dekwaneh/ All Decoration & Furniture Power Plant & Pumps Station Buildings Project/ Civ. Work/ AL Ghadir/ 794 500 $/ CEW s.a.r.l Diamond Forever/ Offices/ Jewelry Stores/ Mr.Khalil NASSOUR/Jnah Future Television/Studios/ Outside Broadcasting Vans/ Furniture ZEIN Channel/ Offices & Studios/ Decoration and Furniture CableVision/ Building & Offices/ Beit Meri & Achrafyeh/ All Renovation/ Decoration and Furniture Precious Pieces to the Order of AL JABER Jewelry in Abou Dhabi Golf Health Club/ Lockers Doors and Cabinets Ing. Walid DALLOUL Info Bay Showroom/ Mcharrafyeh/ 750 sqm/ Mr. Mahmoud ASSAD/ All Decoration Work SHERATON 4 Points Hotel/ Mockup Room/ Verdun/ Beam Engineering/ Mr Fahd El Dayekh/ G.M.Architect Crown Plaza Hotel/ Amusement Center/ Hamra// Beam Engineering/ Dec: G.M.Architect/ Decoration Mr. Issam ZEENI Est for steel/ Offices & Show Room/ Bir Hassan/ All Decoration & Furniture B.N.P.I. Bank/ Borj El Ghazal/ Third & Fourth Floor/ Main Cont: MODEC/ Cabinets, Doors and Desks Hibri Yehya Home/ Kraytem/ Main Contractor: Modec Engineering/ All Decoration & Furniture/ Arabesques Villa Hamed Building/ Lot #1481/ Aramoun/ 140 000 $/ Imaar for Building & Contracting/ All Decoration BLOM BANK/Jiitawi, Rawcheh, Ain el Mraysseh Branches Main Contractor: Modec Engineering / All Wood Work/ Cabinets and Desks Doha Hill Project/ Zone C/ Masonry, Plastering, Carpentry/ 387000$/ Daco for Constrution SHERATON Hotel (Four Points), Beirut Lobby Work, Fire Rated Doors/ Kocache Engineering, GM.Architect/ Dec.Ghalal Mahmoud Building Lot # 602/ Aley/ 134 000 $/ Imaar for Building and Contracting/ Doors and Kitchens 33 Retaining Walls/ Ersall/ Baalbek/ Infrastructure Pr. #1 – 200 000 $ / CEW s.a.r.l/ C. D. R Building Lot # 39 Mazraa/ 340 000 $/ Imaar for Building and contracting/ Concrete and masonry Work METROPOLITAN Hotel/Sin El Fil/ Wooden Cladding for Banquet, Main Contractor: Kocache Engineering Khalil Abdelwahab Building / Ramlet el Bayda/ Doors and Kitchen/ 607, 000$/ Main Contractor: Imaar Mosque Bahaaeddine HARIRI/ Saida/ Upholstery Wall Cladding/ Main Contractor: Kocache Engineering Mr. Jamal Itani Home & Office/ Former President C.D.R All Wood and Decoration Work/ Dec. Fadi Hassbani